HomeMy WebLinkAboutMISC EMAIL 1i
MGM SheIR Contractors
Date. 12-2-3-14
Proposal To:
1889N.Uslawyl
ft Pierce, FL 34946
Re. A 20IX301 concrete basketball court and
A U9 �
4889 N.US - IFFOy I
F L Pieree, FL
7 separate concrete slabs.
Pricin
S 5086.00
Certified General Contractor Lic, #CGCO23868
15821 Mercantile Court #6
Jupiter FL 33478
Telephone 5616915031 Fax 5616915037
SCANNED
BY
S!-.4cjeCounty
We propose to furnish all labor and materials necessary to complete the concrete worL
XTE S91=21MM&
11) 1� �GMwffl ScraRe Off existing sod and remove from site.
2.) Provide 3oge psi concrete with 6X6 —WIA X WIA WWM.
3.) Provide all forms and grading of area for a 411 concrete pour, compact area with a plate
compactor.
4.) All labor to gradep form, pour and finishcolle"te slabs with a light br&om finish.
S-) Clem up our mess and remove from site.
�QNCRRTE w b G.C/Owner Not mig-m.
1-) AD Permits, Inspections and Surveys.
2-) AnY mXeh2nic84 electrical or plumbing work
M b — 3.) Concrete testing.
4.) Provide A Gco�Tec� engineer for density if neMsery,
5-) Provide location of 2 concrete slabs.
Q MGM wig Hot bring in dirt or remove dirt from site.
7-) MGM win compact Areas but not be responsible forDensity,
MAS LMY SCOPE of WORK
I-) This bid �'Oes �110tin-du—ie any masonry work.
CARPENTRY SCOPE of WORK
1.) This bid does not lncluje-3-Uy carpentry work.
NOT":
1.) No caulun
gs PaInting or waterproo&g.
2.) MGM will Not be responsible for Density.
3.) MGM will not bring in dirt or haul away dirt.
4-) All concrete to be poured out of trueb, there are no concrete Pumps figured in this pricing.
5.) Termite spray is not included and should not be required.
PAYMNT-TERM-
I-) Invoices received by the 25'h of the month to be paid by the loth of the follow g outh
L) This proposal is subject to review and/or revision if not accepted with siguat in m
thirty (30) days of proposal date, ure� within
Thauk yonfor the opportuni& to bg we eafon,,ard t,
, torkiWg wft4 you.
MGM Shell Contractors, Inc.
Qtk /07, 0,; - /0
Rick Garrison, President Date
tv
MGM Shell Contractors
Date. 12-2-3-14
Proposal To:
4889 N. US Hwy I
Ft. Pierce, FL 34946
Re. A 201X301 concrete basketball court and
A 14'X241 concrete Tild Rut concrete slab
-4889-N.- YjS-RjFq7j
A Pierce, FL
7 separate concrete slabs.
Pricin
S 5086.00
SCANNED
St LU BY
Cie CountV
Certified General Contractor Lic. 4CGCO23868
15821 Mercantile Court #6
Jupiter FL 33478
Telephone 5616915031 Fax 5616915037
00
C"
We propose to furnish all labor and materials necessary to complete the concrete work.
Ern ���
L) MGM WM scrape Off existing sod and remove firom site.
2.) Provide 3000 psi concrete with 6X6 — WIA X WIA VAVM.
3.) Provide all forms and grading of area for a 4" concrete pour, compact area with a plate
compactor.
4.) All labor to grade, form, pour and finish concrete slabs with a light broom finish.
5.) Clean up our moss and remove from site.
CONCRETE WORK by G. ner Not MG
1.) Ali Permits, inspection$ and Survey$,
2-) Any Inethanica4 electrical or plumbing work
Q.— 3.) Concrete testing.
4.) Provide A Geo-Tech engincer for density if necqsary.
5.) Provide location of 2 concrete slabs.
6.) MGM Will Hat bring in dirt or remove dirt from site.
7-) MGM will compact areas but not be responsible for Density.
I/
MASONRY SCOPE of WORK
iiii �iOoiineiu;e any masonry work
CA NTRY SCOPE of WORK
1.) This bid do
es not include any carpentry worIL
NOTES:
1.) NO caulking, Painting or waterproofing.
2-) MGM will Not be responsible for Density.
3.) MGM will not bring in dirt or haul away dirt.
4.) Ali concrete to be poured out of trucks, there are no concrete pumps figured in this pricing.
5.) Termite spray is not included and should not be required.
NLTERMS,
1.) Invoices received by the 25" of the month to be paid by the 10"' of the following month.
26) This Proposal is subject to review and/or revision if not accepted with signature, within
thirty (30)`da�s of proposal date. - I
ThaRkY011for the opportuni& to bid, we lookforward to ivorking with you.
MGM Shell Contractors, Inc.
Rick Gandson, Presidcnt�Date