Loading...
HomeMy WebLinkAboutINSPECTION REPORTFacility Information: SCANNED By Facility ID: 8631107 County: ST. LUCIE St. Luc eColfn,rspection Date: 10/01/2015 Facility Type: G -State Government Facility Name: FL ATLANTIC UNIV-HARBOR BRANCH OCEANO INST # Of Inspected ASTs: 1 5600 OLD DIXIE HWY USTs: 0 FORT PIERCE, FL 34946 Mineral Acid Tanks: 0 Latitude: 270 32' 6.1877" 2 r� �—/7 — Longitude: 80° 21' 25.154" Rn E C LE O V E LL Method: DPHO NOV - 4 Ho Inspection Result: Result: In Compliance Description: Facility is In Compliance. Financial Responsibility Financial Responsibility: EXEMPT -STATE OR FEDERAL GOVERNMENT ENTITY Signatures: TKPBEM - PALM BEACH CNTY ENVIRONMENTAL RESOURCES MGMT —Storage-Tank-Program-Office (561)233-2,00 Storage Tank Program Office Phone Number Martha E Rutherfoord INSPECTOR NAME INSPECTOR SIGNATURE Jason De Gaglia REPRESENTATIVE NAME REPRESENTATIVE SIGNATURE Activity Opened 10/01/2015 Page 1 of 5 Rutherfoord, Martha Facility ID: 8631107 ' Owners of UST facilities are reminded that the Federal Energy Policy Act of 2005 requires Operator Training at all facilities by August 8, 2012. For further information please visit: http://www,dep.state.fl.us/waste/categories/tanks/pages/op train.htm System Tests Completed Tests Breach of Integrity Test Line Tightness Test Inspection Comments 10/01/2015 04/22/2015 Passed 11/02/2015 04/22/2015 Tank #21 outerwall per factory specs 10/21/2015 Passed 11/02/2015 10/21/2015 Tank #21 lines on install NOTIFICATION FOR INSTALLATION PROVIDED BY: Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385 (ext. 72385), 561-414-3224 (cell), cobbl@fau.edu. CONTRACTOR: Glasgow Equipment Services, Inc. (PCC 045031), 1750 Hills Ave, West Palm Beach, 33407, www.glasgowequipment.com, contact Jason De Gaglia, Project Manager, 561-767-0341(cell), jason@glasgowequipment.com. OBSERVATIONS: - Onsite 10/21/15 with Glasgow Project Manager Jason De Gaglia for installation of doublewall aboveground storage tank (AST) Tank #21. - Tank #21 is a new Modern Welding Fireguard (EQ-352) shop -fabricated dw 5K gallon compartmented AST (2,500 ULgasoline/2,500 vehicular diesel). Outerwall breach of integrity, as stated in attached specs and onsite, was factory tested and then filled with lightweight insulating concrete, specs attached in FIRST. Tank has (2) primary fuel vents, (2) emergency fuel vents and (1) interstitial vent. - Tank #21 was installed on existing slab in exact location of closed and removed Tank #14 and Tank #15. Well siting for no public potable wells in 500 ft was provided and attached in FIRST. - Tank #21 east compartment contents will be UL gasoline and the west compartment contents diesel, color- coding/labeling are per API. - Piping is aboveground singlewall no contact with soil. Tight fills are in one fill spill shop -fabricated and tested containment on west end of the Tank #21, piping runs directly to top of tank. Dispensing suction piping to deliver fuel to separate free-standing dispensers. Glasgow installed previously existing (2) dispensers, pans and the piping above the pressure regulator/shear valves that had been used with the removed Tank #14 and Tank #15 systems. No obvious integrity issues had been noted for the dispenser pans. The pressure regulator/shear valves are noted per Jason as 52 valves. New dispensing piping is installed from Tank #21 to - Outerwall monitoring port is on the east end on top of Tank #21. - An updated storage tank registration form was emailed to Tallahassee showing