HomeMy WebLinkAboutMISC EMAIL— Ah
M L Engineering Inc.
2030 37"' Ave
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772) 569-4041
Threshold Inspections
Special Inspection Plan SCANNED
BY
September 16, 2015 St. Lucie Countv
Project:
Owner's Representative
Structural Engineer of Record
Bryn Mawr
SW, 5059, 5061 N. AIA
Ft. Pierce, Florida
Elliott Merrill Community Management
Mr. Gene Ross
835 200'Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37 s Ave
Vero Beach, Florida 32960
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall famish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to
the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be
brought to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. Job site safety means and methods are solely the responsibility
of the Contractor.
ichael A. Lue, P.E.
lorida P.E. No. 47520
Special Inspector No. 1061
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 ' (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Bryn Mawr — Building A, B & C SCANNED
5055, 5059, 5061 N. Al By
Ft. Pierce, Florida St. Lude COUnty
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector's Field Representative shall have a minimum of two years
inspection experience and shall be either a:
a. Graduate Engineer or Architect
b. General Contractor
c. Licensed Building Inspector
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960
(772) 569-1257(P) / (772) 569-4041(F)
2
1
Special Inspection -clan
Bryn Mawr — Building A, B & C
5055, 5059, 5061 N. Al A
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of walkway railing posts
2. Repair of concrete spalls at walkways
3. Repair of concrete ceiling spalls
4. Repair of concrete beam and expansion joint at entry canopy
5. Repair of concrete slab edge at balconies
6. Repair of deck coating on walkway floors
Concrete Repairs
1. Verify location and quantity of repairs
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs
4. Continuous observation of concrete placement for repair areas in accordance with the Contract
Documents.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
3
September 15, 2015
Mr. Joe Cicio, Plans Examiner
St. Lucie County Building Department
2300 Virgina Ave.
Ft. Pierce, Florida 34982
M L Engineering Inc.
2030 —37" Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
SGANNED
St puce County
Re: Bryn Mawr Ocean Towers Bldg. A, B & C — Concrete Repairs
5055 N. AlA
Ft. Pierce, Florida 34949
Project No: 15-145
Dear Mr. Cicio:
Please be advised that M L Engineering, Inc. has been retained to provide Special Inspection
services for the concrete balcony repairs as indicated on the design and repair plans dated June 5,
2015.
Copies of all inspection reports and final certification will be forwarded to all respective parties
including the St. Lucie County Building Department.
If there are any questions, please contact our office.
Respectfully,
(Michael:Lue,:P.E.,z w
Structural Engineer FL PE.,47520
Thies-Inspector.-Sl 1Q61 _ _-_
Cc:
Chris Arias — Daniello & Assoc.
Gene Ross - Elliot Merrill
Joe Cicio
From: Joe Cicio
Sent: Tuesday, September 15, 2015 2:44 PM
To: Patrica Salazar (info@concreterepairing.net)
Cc: Juliet@ ell iottmerrill.com'; Joe Cicio SCANNED
Subject: Review comments for Permit Number 1508-0405 BY
Attachments: Report_FL_Review_Comments_Noncompliantjrf.pdf St. Lucie County
Dear St. Lucie County Permit Applicant,
Please see the attached plan review comments which have been generated for your permit. As soon as we receive the
modified plans and any additional required documentation back from the design professional, contractor or owner we
will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have
been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to
permitting for permit issuance.
Thank You,
!I Wt. &&
Plans Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
SfLueit,Couwty PCavwt.i" a4id.D&vel.o-1�ServEt_e
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and /
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the. communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
Joe Cicio
From: Joe Cicio SCANNED
'Sent: Thursday, September 24, 2015 8:29 AM BY
To: Patrica Salazar (info@concreterepairing.net) St. Ulde
Cc: juliet@elliottmerrill.com'; Joe Cicio COunt1
Subject: Re -Review Comments for Permit Number 1508-0405
Attachments: Report_FL_Review_Comments_Noncompliantjrf.pdf
Dear St. Lucie County Permit Applicant,
Please see the attached plan review comments which have been generated for your permit. As soon as we receive the
modified plans and any additional required documentation back from the design professional, contractor or owner we
will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have
been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to
permitting for permit issuance.
