HomeMy WebLinkAboutKSM SOIL REPORTTr C'► f
AR17M
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmenginearing.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
April 27, 2015
Brad Schuh
Summit Construction
2837 Flight Safety Drive
Vero Beach, Florida 32960
Re: North Hutchinson Island
Waste Water Treatment Plant
3251 North A1A
14AY - 1 2015
Public Works
St. Lucie County, FL
Fort Pierce, Florida
Permit #: 44994)W Xso/- 02o3
KSM Project #: 141846-9d
Dear Mr. Schuh:
SCANNED
BY
St. Lucie County
Enclosed, please find the nuclear density test results performed on the sidewalk around
the EFI building at the above referenced project.
any questions, please feel free to call.
No.
E-mail to: brad(dsummitcm.net
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
trcy��
i117M
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321)768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 2922
DATE TESTED: April 24, 2015 KSM JOB #: 141846-9d/ESfjl
PERMIT #: 1409-0106
CONTRACTOR: Summit Construction
JOB LOCATION: North Hutchinson Island
Waste Water Treatment Plant
3251 North AIIA
Fort Pierce, Florida
MATERIAL:
Brown Sand
ITEM TESTED:
Sidewalk around the EFI
Building
---------
TEST LOCATION
DEPTH
MOIS-
PEN
------------------------
DRY
MAX. DRY
PERCENT
OF SAMPLE
TURE
READ
DENSITY
PROCTOR
COMPACTION
-------------------------------------------------VALUE
---------------
1. S.E.
0" —12"
6.4
44
109.1
110.8
98.4
2. S. Center
48
110.3
99.5
3. S.W.
"
46
109.3
98.6
4. W. Center
"
48
109.7
99.0
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
Tl a 19
&%FJzVi
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.:5693 FAX (772)589-6469
DATE TESTED:
PERMIT #:
CONTRACTOR:
JOB LOCATION
O
u:
U
a:
H
2
C0
FE
MOISTURE -DENSITY RELATIONSHIP
MODIFIED PROCTOR (ASTM D 1557)
Apri124, 2015
1409-0106
Summit Construction
North Hutchinson Island
Waste Water Treatment Plant
3251 North A1A
Fort Pierce, Florida
KSM JOB #: 141846-9p
112 T---T----i----I----r----T---
1 I ! I I I I
I I I I I I I
I I I I I I I
111 4----4-----1----1----4-----4----4
I I I I I I
I I I I I I I
I I I 1 I I
110J----1---J---I----I- --1---
I I I I I I
I I I I I I I
I I I I I I I
I I I I I I
109T---T—--1----I----r--- ---,
I I ! I I I I
1 I I I I I I
I I I I I I
108 4----+----a---- I --------- 4----1
I I 1 I I I I
I ! I I I I I
1074--------4----1----i---4----4
10 11 12 13 14 15
Moisture - Percent of Dry Weight
Soil Description
Max. Dry Density:
Brown Sand
110.8 P.C.F.
Optimum Moisture: 12.0 Percent
Julie E. Keller, P.E.
President
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
Tl O 1 s
JN16JAW
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377' SEBASTIAN' FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www. ksmeng ineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
February 25, 2015
Brad Schuh
Summit Construction
2837 Flight Safety Drive
Vero Beach, Florida 32960
Re: North Hutchinson Island
Waste Water Treatment Plant
3251 North A1A
Fort Pierce, Florida , �� t
Permit #: 9486-
KSM Project M 141846-8d
Dear Mr. Schuh:
— 6 Zp3
:SCANNED
BY
St. Lucie County
Enclosed, please find the nuclear density test results performed on the EFI building pad
at the above referenced project.
any questions, please feel free to call.
No.
E-mail to: bradCaD-summitcm.net
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
*rcrILN
R17jYi
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 2922
DATE TESTED: February 24, 2015
PERMIT #: 1409-0106
CONTRACTOR: Summit Construction
JOB LOCATION: North.Hutchinson island.
Waste Water Treatment Plant
3251 North A1A
Fort Pierce, Florida
KSM JOB #: 141846-8d/SH/jl
MATERIAL:
Very Light Brown Shelly Sand
ITEM TESTED:
EFI Building Pad
------------------------------
TEST LOCATION
----
DEPTH MOTS-
-----------------------------------
PEN
DRY
MAX. DRY
PERCENT
OF SAMPLE
TURE
READ
DENSITY
PROCTOR
COMPACTION
------------------------------------------------VALUE
---------
1. S.E.
0" —12" 8.9
42
107.3
107.4
99.9
2. Center
41
106.8
99.4
3. N.W.
41
106.5
99.2
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
Tdr019
L%LJIVi
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 wvvw.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
DATE TESTED:
PERMIT #:
CONTRACTOR:
JOB LOCATION
Soil Description:
Max. Dry Density:
MOISTURE -DENSITY RELATIONSHIP
MODIFIED PROCTOR (ASTM D 1557)
February 24, 2015
1409-0106
Summit Construction
North Hutchinson Island
Waste Water Treatment Plant
3251 North A1A
Fort Pierce, Florida
KSM JOB #: 141846-8p
108T_ T--7---i---,---r---T--_T —1
I I I I I I I I I
I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I
106t--t--�----I---N--t —�--�
I I I I I I I I
I I I I I I I I
I __I __ I __ I ___I
105 I I I I I I I I 1
I I I I I I I I
I I I I I I I I I
104-1---J- _4_1---I---I----4----4---A
I I I I I I I I
I I 1 I 1 I I I
i i I i 1 I I I
103-r---r---r----I---1---r--T--7---1
I I I I I I I I I
I I I I I I I I I
102�----------�---�----�--�
10 11 12 13 14 15
Moisture - Percent of Dry Weight
Very Light Brown Shelly Sand
107.4 P.C.F.
Optimum Moisture: 11.8 Percent
Julie E. Keller, P.E.
President
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366