Loading...
HomeMy WebLinkAboutMISC EMAILGODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop, Pensacola, FL 32526 1 (850)712-4219 1 chad(g)godwineng MNNtc BY October 29, 2019 St. LUCiP r' To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: Roberts - Residential PV Roof Mount Installation NOV 2 1 ? 6405 Oleander Ave 9 Fort Pierce, FL 34982 ST. Lucie County, Permitting Plan Reviewer, This letter is regarding the installation of a new roof mounted Solar PV System on the existing residential structure at the address above. 1 have reviewed the attachment plan and have determined that the roof mounted PV system is in compliance with the applicable sections of the following Codes as amended and adopted by the jurisdiction: 2017 Florida Building Code 61h Edition, FBC ASCE 7 Min. Design Loads for Buildings & Other Structures Per 2017 FBC, the Roof Mounted PV system will be subject to the following design criteria: Design Wind Speed(V it) - 160mph 3sec gust, Exposure Category - C The PV System consist of the modules, railing, and connection hardware. The system will add a dead load of approximately 3 psf to the roof. The existing roof covering is Standing Seam Metal panel with min.'k" plywood decking and 2" x 4" roof trusses 24" O.C. The roofing, decking, and roof trusses are in good condition. The existing structure will be adequate for supporting the additional PV dead load and wind loads. The securement method of the PV system is to be flush mounted to the standing seam metal roof with the Ironridge railing and flashings/attachments. The attachments are the S-5!-N 1.S can be attached up to 48" apart in roof zone 1 and 48" apart in roof zone 2. No mounts in roof zone 3. The mounts should be staggered, where possible, to allow distribution of the design loads evenly to the structure. ST UCIE COUNTY Please see attached documents and contact me should yo REVgW estions. \����►I I I11///7 Sincerely, D. Chad Godwin, PE 81360 Exp.02/28/2021 FILE Copy BLDG: DATE: ELE DATE:,,L�L/ {�f PLUMB: DATE: MECH: DATE: ole C. 6o //// �� Q AF Q /� , OF "OR I D N BUILDING DESIGN PROPERTIES BASIC WIND SPEED ROOFPITCH MEAN ROOF HEIGHT ROOF SETBACK ADJUSTMENT FACTOR FOR BUILDING HEIGHT AND EXPOSURE TOPIGRAPHICAL FACTOR EXPOSURE EFFECTIVE WIND AREA UNIT mph Figure 26.5-1C, page 249. degrees it It sf Figure 30.5-1, pg 347 Figure 26.8-1, pg 252 ZONEI ZONE2 ZONES VARIABLEDESCRIPNON SYMBOL VALUE VALUE VALUE UNIT REFERENCE: ASCE 7-10 NET DESIGN WIND PRESSURE (UPLIFT) P„nn -42.1 73.4 -108.5 psf Figure 30.5-1, Fig 346 NET DESIGN WIND PRESSURE (DOWN) Pne1u 1 20.3 20.3 20.3 psf Figure 30.5-1, Fig 346 NET DESIGN WIND PRESSURE (UP) Paiw1 -50.94 -88.81 -131.29 psf Calculation: P„,,w=Ax K.x Pmn NET DESIGN WIND PRESSURE (DOWN) p„u, 1 24.56 psf Calculation: P,ree„,=1x Kax P,ti DESCRIPTION DEAD LOAD SNOW LOAD DESIGN WIND LOAD ASO DESIGN LOAD (UPLIFT) DOWNFORCE CASE 1 DOWNFORCECA 1!2 DOWNFORCECASE3 24.56 24.56 SYMBOL VALUE VALUE VALUE D S W paopn Padw Nnu. !`..n 0 1.2999.37327.5621.4 N3 DESIGN FACTORS & CALCULATIONS FOR THE USE OF L-FOOTANCHORS DESCRIPTION SYMBOL VALUE VALUE VALUE MODULE WIDTH B TOTAL DESIGN LOAD (UPLIFT) P TOTAL DESIGN LOAD(DOWNFORCE) P DISTRIBUTED LOAD (UPLIFT) w DISTRIBUTED LOAD(DOWNFORCE) w RN L SPAN BETWEEN ANCHORS POINTS L POINT LOAD (UPLIFT) It POINT LOAD(DOWNFORCE) R L-FOOT CONNECTED BY 5-51 TO STANDINGSEAM Metal roof panel ga. Set Screw Tension Ultimate Tensile Load W Saftey Factor for S-51 Load Test Design Pullout Value per Mount W, SAFTEY FACTOR SF 3.43 3.43 3.43 -37.13 -66.47 -99.37 27.56 27.56 27.56 -63.69 -114.00 -270.42 47.27 47.27 47.27 4 4 2 .254.75 -455.99 .340.84 189.08 189.08 94.54 24 24 24 115 115 115 1000 1000 1000 2 2 2 Soo Soo Soo 2.96 1.10 1.47 w a,u.re.s..A.yyra.t•..,r.,as u:va..dz..sw..as.mn..m.mr<a.,.wa. tlnvu, nMYa Mu••WP•)m^ <Mtl Lu L1wxrMnannenl cml.Is<er(es7.1 / M Ga6M Raalt)'<�6 �M,wtr2nv, � fn4L 11M. L,IINa.(�x M: i.v uusu xu.n�a.rtrhtra.<n.rao.es••�. UNIT psf psf psf pst Calculation: Pana,= D•SQRT(D.6)W(asd) pst Calculation: Pe, 1.0D+1.0S pst Calculation: Py, ,=1.OD•1.OW pst Calmlation: P,,,= 1.OD•0J5S•0JSW UNIT it PSI psf pit Calmlation: w=PB/2•""'"'- pU Calmlatime w=PB/2 •"""'"'°""'°"'°" R His Calculation: R=PLB/2 •"""m..z„�ep..,o. Ibs Calculation: R=PLB/2 •"""'""a'nnce..e. In Ibs S-51 Load Test results W, = W • 4 of Lags •Td Calculation: SF=WVR (Uplift) ���a1E C•;G •�,�CEps 7f; No :Z a s � 1 0 sr �i07017 ORION ONA L Vt' \ �� !o 0/0