Thank You,
faceAd lid, ek&
Plans Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
St L-w i.2 Coix+gV PLa4veam,6 and Develop fServuceti
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and /
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
1
Threshold Inspections
Special Inspection Plan
September 16, 2015
Project:
Owner's Representative
Structural Engineer of Record
SCANNED
BY
St. Lucie County
B n Mawr
5055, 059, 5061 N. AIA
t. Pierce, Florida
Elliott Merrill Community Management
Mr. Gene Ross
835 20`h Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37`h Ave
Vero Beach, Florida 32960
M L Engineering Inc.
2030 37`h Ave
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772) 569-4041
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to
the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be
brought to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. 'Job site safety means and methods are solely the responsibility
of.the Contractor.
47/2
f 1A. Luc, P.E.
P.E,,No.47520
Inspector No! _1061
EC'E"'E-
SEP 2 8 PWD
o
M L Engineering, Inc.
2030 37rh Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
SCANNED
Bryn Mawr — Building A, B & C
By
6055, 5059, 5061 N. Al A
St. Lucie County
Ft. Pierce, Florida
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector's Field Representative shall have a minimum of two years
inspection experience and shall be either a:
a. Graduate Engineer or Architect
b. General Contractor
c. Licensed Building Inspector
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc.
2030 37h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Bryn Mawr — Building A, B & C
5055, 5059, 5061 N. Al A
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of walkway railing posts
2. Repair of concrete spalls at walkways
3. Repair of concrete ceiling spalls
4. Repair of concrete beam and expansion joint at entry canopy
5. Repair of concrete slab edge at balconies
6. Repair of deck coating on walkway floors _
Concrete Repairs
1. Verify location and quantity of repairs
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs
4. Continuous observation of concrete placement for repair areas in accordance with the Contract
Documents.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
3
Bryn Mawr Ocean Towers Condominium Association
C/O Elliott Merrill Community Management
835 20th Place
Vero Beach, FL 32960
772-466-2630
September 24, 2015
St. Lucie County Planning & Development
2300 Virginia Ave.
Ft. Pierce, FL 34982
Attn. Joe Cicio
RE: Bryn Mawr Ocean Towers
5055 -5061 N. AIA, Ft. Pierce, FL 34949
1508-0406,1508-0407, 1508-0405
Dear Mr. Cicio,
SCABN,NED
St. Lucie County
Bryn Mawr Ocean Towers has entered into a contractual agreement with ML Engineering,
Inc. to provide onsite inspections for the site above. ML Engineering, Inc. has agreed
that they will monitor, enforce and inspect guidelines as set forth by St. Lucie County and
the Florida Building Codes. The Association has hired and will pay all costs of
employing a special inspector.
�r
Christine Prandy, I
Bryn Mawr Ocean
E
e-,. 1 I c Ocoe
i.'
JULIEA13ARRETI'
MY COMMISSION#FF13
2752
(407) 39e-0153
EXPIRES Se Plember 28, 2018
FloritlallolarySeryicp,00m
Joe Cicio
From: Joe Cicio
Sent: Wednesday, September 30, 2015 12:56 PM SCANNED
To: Joe Cicio BY
Subject: RE: Permit Number 1206-03545 St. Lucie Countv
Patricia,
I will move the note over to the inspection card which will give you a little time to complete this permit
renewal * This will release the last permit so you may start working
Thanks
Joe
From: Joe Cicio
Sent: Wednesday, September 30, 2015 9:40 AM
To: Patrica Salazar (info@concreterepairing.net)
Cc: Joe Cicio; Monica Barrios; Carl John Peterson
Subject: Permit Number 1206-03545
Good morning Patricia
I am working your permits and have not heard anything regarding your expired Permit . I can issue the permit but
will have to send this to code enforcement. Please advise
Thanks
"eAd x (Maio
Plans Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
St L_vtZ, Cowwty PtaftftZ Lg &4%& D&4i&p4vz*Lf -Servic-
----Forlda------- - - - - -
�lease`Nofe'Fforida`�s�eiery-tiFoatl`pliblic r�rbfds�Ia�s rREe�C�mitl�iriiCetiohs o or rom- oun y o iGa s regar- ing oun y 15usiness are pul5lic records
- - available to the public and :media -upon.requesl. It is the policy of St.,Lucie County that all Countyrecords shall beopen for personal inspection, examination and l or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
1
M L Engineering, Inc.
