HomeMy WebLinkAboutMISC EMAILSeptember 15, 2015
Mr. Joe Cicio, Plans Examiner
St. Lucie County Building Department
2300 Virgina Ave.
Ft. Pierce, Florida 34982
Re: Bryn Mawr Ocean Towers Bldg. A, B & C — Concrete Repairs
5055 N: AIA
Ft. Pierce, Florida 34949
Project No: 15-145
Dear Mr. Cicio:
M L Engineering Inc.
2030 —37" Avenue
Vero Beach, Florida32960
Phone: (772)569-1257
Fax: (772) 569-4041
SC By ED
St. LuciA County
Please be advised that M L Engineering, Inc. has been retained to provide Special Inspection
services for the concrete balcony repairs as indicated on the design and repair plans dated June 5,
2015.
Copies of all inspection reports and final certification will be forwarded to all respective parties
including the St. Lucie County Building Department.
If there are any questions, please contact our office.
Respectfully,
/P
E'Miciiae.Lu6; P.E.; — T
Structural Engineer FL'PE.47520
- -11"1 DLAUI" 11Jk1V VLV1'U 1-1VV1
Cc: Chris�Anas — Daniello & Assoc.
Gene Ross - Elliot Merrill
M L Engineering Inc.
2030 37'h Ave
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
Threshold Inspections
Special Inspection Plan St Cuu)E?CountV
September 16, 2015
Project:
Owner's Representative
Structural Engineer of Record
Bryn Mawr
5055, 5059; 5061 N. AlA
Ft. Pierce, Florida
Elliott Merrill Community Management
Mr. Gene Ross
835 20th Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37`h Ave
Vero Beach, Florida 32960
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall famish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to
the Contractor's attention, and if such discrepancies are not corrected, these discrepancies'shall be
brought to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. Job site safety means and methods are solely the responsibility
of the Contractor.
lchael A. Lue, P.E.
lorida P.E. No. 47520
Special Inspector No. 1061
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Bryn Mawr — Building A, B & C
5055, 5059, 5061 N. AllA
Ft. Pierce, Florida
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector's Field Representative shall have a minimum of two years
inspection experience and shall be either a:
a. Graduate Engineer or Architect
b. General Contractor
c. Licensed Building Inspector
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however'possible the Special Inspector in
performing his inspection's. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc.
2030 37"' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection plan
Bryn Mawr— Building A, B & C
5055, 5059, 5061 N. Al
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of walkway railing posts
2. Repair of concrete spalls at walkways
3. Repair of concrete ceiling spalls
4. Repair of concrete beam and expansion joint at entry canopy
5. Repair of concrete slab edge at balconies
6. Repair of deck coating on walkway floors
Concrete Repairs'
1. Verify location and quantity of repairs
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs
4. Continuous observation of concrete placement for repair areas in accordance with the Contract
Documents.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(1?) / (772) 569-4041(F)
3
Joe Cicio
From: Joe Cido
Sent: Friday, September 18, 2015 3:44 PM
To: Patrica Salazar (info@concreterepairing.net)
Cc: juliet@elliottmerrill.com'; Joe Cicio SCAfVIVE�
Subject: Review Comments for Permit Number 1508-0406 BY
Attachments: Report _FL_ Review _ Comments_ Noncompliantjrf.pr� LUCI@Colin n
Dear St. Lucie County Permit Applicant,
Please see the attached plan review comments which have been generated for your permit. As soon as we receive the
modified plans and any additional required documentation back from the design professional, contractor or owner we
will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have
been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to
permitting for permit issuance.
Thank You,
Aw'" ail. e a
Plans Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
Sf- Lv4Z& Cat,vl fy a.vl.& Peve�ServU e y
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
Joe Cicio
From: Joe Cicio
Sent: Thursday, September 24, 2015 9:57 AM S(;HNNED
To: Patrica Salazar (info@concreterepairing.net) BY
Cc: juliet@elliottmerrill.com'; Joe Cicio St. Lucie county
Subject: Re-REview Comments for Permit Number
Attachments: Report_FL_Review_Comments_Noncompliantjrf.pdf
Dear St. Lucie County Permit Applicant,
Please see the attached plan review comments which have been generated for your permit. As soon as we receive the
modified plans and any additional required documentation back from the design professional, contractor or owner we
will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have
been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to
permitting for permit issuance.
