Loading...
HomeMy WebLinkAboutPROJECT INFORMATION 3Right -Suite@ Universal 2015 Short Form Job: wrightsoft Date: Entire Bldg. 13y; SCANNED QUICK CALCS, INC. BY St. Lucie County 317 ST LUCIE LN., FT PIERCE, FL 34946 Phwe: 772466-6799 Fax 772-466-6796 Emil: QUICKCALCS@AOLCOM Project Information For. BLUE COLLAR DOG TRAINER 3988 KINGS HIGHWAY, Fr. PIERCE, FL Htg Cig Htg Clg Outside db CF) 42 90 Inside db (OF) 70 75 Outside RH (0/0) - 59 Inside RH M - 50 Outside wb (OF) - 78 Inside wb (OF) - 63 Daily range (OF) - 15 Design TD CF) 28 15 Moisture diff. (gr/lb) - 61 Heating Equipment Cooling Equipment Make Model Type Efficiency Heating Input Heating Output Humidifier LewAng Air Temp Actual Heating Fan Else strip 100 EFF 6.1 kW 20.9 MBtuh 6.7 gpd 80.9 OF 1750 cfrn Equipment Location System Type Fan Motor Heat Type Fan & Motor Combined Efficiency Static Pressure Across Fan Make CarTier Model CA16NA060-0-A1FX4DN(B,F)061 Type SplitAC COP/EER/SEER 16.0 Sensible Cooling 36.8 MBtuh Latent Cooling 15.8 MBtuh Total Cooling 52.5 MBtuh Lea,AngAirTemp 55.0 OF Actual Cooling Fan 1750 cfm Entire Bldg. PEAKCV PACKAGE 0 % 0 in H20 NAME Area ftZ Heat Loss Sensible Gain Latent Gain Htg Cfm Cig Cfm Time ROOM 3 196 1213 2912 1957 153 181 Jul 1600 LDT ROOM 4 154 953 2483 1847 120 150 Jul 1600 LDT ROOM 6 275 2843 3983 2582 353 259 Jul 1600 LDT ROOM 1 286 1645 8480 13977 203 585 Jul 1600 LDT ROOM 2 234 1637 3049 1857 211 191 Jul 1600 LDT ROOM 5 440 5591 5681 3232 710 382 Jul 1600 LDT I Entire Bldg. 1 1585 1 13882 1 26587 1 25452 1 1750 1 1750 1 Jul 1600 LDT 2015Zep-22 13:42:51 wrlghtSoft� R'Ight.SulteOLInN�a[201515.0.19RSL]38101 Page 1 ... ck CaIWD=u=ntsNI3LUE COLLAR DOG TRAINING.mp Calc=CLM FmtDwrbces: N Right -Suite@ Universal 2015 Load Summary Job: wrightsofr Date: Entire Bldg. Ely: QUICK CALCS, INC. 317 ST. LUCIE LN., FT. PIERCE, FL 34946 Phwe: 772466-6799 Fax 772466-6796 Errdl: OUICKCALCS@AOLCOM For. BLUE COLLAR DOG TRAINER 3988 KINGS HIGHWAY, FT PIERCE, FL I;Nw Ci� Opy tire: - g. C00LINGL0AD--"--' 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1600 LDT Inside: 75 OF Outside: 90 OF TD: 15 OF RH: 59 % Moist[Diff: 61.5 gr/lb Mult: 1.0 Ins.wb 63 OF Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSNUSSION GAINS Sensible 4554 Walls: 0 - - Glass: 0 - - Doors: 302 - - Partitions: 0 - - Floors: 0 - - Ceilings., 4253 - - 4. INTERNAL HEAT GAIN Sensible Latent 12778 2000 Occupants: 2500 2000 - - Lights: 10278 - Motors: 0 - Appliances: 0 0 - - 5. INFUTRATION: Outside air cfm: 411 6782 17186 6. SUBTOTAL: Spaceload Sensible Latent 24115 19186 Envelope 24115 19186 - - Less e)demal 0 - Redistribution 0 0 - 7. SUPPLY]DUCT 0 8. SUBTOTAL: Space load + supply duct 24115 Actual cfm: 1750 at sup?ly TD: 20 - - 9. VENTILATION: Make-up air c m: 150 2473 6266 10. RETURNAIRLOAD: Lighting + plenum (net) 0 - 11. RETURINDUCT 0 - 12. TOTAL LOADS ON EQUIPMENT 26587 25452 HEATING LOAD---'..--'- 13. DESIGN CONDITIONS Mult: 1.0 Inside: 70 OF Outside: 42 OF TD: 28 OF 14. TRANSMISSION LOSSES 4922 Walls: 0 - Glass: 0 - Doors: 583 - Partitions: 0 - Floors: 2822 - Ceilings: 1517 - 15. INFULTRATION: Outside air cfm: 209 6431 16. SUBTOTAL: Spaceload 11353 Envelope 11353 - Less external 0 - Less transfer 0 - Redistribution 0 - 17. SUPPLYDUCT- 0 18. VENTELATION: Make-up air cfm: 0 0 19. HUNUDETICATION 2529 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 13882 wrightsoft, 2015-Sep-22 13:42:51 Right-SulteQ Univemal 201515.0.19 RSLM101 Page I ... ck CaIcsXDmuwntMB1-UE COLLAR DOG TRAINING.mp Calc=CLM ftntDODrfaces: N PROJECT SUMMARY Short Desc: BLUE COLLAR Owner: Addressl: 