Project No. 15-145C
Report No. 2
Consulting Engineers
2030 37' Avenue
SCANNED
NNED
cc: Gene Ross
Chris Arias
Elliott Merrill
Daniello Const.
Vero Beach, Florida 32960
13Y
Carl Peterson SLC Bldg Dept
File
Phone (772) 569.-1257
Fax (772)569-4041
St. Lucie County
a
mlengineeringincom
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1512-0196
PROJECT NAME:
Bryn Mawr —Bldg. C (additional) DATE:
December 11, 2015
CLIENT:
Elliott Merrill Community Mgt. LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Daniello & Assoc. PROJECT MGR:
Chris Arias
INSPECTED BY:
Mike Lue WEATHER:
Overcast
WORK INSPECTED:
Stucco repair @ parapet wall, Ceiling spall @ unit 601 & Surface spall @ unit 701
Stucco @parapet wall
Work is in progress at the roof parapet wall. All damaged stucco has been removed and a strip of
NP-1 sealant was placed along the roof flashing. One layer of waterproofing and the first coat of
stucco have been placed as per specifications. The area of stucco repair is 5'x10'.
As mentioned in the previous memo, the lack of a flashing cap at the top of the wall could have
caused these stucco problems. We visually inspected the adjacent parapet walls and we did not
see further issues with the stucco.
Ceiling seal] @ Unit 601
The ceiling spall repair at unit 601 is in progress. A temporary weather barrier wall is in place
and the slab shall be shored prior to chipping. The sliding glass doors and top track are being
removed and stored on site. Chipping of the ceiling spall will start on Monday, December 14th.
- - -----Surface spall@-Unit--701- - - - - - - - - - - - - - - -
The removal of the hurricane shutters at the unit above (Unit 701) is on hold until the ceiling
_ _--_,span_Deiow 1s.cnlppea
•'sky s E • �`
le, P.E.
FL pil'•�C
SSION?';:
1
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Stucco repair @ parapet wall
2
Project No.15-145C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const,
Carl Peterson SLC Bldg Dept
File
Temporary barrier wall @ unit 601
M L Engineering, Inc. Project No. 15-145C Report No. 4
Consulting Engineers
cc: Gene Ross ElliottMerrill
203037' Avenue
Chris Arias Daniello Const.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772)569-4041
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1512-0196
PROJECT NAME: Bryn Mawr— Bldg. C (additional)
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED:
Unit 601 ceiling spall & Unit 701 Surface spall
DATE: December 16, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
Unit 601
All loose concrete has been chipped at the ceiling of Unit 601 and corroded reinforcing exposed.
The area of demo is located on each side of the sliding glass door and measures approximately
27 square feet. The area of corrosion is located directly below the hurricane shutter track at Unit
701. The existing reinforcing has some surface corrosion but no bars will need to be replaced.
The bars shall be power tool cleaned and primed.
1
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 15-145C Report No. 4
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Unit 701
The hurricane shutters at the east facing sliding glass doors will need be removed and re-
installed. The bottom track of the shutters shall be removed and all loose topping repaired with
new coating, back to the sliding glass door. NP-1 sealant shall be placed at the sliding glass door
track but not to cover up the existing drain holes.
