HomeMy WebLinkAboutMANUFACTURED HOME INSTALLATION SPECManufactured Home Installation Specifications
(Must be completed and submitted with your application)
Applicant 5059 Land Trust, Carr Investment Properties As trustee
Address 5059 Amy Lane Fort Pierce FL
Manufacturers Name Clayton/Tru MH
Roof Zone n/a Wind Zone 3
No. of Sections 2 Width 28 Length 44
Installation Standard Used (check) Manufacturers Manual XX
Permit #
RECEIVED
NOV .1 9 -9
ST. Lucte county, porn
Year 2019 Serial # TBD
I5C-1
SCANNED
BY
St. Lucie Countv
Site Preparation
Debris and Organic Removal YeS Page # 15-19
Water Drainage: Natural XX Swale Pad Other Page # 15-19
Foundation
Load bearing soil density 1500+ Or assumed 1,000 psf
Page # 20-34
Footing type: Poured in place Portable XX
Page # 20-34
Maimail frame block: Size 17X25 Placement o.c. 77"MAX
Page # 20-34
Perimeter blocking: Size 16X16 Number 4 Location
DOORS Page# 20-34
Ridge beam support: Number 5 Size 24X24 Location
ENDS Page # 20-34
Center line blocking: Number 5 Size 24X24 Location
FACTORY su Page # 20-34
Special supports required (fireplace, bay window) Yes No XX
Page it 20-34
Mating of Units: Mating gasket Y Type used foam
Page # 45
Fasteners: Roof Type #10X4" Spacing 121N
o.c. Page# 50-52
Endwall Type #8x4" Spacing 6 IN
O.C. Page # 47-48
Floors Type 3/8X6'LAG Spacing 241N
o.c. Page# 46
Anchors: Type 6,000 3,150 4FT
Page # 77-94
Height of Unit (top of foundation to frame): MINIMUM 181N
Page# 41+42
Angle of straps MINIMUM 45 DEG.,
Page # 77-94
Number of frame ties N/A Spacing n/a O.C.
Page # N/A
Number of over -roof ties (if required) N/A
Page # N/A
Number of sidewall anchors 24 Zone II Zone III
XX Page # 77-94
Number of centerline anchors 4 Number of stabilizers 0
Page # 77-94
Vents required for underpinning (1 50 s floor area): No. N/A
Page # N/A
Prepared b
Date: J /�
Revised 7/22/2014
FILE COPY
-�,
DEC 12,,2019