OCEAN HARBOR NORTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
S LC BUILD IN G PERM IT NUM BER:Mcllix - 0 Call 9
PROJECT NAME: Ocean Harbor — North DATE: November 2, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Randy Fitzgerald
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Unit 109
We inspected the demo areas at the north and cast slab edge. The bursting bars at both edges are corroded
and the slab edges need to be replaced, approximately 8 to possibly 10 cables will have to be locked off
for removal of the slab edge and repair of the reinforcing. Some of the existing post tension anchors seem
like they have been replaced before. The cable end caps shifted during the last repair and were not placed
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
No. 15-175 Report No. 2
Project
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Cal Peterson SLC Bldg Dept
File
Pic 3
This cable anchor was not original
and the encapsulated end cap
shifted when the pocket was
grouted
Unit 801
There are cracks in the ceiling at unit 801 (the underside of 901) confirming that the bursting
bars are corroded and the slab edge needs replacement. I I
The column at the south comer is under repair, the existing vertical bar is corroded and the loss
of section exceeds 20% of the bar diameter. Clean all reinforcing and add another vertical bar
with a 36 inch lal).
Pic 4
Unit 801 ceiling (under 901)
Bottom bursting bar corded and
bottom of slab is cracked
confirming the slab edge needs
replacement
M L Engineering, Inc. Project No. 15-175 Report No. 2
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 37s' Avenue BobStark Structure -Con.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772) 5694041
nflengineeringuic.corn
Unit 908
There are two surface spalls that were excavated and the corroded bars cleaned and coated with
corrosion inhibitor.
At one of the two areas, there is a cable with a damaged sheathing and there is some mild
corrosion of the post tension cable where it has been exposed. We recommend that more
concrete be excavated more along the cable to verify that the extent of the corrosion. The pt
cable should be cleaned, greased and taped or coated for protection. The section of reinforcing
bar that is too high can be cut back approximately 6 inches
M
M L Engineering, Inc.
SCANNED
Proj6ct No. 15-175
Report No. 3
Consulting Engineers
BY
cc: Gene Ross
Elliott Merrill
2030 37' Avenue
St. Lucie COuntv
Bob Stwk
Structure -Con.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772) 5694041
mlenginceringinc.com
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT---.,,,,,
SLC BUILDING PERMIT NUMBER: S GI 0, - �
PROJECT NAME: Ocean Harbor South — North Bldg.
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Unit 801
The balcony slab has been shored.
DATE: December 4, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Randy Fitzgerald
WEATHER: Sunny
Some of the concrete was removed along the north and east edge of the balcony slab at the
deteriorated edge to determine the extent of the repairs. The edge and bursting bars as well as
the post tension anchors are corroded.
There are approximately 9 post tension cables that are affected and will require to be locked off
and spliced with new cables. Some of the existing bars as well as the post tension cables were
too close to the slab edge with inadequate cover. Some of the pt cables were not cut back to the
anchor and ex tended out into the grout pocket close to the slab edge and is corroded.
Recommendations
Coordinate with General Building Services the post tension specialist, to locate that affected post
tension cables and lock them off before c6ntinuing the demolition at the balcony edge. Repair or
replace all reinforcing bars as per the design and permitted documents.
Re -inspect prior to concrete placement
�'jvl goes'#,
N
A
Michac:Wr.o.' e,4
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fm (772) 569-4041
mlengineeringinc.com
Project No. 15-175 Report No. 3
cc: Gene Ross Elliott Merrill
BobStark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 2
Note
Some of the post tension
cables were not cut back to
the anchor, but were left
extending out into the grout
pocket close to the face of
the slab
M L Engineering, Inc.