The cause of the spalling at the unit below (601) was probably due to moisture entering through
the unsealed fasteners at the shutter track causing corrosion. When the bottom track is re-
installed the fastener holes shall be filled with urethane sealant and also set on non -corrosive
shims to allow water to drain.
The existing hurricane shutters are in very poor condition and are inoperable. Due to the
condition of the shutter system, it may not be possible to remove and reinstall and may require
replacement.
F! C)
SSIOIA�%
Shutters @ bottom track
2
Joe Cicio
From: Danielo &Associates <info@concreterepairing.net>
Sent: Friday, December 18, 2015 9:31 AM
To: Joe Cicio
Cc: Chris Arias
Subject: FW: Bryn Mawr - Bldg C
Attachments: final certif letter bldg C.pdf, Bryn Mawr C Report 2.pdf; Bryn Mawr C Report 3.pdf; Bryn
Mawr C Report 4.pdf
Good morning Joe, please let me know how much will be a fee to close out this permit. Thank
you and have a great day.
SCANNED
Patricia Salazar BY
Secretary/Treasurer St. Lucie County
Daniello & Associates, Inc.
From: Todd Rhoten[mailto:todd@mlengineeringinc.com]
Sent: Thursday, December 17, 2015 12:06 PM
To: Geno Ross <gener@elliottmerrill.com>; Danielo & Associates <info@concreterepairing. net>
Cc: Chris Arias <carias@concrete repairing.net>; Julie Barrett <juliet@elliottmerrill.com>
Subject: Bryn Mawr - Bldg C
Please see attached Report #2, #3, #4 and Final Letter of Certification for Building A for your files.
Todd Rhoten
M L Engineering, Inc.
2030 37t^ Ave.
Vero Beach, FL 32960
--
772_569�4941f
1
M L Engineering, Inc. Project No. 15-145C Report No. 3
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37' Avenue
Chris Arias Daniello Const.
Vero Beach, Florida32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772)569-4041
nalengineeringincwm
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1508-0405
PROJECT NAME: Bryn Mawr - Bldg.0
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED & COMPLETED:
DATE: December 16, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
Building B (additional) - 5055
1. Railing posts (28 total)
a. Ist Floor @ Unit 102 Door, Bedroom, Unit 105 Bedroom & Bottom of Steps
b. 2nd Floor @ Unit 204 Kitchen
c. 3`d Floor @ Unit 304 Door, Unit 305 Bedroom & Unit 306 Corner Post
d. 4 h Floor @ Unit 404 Bedroom, Door & Unit 405 Door
e. 5 h Floor @ Unit 503 Bedroom, Unit 504 Door, Kitchen & Unit 505 Bedroom
f. 6d' Floor @ Unit 601 Stairwell Door, Unit 603 Bedroom, Unit 604 Bedroom &
605 Kitchen
g. 7 h Floor @ Unit 704 Bedroom & Unit 705 Kitchen
h. 8th Floor @ Unit 803 Door, Bedroom, Unit 804 Bedroom & Unit 805 Bedroom
i. 9 h Floor @ Unit 904 Bedroom, Unit 905 Kitchen & Unit 906 Comer Post
2. Walkway Concrete Spalling
a. 5d' Floor @ Unit 504
3. Deck Coating on Walkway Floors
- -- — - -- -- — a.- 3`d Floor _@ .Unit 306 - - — - - - - - - -
- --- --- ---- - -- - - - - -- - - - --- -- - -
4k%/ SF�'GF�'L
�� �• �G 13
CPA. Lt%'?:E. Q
,�'Q, PLO?-.- c
�: cFS$ION P�••v
,""2111101rr
I
December 17, 2015
Mr. Carl Peterson, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, Florida 34982
6GANNED
BY
St. Lucie Countv
M L Engineering Inc.
2030 37ih Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax:(772) 569-4041
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5055 North Hwy. AIA "Building C"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145C
I.R.C. Bldg. Permit No.
