Loading...
HomeMy WebLinkAboutMISC EMAIL 2' PROPOSAL RICHMOND ELECTRIC 3086 ENTERPRISE ROAD FT. PIERCE, FLORIDA 34982 77Y 461-1951 FAX 772-461-1907 ATTENTION: CHUCK MACALUSO EMAIL: oma278 @ hotmail.wm PROPOSAL SUBMITTED TO: MACALUSO BUILDERS, INC 2805 ATLANTIC BLVD. VERO BEACH, FL 32960 PROPOSE TO WIRE AS FOLLOWS: PHON JOB NAME AND LOCATION: 35041NDUSTRLAL 33'm ST, FORT PIERCE SCANNED BY St. Lucie County RECEjep� APR'22015 THE EXISTING BUILDING SERVICE IN THREE PHASE 200 AMP. WITH TWO INTERIOR SUB PANELS. REMOVE DAMAGED CONDUIT AND CONDUIT MOUNTED ON INTERIOR OF WALLS. REROUTE CONDUITS NEEDED TO FEED EXISTING DEVICES. - REMOVE EXISTING 125 AND BREAKER IN PANEL RATED FOR ONLY 100 AMPS. INSTALL TWO POLE 100 AMP BREAKER. REMOVE EXISTING WRING TO EXISTING AIR HANDLER UNIT AND EXTERIOR AM CONDENSOR- SUPPLY AND INSTALL THE FOLLOWING IN THE WAREHOUSE AREA: 10 DUPEX RECEPTACLES 7 4' T-8 FOUR LAMP, ALUMINUM MIRRORED REFLECTIVE LENS, FLUORESCENT FIXTURES 2 THREE WAY SWITCHES (ONE BY EACH ENTRY/EXIT DOOR TO THE WAREHOUSE) 1 TWO LAMP 4' FLOURESCENT FIXTURE IN THE ELECTRICIELEPHONE ROOM 1 SWITCH FOR FIXTURE IN ELECTRIC/TELEPHONE ROOM 1 AIR HANDLER HOOK INCLUDING DISCONNECT WIRE TO BE 60 AMP RATED WITH 60 AND BREAKER IN PANEL. 1 AIR CONDENSOR HOOK INCLUDING DISCONNECT. WIRE TO BE 30 AMP RATE WITH 30 AND BREAKER IN PANEL. 1 GFI 20 AMP RECEPTACLE LOCATED WITHIN 25' OF EXTERIOR CONDENSOR UNIT PER CODE. 4EXTERIOR. TWO HEAD, MOTION SENSOR FLOOD LIGHTS. ONE ON EACH CORNER OF THE BULL T�G.I - COP� 1 150 W METAL HALIDE WALL PACK LIGHT FIXTURE ABOVE THE FRONT ENTRY DOOR 1 150 W METAL HALIDE WALL PACK LIGHT FIXTURE ABOVE THE REAR ENTRY DOOR 1 JUNCTION BOX WITH CONDUIT TO PANEL FOR A FUTURE SIGN ABOVE FRONT ENTRY AREA. STRING ONLY IN THE CONDUIT. EXISTING RECEPTACLE AT SLAB AREA TO BE CHECKED. NO REPAIR OF RECEPTACLE AT THIS TIME IS INCLUDED. ANEW BATHROOMISHOWER AREA: 1 LED CAN LIGHT FIXTURE VAPOR PROOF LENS ♦- 1 SWITCH FOR FIXTURE 1 GFI RECEPTACLE. 