V Florida Consulting Engineers, Inc.
134 N.W. 1611 Street, Suite 1
Phone:561-353-1152
November 5, 2016
ME
E-mail: zjpe@flcengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
Boca Raton, Florida 33432
Fax:561-353-1708
SCANNED
BY
St. Lucie County
Re: Concrete Restoration Project- Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo 15&C .000
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from September 2, 2015 through November 5, 2015.
Demolition work observed is summarized as follows:
Unit No. 905:
• Floor partial depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Unit No. 805:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 705:
• Floor partial depth demolition in areas where spalling concrete was found.
-*--Floor full depth demolition in areas where spalling concrete was found.
Unit No. 605:
• Floor full depth demolition in areas where s—pa ling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Units 505:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo
November 5, 2015
Page 2 of 2
Unit 405:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 305:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found
Unit No. 205:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
All exposed rebars were coated with rust inhibitor in preparation for concrete
pour. All concrete edges were saw cut. All work appears to be done in compliance
with the project specifications. Should you need additional information, please
call me.
Sincerely,
Zuhau• Jalloul, PE.
FL. License Nti. 35416
Florida Consulting Engineers, Inc.
134 N.W. 1611 Street, Suite 1
Phone:561-353-1152
December 24, 2015
W)
E-mail: zjpe@flcengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
Boca Raton, Florida 33432
Fax:561-353-1708
SCANNED
BY
St. Lucie County
Re: Concrete Restoration Project- Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo 1 y 01-poyy ,
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from November 5, 2015 through December 23, 2015. The following is a
summary of observed demolition work:
Unit No. 905:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 805:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found. - - ---
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring-concrete-inareas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department December 24, 2015
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
vstana's Beach Club Condo Page 2 of 3
Unit No. 705:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 605:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Units 505:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
_installing_wood forms -and concrete pour in -areas where •spalling - concrete - was found
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
December24, 2015
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo Page 3 of 3
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, fonning and pouring new concrete.
Unit No. 305:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spelling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spelling concrete
was found.
Unit No. 205:
Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spelling concrete was found.
Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spelling concrete were found.
All work appears to be done in compliance with the project specifications. The
work completed included all units in stack 5 (Units 905, 805, 705, 605, 505,
405, 305 and 205). Should you need additional information, please call me.
Sincerely;
Zuhair Jalloul, P.E_
FL. License No. 35416-
Florida Consulting Engineers, Inc.
134 N.W. 1611 Street, Suite 1
Phone:561-353-1152
0
E-mail: zjpe@flcengineers.com
Boca Raton, Florida 33432
Fax:561-353-1708
November 5, 2016 SC BY NNF_S
Mr. Joe Cicio, Building Official 1e COUntV
St. Lucie County Building Department St. LuC
2300 Virginia Avenue
Ft. Pierce, FL 34982
Re: Concrete Restoration Project- Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo 0
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from September 2, 2015 through November 5, 2015.
Demolition work observed is summarized as follows:
Unit No. 905:
• Floor partial depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Unit No. 805:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 705:
• Floor partial depth demolition in areas where spalling concrete was found.
—Floor full -depth demolition in areas where spalling concrete was found.
Unit No. 605:
• Floor full depth demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Units 505:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vstana's Beach Club Condo
November 5, 2015
Page 2 of 2
Unit 405:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 305:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found
Unit No. 205:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
All exposed rebars were coated with rust inhibitor in preparation for concrete
pour. All concrete edges were saw cut. All work appears to be done in compliance
with the project specifications. Should you need additional information, please
call me.
Sincerely,
Zuhair Jalloul,'P.E.
FL. License No. 35416--
Florida Consulting Engineers, Inc.
134 N.W. 1611 Street, Suite 1 E
Phone:561-353-1152
December 24, 2015
E-mail: zjpe@flcengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
Boca Raton, Florida 33432
Fax:561-353-1708
SCANNED
BY
St. Lucie County
Re: Concrete Restoration Project- Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo (Sai -0057
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
u
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from November 5, 2015 through December 23, 2015. The following is a
summary of observed demolition work:
Unit No. 905:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 805:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found. — -
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete
BILkM
E
I'r
Mr. Joe Cicio, Building Official
/ St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vstana's Beach Club Condo
Unit No. 705:
December 24, 2015
Page 2 of 3
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 605:
Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Units 505:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
- - installing wood forms and concrete pour in -areas where spalling-concrete-
was found
Unit 405:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo
December24, 2015
Page 3 of 3
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 305:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Unit No. 205:
Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
All work appears to be done in compliance with the project specifications. The
work completed included all units in stack 5 (Units 905, 805, 705, 605, 505,
405, 305 and 205). Should you need additional information, please call me.
Sincerel
Zuhair Jalloul, P.E. , y'
FL. License No. 35416
Y
F . ida Consulting` Engineers, 1'
134 NW 16m Street, Suite 1 Boca Raton, Florida 33432
Phone: 561-353-1152 E-mail: floridaengineers@gmail.com Fax: 561-353-1708
October 2, 2015
Mr. William Durden RECEIVED
Building & Code Regulation Division
St. Lucie County SCABNYNED OCT 15 2015
2300 Virginia Avenue
Fort Pierce, Florida 34982 St. Lucie County
RE: Beach Club Property Owner's Assoc.