2030 37'� Avenue
Vero Beach, Florida 32962
Phone: 772-569-1257
Fax .772-569-4041
E-mail: mlengineeringinc.com
Transmittal
DATE: 12/04/15
RE: Job # 15-175
ATTN: Mr. Carl fterson
TO: RE:
St. Lucie County Building & Zoning Bryn Mawr Condominiums -Bldg. B
Department 5059 North Highway AlA
2300 Virginia Ave., Ft. Pierce, FL 34982 Ft. Pierce, Florida
(772) 462-1553
WE ARE SENDING YOU:
Conies Date
Attached / Via:
Number
USPS
naepwi�+...
Report for Prqje�i 5-
-j�-175 report 3 SLC
County Permit No. 1507-0119, Signed &
Sealed
'-COPY TO.-Elhott Merrill, StruCture-Con, Sf C Bldg. Dept. & File
Signed:
SCANNED
M L Engineering, Inc.
Project No. 15-175
Report No. 3
Consulting Engineers
BY
cc: Genc Ross
. Elliott Merrill
2030 37� Avenue
St. Lucie Couniv
BobStark
Structure -Con.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772) 569-4041
mlenginceringinc.com
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
T14RESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER��
PROJECT NAME: Ocean Harbor South— North Bldg DATE:
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Concrete balconies
LOCATION:
November 23, 2105
Ft. Pierce, Florida
PROJECT MGR: Randy Fitzgerald
WEATHER: Sunny
Unit 901 W ��
We inspected the balcony slab at unit 901 and observed the following:
The slab has been shored, and the edge was removed and the reinforcing bars have been
replaced, repaired and coated. There are (13) post tension cables that have been locked off,
spliced and extended through the slab edge form.
Full depth edge areas 21'x2'-3,3'x4'-6,4'-4x4-10,10'-4xl'-7
Full depth repairs (6) areas 0-10" x l'-6 at pt cable splices
There are bottom reinforcing bars along the north edge that need raised to provide adequate
concrete cover. There are bars at the slab south edge of the slab that need to be cut back. There
are three reinforcing bars that have is yet to be coated with corrosion inhibitor.
All pt cables have been spiced and taped.
Unit 208
There are 3 corroded pt cables found just east of the building column that requires repair. This
area appears to be an old repair due to the color of the concrete aggregate. The cables are bands
that appear to run under through the column and under the south sliding glass door. One of the
cables is broken completely through and one end has retracted past the end of the casing. The
other two cables are also corroded.
The sliding glass door may require removal for proper repairs depending on whether there is
adequate room to effectively lock off the cables. The broken cable requires replacement.
H 0
-Z,. C,
CD
�_R � 91�'
1.
-1. F fFNOV 3 0 RECD
4( *. 5' —Ir
o . 2,
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
Project No. 15-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
M L Engineering, Inc.
Consulting Engineers
2030 3r Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mlengineeringine.com
Project No. 15-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 4
Unit 208
Three tendons that appear to run
over column and under south
sliding glass door
T
I
M L Engineering, Inc.
2030 37'� Avenue
Vero Beach, Florida 32962
Phone: 772-569-1257
Fax 772-5694041
E-mail: miengineeringine.com
SCANNED
BY
St. Lucie Countv Transmittal
DATE: 12/21/11
RE: Job # 15-175
ATTN: Mr. Carl Peterson
TO: RE:
St. Lucie County Building & Zoning Ocean Harbor South Condominiums
Department Concrete Repairs-4200 North HWY AIA
2300 Virginia Ave., Ft. Pierce, FL 34982 (South) & 4250 North HWY AIA
(772) 462-1553 (North)
WE ARE SENDING YOU: Attached / Via: USPS
Conics Date Nivmhp.r npcevi�f4�.
Letter to SLC Bldg. Dept. Project No. 15-175
Letter to SLC Bldg. Dept. Project No. 15-175
Report No. 6:SLCl 507-0118
REMARKS:
COPY TO: Elliott Merrill, Structure -Con., SLC Bldg- Dept. & File
Signed:
V
M L Engineering, Inc.
Consulting Engineers
2030 3r Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mienginceringine.com
Prvjit�ct No. 15-175 Report No. 5
ce: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER19��
PROJECTNAME: Ocean Harbor South —North Bldg.
