Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONRECEIA."D JUL 00-2015 58�1 11 1,1()( 1 1) PEMWLEUM GAS (3) Bel -ore exposure to the Lurch Fire, none of' the thernic- couples oil file thermal insulation system steel plate con- figuration Shall indicate a Plate temperature in excess of 100-17 (37.8-G) or less than 32'F (O*C) - (4) The entire outside urf-Ace of tile thermal insulation sys- t&ffi �hall be exfj()sccJ U) dic torch fire environment. (5) A torch fire Lestshall be run fora rnininnum of-50 minutes. The thermal insulation system shall retard [lie beat flow to the Steel plates So that none ol'the Lilerrylocouples on the uninsulated side of the steel plate indicate a plate Wal- perlLure in exces's of'800'F (427*(). 1-1.4 Hose Stream Resistance Tlest. After 20 minutes exposure to th c Lurch test., the test sample shall be hi L wit], a hosestrearn concurientlywid, the torch fbraperiod ()I'll) minutes.The ]lose sircarn test Shall be conducted in the Following manner: (1) Thes LrcAM shall be directed first. at. the middle And then at all parts of the exposed surf -Ace, making changes in direction slowly. (2) Tbchosc stream shall be delivered through a 21/2 in. (64 mm) hose c . lischarUilig through a r4ational Standard playpipe of corresponding size equipped with a VA in. (29 mm) discharge tip of the standard-tapersmooLh-bore pattern without shoulder at the orifice. The water pres- sure at the hj.%e of the nozzle and for the duration of the OCSI.Shall be 30 psig (207 kPag). [Estimated delivery �afe is 205 gpm (776 L/mill) .1 to (3) The Lip of the nozzle shall be located 20 I'L (6 m) from, and on a line normal to, the center of the le , SI-SIX6111cu. If* impossible to be so located, the nozzle can be on a line with a deviation not to exceed 30 degrees from the line normal to the center of the test speciluen. When SO 10- CaLed, tile distance from the ceniershall be less; than 20 ft (6 rn) by an amount equal to I fl. (0.3 in) for each 10 degrees of deviation f'i om the normal.. K) Subsequent to the Application of the ]lose stream, the torching shall continue until any thermocouple on the uninsulaxed side of the steel plate indicates a plate trim- perat . tire ul excess oi'800*r (427*G ). (5) The thermal insulation system Shall be ' judge(] to be resis- tart. 1.0 the Action of' the hose stream it' the time from initiation oftorching for Any thermocouple on the unit)- sL,].,Lcd side of the steel plate to reach in excess ol'800'F (427*C) is 50 minutes or greater. (6) one successrul combination torch fire and hose strearil test shall be required for certification. . Annex I Container Sp�ciflg� 7'lliv annex is not apart of therrquir�­ LY0f1hiwvN1'7'A(1M&�l but i5 includedjizr informational Purposes (Mly. 1.1 Spacing of Containers. Figure-T.I(a), Figure 11(b), inSCANP 1-ligure 1.1 (c) illustrate container spacing required in 6.3. 1. BY St Lucie C WIndow Cylinder filled on bulk truck 5 it (mln) (min) / (Note 3) (source ofignition) . Pylinders not filed ClAwl space opening, doxims, or uhaust fan For SI units, 1 it = 0.3048 in N mlnm in any direction Note 2: If the cylinder is filled on site from a bulk truck. 010 I 've !om, openings into filling connection and vent valve must be at least 10 it from -f ig.'t -vent 1 5 " any a um 'mm 50cal ventilation air Intakes. any exterloir source of Ignition, openings Into direct �'_ den., Source w Y appliances. la ol,roo.jtnt me n appliances, or mechanical ventilation air intakes. Referto6.3,9. Note 3: Refer to 6.3.13. FIGUREI.I(a) Cyrmdcrs. (Figurefor illustrative purposes only; cade compliance required.) 2011 Edition