Loading...
HomeMy WebLinkAboutKSM REPORT/ O CL 9 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 ' `'e-i ' MELBOURNE (321) 768-8488 FAX (561) 845-8876 www.@KSMENGIN ERR E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 gej.mi7' Isn-0307 June 18, 2015 Heritage Contracting 3690 N. U.S.1 Fort Pierce, Florida 34946 Re: Liberty Baptist Church Addition 3660 Midway Road Fort Pierce, Florida Permit #: 15-020307 KSM Project#: 150837-1d Dear Sir: SCANNED st l" . Y Enclosed, please find the nuclear density test results performed on the compacted foundation fill for the above referenced project. Shoulq%ypwlhgye any questions, please feel free to call. E-mail to: paul.k.hcs@gmail.com Fax and Mail to: St. Lucie County Building Department RECEIVED JUN 2 3 2C:5 Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED: June 17, 2015 KSM JOB #: 150837-1d/ES/km PERMIT #: 15-020307 CONTRACTOR: Herritage Contracting JOB LOCATION: Liberty Baptist Church Addition 3660 Midway Road Fort Pierce, Florida MATERIAL: Brown and Gray Sand ITEM TESTED: Compacted Foundation Fill ----------------------------- TEST LOCATION ----- DEPTH MOTS- ----------------------------------- PEN DRY MAX. DRY PERCENT OF SAMPLE TURE READ DENSITY PROCTOR COMPACTION -------------------------------------------------VALUE --------------- 1. N.E. 0" —12" 8.8 40 107.7 97.7 97.7 2. N.W. 36 106.5 96.6 3. Center 44 105.4 95.6 4. S.W. 42 106.6 96.7 5. S.E. 40 107.3 97.4 Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MaCWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 DATE TESTED PERMIT #: CONTRACTOR: JOB LOCATION: Soil Description: Max. Dry Density: Optimum Moisture Julie E. Keller, P.E. MOISTURE -DENSITY RELATIONSHIP MODIFIED PROCTOR (ASTM D 1557) June 17. 2015 15-020307 Herritage Contracting Liberty Baptist Church 3660 Midway Road Fort Pierce, Florida KSM JOB #: 150837-1p 112 T---I---T---r--,---T---r--, I I I I I I I I I I I I I I I I I I I I I I I I 111 4----4---4---1-----4---+---1-----I I I I I I I I I I I I I I I I I I I I I I I I 110---I---� -- --I------I----I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I 108 4----I---+---1-----I---+---1-----4 I I I I I I I I I I I I I I I I I I I I I I I I 107�-----------�------�---� 10 11 12 13 14 15 16 Moisture - Percent of Dry Weight Brown and Gray Sand 110.2 P.C.F. 12.0 Percent Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 TlCA1S 4%Gi M KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 April 23, 2015 -CS 0-7. Heritage Contracting RECEIVED 3690 N. U.S.1 SCAMAIED Fort Pierce, Florida 34946 St. Lucie county SY JUN 2 2 2015 Re: Liberty Baptist Church Addition fY 3660 Midway Road Fort Pierce, F orida KSM Project #: 150837-b Dear Gentlemen: As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the site was fairly flat and cleared. B. Project Description: A one story metal building addition (2,250 s.f.) is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. We estimate the maximum loads will be less than 2,500 pounds per linear foot along the wall foundation, and less than 50 Kips for any individual column loads. We estimate that some site fill will be required to reach the desired grades. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 Tl' CA 19 "IQPAVi KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Liberty Baptist Church Addition -2- April 23, 2015 3660 Midway Road Fort Pierce, Florida C. The scope of our study consisted of the following: 1. Performed Standard Penetration Test Borings in the proposed construction area to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing four (4) Standard penetration test borings in the proposed construction area. The borings were terminated at depths of 10 to 14 feet below grade. The