Thank You,
fodeA` x eaeeo
Plans Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
St Lucie.0&"� FL&vviZ"c+*Ld,Dovttop*",rufServfcvti
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and /
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
Threshold Inspections 6GANNED
Special Inspection Plan
Sr. Luce County
September 16, 2015
Project:
Owner's Representative
Structural Engineer of Record
Bryn Mawr
5055, 5059, 5061 N. AIA
Ft. Pierce, Florida
Elliott Merrill Community Management
Mr. Gene Ross
835 20" Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37 ° Ave
Vero Beach, Florida 32960
M L Engineering Inc.
2030 37'" Ave
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to
the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be
brought to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. Job site safety means and methods are solely the responsibility
of the Contractor.
]Uichael A. Lue, P.E.
Florida P.E. No. 47520
Special Inspector Xo. '1061
ECIEDVE
SEP 2 8 UD 51
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Bryn Mawr — Building A, B & C
5055, 5059, 5061 N. A1A
Ft. Pierce, Florida
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector's Field Representative shall have a minimum of two years
inspection experience and shall be either a:
a. Graduate Engineer or Architect
b. General Contractor
c. Licensed Building Inspector
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate'the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc.
2030 37"' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
2
Special Inspection Plan
Bryn Mawr— Building A, B & C
5055, 5059, 5061 N. Al
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of walkway railing posts
2. Repair of concrete spalls at walkways
3. Repair of concrete ceiling spalls
4. Repair of concrete beam and expansion joint at entry canopy
5. Repair of concrete slab edge at balconies
6. Repair of deck coating on walkway floors
Concrete Repairs
1. Verify location and quantity of repairs
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs
4. Continuous observation of concrete placement for repair areas in accordance with the Contract
Documents.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
3
Bryn Mawr Ocean Towers Condominium Association
C/O Elliott Merrill Community Management
835 20th Place
Vero Beach, FL 32960
772-466-2630
September 24, 2015
St. Lucie County Planning & Development
2300 Virginia Ave.
Ft. Pierce; FL 34982
Attn. Joe Cicio
RE: Bryn Mawr Ocean Towers
5055 -5061 N. AIA, Ft. Pierce, FL 34949
1508-0406,1508-0407, 1508-0405
Dear Mr. Cicio,
o(; BY ED
,t L Lucie County
Bryn Mawr Ocean Towers has entered into a contractual agreement with ML Engineering,
Inc. to provide onsite inspections for the site above. ML Engineering, Inc. has agreed
that they will monitor, enforce and inspect guidelines as set forth by St. Lucie County and
the Florida Building Codes. The Association has hired and will pay all costs of
employing a special inspector.
On
Christine Prandy, Presiden
Bryn Mawr Ocean Towers
E Cam' FSE D V IE
SEP 2 8 RECD
(-'-It4n jc
Q . 1
C.Llaj
�_. A ,'%. JEJUE A BARRETT
�`o MY COMMISSION#FF132752
�'':F; n°"' EXPIRES September 28,201,
(4W)39g. 3 Floritlallota Seryj
^/ ce.com
-60....,
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
SCANNED
BY
St. Lucie County
Project No.15-145B Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE„ FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: I508-0406
PROJECT NAME: Bryn Mawr —Bldg. B
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
DATE: October 27, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Overcast/Rainy
WORK INSPECTED:
Railing posts, walkway concrete spalls, concrete beam & expansion joint, balcony & column
spalls
OBSERVATIONS:
Railing posts
20 total @ Building B. Majority of damaged posts & caps are removed. Installation of new posts
& caps to start next week. Reinforcing in existing cap is in serviceable condition and is to
remain. Clean and prime with a corrosion inhibitor as per specs.
