HomeMy WebLinkAboutINSPECTION REPORTFacility Information: SCANNED
By
Facility ID: 8631107 County: ST. LUCIE St. Luc eColfn,rspection Date: 10/01/2015
Facility Type: G -State Government
Facility Name: FL ATLANTIC UNIV-HARBOR BRANCH OCEANO INST # Of Inspected ASTs: 1
5600 OLD DIXIE HWY USTs: 0
FORT PIERCE, FL 34946 Mineral Acid Tanks: 0
Latitude: 270 32' 6.1877" 2 r� �—/7 —
Longitude: 80° 21' 25.154" Rn
E C LE O V E
LL Method: DPHO NOV - 4 Ho
Inspection Result:
Result: In Compliance
Description: Facility is In Compliance.
Financial Responsibility
Financial Responsibility: EXEMPT -STATE OR FEDERAL GOVERNMENT ENTITY
Signatures:
TKPBEM - PALM BEACH CNTY ENVIRONMENTAL RESOURCES MGMT
—Storage-Tank-Program-Office
(561)233-2,00
Storage Tank Program Office Phone Number
Martha E Rutherfoord
INSPECTOR NAME
INSPECTOR SIGNATURE
Jason De Gaglia
REPRESENTATIVE NAME
REPRESENTATIVE SIGNATURE
Activity Opened 10/01/2015 Page 1 of 5 Rutherfoord, Martha
Facility ID: 8631107 '
Owners of UST facilities are reminded that the Federal Energy Policy Act of 2005 requires Operator
Training at all facilities by August 8, 2012. For further information please visit:
http://www,dep.state.fl.us/waste/categories/tanks/pages/op train.htm
System Tests
Completed Tests
Breach of Integrity Test
Line Tightness Test
Inspection Comments
10/01/2015
04/22/2015 Passed 11/02/2015 04/22/2015 Tank #21 outerwall per
factory specs
10/21/2015 Passed 11/02/2015 10/21/2015 Tank #21 lines on install
NOTIFICATION FOR INSTALLATION PROVIDED BY:
Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385 (ext. 72385), 561-414-3224 (cell), cobbl@fau.edu.
CONTRACTOR:
Glasgow Equipment Services, Inc. (PCC 045031), 1750 Hills Ave, West Palm Beach, 33407,
www.glasgowequipment.com, contact Jason De Gaglia, Project Manager, 561-767-0341(cell),
jason@glasgowequipment.com.
OBSERVATIONS:
- Onsite 10/21/15 with Glasgow Project Manager Jason De Gaglia for installation of doublewall aboveground
storage tank (AST) Tank #21.
- Tank #21 is a new Modern Welding Fireguard (EQ-352) shop -fabricated dw 5K gallon compartmented AST
(2,500 ULgasoline/2,500 vehicular diesel). Outerwall breach of integrity, as stated in attached specs and
onsite, was factory tested and then filled with lightweight insulating concrete, specs attached in FIRST. Tank
has (2) primary fuel vents, (2) emergency fuel vents and (1) interstitial vent.
- Tank #21 was installed on existing slab in exact location of closed and removed Tank #14 and Tank #15.
Well siting for no public potable wells in 500 ft was provided and attached in FIRST.
- Tank #21 east compartment contents will be UL gasoline and the west compartment contents diesel, color-
coding/labeling are per API.
- Piping is aboveground singlewall no contact with soil. Tight fills are in one fill spill shop -fabricated and tested
containment on west end of the Tank #21, piping runs directly to top of tank. Dispensing suction piping to
deliver fuel to separate free-standing dispensers. Glasgow installed previously existing (2) dispensers, pans
and the piping above the pressure regulator/shear valves that had been used with the removed Tank #14 and
Tank #15 systems. No obvious integrity issues had been noted for the dispenser pans. The pressure
regulator/shear valves are noted per Jason as 52 valves. New dispensing piping is installed from Tank #21 to
- Outerwall monitoring port is on the east end on top of Tank #21.
- An updated storage tank registration form was emailed to Tallahassee showing Tank #14 and Tank #15
removed from site.
