Project No. 15-175 Report No. 4
cc: Gene Ron Elliott Merrill
Bob Stark structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4200 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBEQ�SAC-11W, -�JIT
PROJECT NAME: Ocean Harbor - South DATE: October 5, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft, Pierce, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Randy Fitzgerald
INSPECTED BY: Mike Lue WEATHft. ,�
WORK INSPECTED: St. Py —
Units 309 tuu� C01AW
On site meeting as requested by Randy with Structure Con.
Balcony is shored. The (3) cables in the E/W direction that is to be replaced has been locked off and
distressed behind the work area. The cable running in the N/S direction along the balcony edge behind
the bursting bars that are to be repaired is also locked off and distressed.
The corrosion of the bursting bars along the east balcony edge continues out to the north edge beyond the
area we first anticipated. Structure Con should continue the repairs towards the north edge. Contractor
should first verify if there are any pt cables in the EAV direction that may affect the work at that area prior
to completing the demo work.
Replacement of the three pt cables to be sequenced with the concrete repairs
- �Zm�
py Al),
/Z
1
Wic4b A e, P.E.
O� LLi
Pic I
Corrosion of the bursting bars
continue out to edge
Verify if any pt cables in this
direction before completing the
demo at edge
Cables locked off in both directions
M L Engineering, Inc. Pr6j ect No. 15-175 Report No. 6
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37� Avenue
Bob Stark structure -Con.
Vero Beach, Florida 32960
Car] Peterson SLC Bldg Dept
Phone (772) 569-1257
Randy Fitzgerald Structure -Con
Fax (772) 569-4041
File
mlengineeringine.com
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4200 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: jffN0;1j;5;g0,7&,020;1T
PROJECT NAME:
Ocean Harbor - South DATE: December 21, 2015
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Randy Fitzgerald
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Units 3 09, 1116 & 1216
Final inspection
All structural repairs have been completed in substantial accordance with the design and permitted
documents. A final certification letter of completion will be issued
The following miscellaneous items were observed which are to be corrected:
Unit 309
Clean the caulk off the top of the fasteners on the shutter track
Unit 1216
The bottom rail is missing a fastener to the guard rail post on the balcony, install fastener.
P7
Z�' Z
Sic fs�T_ -Z- �Z-
P L
Michael A. Lue, P.E.
M L Engineering, Inc. Project No. 15-175 Report No. 4
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37� Avenue
Bob Stark Structure -Con.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772) 5694041
mlenginceringinc.com
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4200 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER SL�7�_�
PROJECT NAME:
Ocean Harbor � South DATE: October 5, 2015
CLIENT:
Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR:
Structure -Con PROJECT MGR: Randy Fitzgerald
INSPECTED BY: Mike Lue
WORK INSPECTED:
Units 309
WEATHER: Sunny
On site meeting as requested by Randy with Structure Con.
Balcony is shored. The (3) cables in the E1W direction that is to be replaced has been locked off and
distressed behind the work area. The cable running in the N/S direction along the balcony edge behind
the bursting bars that are to be repaired is also locked off and distressed.
The corrosion of the bursting bars along the east balcony edge continues out to the north edge beyond the
area we first anticipated. Structure Con should continue the repairs towards the north edge. Contractor
should first verify if there are any pt cables in the E/W direction that may affect the work at that area prior
to completing the demo work.
Replacement of the three pt cables to be sequenced with the concrete repairs
Pic 1
Corrosion of the bursting bars
continue out to edge
Verify if any pt cables in this
direction before completing the
demo at edge
Cables locked off in both directions