HomeMy WebLinkAboutFINAL CLOSE OUTSOWN MATHERS ENGINEERING CORPORATION FINAL CLOSE-OUT ON RESTORATION WORK Date: March 8, 2016 To: Mr. Joe Cicio, Plan Reviewer St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Contractor: Blue Coast Construction - 2587 SE Monroe Street, Stuart, FL 34997 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 Fax: (772) 220-8686 EB#0004456 SCHNNtL� BY St. Lucie Count Referenced Project:. Concrete Restoration for Atlantis B Condominium Located at 10152 S. Ocean Drive, Jensen Beach, FL 34957 Permit No. 1503-0052 The completed concrete restoration did not reduce the structural integrity of the remaining existing structural systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's components and elements outside the renovation area of this permit do not have their current wind load resistant capacity or gravity load capacity compromised by the completed concrete restoration. Mathers Engineering Corporation performed onsite inspections and reports to the building department as the job progressed. Repairs required minor shoring. Work such as concrete repair and addition of steel reinforcement were inspected. The enclosed Record Drawings (Sheet 1) shows the areas of restoration and repair, and are made part of this final close-out document approval under Permit Number 1503-0052. Materials used and work performed to date has been substantially -completed in conformance with the specifications outlined in the IRCI Guideline No. 03 73 0, as well as the applicable 2010 Florida Building Codes (and updates), other industry guidelines, or standard engineering practices. Approved by, illi .5 a s E Florida License #19658 Special Inspector FL License #SI-155 2431 SE Dixie Highway Stuart. FL 34996 Phone: (772) 287-0525 MATHERS ENGINEERING Fax: (772) 220-8686 CORPORATION E13#0004456 Post -Building Permit Addendum Engineer's Field Observation Report #4 Date: December 22, 2015 To: Plan Reviewer St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Contractor: Blue Coast Construction 2587 SE Monroe Street, Stuart, FL 34996 Referenced Project: Concrete Restoration for Atlantis B Condominium Located at 10152 S. Ocean Drive, Jensen Beach, FL 34957 Permit No. SLC 1503-0052 Mathers Engineering Corporation visited the job site and made the following observations of the ongoing concrete restoration and repairs of exterior balconies. Site Observations from 09/10/2015 thru 12/21/2015: • Unit 220: Concrete Restoration of Unit 220 has been completed. Waterproofing and reinstallation of guardrails have been completed. • Unit 320: Concrete Restoration of Unit 320 has been completed. reinstallation of guardrails have been completed. • Unit 420: Concrete Restoration of Unit 420 has been completed. reinstallation of guardrails have been completed. • Unit 520: Concrete Restoration of Unit 520 has been completed. reinstallation of guardrails have been completed. • Unit 620: Concrete Restoration of Unit 620 has been completed. reinstallation of guardrails have been completed. • Unit 720: Concrete Restoration of Unit 720 has been completed. reinstallation of guardrails have been completed. Waterproofing and Waterproofing and Waterproofing and Waterproofing and Waterproofing and Limitations: Our professional services have been performed, our findings obtained and our opinions prepared in accordance with general accepted engineering principles and practices. This company is not responsible for the conclusions, opinions or recommendations made by others based on our findings. Approved by: Will 'Jc atherssPE Florida License PE #19658 Florida SI #155 MATHERS ENGINEERING CORPORATION FINAL CLOSE-OUT ON RESTORATION WORK Date: March 8, 2016 To: Mr. Joe Cicio, Plan Reviewer St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Contractor: Blue Coast Construction 2587 SE Monroe Street, Stuart, FL 34997 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 Fax: (772) 220-8686 EB#0004456 Referenced Project: Concrete Restoration for Atlantis B Condominium Located at 10152 S. Ocean Drive, Jensen Beach, FL 34957 Permit No. 1503-0052 The completed concrete restoration did not reduce the structural integrity of the remaining existing structural systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's components and elements outside the renovation area of this permit do not have their current wind load resistant capacity or gravity load capacity compromised by the completed concrete restoration. Mathers Engineering Corporation performed onsite inspections and reports to the building department as the job progressed. Repairs required minor shoring. Work such as concrete repair and addition of steel reinforcement were inspected. The enclosed Record Drawings (Sheet 1) shows the areas of restoration and repair, and are made part of this final close-out document approval under Permit Number 1503-0052. Materials used and work performed to date has been substantially completed in conformance with the specifications outlined in the IRCI Guideline No. 03 73 0, as well as the applicable 2010 Florida Building Codes (and updates), other industry guidelines, or standard engineering practices. Approved by, 4hain JpM thers,/PE o�%/� Florida License #19658 Special Inspector FL License #SI-155 APR 7 RTD 2431 SE Dixie Highway Stuart, FL 34996 No WE MATHERS ENGINEERING Phone: (772) 2-0525 CORPORATION Fax: (772) 220206 EB#0004454456 Post -Building Permit Addendum Engineer's Field Observation Report #4 Date: December 22, 2015 To: Plan Reviewer St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Contractor: Blue Coast Construction 2587 SE Monroe Street, Stuart, FL 34996 Referenced Project: Concrete Restoration for Atlantis B Condominium Located at 10152 S. Ocean Drive, Jensen Beach, FL 34957 Permit No. SLC 1503-0052 Mathers Engineering Corporation visited the job site and made the following observations of the ongoing concrete restoration and repairs of exterior balconies. Site Observations from 09/10/2015 thru 12/21/2015: • Unit 220: Concrete Restoration of Unit 220 has been completed. reinstallation of guardrails have been completed. • Unit 320: Concrete Restoration of Unit 320 has been completed. reinstallation of guardrails have been completed. • Unit 420: Concrete Restoration of Unit 420 has been completed. reinstallation of guardrails have been completed. • Unit 520: Concrete Restoration of Unit 520 has been completed. reinstallation of guardrails have been completed. • Unit 620: Concrete Restoration of Unit 620 has been completed. reinstallation of guardrails have been completed. • Unit 720: Concrete Restoration of Unit 720 has been completed. reinstallation of guardrails have been completed. Waterproofing and Waterproofing and Waterproofing and Waterproofing and Waterproofing and Waterproofing and Limitations: Our professional services have been performed, our findings obtained and our opinions prepared in accordance with general accepted engineering principles and practices. This company is not responsible for the conclusions, opinions or recommendations made by others based on our findings. Approved by: a�.�S` [SC�COMC� Wi liam J. Mathers, PE Florida License PE #19658 Florida SI #155 FRI APR 7 RECD