Common walkway concrete spalling (area of repair in square feet)
Area has been demo and reinforcing exposed
*nit 203 — 3.5
Unit 504 — 4 (Removed screen front door & frame)
Unit 505 — 6.75 (Removed screen front door & frame)
Unit 705 — 2.5 (Removed screen front door & frame)
Unit 804 — 5.5 (Removed screen front door & frame)
Unit 805 —10.25 (Removed screen front door & frame)
8th Floor by North Stairwell - 2 _ _w
Concrete Beam & Exnansion Joint (a, Entry Way
Work in progress. Expansion joint cleaned of all debris and spalls in damaged areas at bottom of
beam being demo.
Concrete Balcony Spalling
Unit 206 — l I square feet
Concrete Column Rem
Unit 401— 3 square feet
[ECIEUVE
NOV - 5 REC'D
M L Engineering, Inc.
Consulting Engineers
2030 371h Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.com
Project No.15-145B Report No.1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
RECCOMMENDATIONS:
Contractor to provide an OSHA approved handrail barrier at area where work is being
performed. All existing reinforcing shall be power tooled cleaned and primed with a corrosion
inhibitor as per specifications.
The corrosion at the entry doors appear to be from the existing screen frame fasteners. Majority
of the corrosion was directly under the frames. Front entry screen doors to be replaced with new
and all fasteners sealed.
Railing post
chae . Lue, P.E:
`A
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringine.com
SLHIVIVtU Project No.15-145B Report No. 2
BY cc: Gene Ross Elliott Merrill
St. LucieC(vin+i, Chris Arias DanielloConst.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER 1508- 406
PROJECT NAME: Bryn Mawr — Bldg. B DATE: October 30, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Column at Unit 401doorjamb
Concrete slab on grade at rear
Entry expansion joint
OBSERVATIONS:
Column at doorjamb unit 401B
The deteriorated concrete was removed and the reinforcing exposed: The corrosion is minimal the
existing reinforcing to remain cleaned, coated and concrete repaired as per specs. The column ties should
be moved as much as possible away from the exterior face of the column to provide the maximum
concrete coverage possible. Remove all loose concrete, provide moisture barrier between the existing
wood jamb and new concrete.
Concrete slab on grade
The,slab has been cleaned, the cracks ground out and the low areas in the slab marked for leveling. The
cracks are shallow and do not appear to be full depth of the slab and therefore does not warrant to be
epoxied. The cracks are random in direction and are not continuous to the edge of the slab and does not
appear to be shrinkage or expansion cracks that would be typical from a re-entrant corner.
Repair with NP I and Flextight with reinforcing mesh.
The bird baths should be repaired with Tamms Thin Patch by Euclid which can go to a feather edge. (See
—attached-product:sheet)_
The joint is being prepared for the backer rod and sealant. The joint is about 1 -1/4 inch wide at places.
The edges of the concrete and stucco should be repaired to a straight line and the NP-1 sealant depth
should be at least % the width of the joint, approximately''/z" to 3/d' deep.
R�c� [E°dry
o COPY
.. ;r�
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlenginmringinc.com
Pic 1 Doorjamb at Unit 401
Pic 3 Expansion joint at entry
Project No. 15-145B Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
N
+1�
M L Engineering, Inc.
Consulting Engineers
2030 37i° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
SCANNED
BY
t i_ucieCounty
Project iNo. 15-145B Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1508-0406
PROJECT NAME: Bryn Mawr — Bldg. B DATE: October 30, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Column at Unit 401 door jamb
Concrete slab on grade at rear
Entry expansion joint
OBSERVATIONS:
Column at doorjamb unit 401 B
The deteriorated concrete was removed and the reinforcing exposed. The corrosion is minimal the
existing reinforcing to remain cleaned, coated and concrete repaired as per specs. The column ties should
be moved as much as possible away from the exterior face of the column to provide the maximum
concrete coverage possible. Remove all loose concrete, provide moisture barrier between the existing
wood jamb and new concrete.
Concrete slab on grade
The slab has been cleaned, the cracks ground out and the low areas in the slab marked for leveling. The
cracks are shallow and do not appear to be full depth of the slab and therefore does not warrant to be
epoxied. The cracks are random in direction and are not continuous to the edge of the slab and does not
appear to be shrinkage or expansion cracks that would be typical from a re-entrant corner.
Repair with NP 1 and Flextight with reinforcing mesh.
