Loading...
HomeMy WebLinkAboutINSPECTION CERTIFICATIONr� r r J'f.-I -'il: PO6ee A� TREASURECOAST� 267-1399 FILE Fort Pierce, FL 34950 benchmarkengineeringtc@gmail.com February 8, 2016 RE: Certification of Inspection: Permit # SLC-1507-0355 Florida Fruit / Rio Citrus 2106 N Kings Hwy., Fort Pierce, FL Dear St. Lucie County Building Department: SDBY ED St. Lucie count,, FEB 1 2 AECD Please be advised, that I have performed the following inspections at the aforementioned location and certify to the best of my ability and belief that the construction meets or exceeds the applicable portions of the FBC 2014 to every extent possible. As you are aware, several items are pending revisions and are noted as such. Electrical, mechanical and fire inspections are outside of my scope of and are also noted as such. Specific items inspected are listed below: • Inspection 110 Footer/Foundation* - Inspection 111 Shoring- Inspection 119 Stem Wall* - Inspection 123 Stairs - Inspection 185 Piers* - Inspection 420 Plumbing Rough - Inspection 106 Termite Spray* - . Inspection 140 Construction Rough Framing- . Inspection 148 Window Door Attachment - Inspection 134 Electrical Rough - Inspection 351 Mechanical Rough - Inspection 115 Slab - Inspection 134 Roof Sheathing - Inspection 138 Wall Sheathing - Inspection 115 Rainwater Rough - approved approved approved pending revision approved ` approved approved approved approved by SLC by SLC approved approved approved approved Inspection 141 Instiraron** - Inspection 280 Electrical Final - Inspection 380 Mechanical Final - Inspection 480 Plumbing Final - Inspection 700 Fire Dept. Final - Inspection 808 Landscape/Trees- Inspection 166 Handicapped Ramp - Inspection 999 Final Inspection - approves" by SLC by SLC approved by SLCFD outstanding pending revision outstanding Notes: *Contractor shall submit original concrete batch tickets, density reports and termite treatment receipts with this certification. • **Engineer has reviewed the spray foam insulation requirements and an approved equal was installed. Thank you for your diligence and please feel free to contact me at (772) 267-1399 with any comments or concerns that you may have. I look forward to your assistance with a timely completion of this project. \�\\\`\\ GI HUr�y////, r: 51�,i6spENSe'-,N,, -i�,- m' NST 12, k W� 0�FS Bow/dGYyr�,� 8t�b�i\P. E. BENCHMARK ENGINEERING Of THE TMASURE COAST LLC. 806 Delaware Ave. (772) 267-1399 RECI_F,VED Fort Pierce, FL 34950 benchmarkengineeringtc@gmail.com August 30, 2016 RE: Certification of Final Inspection: Permit # SLC-1507-0355 Florida Fruit / Rio Citrus 2050 N Kings Hwy., Fort Pierce, FL Dear St. Lucie County Building Department: SEP 0 6 2016 PERMITTING St. Lucie County, FL SCANNED BY St. Lucie County Please be advised, that I have performed the following inspections at the aforementioned location and certify to the best of my ability and belief that the construction meets or exceeds the applicable portions of the FBC 2014 to every extent possible. Furthermore, I hereby certify that all construction performed by PR conforms to the approved plans by the design professional of record. Specific items inspected are listed below: Inspection 141 Insulation* - approved Inspection 600 Welding Overhead Steel Doors - approved Bolting per Plan- approved Inspection 999 Final Inspection - approved Notes: *Signed & Sealed Insulation Installation Certification attached hereto. Thank you for your diligence and please feel free to contact me at (772) 267-1399 with any comments or concerns that you may have. �0111IIII//// \\\\\O\� G. Hurc // f? ' ��c"ENSF'•••S'O m. OF % W '�"P TONAL � P.E. �1 LE Y Bowdo�r((3/uf�(t(r#sbh P.E. BENCHMARK i(IG Of: THE TREASURE COAST LLC. 806 Delaware Ave. (772) 267-1399 Fort Pierce, FL 34950 benchmarkengineeringtc@gmail.com August 30, 2016 RE: Certification of Final Inspection: Permit # SLC-1507-0355 Florida Fruit / Rio Citrus 2050 N Kings Hwy., Fort Pierce, FL Dear St. Lucie County Building Department: Please be advised, that 1 have performed the following inspections at the aforementioned location and certify to the best of my ability and belief that the construction meets or exceeds the applicable portions of the FBC 2014 to every extent possible. Furthermore, I hereby certify that all construction performed by PR conforms to the approved plans by the design professional of record. Specific items inspected are listed below: Inspection 141 Insulation* - approved Inspection 600 Welding Overhead Steel Doors - approved Bolting per Plan- approved Inspection 999 Final Inspection - approved Notes: *Signed & Sealed Insulation Installation Certification attached hereto. Thank you for your diligence and please feel free to contact me at (772) 267-1399 with any comments or concerns that you may have. ��11111111lI//� srCx7'�s /lei ;0 LU zz AIX- Bo IfyHAgfiirison P.E. OF THE TREASURE COAST LLC. 806 Delaware Ave. (772) 267-1399 Fort Pierce, FL 34950 benchmarkengineeringtc@gmail.com August 30, 2016 RE: Certification of Final Inspection: Permit # SLC-1507-0355 Florida Fruit / Rio Citrus 2050 N Kings Hwy., Fort Pierce, FL Dear St. Lucie County Building Department: Please be advised, that I have performed the following inspections at the aforementioned location and certify to the best of my ability and belief that the construction meets or exceeds the applicable portions of the FBC 2014 to every extent possible. Furthermore, I hereby certify that all construction performed by PR conforms to the approved plans by the design professional of record. Specific items inspected are listed below: Inspection 141 Insulation* - approved Inspection 600 Welding Overhead Steel Doors - approved Bolting per Plan- approved Inspection 999 Final Inspection - approved Notes: *Signed & Sealed Insulation Installation Certification attached hereto. Thank you for your diligence and please feel free to contact me at (772) 267-1399 with any comments or concerns that you may have. G. �HUTC \��1ry�re[vy�ceMs •-y�4is���� `'.ov * I 78 O 8bjpdciiriQ;:>f'luti:hlrlsb� P.E.