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Units 108, 208, 308, 801 & 901
DATE: December 21, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Randy Fitzgerald
WEATHER: Sunny
Final inspection
All structural repairs have been completed in substantial accordance with the design and
permitted documents. A final letter of completion will be issued.
The following miscellaneous item was observed which is to be corrected:
Unit 801
The deck paint is to be touched up where it is discolored from cleaning the guard rails
1
0
M L Engineering, Inc.
2030 37"' Avenue
Vero Beach, Florida 32962
Phone: 772-569-1257
Fax 772-5694041
E-mail: n-Aengineeringinc.com
SCANNED
BY
St. Lucie countv
Transmittial
DATE: 12/11/15
RE: Job # 15-175
ATTN: h1r. Carl Peterson
TO: RE:
St. Lucie County Building & Zoning Ocean Harbor South Condominiums
Department Concrete Repairs 4250 N HWY AIA
2300 Virginia Ave., Ft. Pierce, FL 34982 Ft. Pierce, Florida
(772) 462-1553
WE ARE SENDING YOU:
CoWes Date
Attached / Via:
Number
USPS
Descrintion
Report for Project 15-175 report 4 SLC
Building Permit No. 1507-0119, Signed &
Sealed
N
COPY TO: Elliott Merrill, Structure -Con.., SLC_Bldg. Dept. 4 File -
Signed:
-AP
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mlenginecringinc.cont
Project No. 15-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bid& Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: SL-edff[TZ�
PROJECT NAME: Ocean Harbor South — North Bldg. DATE: December 11, 2015
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Randy Fitzgerald
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Observations
Ogg*
Concrete was removed at edges and in the middle of the slabs to access the affected cables.
8 Post tension cables have been locked off and spliced.
Reinforcing bars have been added, repaired.and coated with corrosion inhibitor.
Repaired areas
Balcony edge repairs l8"x6'-7,l8"xl0'-6
Full depth repairs 2'-7x 2'-9, 10"x 18", 6" x 6'.'
Surface spalls 911x 21"
No of pt cables 8
Recommendations
Coat all the remaining reinforcing bars with corrosion inhibitor
Provide a #4 90 degree comer lap bar at the NE balcony edge
Tape or coat all damaged sheathing where the cables are exposed
Provide anchor to bottom railing at south comer
First concrete pour has been approved in order to stress the cables
I I If I""
riOlvy
I yX( -
M L Engineering, Inc. Project No. 15-175 Report No. 4
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 37' Avenue Bob Stark Structure -Con.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772) 569-4041
ndengineeringinc.com
Pic I
NE comer of balcony edge
Pic 2
Post tension lock off and
splices at banded cables
next to column
Pic 3
Pt splice at single cable
running in north south
direction
I
2
17�1
/ .5-1-0;
0
M L Engineering, Inc.
2030 37 Avenue
Vero Beach, Florida 32962
Phone: 772-569-1257
Fax 772-5694041
E-mail: mlengineeringinc.com
SCANNEU Transmittal
BY
St. Lu6te C01 DATE: 10105117'
RE: Job # 15-175
ATTN: Mr. Carl Peterson
TO: RE:
St. Lucie County Building & Zoning Ocean Harbor North & South
Department Condominiums
2300 Virginia Ave., Ft. Pierce, FL 34982 4200 & 4250 North Highway AIA
(772) 462-1553 Ft. Pierce, Florida
WE ARE SENDING YOU
Conies Date
Attached / Via:
Numher
tcll Q
Dp-Rorinfinn -
I copy
Report No. 4 (South)
I copy
ReportNo. 1 (North)
REMARKS:
COPY TO: Structure Con, Elliott Merrill, & File
Signed:
9
M L Engineering, Inc. Pr!Ro. 15-175 Report No. 1
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 37' Avenue Bob Stark Structure -Con.
