Loading...
HomeMy WebLinkAboutSOIL NUCLEAR GAUGE1 rc) 6 cal ,fr- Soil Nuclear Gauge Client: Project: Report Date: 9/25/2015 Paul Jacquin & Sons, Inc. 13-2491.00 �. Test Method: ASTM D 6938 7348 Commercial Circle Paul Jacquin & Sons, Inc. - Various Projects Port St Lucie Fort Pierce, FL 34951 FBPE CA a 4930 521 NW Entemdse Ddve Pod St Lucie, FL 34986 Phone: 772-924.35751 Fee 772-9243580 , Test Results Test# Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture % Maximum Dry Density p In Place Moisture c/.) In Place Dry Density pc Probe Depth In Percent Compaction Min/Max Comp. % Remark 6 9/22/15 P-1 N/A 9.0 112.0 11.1 110.7 12 99 95/105 Pass 7 9122/15 P-1 N/A 9.0 112.0 9.2 111.5 12 100 95/105 Pass 8 9/22/15 P-1 N/A 9.0 112.0 9.1 112.2 12 100 95/105 Pass Test Information Test # Test Location Elevation Reference Gauge Make I Model / SN Field Technician 6 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Center Area 0 - 1 Troxler T3430 22260 Thomas, Kenneth 7 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Northwest End 0-1 Troxler T3430 22260 Thomas, Kenneth 8 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Southeast End 0 - 1 Troxler T3430 22260 Thomas, Kenneth Remarks Comments Related Tests Pass: Tests results comply with specifications Tests are'Direct Transmission" (Method A) unless probe depth is noted as'Backscaher'. Gauge calibration data on file with the testing agency. I Test # I Related Test # Test T e SGAN4ED St, j_ucie COU11W Test Reports shall not be reproduced, except in full, without the written approval of GFA International Inc. �btISO 080lps SS m # ponald W.iMoler, m Page 1 of 1 l ra & o / s- 7- Soil Nuclear Gauge Report Date: 9/25/2015 Test Method: ASTM D 6938 Pont St. Lucie FBPE CA # 4930 M NW Enterprise Cme Pori St. Lucie, FL 34986 Phone:772-924-35751 Fax: 772-9243580 Client: Paul Jacquin & Sons, Inc. 7348 Commercial Circle Fort Pierce, FL 34951 Project: 13-2491.00 Paul Jacquin & Sons, Inc. - Various Projects Test Results Test# Retest Of Test Date ProctorlD Method Soil Classification Optimum Moisture % Maximum Dry Density p In Place Moisture e/a In Place Dry Density pc Probe Depth In Percent Compaction 6950,f1poms Remark 6 9/22/15 P-1 N/A 9.0 112.0 11.1 110.7 12 99 Pass 7 9/22/15 P-1 N/A 9.0 112.0 9.2 111.5 12 100 Pass 8 9/22115 P-1 N/A 9.0 112.0 9.1 112.2 12 100 Pass Test Information Test # Test Location I Elevation Reference Gauge Make / Model I SN Field Technician 6 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Center Area 0 - 1 Troxler T3430 22260 Thomas, Kenneth 7 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Northwest End 0 - 1 Troxler T3430 22260 Thomas, Kenneth 8 Slab on Grade: 8311 Holley Tree Lane, Port St. Lucie - Interior Slab Area, Southeast End 1 10-1 Troxler T3430 22260 Thomas, Kenneth Remarks Comments Related Tests Pass: Tests results comply with specifications Tests are "Direct Transmission" (Method A) unless probe depth Is noted as "Backscatter". Gauge calibration date on file with the testing agency. I Test # Related Test # Test Type 21 Test Reports shall not be reproduced, except in full, without the written approval of GFA International Inc. Page 1 of 1