Loading...
HomeMy WebLinkAboutINSPECTION INFORMATIONSLC—Inspections Page 1 of 3 '0011 r_C I 13�k C I St. Lucie Courity Cli,kh, toretimitotheaffilinPeouniMpa9C. Subautauery Permit: 1412-0365 Permit Status: Issued Job Description: INTERIOR RESTAURANT MODIFICATION INCLUDING NEW INTERIOR WALLS & DRYWALL, ELECTRIC� PLUMBING, RESTAURANT EQUIPMIENT� NEW CEILINGS AND FLOORING. HVAC TO BE PERM]TTED BY SEPARATE 64ONTRACTOR. (FOR COMMON AREA) To pay a reinspection fee, please click PavFe link for each fee due. You my use Vim, Mastercard, Discover Card, or echeck to pay the fee using the Govaeller gateway. To schedule an Inspection, please select Request for each inspection you would like to schedule. Inspections must be scheduled in the order of the Priority listed below. An inspection will not schedule until all inspections with a lower Priority number show an "Approved" status and ALL reinspection fees have been PAID. To add a note for the Inspector for scheduled Inspections, please select Add No enter note in Inspection Notes textbox below, and click Update link for each inspection you would like to add a note for. If you am unable to schedule an inspection or require any msistance, please contact the Building Division at M2) 462-2172. Type Cert # 'Status Peruft Type Name Company Phone Fax . .. ............... .. Contracto, 27135 Active !COMMERCIAL RENOVATION RYAN L STROM TEAM PARKS INC (772) 781-1616 Request Add Note Pay Fee Fee Code I I 1 1 Inspecto Status ly Data SCheduled Data Inspected Insp ID Comments i Notes R��esr AddNote Payfee 901 - ZONING ZONING COMPLIANCE 0 COMPLIANCE APPL SUBM1TrED. 104- COMPACTION Add Note Pay Fee TEST - Not Requred 1 2/2712015 2/27/2015 23 PLUMBING ORIGINAL TRENCHES ONLY TURN INTO OFFICE 420- Add Note Pay Fee PLUMBING Appnoyed 1 ROUGH 108 -ENGINEER LETTER - Add Note- Paj Fee ORIGINAL- Accepted as noted I TURN INTO OFFICE Inspectx Pleasec. or teact I Cour at 1 215-796 with approxil 2127/2015 2/27/201S 23 Inspecti, time to access tenant Spam Thank Y Web 2/26/2C 5:57:58 RECEIVED ENGINEERS 3/4/2015 314/2015 23 LETTER FOR INTERIOR BEAM ALTERATION DATED 3-3-15 Re�est Add Note Pay Fee 900 - PLAN REVISION I Add Note Pay fee ilS - SLAB Approved 2 3/6/2015 3/(i/2015 Add Note Pay Fee 121 - TERMITE SPRAY Approved* 2, 316/2015 316/2015 9D6 - BATCH TICKETS Add Note Pay Fee (CONCRETE) - Cancelled try 2 TURN INTO CDntractx/Custamer OFFICE 906 - BATCH 121 3/6/2015 316/201S 23 PLUMBING TRENCHES ��"/ P71Q1e)01 1Z TICKETS Add Note Pay Fee (CONCRETE) - APPMed 2 3/11/2015 3/10/2015 23 PSI 3000 TURN INTO OFFICE Add Note Pay Fee 118 - COLUMN Appoved 3 3/11/2015 311112015 23 O.kto dry %yall on mlls inspected, Add Note Pay Fee 238 - ELECTRIC Partial Approval 4 3/31/2015 3/3112015 35 oil hen other ROUGH area is ready.walt pride sr. 423- Add Note Pay Fee PLUMBINGTOP Partial Approval 4 3/3112015 313112015 23 BATHROOKS ONLY OUT Add Note Pay Fee 238 - ELECTRIC Partial Appnnral 4 4/812015 41812015 35 ROUGH 423- Add Note Pay Fee PLUMBING TOP Appmved 4 4/1012015 4110/2015 23 OUT' Add Note Pay Fee 236 - ELECTRIC Partial Approyal 4 4/1312015 4/1312015 35 ROUGH Add Note Pay Fee 238 - ELECTRIC Appmyed 4 4116/2015 4/16/2015 35 ROUGH Add Note Pay Fee 127 - MULLION Dimpproved 5 3/11/2015 311112015 23 NOT DONE .140- Add Note Pay Fee CONSTRUCTION Approved 5 4117/2015 4/17/2015 23 ROUGH FRAMING Add Note Pay Fee 135 - WALL Approved 5 5115/2015 5115/2015 23 SHEATHING 148- Add Note Pay Fee WINDOW/DOOR Approved 5 5/15/2015 5/15/2015 23 ATTACHMENT 187 - REVISION ADDED REAR Add Note Pay Fee READY TO Approyed 5 4/17/2015 4117/2015 011 DOOR.. PICKED UP PICKUP BY DEBBIE 153- Add Note Pay Fee INSULATION Approved 5 4/30/2015 4/30/2015 21 CERTIFICATION -OFFICE 165- Add Note Pay Fee HANDICAP Approved 6 7/2/2015 7/212015 23 RESTROOMS Add Note Pay Fee 180 - BUILDING 6 FINAL Add Note Pay Fee 280 - ELECTRIC Cancelled by 6 6117/2015 6/17/2015 35 FINAL Oontractor/Cmtomer 480- Add Note Pay Fee PLUMBING Approved 6 7/2/2015 71212015 23 FINAL 700 - FIRE Add Note Pay Fee DEPARTMENT 6 FINAL Add Note Pay Fee 999 - FINAL 6 INSPECTION PLiPSE INFORM L. GALBRAITH WHEN FINAL HAS BEEN 199 - ZONING APPROVEDSO Add Note Pay Fee COMPLIANCE 6 ZONING INSPECTION COMPLIANCE CAN BE ISSUED. Add Note Pay Fee 280 - ELECTRIC Partial Appmal 6 7/212015 7M2015 35 FINAL qtbiriprn onv/ 7/g/2015