Inspection Photos
Activity Opened 10101/2015 Page 2 of 5 Rutherfoord, Martha
e
Facility ID: 8631107
Added Date 11/02/2015
2015 10 21 Tank #21 installed SW view
Added Date 11/02/2015
Tank #21 fill end south view
Added Date 11/02/2015
Added Date 11/02/2015
Tank #21 east view
Added Date 11/02/2015
Tight fills & fill spill bucket
Added Date 11/02/2015
Top of Tank #21 Line pressure gauges on piping
Activity Opened 10/01/2015
Page 3 of 5
Rutherfoord, Martha
Facility ID: 8631107
Added Date 11/02/2015
Line pressure diesel
Added Date 11/02/2015
Soap lines
Added Date 11/02/2015
Soap test new piping in disp
Activity Opened 10/01/2015
Added Date 11/02/2015
Line pressure UL
a•-
i
pv
Added Date 11/02/2015
Soap lines
Added Date 11/02/2015
New piping in disp
Page 4 of 5
Rutherfoord, Martha
Facility ID: 8631107
Added Date 11/02/2015
Dispenser piping soap
Added Date 11/02/2015
Dispenser & piping
Added Date 11/02/2015
Outerwall monitoring port top of Tank #21
Activity Opened 10/0112015
Added Date 11/02/2015
Dispenser & piping with pressure reg 52 valve
Added Date 11/02/2015
Overfill audible alarms
Page 5 of 5
Rutherfoord, Martha
Facility Information: SCANNED
BY
Facility ID: 8631107 County: ST. LUCIE St. LUCIe COUntMnspection Date: 10/01/2015
Facility Type: G -State Government
Facility Name: FL ATLANTIC UNIV-HARBOR BRANCH OCEANO INST # Of Inspected ASTs: 2
5600 OLD DIXIE HWY USTs: 0
FORT PIERCE, FL 34946 Mineral Acid Tanks: 0
Latitude: 27° 32' 6.1877"
Longitude: 800 21' 25.154" (� �/ nn
ILL Method: DPHO UJI I
Inspection Result: I I I I ' I I I I
Result: In Compliance LI LI c/lJ
Description: Facility is In Compliance.
Financial Responsibility
Financial Responsibility: EXEMPT -STATE OR FEDERAL GOVERNMENT ENTITY
Signatures:
TKPBEM - PALM BEACH CNTY ENVIRONMENTAL RESOURCES MGMT
Storage Tank-Prograrn-Office
(561)`233-2400 - - - ------------ -- - - - --- - - = -
Storage Tank Program Office Phone Number
Martha E Rutherfoord
INSPECTOR NAME
INSPECTOR SIGNATURE
Jason Degaglia
REPRESENTATIVE NAME
I/�
REPRESENTATIVE SIGNATURE
Activity Opened 10/01/2015 Page 1 of 7 Rutherfoord, Martha
Facility ID: 8631107
Owners of UST facilities are reminded that the Federal Energy Policy Act of 2005 requires Operator
Training at all facilities by August 8, 2012. For further information please visit:
http://www.dep.state.fl.us/waste/categories/tanks/pages/op train.htm
System Tests
Completed Tests
Breach of Integrity Test 04/22/2015 Passed 11/02/2015 04/22/2015 Tank #21 outerwall per
factory specs
Line Tightness Test 10/21/2015 Passed 11/02/2015 10/21/2015 Tank #21 lines on install
Inspection Comments
10/01 /2015
NOTIFICATION FOR CLOSURE (2) AST TANKS WITH PIPING:
Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385 (ext. 72385), 561-414-3224 (cell), cobbl@fau.edu.
CONTRACTOR:
Glasgow Equipment Services, Inc. (PCC 045031), 1750 Hills Ave, West Palm Beach, 33407,
www.glasgowequipment.com, PCC 045031, contact Jason De Gaglia, Project Manager, 561-767-0341 (cell),
jason@glasgowequipment.com.
CONSULTANT:
Envirospec, Inc., Cindi Brunot, PG, Pres., 1303 W Drew St, Lantana 33462, 561-389-0339,
Espec95@aol.com.