3988YJNGSHOGHWAY Address2: Description: BLUE COLLAR DOG City: FT. PIERCE State: FL Zip: 0 1�pe: Office Class: Renovation to existing Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 1585 SF Conditioned & UnConditioned Area: 1585 SF No of Stories: I Area entered from Plans 0 SF Permit No: 0 Max Tonnage 4.4 If different, write in: EnergyGauge Summit@ Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page I of 7 Component Energy Cost LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? Design Criteria Result 832.0 1,130.0 PASSED PASSES No Entry PASSES No Entry No Entry No Entry Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this W I 1MVIS it - VQ -- ME" 4"'1:11 1 r ue)" a-1. I -A" - I N, � M RlfffARF I EnergyGauge Summit@ FlatCom-201 0. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 1 Page 2 of 7 CERTTICATIONS I hereby certify that the plans and specification covered by this calculation are in compliance with the Florida Energy Code ;�<' I Prepared By. 41itgg Official: Date: Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: K- &QC4W42 I / Reg No: Mechanical Designer:, CCKAXOLttSWS�7k�-RegNo: /9/65i'q/ Plumbing Designer: Reg No: Signature is required where Florida Law requires design to be performed by registered design professionals. U, k EnergyGauge Summit@ Fla/Com-201 0. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page 3 of 7 Project: BLUE COLIAR Tifle: BLUE COLIAR DOG TIRAINING '4pe: Office F LE COPY —(WEA File: FL ST LUCEE CO ETM.tm3) Building End Uses 1) Proposed 2) Baseline Total 53.60 90.30 $832 $1,413 ELECTRICITY(MBtu/kWh 53.60 90.30 15701 26456 S832 S1,413 AREA LIGHTS 3.90 18.20 1148 5340 $61 $285 MISC EQUIPMT 23.80 23.80 6967 6967 $369 $372 PUMPS & MISC 0.10 0.10 22 19 $1 $1 SPACE COOL 12.40 24.00 3631 7018 $192 $375 SPACE HEAT 0.80 1.40 238 419 $13 $22 VENT FANS 12.60 22.80 3695 6693 $196 $357 Credits Applied: None PASSES Passing Criteria = 1130 Design (including any credits) = 832 ,Passing requires Proposed Building cost to be at most 80% of Baseline cost. This Proposed Building is at 58.9% EnergyGauge Summit@ Fla/Com-201 0. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page 4 of 7 External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W[Unit) or No. of Units (W) (W) (Sqft or ft) None Project: BLUE COLLAR Title: BLUE COLLAR DOG TRAINING Type: Office (WEA File: Fl, ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Descriution Area Design Min Compli- ID (sq.ft) CP CP once PrOZOISPI 16 Office - Open Plan 1,585 1 1 PASSES I PASSES I ect: BLUE COLLAR BLUE COLLAR DOG TRAINING Office System Report Compliance System 1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Eff Eff Criteria Design 11PLV Comp- IPLV Criteria liance Cooling System Air Conditioners Air Cooled 52500 16.00 12.23 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 34000 1.00 1.00 PASSES Air Handling System Air Handler (Supply) - 1750 0.80 0.82 PASSES -supply Constant Volume PASSES EnergyGauge Summit@ Fla/Com-201 0. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page 5 of 7 Plant Compliance Description Installed Size Design Min Design No Eff Eff IPLV Min Category Comp IPLV Hance I I NonE::::::::1j Water Heater Compliance Design Min Description Type Category Eff Eff Design Max Comp Loss Loss Hance I None :3 Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thicklinj Thick[inj M SF.Fj I None EnergyGauge Summit@ Fla[Com-201 0. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page 6 of 7 BLUE COLLAR BLUE COLLAR DOG TRAhqNG Office L File: FL_ST_LUCEE_C0_INTL.tm3) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Report 506.4.2 Input Report Print -Out from EnergyGauge FlaCom attached Q Operations Manual 303.3.1, Operations manual provided to owner El 503.2.9.3, 505.7.4.2 Windows & Doors 502.3.2 Glazed swinging entrance & revolving doors: max. 1.0 cfin /ft2 ; all other products: 0.3 cfin/ft2 Joints/Cracks 502.3.3 To be caulked, gasketed, weather-stripped or otherwise sealed El Dropped Ceiling Cavity 502.3 Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Efficiency 503.2.3 Minimum efficiencies: Tables 503.2.3(l)-(8) El HVAC Controls 503.2.4 Zone controls prevent reheat (exceptions); separate thermostatic El control per zone; Ventilation 503.2.5 Outdoor air supply & exhaust ducts shall have dampers that automatically shut when systems or spaces served are not in use. Exhaust air energy recovery required for cooling systems (Exceptions). ADS 503.2.7.5 Duct sizing and Design have been performed HVAC Ducts 503.2.7 Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Table 503.2.7.2. Fan power limitations. Balancing 503.2.9.1 HVAC distribution system(s) tested & balanced. Report in construction documents. Piping Insulation 503.2.8 HAC and service hot water. In accordance with Table 503.2.8. Water Heaters 504 Performance requirements in accordance with Table 504.2. Heat trap required. Swimming Pools 504.7 Vapor -retardant or liquid cover or other means proven to reduce heat loss on heated pools; Ti ime switch (exceptions); readily accessible on/off switch. Motors 505.7.5 Motor efficiency criteria have been met El Lighting Controls 505.2, 502.3 Automatic control required for interior lighting in buildings >5,000 El s.f; Space control; Exterior photo sensor; Tandom wiring with I or 3 linear fluorescent lamps>30W -M3 EnergyGauge Summit@ Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 8/24/2015 Page 7 of 7 oil I Avnv� num 10 EnergyGauge Summit@ v5.00 Project Information Project Name: BLUE COLLAR ProjectTitle: BLUE COLLAR DOG TRAINING Address: 3988 KINGS HOGHWAY State: FL Zip: 0 Owner: Orientation: North Building Type: Office Building Classification: Renovation to existing building No.of Stories: I GrossArea: 1585 SF Zones No Acronym Description T�pe Area lsfl Multiplier Total Area Isq I PrOZol Zone I CONDITIONED 1585.2 1 1585.2 El Spaces No Acronym Description 1�pe Depth IN Width Height Multi IN [ftl plier TotalArea lsq Total Volume leg 8/24/2015 EnergyGauge Summit@ v5.00 I M 10 mull 1 vii 09,2111 In Zone: Pr0ZoI I Pr0ZolSD1 ZoOSpl Office - Open Plan 32.35 49.00 9.00 1 1585.2 14266.4 Lighting No Type Category No. of Watts per Power Control 1�pe No.of Luminaires Luminaire [W] Ctrl pts In Zone: PrOZo In Space: Pr0ZoISpI I Compact Fluorescent General Lighting is 25 375 Manual On/Off I El Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier Isf] [Btu/hr. sf. F] Capacity Ilb/cfl [h.sEF/Btu] [Btu/sEFj In Zone: PrOZol I PrOZolWal 8"CMU/3/4"ISO 49.00 9.00 1 441.0 North 0.2642 9.696 62.72 3.8 El BTWN24"oc/5/8 2 Pr0ZolWa2 Gyp 8"CMU/3/4"ISO 32.35 9.00 1 291.2 East 0.2642 9.696 62.72 3.8 El BTV;N24"oc/5/8 3 Pr0ZolWa3 Gyp 8"CNW/3/4"ISO 49.00 9.00 1 441.0 South 0.2642 9.696 62.72 3.8 El BTWN24"oc/5/8 GYP Windows No Description I�Vpe Shaded U SHGC Vis.T)ra W H (Effec) Multi Total Area [Btu/hr sf F1 Ift] [ft] plier Isf] In Zone: In Wall: 9/2412015 EnergyGauge Summit@ v5.00 Doors No Description 1),pe Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value Ift] 11t] plier [sp [Btu/hr. sf. F] [lb/cfl [Btu/sE 19 [h.sf.F/Btu] In Zone: PrOZol In Wall: EAST I Pr0ZolWa2Drl Solid core flush No 3.00 6.80 1 20.4 0.3504 0.00 0.00 2.85 F-1 (2.25) In