HomeMy WebLinkAboutMISC EMAILi'
I < rida Consulting Engineers,
134 N.W. 161' Street, Suite 1
Phone:561-353-1152
December 24, 2015
F
E-mail: zjpe@ficengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
Re: Concrete Restoration Project- Permit# SLC 1509-0058
Vistana% Beach Club Condo
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
eSCANNED
BY
Boca RatorYA9fM9&%nty
Fax:661-353-1706
MAY 2 0 RECD
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from November 5, 2015 through December 23, 2015. The following is a
summary of observed demolition work:
Unit No. 905:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coaling rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 805:
• Floor partial depth was done recoating of rebar and concrete pour in areas
-_ - - - -where snalline concrete was found. — -- - — —
x was completea oy aemoution, adding rebar where
it with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.—
Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# SLC 150MO58
Vstana's Beach Club Condo
December 24, 2015
Page 2 of 3
Unit No. 705:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 605:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Units 505:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
_ • Balcony edge repair was completed by coat rebar with rust inhibitor,
- - --installing_wood -forms and concrete pour in areas where spalling concrete- - - - -
_ was found
Unit 405:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# SLC 1509-0058
vstana's Beach Club Condo
December 24, 2015
Page 3 of 3
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 305:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Unit No. 205:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
All work appears to be done in compliance with the project specifications. The
work completed included all units in stack 5 (Units 905, 805, 705, 605, 505,
405, 305 and 205). Should you need additional information, please call me.
Zuhair Jalloul, RE
FL. License No. 35416
M1
F-
134 N.W. 161h Street, Suite 1
Phone:561-353-1152
November 5, 2016
rida Consulting Engineers, .i:�.
E-mail: zjpe@flcengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
SCANNED
BY
St. Lucie County
Boca Raton, Florida 33432
Fax:561-353-1708
MAY 2 0 RE{,"D
Re: Concrete Restoration Project- emnt iS 9-OQ59 emo Permit)
Vistana's Beach Club Condo
S Ocean
Jensen Beach, FLL
PY
Dear Mr. Cicio: .
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from September 2, 2015 through November 5, 2015.
Demolition work observed is summarized as follows:
Unit No. 905:
• Floor partial depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Unit No. 805:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 705:
• Floor partial depth demolition in areas where spalling concrete was found.
Floor full depth demolition- 'in areas where spalling concrete was found.-- - - -- -
• Floor full depth demolition in areas where spalling concrete was four.
• Balcony edge demolition in areas where spalling concrete was found.
Units 505:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
W
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 1509-0059 (Demo Permit)
Vstana's Beach Club Condo
November 5, 2015
Page 2 of 2
Unit 405:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 305:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spelling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found
Unit No. 205:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
All exposed rebars were coated with rust inhibitor in preparation for concrete
pour. All concrete edges were saw cut. All work appears to be done in compliance
with the project specifications. Should you need additional information, please
call me.
Sincerely,_
Zuhair Jalloul; P.E.FL. License No. 35416 ~
134 N.W. 161' Street, Suite 1
Phone:561-353-1152
December 24, 2015
.. irida Consulting Engineers,':.. c.
z
E-mail: zjpe@flcengineers.com
W. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
Re: Concrete Restoration Project- Permit# SLC 1509-0058
Vistana's Beach Club Condo
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
G}SCANNED
BY
Boca Raton'4oAdAQI&@0Unty
Fax:561-353-1708
M AY 2 0 REC'D
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from November 5, 2015 through
summary of observed demolition work:
Unit No. 905:
December 23, 2015. The following is a
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 805:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spallirig concrete -was found. - - — - - - -
• Floor full depth repair was completed_ by demolition —adding rebar-where
needed. coatinc rebar with rust inhibitor. completing form work and
pouring concrete in areas where spalling concrete was fob.
Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# SLC 1509-0058
vstana's Beach Club Condo
Unit No. 705:
December 24, 2015
Page 2 of 3
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spelling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spalled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 605:
Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Column repair was completed by the removal of spalled,concrete, adding
rebar where needed, forming and pouring new concrete.
Units 505:
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
-wood forms
was
where spalling-concrete --
urn fIUJ:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department December 24, 2015
RE: Page Concrete Restoration Project -
Permit# SLC 1509-0058
Vstana's Beach Club Condo Page 3 of 3
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
• Column repair was completed by the removal of spelled concrete, adding
rebar where needed, forming and pouring new concrete.
Unit No. 305:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
• Balcony edge repair was completed by coat rebar with rust inhibitor,
installing wood forms and concrete pour in areas where spalling concrete
was found.
Unit No. 205:
• Floor partial depth was done recoating of rebar and concrete pour in areas
where spalling concrete was found.
• Floor full depth repair was completed by demolition, adding rebar where
needed, coating rebar with rust inhibitor, completing form work and
pouring concrete in areas where spalling concrete was found.
• Ceiling repairs completed by coating rebar with rust inhibitor and
patching areas where spalling concrete were found.
All work appears to be done in compliance with the project specifications. The
work completed included all units in stack 5 (Units 905, 805, 705, 605, 505,
405, 305 and 205). Should you need additional information, please call me.
ZuhairJalloul, V.E.
FL. License No. 354161,1-
134 N.W. 161^ Street, Suite 1
Phone:561-353-1152
November 5, 2016
rida Consulting Engineers, r:.
0
E-mail: zjpe@flcengineers.com
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, FL 34982
ZX ANNED
BY
St. Lucie County
Boca Raton, Florida 33432
Fax:561-353-1708
[ECEOVE
MAY 2 0 REC'D
Re: Concrete Restoration Project- Permit# 1509-0059 (Demo Permit)
Vistana's Beach Club Condo
10740 S Ocean Dr.
Jensen Beach, FL
Dear Mr. Cicio:
This is to confirm my observation of the construction for the above referenced
project. I have observed the shoring and demolition work at the above referenced
project from September 2, 2015 through November 5, 2015.
Demolition work observed is summarized as follows:
Unit No. 905:
• Floor partial depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Unit No. 805:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found.
Unit No. 705:
• Floor F
demolition in areas where spalling concrete was found.
where snallina concrete -was found. - --
• Floor full depth demolition in areas where spalling concrete was four
• Balcony edge demolition in areas where spalling concrete was found.
Units 505:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spalling concrete was found.
Mr. Joe Cicio, Building Official
St. Lucie County Building Department
RE: Page Concrete Restoration Project -
Permit# 150MO59 (Demo Permit)
Vstana's Beach Club Condo
November 5, 2015
Page 2 of 2
Unit 405:
• Floor partial depth demolition in areas where spelling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Balcony edge demolition in areas where spelling concrete was found.
Unit No. 305:
• Floor partial depth demolition in areas where spalling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spelling concrete was found.
• Balcony edge demolition in areas where spalling concrete was found
Unit No. 205:
• Floor partial depth demolition in areas where spelling concrete was found.
• Floor full depth demolition in areas where spalling concrete was found.
• Ceiling demolition in areas where spelling concrete was found.
All exposed rebars were coated with rust inhibitor in preparation for concrete
pour. All concrete edges were saw cut. All work appears to be done in compliance
with the project specifications. Should you need additional information, please
call me.
Sincerely,
Zuhair Jalloul,-P.E.
FL. License No. 35416 / -,;