Tank #14 and Tank #15 removed from site. Inspection Photos Activity Opened 10101/2015 Page 2 of 5 Rutherfoord, Martha e Facility ID: 8631107 Added Date 11/02/2015 2015 10 21 Tank #21 installed SW view Added Date 11/02/2015 Tank #21 fill end south view Added Date 11/02/2015 Added Date 11/02/2015 Tank #21 east view Added Date 11/02/2015 Tight fills & fill spill bucket Added Date 11/02/2015 Top of Tank #21 Line pressure gauges on piping Activity Opened 10/01/2015 Page 3 of 5 Rutherfoord, Martha Facility ID: 8631107 Added Date 11/02/2015 Line pressure diesel Added Date 11/02/2015 Soap lines Added Date 11/02/2015 Soap test new piping in disp Activity Opened 10/01/2015 Added Date 11/02/2015 Line pressure UL a•- i pv Added Date 11/02/2015 Soap lines Added Date 11/02/2015 New piping in disp Page 4 of 5 Rutherfoord, Martha Facility ID: 8631107 Added Date 11/02/2015 Dispenser piping soap Added Date 11/02/2015 Dispenser & piping Added Date 11/02/2015 Outerwall monitoring port top of Tank #21 Activity Opened 10/0112015 Added Date 11/02/2015 Dispenser & piping with pressure reg 52 valve Added Date 11/02/2015 Overfill audible alarms Page 5 of 5 Rutherfoord, Martha Facility Information: SCANNED BY Facility ID: 8631107 County: ST. LUCIE St. LUCIe COUntMnspection Date: 10/01/2015 Facility Type: G -State Government Facility Name: FL ATLANTIC UNIV-HARBOR BRANCH OCEANO INST # Of Inspected ASTs: 2 5600 OLD DIXIE HWY USTs: 0 FORT PIERCE, FL 34946 Mineral Acid Tanks: 0 Latitude: 27° 32' 6.1877" Longitude: 800 21' 25.154" (� �/ nn ILL Method: DPHO UJI I Inspection Result: I I I I '­ I I I I Result: In Compliance LI LI c/lJ Description: Facility is In Compliance. Financial Responsibility Financial Responsibility: EXEMPT -STATE OR FEDERAL GOVERNMENT ENTITY Signatures: TKPBEM - PALM BEACH CNTY ENVIRONMENTAL RESOURCES MGMT Storage Tank-Prograrn-Office (561)`233-2400 - - - ------------ -- - - - --- - - = - Storage Tank Program Office Phone Number Martha E Rutherfoord INSPECTOR NAME INSPECTOR SIGNATURE Jason Degaglia REPRESENTATIVE NAME I/� REPRESENTATIVE SIGNATURE Activity Opened 10/01/2015 Page 1 of 7 Rutherfoord, Martha Facility ID: 8631107 Owners of UST facilities are reminded that the Federal Energy Policy Act of 2005 requires Operator Training at all facilities by August 8, 2012. For further information please visit: http://www.dep.state.fl.us/waste/categories/tanks/pages/op train.htm System Tests Completed Tests Breach of Integrity Test 04/22/2015 Passed 11/02/2015 04/22/2015 Tank #21 outerwall per factory specs Line Tightness Test 10/21/2015 Passed 11/02/2015 10/21/2015 Tank #21 lines on install Inspection Comments 10/01 /2015 NOTIFICATION FOR CLOSURE (2) AST TANKS WITH PIPING: Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385 (ext. 72385), 561-414-3224 (cell), cobbl@fau.edu. CONTRACTOR: Glasgow Equipment Services, Inc. (PCC 045031), 1750 Hills Ave, West Palm Beach, 33407, www.glasgowequipment.com, PCC 045031, contact Jason De Gaglia, Project Manager, 561-767-0341 (cell), jason@glasgowequipment.com. CONSULTANT: Envirospec, Inc., Cindi Brunot, PG, Pres., 1303 W Drew St, Lantana 33462, 561-389-0339, Espec95@aol.com. OBSERVATIONS: - Onsite 10/1/15 with Glasgow Project Manager Jason De Gaglia and Envirospec Environmental Consultant Cindi Brunot for closure inspection of aboveground storage Tank #14 and Tank #15. - Tank #14 and Tank #15 were each 3K gallon compartments of one aboveground doublewall storage tank, registered in DEP FIRST as two tanks. Both tanks