The bird baths should be repaired with Tamms Thin Patch by Euclid which can go to a feather edge. (See
_ attached product sheet) _ — --
The joint is being prepared for the backer rod and sealant. The joint is about I -1/4 inch wide at places.
The edges of the concrete and stucco should be repaired to a straight line and the NP-1 sealant depth
should be at least'/2 the width of the joint, approximately %2" to'/4" deep.
A
•L:�� �'R�4�•��v•
E0VF
NOV 30 DECO
r-
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Pic 1 Doorjamb at Unit 401
Pic 3 Expansion joint at entry
Project No.15-145B Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
2
r—
M L Engineering, Inc.
Consulting Engineers
2030 371° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 15-145B Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. B SCANNED
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA BY
THRESHOLD INSPECTION REPORT St. Lucie County
SLC BUILDING PERMIT NUMBER: 1508-0406
PROJECT NAME: Bryn Mawr — Bldg. B
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
DATE: October 27, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Overcast/Rainy
WORK INSPECTED:
Railing posts, walkway concrete spalls, concrete beam & expansion joint, balcony & column
spalls
OBSERVATIONS:
Railing posts
20 total @ Building B. Majority of damaged posts & caps are removed. Installation of new posts
& caps to start next week. Reinforcing in existing cap is in serviceable condition and is to
remain. Clean and prime with a corrosion inhibitor as per specs.
Common walkway concretes aD lling (area of repair in square feet)
Area has been demo and reinforcing exposed
tilt 3.5
/ Unit 504 — 4 (Removed screen front door & frame)
I/Unit 505 — 6.75 (Removed screen front door & frame)
gKMIF� 2.5 (Removed screen front door & frame)
I/Unit 804 — 5.5 (Removed screen front door & frame)
ry' nit 80- 10.25 (Removed screen front door & frame)
8t Floor by North Stairwell — 2
- Total=spalledmrea-to=lie•repaired 34:5 square feet
Concrete Beam & Expansion Joint aa. Entry y
Work in progress. Expansion joint cleaned of all debris and spalls in damaged areas at bottom of
beam being demo.
Concrete Balcony Spalling
Unit 206 —11 square feet
Concrete Column Repair
Unit 401— 3 square feet
EIV
NOV 3 0 RECD
. M L Engineering, Inc.
Consulting Engineers
203037' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mlengineeringinc.com
Project No. 15-145B Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
SCANNED
Peterson SLC Bldg Dept
BY File
St. Lucie County
RECCOMMENDATIONS:
Contractor to provide an OSHA approved handrail barrier at area where work is being
performed. All existing reinforcing shall be power tooled cleaned and primed with a corrosion
inhibitor as per specifications.
The corrosion at the entry doors appear to be from the existing screen frame fasteners. Majority
of the corrosion was directly under the frames. Front entry screen doors to be replaced with new
and all fasteners sealed.
Railing post
tU - F lW.M4AddV%I; V, ice.^
._.
Concrete column
a
2
Walkway concrete spalling
Concrete balcony spalling
164.
Joe Cicio
From: Joe Cicio
Sent: Monday, December 07, 2015 3:39 PM
To: Patrica Salazar (info@concreterepairing.net) SCANNED
Cc: - Joe Cicio BY
Subject: Permit Number 1508-0406 St. Lucie County
Hi Patricia,
Please obtain separate permits for Units 203, 705 and 805 for Bryn Mar Bldg B * these are not identified on the
original plans
Thanks
%°eAd x &'&
Plans -Examiner II
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
St Lwei,& Cou*4y Mq*t, i anal. Pive-tonvwevu! Se �-vicati
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and 1
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
1
M L Engineering, Inc.
