HomeMy WebLinkAboutPROJECT INFORMATIONRECEIA."D JUL 00-2015
58�1 11 1,1()( 1 1) PEMWLEUM GAS
(3) Bel -ore exposure to the Lurch Fire, none of' the thernic-
couples oil file thermal insulation system steel plate con-
figuration Shall indicate a Plate temperature in excess of
100-17 (37.8-G) or less than 32'F (O*C) -
(4) The entire outside urf-Ace of tile thermal insulation sys-
t&ffi �hall be exfj()sccJ U) dic torch fire environment.
(5) A torch fire Lestshall be run fora rnininnum of-50 minutes.
The thermal insulation system shall retard [lie beat flow
to the Steel plates So that none ol'the Lilerrylocouples on
the uninsulated side of the steel plate indicate a plate Wal-
perlLure in exces's of'800'F (427*().
1-1.4 Hose Stream Resistance Tlest. After 20 minutes exposure
to th c Lurch test., the test sample shall be hi L wit], a hosestrearn
concurientlywid, the torch fbraperiod ()I'll) minutes.The
]lose sircarn test Shall be conducted in the Following manner:
(1) Thes LrcAM shall be directed first. at. the middle And then
at all parts of the exposed surf -Ace, making changes in
direction slowly.
(2) Tbchosc stream shall be delivered through a 21/2 in.
(64 mm) hose c . lischarUilig through a r4ational Standard
playpipe of corresponding size equipped with a VA in.
(29 mm) discharge tip of the standard-tapersmooLh-bore
pattern without shoulder at the orifice. The water pres-
sure at the hj.%e of the nozzle and for the duration of the
OCSI.Shall be 30 psig (207 kPag). [Estimated delivery �afe is
205 gpm (776 L/mill) .1
to
(3) The Lip of the nozzle shall be located 20 I'L (6 m) from,
and on a line normal to, the center of the le , SI-SIX6111cu. If*
impossible to be so located, the nozzle can be on a line
with a deviation not to exceed 30 degrees from the line
normal to the center of the test speciluen. When SO 10-
CaLed, tile distance from the ceniershall be less; than 20 ft
(6 rn) by an amount equal to I fl. (0.3 in) for each 10
degrees of deviation f'i om the normal..
K) Subsequent to the Application of the ]lose stream, the
torching shall continue until any thermocouple on the
uninsulaxed side of the steel plate indicates a plate trim-
perat . tire ul excess oi'800*r (427*G ).
(5) The thermal insulation system Shall be ' judge(] to be resis-
tart. 1.0 the Action of' the hose stream it' the time from
initiation oftorching for Any thermocouple on the unit)-
sL,].,Lcd side of the steel plate to reach in excess ol'800'F
(427*C) is 50 minutes or greater.
(6) one successrul combination torch fire and hose strearil
test shall be required for certification.
. Annex I Container Sp�ciflg�
7'lliv annex is not apart of therrquir� LY0f1hiwvN1'7'A(1M&�l
but i5 includedjizr informational Purposes (Mly.
1.1 Spacing of Containers. Figure-T.I(a), Figure 11(b), inSCANP
1-ligure 1.1 (c) illustrate container spacing required in 6.3. 1. BY
St Lucie C
WIndow
Cylinder filled on
bulk truck
5 it (mln) (min)
/ (Note 3)
(source ofignition) . Pylinders not filed
ClAwl space opening,
doxims, or uhaust fan
For SI units, 1 it = 0.3048 in
N mlnm in any direction Note 2: If the cylinder is filled on site from a bulk truck. 010
I 've !om, openings into filling connection and vent valve must be at least 10 it from
-f ig.'t -vent
1 5 " any a um 'mm 50cal ventilation air Intakes. any exterloir source of Ignition, openings Into direct
�'_ den., Source
w Y appliances. la
ol,roo.jtnt me n appliances, or mechanical ventilation air intakes.
Referto6.3,9.
Note 3: Refer to 6.3.13.
FIGUREI.I(a) Cyrmdcrs. (Figurefor illustrative purposes only; cade compliance required.)
2011 Edition