Loading...
HomeMy WebLinkAboutWINDOW DOOR SCHEDULE{� WINDOW/DOOR SCHEDULE L 33 ADM 1 tiq-t •10 1 V 0 W .•IV REMARKS *Window Replacement using existing shutters to comply with impact. protection will require the existing shutters to meet the requirements of the 2010 FBC/Residential R301.2.1.2 TOTAL GLAZED OPENING AREA FOR STRUCTRE: S.F. PERCENTAGE OF NEW GLAZED AREA: % (TOTAL INSTALLED GLAZED AREA DIVIDED BY TOTAL GLAZED OPENINGS FOR STRUCTURE) NOTE: The replacement of more than 25%of the aggregate area of exterior glazing (windows & doors) in one & two family dwellings within a 12 month period will require impact protection on all proposed glazed opening replacement (approved shutters or impact resistant glazing) as per 2010 FBC/ EXISTING BUILDING 606.4. ** TYPE WINDOWS SH—SINGLE HUNG AWN —AWNING SL—SLIDING DH — DOUBLE HUNG CAS — CASEMENT FIX — FIXED C?3