Consulting Engineers
2030 37th Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
ralengineeringinawm
SCANNED
BY
St. Lucie County
Project No. 15-145A Report No. 3
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER 5 8-040
PROJECT NAME: Bryn Mawr— Bldg. B
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED & COMPLETED:
DATE: December 11, 2015
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Overcast
Building B — 5059
1. Railing posts (15 total)
a. 2nd Floor @ Unit 205 Bedroom
b. 5th Floor @ Unit 502 Bedroom, 503 Kitchen, 504 Door & 505 Kitchen
c. 6th Floor @ Unit 603 Bedroom & Units 606 Corner Post
d. 7th Floor @ between Units 701/702 & Unit 706 Corner Post
e. 8dt Floor @ Unit 803 & Unit 804 Bedroom
f. 9th Floor @ between Units 902/903, Unit 903 Kitchen, between Unit 904/905 &
906 Stair Door
2. Walkway Concrete Spalling
a. 5th Floor @ Unit 504 Door
b. 8th Floor @ North Stair Door
3. Concrete Beam & Expansion Joint Repair
a. South end of entry way canopy
4. Concrete Balcony Spalling
a. 2nd Floor @ Unit 206 Northwest Comer
b. 3rd Floor @ Unit 301 Balcony
5. Concrete Columns Repair— - —
a. 4 h Floor @ Unit 401 Door Jamb
between
++%1++n 1281
PN' HON y�G.,'.
d 1. LutO'P:E. �
O-
'• ,8SIONP+
�''* 1 n n„++
I�
Joe Cicio
From: Danielo &Associates <info@concreterepairing.net>
Sent: Friday, December 18, 2015 9:30 AM
To: Joe Cicio
Subject: FW: Bryn Mawr - Bldg B
Attachments: Bryn Mawr B Report 3 12-11-15.pdf, final certif letter bldg B.pdf
Good morning Joe, please let me know how much will be a fee to close out this permit. Thank
you and have a great day.
Patricia Salazar
Secretary/Treasurer
Daniello & Associates, Inc.
SCANNED
BY
St. Lucie County
From: Todd Rhoten[mailto:todd@mlengineeringinc.comj
Sent: Thursday, December 17, 2015 12:02 PM
To: Geno Ross <gener@elliottmerrill.com>; Danielo & Associates <info@concreterepairing. net>
Cc: Chris Arias <carias@concreterepairing.net>; Julie Barrett <juliet@elliottmerrill.com>
Subject: Bryn Mawr - Bldg B
Please see attached
Todd Rhoten
M L Engineering, Inc.
2030 371h Ave.
Vero Beach, FL 32960
772-569-1257 p
772-569-4041f
www.miengineeringinc.com
#3 and Final Letter of Certification for Building B for your files.
1
Joe Cicio
From: Danielo &Associates <info@concreterepairing.net>
Sent: Friday, December 18, 2015 9:30 AM
To: Joe Cicio
Subject: FW: Bryn Mawr - Bldg B
Attachments: Bryn Mawr B Report 3 12-11-15.pdf, final certif letter bldg B.pdf
Good morning Joe, please let me know how much will be a fee to close out this permit. Thank
you and have a great day.
Patricia Salazar
Secretary/Treasurer
Daniello & Associates, Inc.
SCANNED
BY
St. Lucie County
From: Todd Rhoten[mailto:todd@mlengineeringinc.comj
Sent: Thursday, December 17, 2015 12:02 PM
To: Geno Ross <gener@elliottmerrill.com>; Danielo & Associates <info@concreterepairing. net>
Cc: Chris Arias <carias@concreterepairing.net>; Julie Barrett <juliet@elliottmerrill.com>
Subject: Bryn Mawr - Bldg B
Please see attached
Todd Rhoten
M L Engineering, Inc.
2030 371h Ave.
Vero Beach, FL 32960
772-569-1257 p
772-569-4041f
www.miengineeringinc.com
#3 and Final Letter of Certification for Building B for your files.
1
M L Engineering Inc.
2030 37ih Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
December 14, 2015 SCANNED
Mr. Carl Peterson, Building Official BY
St. Lucie County Building Department St. Lucie County
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5061 North Hwy. AIA "Building B"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145B
I.R.C. Bldg. Permit No. 1508-0406
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from October 27', 2015
through December 1 ls', 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
Threshold
Cc: Daniello & Associates Inc.
M L Engineering, Inc. Project No. 15-145B Report No. 3
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030371h Avenue
bGANNED Chris Arias Daniello Const.