Vistana Beach Club,10740 S Ocean Dr. Jensen Beach
Unit Numbers 906, 806, 706, 606, 506, 406, 306, 206, 905, 805, 705, 605, 505, 405, 305
and 205
Permit Number: 1
Dear Mr. Durden:
This is to provide you with answers to your comments as follow:
Comment No. 1
GUIDE FOR THE SURFACE PREPARATION FOR THE REPAIR OF DETERIORATING
CONCRETE RESULTING FROM REINFORCING STEEL CORROSION MUST BE SIGNED
AND SEALED OR ADDED TO COVER PAGE OF EXHIBIT C.
Response No.l
Please find copy of revised Exhibit C signed and sealed on every page
Comment No. 2
TYPICAL SHORING DETAILS MUST BE SIGNED AND SEALED OR ADDED TO COVER
PAGE OF EXHIBIT C.
Response No.2
All pages on the revised Exhibit C are signed and sealed
Comment No. 3-- - -
PAGE 2 OF 27 SCOPE OF WORK AND CODE REQUIREMENTS 1.0 LINE B CALLS OUT
2010-FLORIDA BUILD_IN_G_CODE. PLEASE CORRECT.
Response No.3
Page 2 was corrected by changing FCE 2014
Comment No. 4
PLEASE SUBMIT THE SPECIAL INSPECTORS INFORMATION AS PER FBC 110.8.1
Response No. 4
Attached please find a copy of Florida P.E. License No. 35416 with Special Inspector License No.
1017 and Florida Consulting Engineers, Inc. Certificate of Authorization 5810
Y
Page 2 of 2
Mr. William Durden
Building & Code Regulation Division
St Lucie County
October 2, 2015
RE: Beach Club Property Owners Assoc.
vstana Beach Club, 10740 S Ocean Dr. Jensen Beach
Unit Numbers 906, 806, 706, 606, 506, 406, 306, 206, 905, 805, 705, 605, 505, 405, 305
and 205
Permit Number. 1509-0058
Comment No. 5
NOTE: THIS PERMIT IS FOR CONCRETE RESTORATION ONLY, NEW PERMITS
WILL NEED TO BE PULLED FOR REPLACEMENT ANY NEW HANDRAILS,
SLIDING GLASS DOORS.
Response No. 5
Your note regarding work other than concrete restoration, such as, replacement of handrails, sliding
glass doors are not part of my services and I will advise the contractor of the fact that any work other
than concrete restoration will require another permit
If you need additional information, please call me.
MVER-11MMIN-M
Zuhair M. Jalloul, P.E.
Florida License No. 35416
VISTANA'S BEACH CLUB
ON HUTCHINSON ISLAND
SCANNED
BY
St. Lucie County
Septemberl, 2015
By copy of this letter, Scott Hunter (as Owner's Representative), confirms that all payments to Florida
Consulting Engineers, Inc. will be processed through the Beach Club Property Owners' Association
Accounting Team.
Please submit all payment requests to Connie Ling, connie.line@starwoodvo.com, (407) 418-7479.
Thank you,
Cott Hu tee
Owner's Representative
/cl
f � Notary Pudic Statec�Florid
Barry Rodburg
yv� My Commission EE 214164
•qr• Expires 0710512016
IV %-�-'l- _ _ __ ___ _ — _— _ _ _ _
W t M
R� ''
10740 South Ocean Drive Jensen Beach, Florida 34957
Flom ,<t Consulting Engineers, In(
%s69-cs051
134 NW 1& Street, Suite 1 E
Phone: 561-353-1152 E-mail: floridaengineers@gmail.com
September 1, 2015
Building & Code Regulation Division
St. Lucie County
2300 Virginia Avenue
Boca Raton. Florida 33432
Fax: 561-353-1708
RFcEl,._
SEP 28 z015
Fort Pierce, Florida 34982 SCANNED
RE: Vistana Beach Club
Vistana Beach Club, 10740 South Ocean Drive Jensen Beach, Florida Lucie
COUnIV
Unit Numbers 906, 806, 706, 606, 506, 406, 306, 206, 905, 805, 705, 605,
505, 405, 305 and 205
CONCRETE RESTORATION
Dear Building Official:
This is to confirm I will be performing special inspections for the duration of the above referenced
project. The following inspections will be required:
1. Initial site visit to determine the areas to be repaired
2. Observation of areas to be repaired after removal of deteriorated concrete and exposing rebar.
3. Observation of all cleaned surfaces and cleaned steel rebar prior to coating.
4. Observe all surfaces after coated with rush inhibiters and bonding agent.
5. Observe repaired areas after patching
6. Observe areas after sealant is applied.
All inspections shall be scheduled by the contractor with minimum of one work day notice.
If you need additional information, please call me.
Sincerely, /
Zuhait M. Jalloul, P.E
Florida License No. 354,16
,,.
"K, I