locations of the borings are indicated on the attached Boring Logs. The SPT borings were completed in accordance with procedures described in ASTM D- 1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Ronald G. Keller, P.E.:37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 TAP c 1 9 R17jYi KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Liberty Baptist Church Addition -3- April 23, 2015 3660 Midway Road Fort Pierce, Florida E. Engineering Evaluation and Conclusions: Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: The boring logs indicate the subsurface conditions to be fairly uniform across the site. The soils consist mostly of fine-grained sand. "N" values recorded during the boring operation indicate the soil density is generally medium dense to dense except for some loose soils found from the surface to a depth of approximately 2 feet. The loose surface soils can easily be compacted during the site preparation work. Please refer to the soil boring logs for specific information relative to the soil description. Based on the existing soil conditions, the proposed structure can be supported on a shallow foundation system provided that the site is properly prepared. The following sections provide recommendations for the site preparation and foundation design. F. Typical Site Preparation: The proposed building area and areas to be paved, plus a minimum margin of five feet beyond the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. Stumps shall be removed entirely. The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill. Sufficient passes should be made during compaction operations to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D 1557) to a depth of two feet. This is especially important on this project due to the loose surface soils. After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. The fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact each lift to at least 95 percent of its modified dry Proctor value. After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 i117jYi KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Liberty Baptist Church Addition -4- April 23, 2015 3660 Midway Road Fort Pierce, Florida G. Foundation: Provided that our recommendations for site preparation are followed, the proposed structure may be supported on conventional concrete steel reinforced footings designed for an allowable soil bearing pressure of 2,500 pounds per square foot, or less. With the foundation properly designed and the site properly prepared, we anticipate total settlements less than 3/4 of an inch and differential settlement of less than 1/4 of an inch. The majority of the settlement should occur during construction. H. Floor Slabs: A conventional slab -on -grade can be used in the "at grade" portion of the additions. We recommend the disturbed subgrade below the floor slab be re -compacted to 95 percent of the modified Proctor maximum dry ,density (ASTM D 1557) prior to placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic inch (pci) can be used for design of the slab -on -grade. We recommend that control joints be incorporated in the slab at frequent intervals to control shrinkage cracks and expansion. A moisture barrier is recommended beneath the floor slab to prevent moisture migration from the underlying soil resulting in dampness of the slab. Ronald G. Keller, P.E.: 37293 / Sl Lic. No.: 860 / Julie E. Keller, P.E.: 68366 TrC'►9 E%17jVi KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Liberty Baptist Church Addition -5- April 23, 2015 3660 Midway Road Fort Pierce, Florida I. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. We are pleased to be of assistance to you on this phase of your project. When we may be of `yAliip lA'�ice to you or should you have any questions, please feel free to call. 2 No. #5 0f �ide�r '�� F • . ORVD.? t �� J��/pNA1.,.�`. E-mail to: paul.k.hcs@gmail.com Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KSM Engineering&v :g BORING NUMBER B-1 Box 78-1377 KSMP.O. Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Heritage Contracting PROJECT NAME Liberty Baptist Church Addition PROJECT NUMBER 150837-b PROJECT LOCATION 3660 Midway Road, Fort Pierce, Florida DATE STARTED 4/21115 COMPLETED 4/21/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD _Split Spoon Sample VATTIME OF DRILLING 4.33 ft LOGGED BY DP/MS CHECKED BY JEK AT END OF DRILLING -- NOTES_ East Section of Proposed Addition AFTER DRILLING -- W o tt ♦ SPT N VALUE U > > vi w W 5 20 40 60 80 PL MC LL �.. x0 ~W 0 o a L'c w Q O J MATERIAL DESCRIPTION j a O j Q w y Z 0 C1 rL OOP m O Z v "' } " 20 40 60 80 (�7 O FINES CONTENT (%) ❑ a of 0 20 40 60 80 .: _... Brown Sand : Gray Sand 2-2-3 ...... SS SS 4-6-10 .. .. .. .. - Light Brown Sand 5 ....... SS 5-6-5 .... .. ....:.. SS 8-10-10 ..:. Brown Sand (20) ...................................... 10:.:.:`: 10-12-12 SS a ..:... (24) ........ .. SS 12-14-18 ...................................... (32) .. - SS 1 18-20-20 Bottom of borehole at 14.0 feet. 40 m Y_ w U O O N W F m Y K a M m 0 m 5 m 0 m F 2 U N H O a x m x U W F O w O KSM engineering jig BORING NUMBER B-2 x 78-1377 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Heritage Contracting PROJECT NAME Liberty Baptist Church Addition PROJECT NUMBER 150837-b PROJECT LOCATION 3660 Midway Road Fort Pierce Florida DATE STARTED 4/21/15 COMPLETED 4121/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 4.58 ft LOGGED BY DP/MS CHECKED BY JEK AT END OF DRILLING — NOTES North Center Section of Proposed Addition AFTER DRILLING -- W o z ♦ SPT N VALUE L) y } cog wa 20 40 60 80 PL MC LL a c a 0 MATERIAL DESCRIPTION w m w 0. o z � � N z � ❑ O Co O U " } �- 20 40 60 80 o- Z Z ❑ FINES CONTENT (%) ❑ < a o 0 20 40 60 80 Brown Sand .._..,. Gray Sand 3-2-3 SS SS ...................................... :.�::.: -V Light Brown Sand 5 (14) 14) .....:.......:....... :...... ........ . .. ,..... ' SS 10-10-12 ..::.: 9-10-12 ...................................... .:.;:.... Brown Sand 10 S3 12-12-14 .......:......:. .. 0 Bottom of borehole at 10.0 feet. m 26 W rc W Y_ N U O N W LL N Y > V F i0 0 N F- O ('J m 5 0 0 0 a x m x U W F O O KSM Engineering 81 _ BORING NUMBER B-3 _g _. KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Heritage Contracting PROJECT NAME Liberty Baptist Church Addition PROJECT NUMBER 150837-b PROJECT LOCATION 3660 Midway Road Fort Pierce Florida DATE STARTED 4/21115 COMPLETED 4121/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample SZ AT TIME OF DRILLING 4.42 ft LOGGED BY DP/MS CHECKED BY JEK AT END OF DRILLING -- NOTES South Center Section of Proposed Addition AFTER DRILLING -- w e ♦ SPT N VALUE O i y rn w w 20 40 60 80 PL MC LL =a0 wm wo a� �c ax O MATERIAL DESCRIPTION ,� g > O Oz� O Q ril « Z 0 • i pv 0� �Z m0Z 20 40 60 80 < '-' a � ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 Brown Sand .::... Gray Sand 3-3-3 SS ...... SS 4-6-6 .. .. .. .. Light Brown Sand ...� ���....... ....... 5 ........ SS 6-8-8 SS 8-10-12 (22) Brown Sand 10 SS 11-12-14 .. ' ' (26) ...... 