OBSERVATIONS:
- Onsite 10/1/15 with Glasgow Project Manager Jason De Gaglia and Envirospec Environmental Consultant
Cindi Brunot for closure inspection of aboveground storage Tank #14 and Tank #15.
- Tank #14 and Tank #15 were each 3K gallon compartments of one aboveground doublewall storage tank,
registered in DEP FIRST as two tanks. Both tanks shared the same interstitial space. File photos from 1/14/15
before closure are attached in this report for reference.
- Tank #14 (west end) had been used for diesel fuel, Tank #15 (east end) for UL gasoline. Tanks had been
noted to be in good condition.
- Piping was aboveground singlewall no contact with soil, tight fills were over one concrete fill spill
containment, dispensing suction piping delivered fuel to separate free-standing dispensers. Dispensers and
pans are intended to be used for installation of new tank, along with the piping above the pressure
regulator/shear valves. No obvious integrity issues have been noted for the dispenser pans.
- Per Glasgow Project Manager Jason De Gaglia, tanks were emptied and piping was blown back,_ manifests
- No obvious petroleum odors, staining, or free product was observed on any of the concrete, soil, grassy or
shrub areas at this time.
- The TCAR Exemption Form was submitted by Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385
(72385), 561-414-3224(cell), cobbl@fau.edu, and signed by Dennis Zabel, FAU EH & S Director. Form was
filed, attached in FIRST. Envirospec was contracted to conduct full closure assessment to be submitted within
60 days.
- Observed Consultant Envirospec Cindi Brunot onsite 10/1/15, screening samples on all four sides of tank,
the west sample between the two dispensers, confirmation sample and sampling well at the
Activity Opened 10/01/2015 Page 2 of 7 Rutherfoord, Martha
Facility ID: 8631107
Inspection Comments
NE corner. Closure assessment report to be submitted in 60 days.
- Tank #14 and Tan k#15 removed by Beyel Bros, 561-681-9654, manifest to be provided by Consultant.
- An updated storage tank registration form was emailed to Tallahassee showing Tank #14 and Tank #15
removed from site.
Inspection Photos
Added Date 10/28/2015
Tank #14 dsl & #15 UL east view file before closure
Added Date 10/28/2015
Tank #15 UL & #14 dsl SW view before closure
Added Date 10/28/2015
Tank #14 & #15 NW view before closure
Added Date 10/28/2015
Tank #15 UL & #14 dsl south view before closure
Activity Opened 10/01/2015 Page 3 of 7 Rutherfoord, Martha
Facility ID: 8631107
Added Date 10128/2015
Tank #15 & #14 fills before closure west view
Added Date 11/02/2015
2015 10 01 Tank #14 #15 SE view
Added Date 11/02/2015
Tank #14-#15 north side west view
Added Date 10/28/2015
Tank #14 & #15 underside before closure
Added Date 11/02/2015
Tank #14 #15 SW view
Added Date 11/02/2015
Tank #14 #15 south side
Activity Opened 10/01/2015 Page 4 of 7 Rutherfoord, Martha
Facility ID: 8631107
Added Date 11/02/2015
Tank #14-#15 north view
Added Date 11/02/2015
Piping disconnected top of tank west view
Added Date 11/02/2015
Added Date 11/02/2015
Underside Tank #14 #15
Added Date 11/02/2015
Piping staged for disposal
Added Date 11/02/2015
Piping disconnected Piping at diesel piping disconnect
Activity Opened 10/01/2015 Page 5 of 7 Rutherfoord, Martha
Facility ID: 8631107
Added Date 11/02/2015
Piping disconnected at dispensers
Added Date 11/02/2015
East end concrete & soils north view boring site
Added Date 11/02/2015
Consultant boring site south side
Added Date 11/02/2015
Piping at fill spill containment removed
Added Date 11/02/2015
Consultant boring between dispensers
Added Date 11/02/2015
Consultant NE confirmation sampling and well site
Activity Opened 10/01/2015 Page 6 of 7 Rutherfoord, Martha
Facility ID: 8631107
Added Date 11/02/2015
Consultant screening
Activity Opened 10/01/2015 Page 7 of 7 Rutherfoord, Martha