shared the same interstitial space. File photos from 1/14/15 before closure are attached in this report for reference. - Tank #14 (west end) had been used for diesel fuel, Tank #15 (east end) for UL gasoline. Tanks had been noted to be in good condition. - Piping was aboveground singlewall no contact with soil, tight fills were over one concrete fill spill containment, dispensing suction piping delivered fuel to separate free-standing dispensers. Dispensers and pans are intended to be used for installation of new tank, along with the piping above the pressure regulator/shear valves. No obvious integrity issues have been noted for the dispenser pans. - Per Glasgow Project Manager Jason De Gaglia, tanks were emptied and piping was blown back,_ manifests - No obvious petroleum odors, staining, or free product was observed on any of the concrete, soil, grassy or shrub areas at this time. - The TCAR Exemption Form was submitted by Leanne E.S. Cobb, FAU EHS Coordinator, 561-297-2385 (72385), 561-414-3224(cell), cobbl@fau.edu, and signed by Dennis Zabel, FAU EH & S Director. Form was filed, attached in FIRST. Envirospec was contracted to conduct full closure assessment to be submitted within 60 days. - Observed Consultant Envirospec Cindi Brunot onsite 10/1/15, screening samples on all four sides of tank, the west sample between the two dispensers, confirmation sample and sampling well at the Activity Opened 10/01/2015 Page 2 of 7 Rutherfoord, Martha Facility ID: 8631107 Inspection Comments NE corner. Closure assessment report to be submitted in 60 days. - Tank #14 and Tan k#15 removed by Beyel Bros, 561-681-9654, manifest to be provided by Consultant. - An updated storage tank registration form was emailed to Tallahassee showing Tank #14 and Tank #15 removed from site. Inspection Photos Added Date 10/28/2015 Tank #14 dsl & #15 UL east view file before closure Added Date 10/28/2015 Tank #15 UL & #14 dsl SW view before closure Added Date 10/28/2015 Tank #14 & #15 NW view before closure Added Date 10/28/2015 Tank #15 UL & #14 dsl south view before closure Activity Opened 10/01/2015 Page 3 of 7 Rutherfoord, Martha Facility ID: 8631107 Added Date 10128/2015 Tank #15 & #14 fills before closure west view Added Date 11/02/2015 2015 10 01 Tank #14 #15 SE view Added Date 11/02/2015 Tank #14-#15 north side west view Added Date 10/28/2015 Tank #14 & #15 underside before closure Added Date 11/02/2015 Tank #14 #15 SW view Added Date 11/02/2015 Tank #14 #15 south side Activity Opened 10/01/2015 Page 4 of 7 Rutherfoord, Martha Facility ID: 8631107 Added Date 11/02/2015 Tank #14-#15 north view Added Date 11/02/2015 Piping disconnected top of tank west view Added Date 11/02/2015 Added Date 11/02/2015 Underside Tank #14 #15 Added Date 11/02/2015 Piping staged for disposal Added Date 11/02/2015 Piping disconnected Piping at diesel piping disconnect Activity Opened 10/01/2015 Page 5 of 7 Rutherfoord, Martha Facility ID: 8631107 Added Date 11/02/2015 Piping disconnected at dispensers Added Date 11/02/2015 East end concrete & soils north view boring site Added Date 11/02/2015 Consultant boring site south side Added Date 11/02/2015 Piping at fill spill containment removed Added Date 11/02/2015 Consultant boring between dispensers Added Date 11/02/2015 Consultant NE confirmation sampling and well site Activity Opened 10/01/2015 Page 6 of 7 Rutherfoord, Martha Facility ID: 8631107 Added Date 11/02/2015 Consultant screening Activity Opened 10/01/2015 Page 7 of 7 Rutherfoord, Martha