Loading...
HomeMy WebLinkAboutPLAN REVIEW FORMSAINT LUCIE COUNTY FIRE DISTRICT PLAN REVIEW FORM SCANNED 5160 N.W. Milner Drive BY Port Saint Lucie, FL 34983 St. Lude Co1jr1ty "r,"D /*A,l Telephone: 772-621-3322 ;0" il�/ Fax: 772-621-3604 Tqe�l Web Address: www.sicfd.com Building Dept. SLC FMO Permit# [B-1 5-278 Project Name St Lucie Hopice Pergola and Butterny Screen BLDG Permit # 1507-0018 Address 15090 Dunn Road city [Ft P,.rce Contractor I Helmet House Construction LLC Address 1900 20th Place City JVero Beach State I FL Zip 1 32960 Telephone (772) 562-0866 Architect/Engineer MBV Engineering Inc Telephone (772) 569-0035 OccupancyType Construction Type Square Feet F Occupant Load Number of Stories F Access Box AFS Permit FA Permit I FFP Permit General Notes Access Key Switch F 1. An electronic copy of the construction documents submitted ona CD is required. Thefile formatshall be.pdf only. 2. All revisions, Including the electronic copy must be received priorto permitting. 3. The Fire Marshal requIres24 hournoticeon all inspections. 4. The respective Building Departmentshall schedule all final Inspections through the Fire Marshal's Office. S. Failed Inspections require paymentoffee priorto rescheduling of further Inspections. 6. Penetrations through rated assemblies shall be of the proper UL design. Design criteria shall be submitted with the construction plans. 7. Fire alarm panels shall be located Indoors within air conditioned space. 8. Plans and construction are subject to corrections in the field to maintain code compliance. 9. Automatic fan shutdown is required for IJVAC system/s that exceed 2,000 cim design capacity. 10. The Installation or Alteration of Fire Sprinklers, Fire Alarms, and Fixed Fire Protection Systems require a separate review and permit. THEFLORIDA FIRE PREVENTION CODE,2010 EDITION IS CURRENTLY ENFORCED. BIJ&DINGSWITH LIGHT-FRAMETRUSS-TYPE CONSTRUCTION SHALL BE MARKED WITH APPROVED FIREFIGHTER SAFETY WARNING SIGNS IN ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODES 69A-3.012 AND 69A-60.0081 PRIOR TO RECEIVING A CERTIFICATE OF OCCUPANCY. Page F1 of 11 General Notes Above and Required Revisions Below Reviewed by JTony Jerger Date 1 09//2015 114