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from December 8a', 2015
through December 10h, 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
Mic ae - -ue, -
---Consulting Engineer-
- Threshold Inspector
�✓ L
Cc: Danielle, & Associates Inc. 71 a T,-q
M L Engineering, Inc. Project No.15-145C Report No. 2
Consulting Engineers SCANNED cc: Gene Ross Elliott Merrill
203037'"Avenue Chris Arias Daniello Const.
Vero Beach, Florida 32960 BY Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 St. Lucie County File
Fax (772)569-4041
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1512-0196
PROJECT NAME: Bryn Mawr — Bldg. C (additional) DATE: December 11, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Overcast
WORK INSPECTED:
Stucco repair @ parapet wall, Ceiling spall @ unit 601 & Surface spall @ unit 701
Stucco (a, parapet wall
Work is in progress at the roof parapet wall. All damaged stucco has been removed and a strip of
NP-1 sealant was placed along the roof flashing. One layer of waterproofing and the first coat of
stucco have been placed as per specifications. The area of stucco repair is 5'x10'.
As mentioned in the previous memo, the lack of a flashing cap at the top of the wall could have
caused these stucco problems. We visually inspected the adjacent parapet walls and we did not
see further issues with the stucco.
Ceiling Wall @ Unit 601
The ceiling spall repair at unit 601 is in progress. A temporary weather barrier wall is in place
and the slab shall be shored prior to chipping. The sliding glass doors and top track are being
removed and stored on site. Chipping of the ceiling spall will start on Monday, December 14tn
Qi' • :S F '•Gc�`':
vG �520 ••°�
6,Pa p
1
M L Engineering, Inc.
Consulting Engineers
2030 37'" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Stucco repair (a,) parapet wall
Project No. 15-145C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
2
M L Engineering, Inc.
Consulting Engineers
2030 37a Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.com
Project No. 15-145C Report No. 3
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY At A, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1508-0405
PROJECT NAME: Bryn Mawr — Bldg. C DATE: December 16, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: • Sunny
WORK INSPECTED & COMPLETED:
Building B (additional) — 5055
1. Railing posts (28 total)
a. 1st Floor @ Unit 102 Door, Bedroom, Unit 105 Bedroom & Bottom of Steps
b. 2nd Floor @ Unit 204 Kitchen
c. 3rd Floor @ Unit 304 Door, Unit 305 Bedroom & Unit 306 Corner Post
d. 4lh Floor @ Unit 404 Bedroom, Door & Unit 405 Door
e. 5th Floor @ Unit 503 Bedroom, Unit 504 Door, Kitchen & Unit 505 Bedroom
f. 6th Floor @ Unit 601 Stairwell Door, Unit 603 Bedroom, Unit 604 Bedroom &
605 Kitchen
g 7th Floor @ Unit 704 Bedroom & Unit 705 Kitchen
It. 8th Floor @ Unit 803 Door, Bedroom, Unit 804 Bedroom & Unit 805 Bedroom
i. 9th Floor @ Unit 904 Bedroom, Unit 905 Kitchen & Unit 906 Corner Post
2. Walkway Concrete Spalling
a. 5th Floor @ Unit 504
-3.-DeckCoating-on -Walkway-Floors --------- -- -- ---- - - ------ --_ - - ---- =-----
a. 3`d Floor @ Unit 306
l L
M L Engineering, Inc. Project No. 15-145C Report No. 4
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 371h Avenue Chris Arias Daniello Const.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772)569-4041
mlengineeringine.com
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1512-0196
PROJECT NAME: Bryn Mawr — Bldg. C (additional) DATE: December 16, 2015
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED:
Unit 601 ceiling spall & Unit 701 Surface spall
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Overcast
Unit 601
All loose concrete has been chipped at the ceiling of Unit 601 and corroded reinforcing exposed.