1 BATH EXHAUST FAN BROAN TYPE 696-DUCTING OF BATH FAN EXHAUST BY OTHERS NOT INCLUDED IN PROPOSAL 2 BATHROOM I FIXTURE I SWITCH I BATH EXHAUST FAN BROAN TYPE 696-DUCTING OF BATH FAN EXHAUST BY OTHERS NOT INCLUDED IN PROPOSAL LIGHTING AND SWITCHING IN THE FOLLOWING OFFICE AREAS: 22 LED CAN LIGHT FDMJRES'IN LOCATIONS PER THE PRINT 4 SWITCHES 2 THREE WAY SWITCHES 4 EXIT12 HEAD FLOOD COMBO SURFACE MOUNT FIXTURES 12 RECEPTACLES ARE QUOTED AS (4) PER OFFICE ROOM. 2 RECEPTACLES ENTRY AREA KITCHEN AREA COUNTER AREA TO HAVE (1) GFI PROTECTED CIRCUIT WITH (1) ADDITIONAL RECEPTACLE. NORTH WALL TO HAVE EXISTING RECEPTACLE LOWERED. WEST WALL TO HAVE EXISTING RECEPTACLE LOWERED. THE RECESSED CANS HAVE A T' HEIGHT. IF CEILING AREA ABOVE DRYWALL IS LESS THAN 7" ADDITIONAL LABOR MAYBE REQUIRED TO INSTALL FIXTURES. ALL PERNIMITING TO BE PAID BY OTHERS NOT INCLUDED IN PROPOSAL. ALL ENGINEERING FEES IF REQUIRED BY THE COUNTY TO BE PAID BY OTHERS. NOT INCLUDED IN PROPOSAL. LOW VOLTAGE, FIRE ALARM, SECURITY WIRING AND CONDUITS ARE NOT INCLUDED IN THIS PROPOSAL. LABOR AND MATERIAL $14,747.00 IF THE EXISTING 100 AMP PANEL IS TO BE REPLACED WITH A 125 AND PANEL ADD $775.00 TO ABOVE TOTAL. SERVICE LATERAL UNDERGROUND REMOVE AND CAP OFF EXISTING OVERHEAD SERVICE. INSTALL ONE 2 VT PVC CONDUIT APPROX 100' FROM THE EXISTING METER LOCATION TO THE UTILITY POLE THE CURRENT OVERHEAD SERVICE IS LOCATED. .SUPPLYAND INSTALL FOUR (4) 3/0 COPPER WIRES TO REFEED THE PHASE 200 AND SERVICE. CONDUIT WILL HAVE TO BE INSPECTED BY A FPUA ENGINEER BEFORE IT CAN BE COVERED. EXISTING METER CAN TO BE REUSED. REMOVAL OF METER CAN AND DISCONNECT WHILE BUILDING IS RESKINNED AT THE SAME TIME AS THE SERVICE IS DISCONNECTED IS INCLUDED. ALL ASPHAULT AND/OR CONCRETE CUTTING AND PATCHING IS BY OTHERS. NOT INCLUDED IN PROPOSAL. FPUA FEE'S INCLUDING FPUA IN GROUND JUNCTION BOX IS TO BE PAID BY OTHERS. NOT INCLUDED IN PROPOSAL. RENTING OF TRENCHING MACHINE IS INCLUDED FOR THIS PROJECT. RICHMOND ELECTRIC TO HAVE NO -CUTS VERIFY UNDERGROUND UTILITY LOCATIONS IN THE AREA OF CONDUIT. LABOR AND MATERIAL $ 4,489.00 ANY CHANGES THAT ARE NOT NOTED ABOVE REQUIRED BY THE BUILDING DEPARTMENT WILL BE ADDITIONAL COST. WE PROPOSE HEREBY TO FURNISH MATERIAL AND LABOR- COMPLETE AND IN ACCORDANCE WITH ABOVE FORTEEN THOUSAND SEVEN HUNDRED AND FORTY SEVEN DOLLARS AND XX/100 ... $14,747.00 .................................. PAYMENT TO BE MADEAS FOLLOWS: BI-WEEKLY DAYS. ACCEPTANCE OF PROPOSAL -THE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE SATLSFACTORYAND ARE FIEOEBYACCEPTED. YOU ARE AUTHORIZED TO DO THE WORK AS SPECIFIED. DATE OF ACCEPTANCE: SIGNATUREr SIGNATURE m