Loading...
HomeMy WebLinkAboutCOMMERCIAL LOAD CALCULATIONCommercial Load Calculation Port St Lucie Liftstation NP-03 Caprona Ave Noncontinuous Load Receptacle Load 1 receptacles at 180 VA BELLWETHER ELECTRIC COMPANY SCANNED BY St. Lucie County 180 VA Subtotal 180 VA 1st 10000 VA @ 100% 10000 VA Remainder @ 50%-4910'VA VA Total Equipment Load 0 VA Total Noncontinuous Loadrvv-" ,50901VA Continuous Load General Lighting 1 'outside flood light @ 250w 250 VA Control Panel Equipment 1 6 amps 240v Control panel 2 10 HP Total 1440 VA 13440 VA Total noncontinuous loads +continuous loads=20 0 VA Minimum Number of General Lighting Branch Circuits Required 250 / 120 volts = 2.083333 amps 2.083333 / 15 amps = 1 circuits 2.083333 / 20 amps = 1 circuits Subtotal noncontinuous loads: 5090 VA Subtotal continuous loads X 125%: 18912.5 VA Total:( -=g 24003JVA 120/240 Volt 4-Wire 3-Phase Service Load: 57.74' Amps ST. LUCIE COUNTY BUaDING DIVISION REVIERNTD FOR O 1P 1 REVIEWEII•I}Y �v DATE C2- PLANS AND PERINUT MUST BE KEPT ON JOB OR NO INSPECTION RILL BE HADE. hill i y h py,;a zukS \