The area of demo is located on each side of the sliding glass door and measures approximately
27 square feet. The area of corrosion is located directly below the hurricane shutter track at Unit
701. The existing reinforcing has some surface corrosion but no bars will need to be replaced.
The bars shall be power tool cleaned and primed.
Unit 601 Ceiling spall
holes in
1
r
M L Engineering, Inc. Project No. 15-145C Report No. 4
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 371h Avenue Chris Arias Daniello Const.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772)569-1257 File
Fax (772) 5694041
mlengineeringinc.com
Unit 701
The hurricane shutters at the east facing sliding glass doors will need be removed and re-
installed. The bottom track of the shutters shall be removed and all loose topping repaired with
new coating, back to the sliding glass door. NP-1 sealant shall be placed at the sliding glass door
track but not to cover up the existing drain holes.
The cause of the spalling at the unit below (601) was probably due to moisture entering through
the unsealed fasteners at the shutter track causing corrosion. When the bottom track is re-
installed the fastener holes shall be filled with urethane sealant and also set on non -corrosive
shims to allow water to drain.
The existing hurricane shutters are in very poor condition and are inoperable. Due to the
condition of the shutter system, it may not be possible to remove and reinstall and may require
replacement.
FLOF:�`ti,�
Is
Shutters @ bottom track
F)
M L Engineering Inc.
2030 37'" Avenue
Y Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041-4041
December 17, 2015
Mr. Carl Peterson, Building Official
St. Lucie County Building Department
2300 Virginia Avenue S�UBO �Unty
Ft. Pierce, Florida 34982 St G
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5055 North Hwy. AlA "Building C"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145C
I.R.C. Bldg. Permit No. 9 50 - 4,05
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from December 8a', 2015
through December 161h, 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
_ Michael Lue, P E _
Consulting Engineer
Threshold Inspector
Cc: Daniello & Associates Inc. D
DEC 2 1 AECT
s
December 17, 2015
Mr. Carl Peterson, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, Florida 34982
M L Engineering Inc.
2030 37'" Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
SCANNED
BY
St. Lucie County
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5055 North Hwy. AlA "Building C"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145C
S.L.C. Bldg. Permit No. 1508-0405
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from December 8`h, 2015
through December 161h, 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
Consulting Engineer
Threshold Inspector
Cc: Daniello & Associates Inc.
err c��u
APR 1 1 P'D
Joe Cicio
From:
Sent:
To:
Cc:
Subject:
Good Morning Joe,
Please see below the breakdown:
Liliana Gopalakrishna <gliliana@concreterepairing.net>
Tuesday, April 12, 2016 8:37 AM
Joe Cicio
Danielo & Associates
FW: Permits,
BuildingA $7,530.97(1518-0407)
Building B $2,945.00 (1508-0406)
Building B $2,042.96 (1512-0197)
Building C $11,017.47 (1512-0196)
'1ding C 5 560 88 1t508-0405+)
Thank you,
[edam gopadaysfina
Daniello & Associates Inc
Phone (561) 835-4788
Fax (561) 833-3573
2708 N. Australian Ave., Suite 9
West Palm Beach, FL 33407
From: Joe Cicio [mailto:cicioj@stlucieco.org]
Sent: Monday, April 11, 2016 4:40 PM
To: Liliana Gopalakrishna
Subject: RE: Permits,
Can you break the fees to the 5 permits we have issued
SCANNED
BY
twin
- — ------------ ------
Th—anks—
-- --- - - - - --- - - --- - -
Joe
From: Liliana Gopalakrishna[mailto:gliliana@concreterepairine.netl
Sent: Monday, April 11, 2016 4:18 PM
To: Joe Cicio <cicioi@stlucieco.ors>
Cc: Danielo & Associates <info@concreterepa irina. net>
Subject: FW: Permits,
Attached is the G702 a little bit more clear but does not have the engineer signature, however has the same numbers.
Please see below the breakdown:
Building B
Building A
$4,987.96
$7,530.97
1