Vero Beach, Florida 32960
Phone 569-1257
Carl Peterson SLC Bldg Dept
BY File
(772)
Fax (772)569AO41
St. Lucie County
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1508-0406
PROJECT NAME:
Bryn Mawr —Bldg. B DATE: December 11, 2015
CLIENT:
Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR:
Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY:
Mike Lue WEATHER: Overcast
WORK INSPECTED & COMPLETED:
Building B — 5059
1. Railing posts (15 total)
a. 2"d Floor @ Unit 205 Bedroom
b. 5th Floor @ Unit 502 Bedroom, 503 Kitchen, 504 Door & 505 Kitchen
c. 6`h Floor @ Unit 603 Bedroom & Units 606 Corner Post
d. 7`h Floor @ between Units 701J702 & Unit 706 Corner Post
e. 8`h Floor @ Unit 803 & Unit Bedroom"�
f. 91h Floor @ between Unit°ac Unit 903 Kitchen, between Unit 904/905 &
40LARa`i-R,O
2. Walkway Concrete Spalling
a. 5th Floor @ Unit 504 Door
b. 8th Floor @ North Stair Door
3. Concrete Beam & Expansion Joint Repair
a. South end of entry way canopy
4. Concrete Balcony Spalling
a. 2"d Floor @ Unit 206 Northwest Comer
3ra Floor @ Unit 301 Balcony
5. Concrete Columns Repair
---- -- _ U. 4 r tour � Unit.+V 1 MGM 3 amo_�---"
6. Deck Coating on Walkway Floors
a. 1st Floor @ between Units 101/102
N
M L EC AF&4 pyngineering Inc.
Fach, Florida
LE Vero Fax: (772) 5 9-4041
December 14, 2015
Mr. Carl Peterson, Building Official SCANNED
St. Lucie County Building Department BY
2300 Virginia Avenue St. Lucie Countv
Ft. Pierce, Florida,34982.
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5059 North Hwy. AIA "Building B"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145B
I.R.C. Bldg. Permit No. 1508-040
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from October 27`h, 2015.
through December I Ith, 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
Consblting Engineer
Threshold Inspector
Cc: Daniello & Associates Inc.
DEC 2 1 PWD
Joe Cicio
From: Liliana Gopalakrishna <gliliana@concreterepairing.net>
Sent: Tuesday, April 12, 2016 8:37 AM
To: Joe Cicio
Cc: Danielo & Associates
Subject: FW: Permits,
Good Morning Joe, Sk;ANNED
BY
Please see below the breakdown: St Lude COUnty
Building A $7,530.97 (1518-0407)
Building B 2,945:00 15.08-0406
Building B $2,042.96 (1512-0197)
Building C $11,017.47 (1512-0196)
Building C $ 5,560.88 (1508-0405)
Thank you,
GBlam" 60paeagNsAma
Daniello & Associates Inc
Phone (561) 835-4788
Fax (561) 833-3573
2708 N. Australian Ave., Suite 9
West Palm Beach, FL 33407
From: Joe Cicio [mailto:cicioj@stlucieco.org]
Sent: Monday, April 11, 2016 4:40 PM
To: Liliana Gopalakrishna
Subject: RE: Permits,
Can you break the fees to the 5 permits we have issued
Thanks - - - -
From: Liliana Gopalakrishna [ma ilto:glilia na@concrete re pairing.netl
Sent: Monday, April 11, 2016 4:18 PM
To: Joe Cicio <cicioi@stlucieco.org>
Cc: Danielo & Associates <info@concreterepairing.net>
Subject: FW: Permits,
Attached is the G702 a little bit more clear but does not have the engineer signature, however has the same numbers.
Please see below the breakdown:
Building B
Building A
$4,987.96
$7,530.97
1
M L Engineering Inc.
SCANNED 2030 37'" Avenue
Vero Beach, Florida 32960
BY Phone: (772)569-1257
St I_llria county Fax: (772) 5694041
December 14, 2015
Mr. Carl Peterson, Building Official
St. Lucie County Building Department
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs
5059 North Hwy. AIA "Building B"
Ft. Pierce, Florida 34949
Engineer's Project No. 15-145B
S.L.C. Bldg. Permit No. 1508-0406
Dear Mr. Peterson:
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed from October 27`h, 2015
through December 1 Vh, 2015. Copies of all field reports were distributed to the Property
Management, Engineer of Record, General Contractor and to the St. Lucie County Building
Department.
