Loading...
HomeMy WebLinkAboutPAYMENTG702 APPLICATION and CERTIFICATE for PAYMENT To: SVO Managment, Inc. j Project: Vistana Beach Club Application No: 2 Distribution to: 9002 San Marco Building 1000 10740 S Ocean Drive App. Date: December 23, 2015 ® OWNER Orlando, Florida 32819 Jensen Beach, Florida 34997 ❑ CONSTRUCTION MGR. From: Blue coast Construction SCANNED Period to: ❑ ARCHITECT ® CONTRACTOR 2587 SE Monroe st BY Project No: ® ENGINEER Stuart, Florida 34997 St. Lucie County Contract Date: Contract For: Concrete Restoration Engineer: Florida Consulting Engineers APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet, G703, is attached. 1. ORIGINAL CONTRACT SUM 99,291.99 2. Net Change By Change Orders 12,486.17 3. CONTRACT SUM TO DATE 111,778.16 4. TOTAL COMPLETED AND STORED TO DATE 111,778.16 5. RETAINAGE: a. of Completed Work b. of Stored Material TOTAL RETAINAGE G. TOTAL EARNED LESS RETAINAGE 0.00 0.00 0.00 111.778.16 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 71,638.80 8. CURRENT PAYMENT DUE 40,139.36 9. BALANCE TO FINISH, INCLUDING RETAINAGE 0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner Total approval this Month 12,486.17 0.00 TOTALS 12,486.17 0.00 NET CHANGES by Change Order 12,486.17 The undersigned Contractor certifies that to the best of the Contractors knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates -for Payym_:eF92 r — -s g an_1 paymen received from the Owner. and that current Davmentrsi�wrt 1F eF�i ris1now du�V/ I I fill CONTRACTOR: FED , i3 REO By: Date: State of: I County of: Subscribed and sworn before me this day of _ The above personally appeared before me, the undersigned notary public, and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief. Notary Public: My Commission expires: ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Engineer certifies to the Owner that to the best of the Engineers knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and on the Continuation Sheet that are changed to conform to the amount certified.) ENGINEER By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. CAUTION: You should use an original document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. TORGO SOFTWARE www.TorgoSoftwa .o 01996-2013 ALL RIGHTS RESERVED CONTINUATION SHEET G703 PROJECT: Vistana Beach Club Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing i Contractor's signed Certification is attached. j Use Column I on Contracts where variable retainage for line items may apply. Blue coast Construction Application No: 2 Page 1 of 1 App. Date: December 23, 2015 Period to: Project No: A B C D E F G H I Item # Description of Work Schedule of Values Work Com feted Materials Stored i£ Used Prior+ Current Total Completed and Stored To Date % Balance to Finish Retainage From Previous Application(s) This Period 1 Permit Fees 2,000.00 1,150.00 0.00 1,150.00 57.50 850.00 0.00 2 Mobolization 6,500.00 6.500.00 0.001 6,500.00 100.001 0.00 0.00 3 Column Repair 9,744.00 0.00 2,673.60 2,673.60 27.44 7,070.40 0.00 4 Ceiling Repair 6,287.20 6,236.67 3,639.89 9,876.56 157.09 -3,589.36 0.00 5 Edge Repair 21.560.00 11,408.10 531.63 11,939.73 55.38 9,620.27 0.00 6 Through Deck Repair 23.850.00 35,621.25 11,128.07 46,749.32 196.01 -22,899.32 0.00 7 Deck Repair 14.350.00 11,872.78 2,129.17 14.001.95 97.57 348.05 0.00 8 Rust spots 1,800.00 0.00 0.00 0.00 1,800.00 0.00 9 Steel Column 1,200.00 0.001 0.00 0.001 1.200.00 0.00 10 lWatertight Application 2,003.67 2,730.00 2.730.00 136.25 -726.33 0.00 11 Spray Deck Application 1,001.84 1,365.00 1,365.00 136.25 -363.16 0.00 12 Spray Deck Paint 7,896.00 7,200.00 7,200.00 91.19 696.00 0.00 13 Ceiling- Edge Wall Paint 1,099.28 0.00 0.00 0.00 1,099.28 0.00 14 Handrail paint 2,592.00 2,592.00 -2.592.00 15 Stack 05 paint 5,000.0 1 5,000.00 -5,000.00 GRAND TOTAL: 1 99,291.991 71.638.801 40.139.361 0.001 111,778.16 112.58-12,486.17 0.00 A=Line Item Number B=Brief Item Description C=Total Value of Item D=Total of D and E From Previous Application(s) (If Any) E=Total Work Completed For This Application F=Materials Purchased and Stored for Project G=Total of All Work Completed and Materials Stored for Project H=Remaining Balance of Amount to Finish 1=Amount Withheld from G I TORGO SOFTWARE w .TorgoSoflwam.wm 01996-2013 ALL RIGHTS RESERVED