Vero Beach, Florida 32960 Cut Peterson , SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772) 569-4041
mlenginceringinc.conn
OCEAN HARBOR NORTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER[�EC�15�7701 =1
PROJECTNAME: Ocean Harbor —North DATE: October 5, 2015
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Randy Fitzgerald
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Concrete column repairs @ Unit 109
We inspected the demo areas at the base of the two concrete columns that are under repair. The
concrete has been removed around the corroded bars and the column reinforcing exposed.
North column
There are two vertical bars that have excessive loss of section and require adding two bars. The
existing dowels should also be bent back into the column to maintain the proper concrete
coverage. Clean and coat all bars with the specified corrosion inhibitor and re -pour as specified
in the design documents.
f:t'-t !
r
Pic I
V�
North Column
Bend this dowel back into
column to maintain proper
e.
concrete coverage
Two bars to be added next to
these vertical bars due to loss of
section
FA �4
I
M L Engineering, Inc.
Consulting Engineers
2030 37� Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fm (772) 569-4041
mlenginecringinc.coan
Project No. 15-175
Report No. I
cc: Gene Ross
Elliott Merrill
Bob Stork
Structure -Con.
Carl Peterson SLC Bldg Dept
File
South Column
The vertical reinforcing should be cleaned and coated with the specified corrosion inhibitor.
Remove the portion of the lower column tie that is too close to the surface of the column. There
is an embedded vertical channel in the east face of the column that serves no purpose and is
corroded. This appears to be a channel for masonry anchors that may have been installed in the
original construction and was abandoned. This is corroded and should be removed.
t
0.
140 4
0 ael P.E.
0, 0
i'71
:7-V, ��77 " I Pic 2
Corroded steel channel in east
I% face to be removed from column
10105
2
E5
M L Engineering, Inc.
SGPOS9
Consulting Engineers
BY -
2030 3r Avenue
cowit,
Vero Bewh, Florida 32960
St. L%3c:ie
Phone (772) 569-1257
Fm (772) 5694041
inlengineeringinc.corn
Project No. 15-175 Report No. I
Gene Rm ElliottMeffill
Bob Stark structure -Con.
Cut Peterson , SLC Bldg Dept
File
OCEAN HARBOR NORTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION RE.PO'
03EI ffSL
SLC BUILDING PERMIT NUIV. 7
-aft"
PROJECT NAME: Ocean Harbor — North DATE: October 5, 2015
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Concrete column repairs @ Unit 109
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Randy Fitzgerald
WEATHER: Sunny
We inspected the demo areas at the base of the two concrete columns that are under repair. The
concrete has been removed around the corroded bars and the column reinforcing exposed.
North column
There are two vertical bars that have excessive loss of section and require adding two bars. The
existing dowels should also be bent back into the column to maintain the proper concrete
coverage. Clean and coat all bars with the specified corrosion inhibitor and re -pour as specified
in the design documents.
4".
Pic I
North Column
Bend this dowel back into
column to maintain proper
concrete coverage
Two bars to be added next to
these vertical bars due to loss of
section
M
M L Engineering, Inc. Project No. 15-175 Report No. I
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 370 Avenue
BobStark Structare-Con.
Veto Beach, Florida 32960
Cut Peterson SLC Bldg Dept
Pbone (772) 569-1257
File
Fax (772) 5694041
nalengineeringinc.cont
South Column
The vertical reinforcing should be cleaned and coated with the specified corrosion inhibitor.
Remove the portion of the lower column tie that is too close to the surface of the column. There
is an embedded vertical channel in the east face of the column that serves no purpose and is
corroded. This appears to be a channel for masonry anchors that may have been installed in the
original construction and was abandoned. This is corroded and should be removed.
V I
0-
All
4
ael ue,
0
tq,
2
Pic 2
Vertical bars to be cleaned and
coated
Remove section of column ties that
do not have adequate concrete
cover
Pic 2
Corroded steel channel in east
face to be removed from column