HomeMy WebLinkAboutWINDOW DOOR SCHEDULE{� WINDOW/DOOR SCHEDULE L 33 ADM 1 tiq-t
•10
1 V 0 W .•IV
REMARKS
*Window Replacement using existing shutters to comply with impact. protection will require the
existing shutters to meet the requirements of the 2010 FBC/Residential R301.2.1.2
TOTAL GLAZED OPENING AREA FOR STRUCTRE: S.F.
PERCENTAGE OF NEW GLAZED AREA: %
(TOTAL INSTALLED GLAZED AREA DIVIDED BY TOTAL GLAZED OPENINGS FOR STRUCTURE)
NOTE: The replacement of more than 25%of the aggregate area of exterior glazing (windows & doors) in one & two family
dwellings within a 12 month period will require impact protection on all proposed glazed opening replacement (approved shutters
or impact resistant glazing) as per 2010 FBC/ EXISTING BUILDING 606.4.
** TYPE WINDOWS
SH—SINGLE HUNG AWN —AWNING SL—SLIDING
DH — DOUBLE HUNG CAS — CASEMENT FIX — FIXED
C?3