We are pleased to submit our proposal for the following: Con creto restoration repaks in accordance with ENGINEER'S and/or
INTERNATIONAL CONCRETE REPAIR INSTITUTE specifications and procedures.
This proposal provides an estimate based an visual inspections. Actual auantitles may increase or decrease and are based on
till following filed unit prices and estimuted agantiNes as follows:
See Exhib t "A�
Painting of repaired areas if required is not included in the estimated cost unless Itemized by a unit price (see exhibit "A" unit
price)
All material Is guaranteed to be as specified. Work will be performed In accordance with the drawings and specifications
submitted for above work and completed in a substantial workmanllke manner. Owner to provide electric and watorat no
cost to contractor, including any speclalvieetrleal set upo for swing stage "pig tells" and/or 220v service as necessary.
Contractor will remove debris and leave promises broom clean. However, dust Is an airborne nuisance and the contractor can
not be held liable for dust entry into units due to open windows by residence, broken or damaged windows, doors and other
areas due to wind farces and elements beyond the contractoes control.
A 5 YEAR WARRANTV IS PROVIDED FOR CONCRETE REPAIRS COMPLETED UNDER THIS CONTRACT. A
SEPARATE WARRANTY AS PER ATTACHED WILL BE PROVIDED BY any OTHER SUB -CONTRACTOR
Page 1 of4Pages
£/T'd 00£b699aLT:01 0TTbb966b2T :WO2H LbaTT ST02-0T--nie
JUL-10-20i5 11:47 FROM:
124a96441tO-7):17725694300 P.3/3
PROPOSAL/CONTRACT Continued
Any disputes resulting from this agreement will be rattled by binding arbitration under the rules ofthe BETTER BUSINESS
AUREAU or other arbitration remedles as the parties may decide. If legal action is required in connection with the agreement
the prevailing party shell be entitled to recover its reasonable attorney fees.
Uespeetthlly submitted,
Louis J. Danielle,
'President
We may withdraw this proposal if not accepted within a days.
The above prices, specinoatlons and
as specified Payment will be mode
Debt I—lbr Sil
ACCEPTANCE OF PROPOSAL
Page 3 of4 Pages
You are authorired to do the work
dfen lolly executed by both Parties.
JLJI.-10-20i5 1i:47 FROM: 124B9644110 1:17725994300 P.2/3
PROPOSAL/CONTRACT Continued
Print N'ant
Enclosed: coples of llcenscs, Insurance, warranty form and references upon request
DAbfynmsa4016
Exhibit "A"
scription
Estimated
QuantityTypo
Unit
Unit
Price
Extended
Amount
Fcap
and replace w/new
28.00
Ea.
$62.00
$1,736.00
png post
66.00
Lf.
$31.00
$1,736.00
Concrete spall @ walkways
6.00
at
$78.00
$460.00
Deck coating @ common hallways
2.00
Sf.
$6.50
$13.00
Paint ropshiss arose to match exist w/paint
TOO
BE
$2.10
provided by Association.
Bullldino B - 8068 North A1A
Railing Post remove and replace w/new
itch
Ea.
$02.00
$930.00
Top fall cap for railing poet
32.00
Lf.
$31.00
$992.00
Concrete spall @walkways
6.00
BE
$78.00
$380.00
Concrete boom repair.
10.00
BE
$130.00
$2,000.00
Expenslon Joint repair
18.00
U.
$39.00
$702.00
Concrete apall (M walkways
10.00
BE
$78.00
$780.00
Remove & reinstall guardrails
TBD
U.
$45.00
Concrete column repair
3.00
SL
$130.00
$390.00
Deck coating @ common walkways
4.00
BE
$6.60
$20.00
Stucco repair
22.00
Sf.
$16.00
8330.00
Paint repair areas is match existing w/paint
TBD
Sf.
$2.10
provided by Association.
l9ulldinc A • 6061.Norfh 0
Railing Poo! remove end replace w/new
11.0000.
$62.00
$682.00
Top rail cap for railing post
26.00
U.
$31.00
soce.00
Concrete spall
6.00
5f.
078.00
$390.00
Concrete telling spall
14.00
BE
$91.00
$1,274.00
Conefete_besmr®palr-_______- __
__-_ - _16.00at.
--•f_i30,00
----.-$2,0-80.00-
6xpanelon Joint repair - - - ___ -
36.00
Lf - -
$39.00
c1y404 00 -
Deck seating & common walkways
16.00
S6
$6.50
1104.00
Remove & reinstall guardrails
T130
Lf.
$46.00
Stucco repair
36.00
SL
$15.00
$540.00
Paint repair areas to match existing w/paint
TBD
SL
$2.10
- -
provided by Asaociation
,
Mobilization & General Conditions
1.00
L. Sum
$7,180.00
$7,180.Of
Dumpater, port -lot, swing stage w/3 relocations
Included.
Page 4 of 4 Pats
Grand Total $25,033.03