If you have any questions, please call our office.
Respectfully,
Consulting Engineer
Threshold Inspector
Cc: Daniello & Associates Inc.
APR 1 1 OECD
M L Engineering, Inc. Project No. 15-145B Report No. 1
Consulting Engineers SCANNED cc: Gene Ross Elliott Merrill
2030 37ih Avenue BY Chris Arias Daniello Const.
Vero Beach, Florida 32960 St. Lucie Count Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 y File
Fax (772)569-4041
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER:�6 s
PROJECT NAME: Bryn Mawr — Bldg. B DATE: October 27, 2015
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Overcast/Rainy
WORK INSPECTED:
Railing posts, walkway concrete spalls, concrete beam & expansion joint, balcony & column
spalls
OBSERVATIONS:
Railing posts
20 total @ Building B. Majority of damaged posts & caps are removed. Installation of new posts
& caps to start next week. Reinforcing in existing cap is in serviceable condition and is to
remain. Clean and prime with a corrosion inhibitor as per specs.
Common walkwav concrete snallina (area of repair in square feet)
J Area has been demo and reinforcing exposed
,Unit 504 — 4 (Removed screen front door & frame)
JUnit 505 — 6.75 (Removed screen front door & frame)
1� nit 804 — 5.5 (Removed screen front door & frame)
✓ u h Floor by North Stairwell — 2
Total spalled area to be repaired =18.25 square feet
----beam
being—
Concrete Balcony S an lling
Unit 206 —11 square feet
,Concrete Column Repair
Unit 401 — 3 square feet
areas -atbottom--of--__ _
1
J i
M L Engineering, Inc. Project No.15-145B Report No. 1
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 37' Avenue Chris Arias Danielle, Const.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772)569-4041
mlengineeringino.com
RECCOMMENDATIONS:
Contractor to provide an OSHA approved handrail barrier at area where work is being
performed. All existing reinforcing shall be power tooled cleaned and primed with a corrosion
inhibitor as per specifications.
The corrosion at the entry doors appear to be from the existing screen frame fasteners. Majority
of the corrosion was directly under the frames. Front entry screen doors to be replaced with new
and all fasteners sealed.
Walkway concrete spalling
� r
_.r 3 L"a"
C
Concrete column Concrete balcony spalling
2
M L Engineering, Inc. Project No. 15-145B Report No. 3
Consulting Engineers ,
SCAN cc: Gene Ross Elliott Merrill
SCANNED
2030 37" Avenue
Chris Arias Daniello Const.
Vero Beach, Florida 32960
BY Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
Fax (772) 569AO41
File
St. Lucie County
mlenginmringinacom
BRYN MAWR CONDOMINIUMS - BLDG. B
5059 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1508-0406
PROJECT NAME:
Bryn Mawr —Bldg. B DATE: December 11, 2015
CLIENT:
Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR:
Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY:
Mike Lue WEATHER: Overcast
WORK INSPECTED & COMPLETED:
Building B — 5059
1. Railing posts (15 total)
a. 2"d Floor @ Unit 205 Bedroom
b. 5th Floor @ Unit 502 Bedroom, 503 Kitchen, 504 Door & 505 Kitchen
c. 6 h Floor @ Unit 603 Bedroom & Units 606 Corner Post
d. 7 h Floor @ between Units 701/702 & Unit 706 Corner Post
e. 8a' Floor @ Unit 803 & Unit 804 Bedroom
f. 9d' Floor @ between Units 902/903, Unit 903 Kitchen, between Unit 904/905 &
906 Stair Door
2. Walkway Concrete Spalling .
a.- 5th Floor @ Unit 504 Door
b. 8a' Floor @ North Stair Door
3. Concrete Beam & Expansion Joint Repair
a. South end of entry way canopy
4. Concrete Balcony Spalling
a. 2"d Floor @ Unit 206 Northwest Comer
5. Concrete Columns Repair
a. 4th Floor @ Unit 401 Door Jamb