14-16-18 a' SS 18-20-21 m Bottom of borehole at 14.0 feet. m 41 f m Y_ m U O O N m W 4 m Y k m a M C' P F O ¢m J m O H N F Z N F- O a x m x U w 0 O w O KSM Engineering s _ ,'ig BORING NUMBER B-4 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Heritage Contracting PROJECT NAME Liberty Baptist Church Addition PROJECT NUMBER 150837-b PROJECT LOCATION 3660 Midway Road Fort Pierce Florida DATE STARTED 4/21/15 COMPLETED 4/21/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample aAT TIME OF DRILLING 4.50 ft LOGGED BY DP/MS CHECKED BY JEK AT END OF DRILLING — NOTES _ West Section of Proposed Addition AFTER DRILLING -- W o Z ♦ SPT N VALUE A U > o: > 02 Lu 20 40 60 80 ~ate aO wm wo Oz� He t=� PL MC LL w ... ¢ O MATERIAL DESCRIPTION > d O Q p� z a I 20 40 60 80 ❑ U �Z m0Z U`" �" < K a W El FINES CONTENT (%) El 0 20 40 60 80 ....... Brown Sand : Gray Sand 2 3 g SS _.....:. 4-4-7 .. .. .. 5 SS 7-8-8 .. .. .. .. .:._.., . SS 8-10-10 ..:.. (20) ....... ...... :....... :....... :....... .::.. 10 � Brown Sand SS 10-12-14 ......... ....... _..................... Bottom of borehole at 10.o feet. m 26 0 w s w N y Y_ N U O O h W LL N Y P F o) O m h F O m Q N_ 0 F N F Z N F O 2 2 m 2 U W h 0 W W 06/18/2J15 A:01 7725896469 KSM ENGINEERING PAGE 01/03 se OIL iff AIi"M KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, sSTITIAN nG2) INGz MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SE589-071 MELBOURNE (321) 768-8488 PALM BEACH (561) W-7445 w wn.ksmengineering.net ST. LUCIE V72) 229.9093 FAX (561) 845-8876 E-Mall: KSM@KSMENGINEERING.NET FAx (772) 589-6469 C.A.: 5693 June 18, 2015 ,, Cerdage Contracting 3690 N. UZI Fort Pierce, Florida 34946 Re: Liberty Baptist Church Addition 3660 Midway Road Fort Pierce, Florida Permit M 15-020307 KSM Project #: 150837-1 d Dear Sir: SCANNED BY St Lucie Courtly RECEIVED JUN 18 1015 Enclosed, please find the nuclear density test results performed on the compacted foundation fill for the above referenced project. 1llrlrl Ay;Apny questions, please feel free to call. tlir�� E-mail to: paul.k.hcs@gmail.com Fax and Mail to: St. Lucie County Building Department Ronald G. Kelle , PE., 37293 / SI Lic- No.: 860 / Julie E. Keller, P.E.: 68366 06/18/2015 126:01 7725896469 KSM ENGINEERING PAGE 02/03 �C1t atir�m. KELLER, SCHLEICHER & MaCWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7765 P.O. BOX 78-1377, SEBASTIAN, FL 32978-�1377 SEBASnAN (772) 589-0712 PALM BEACH (561) 845-7445 wwwAsmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED: June 17, 2015 PERMIT #. 15-020307 CONTRACTOR: Herritage Contracting JOB LOCATION: Liberty Baptist Church Addition 3660 Midway Road Fort Pierce, Florida KSM JOB*: 150837-1d/ES/km MATERIAL: Brown and Gray Sand ITEM TESTED: Compacted Foundation Fill TEST LOCATION DEPTH MOTS- PEN DRY MAX. DRY PERCENT OF SAMPLE TUBE READ DENSITY PROCTOR COMPACTION ---- VALUE 1. N-E. 0" — 12" 8.8 40 107.7 97.7 97.7 2. N.W. 36 106.5 96.6 3. Center 44 105.4 95.6 4. S.W. 42 106.6 96.7 5. S.E. 40 107.3 97-4 Ronald G. Keller, P.E.:37293 / Sl Lic. No.: 860 / Julie E. Keller, P.E.: 68366 06/18/2015 N6:01 772589FaF4 KSM ENGINEERING PAGE 03/03 W C1 t AIJM KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (774 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768.8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. L.UCIE (772) 229-9093 C-A_: 5693 FAX (772) 589.6469 DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION: n r1 Soil Description: Max. Dry Density: Optimum Moisture: Julie E. Keller, P.E. MOISTURE -DENSITY RELATIONSHIP MODIFIED PROCTOR (ASTM D 1557) June 17, 2015 15-020307 Herritage Contracting Liberty Baptist Church 3660 Midway Road Fort Pierce, Florida KSM JOB #: 150837-1 p T---I---,---T---r--, I I I I I I I I I I I I I 1 I ( sl I I I I I I I I I I I I I I I I I I I I I I ( I I I 109III II T——IF TI1rI ——III I I I II I I I I I I I I I 108 F---I---+---I----I---+—�—��--4 I I I I I I I I I I I I I I I I I I I I I I I I 10 11 12 13 14 15 16 Moisture - Percent of Dry Weight Brown and Gray Sand 110.2 P.C.F. 12.0 Percent Ronald G. Keller, P.E.:37293 / SI Lic. No.: 860 1 Julie E. Keller, P.E.: 68366