Wall: SOUTH I PrOZolWa3Drl Solid core flush No 3.00 6.80 2 20.4 0.3504 0.00 0.00 2.85 0 (2.25) Roofs No Description Type Width H(Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value IN [ft] plier lsfl [deg] [Btu/hr. SE F] [Btulsf.19 Rb/cfl [h.sf.F/Btul In Zone: PrOZol I PrOZolRfl Mtl Bldg Roof/R-19 49.00 32.35 1 1585.2 0.00 0.0492 1.34 9.49 20.3 El Bart Skylights L No Description Type U SHGC Vis.Trans W H(Effec)Multiulier Area TotalArea [Btu/hr sf F] Ift] Ift] 1Sq IS11 In Zone- E] Floors No Description Type Width H(Effec) Multi Area Cond. Heat Cap. Dens. R-Value Ift] [ft] plier fsfl [Btulhr. sE Fj [Btu/sE F] Rb/cfl [h.sf.F/Btu] lInzone: Prozol 8/24/2015 EnergyGauge Summit@ v5.00 NC, W�bi AME MA NMI I ProZoIFII I ft. soil, concrete floor, carpet and rubber pad 49.00 32.35 1 1585.2 0.2681 34.00 113.33 3.73 Systems PrOSyl System I Constant Volume Air Cooled Split No. Of Units I System < 65000 Btu/hr Component Category Capacity Efficiency IPLv I Cooling System 2 Heating System 3 Air Handling System -Supply 52500.00 16.00 8.00 34000.00 1.00 1750.00 0,80 EJ IJ Plant Equipment Category size Inst.No Eff. IPLv Water Heaters W-Heater Description Capacit3Cap.Unit I/P Rt. Efficiency Loss Ext-Lighting Description Category No. of Wafts per Area/Len/No. of units Control I�pe Wattage Luminaires Luminaire [sVfttNol [W] El 8/24/2015 EnergyGauge Summit@ v5.00 1 t�nmwo--, 7171 t 24 Piping Operating Insulation Nomonal pipe Insulation Is Runout? No Type Temperature Conductivity Diameter Thickness [F] Btu-in/h.sEF] [in] [in] II -�-;Ljli Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance Panes [Btu/h.sEF] El Materials Used Only R-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used lb.sEF/Btu] IN lBtu/h.ft.Fl llb/cfl [Btu/Ib.Fj IS/ MatI187 (JYF OR FLAS No 0.4533 0.0417 0.0920 Mr"= BOARD,1/21N 178 Matl178 CARPET W/RUBBER PAD Yes 1.2300 El 265 Mat1265 Soil, I ft No 2.0000 1.0000 0.5000 100.00 0.2000 [1 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 El 105 Matl105 CONC BLK HW, 81N, No 1.1002 0.6667 O�6060 69.00 0.2000 HOLLOW 269 Mat1269 .75 " ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 23 Matl23 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 94 Mat194 BUILT-UP ROOFING, 3/8IN No 0.3366 0.0313 0.0930 70.00 0.3500 Constructs Used 8/2412015 EnergyGauge SummitV v5.00 5 l V15K r— IFU im No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.Fl fBtu/sf.Fl Pb/cf] jh.sf.F/BtuJ 1014 8"CNW/3/4"ISO BTWN24"oc/5/8 Gyp No No 0.26 9.70 62.72 3.8 Layer Material Material Thickness Framing No. [ft] Factor 1 105 CONC BLK HW, 81N, HOLLOW 0.6667 0.000 2 269 .75" ISO BTWN24" oc; 0.0625 0.000 3 187 GYP OR PLAS BOARD, 1/21N 0.0417 0.000 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.Fl [Btu/sf.Fl [lb/cf] [h.sEF/Btul 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 E3 Layer Material Material Thickness Framing No. IN Factor 1 94 BUILT-UP ROOFING, 3/8IN 0.0313 0.000 2 23 6 in. Insulation 0.5000 0.000 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sEF] [Btu/sf.Fl Ilb/cfl [h.sEF/Btuj 1057 1 ft. soil, concrete floor, carpet and rubber pad No No 0.27 34.00 113.33 3.7 Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, I ft 1.0000 0.000 2 48 6 in. Heavyweight concrete 0.5000 0.000 E] 3 178 CARPET W/RUBBER PAD 0.000 El 8/24/2015 EnergyGange Summit@ v5.00 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.Fj [Btu/sEF] [lb/cfl [h.sEF/Btuj 1058 Solid core flush (2.25) No Yes 0.35 2.9 Layer Material Material Thickness Framing No. Ift] Factor 1 279 Solid core flush (2.25") 0.000 El 8/24/2015 EnergyGauge Summit@ v5.00 7