Loading...
HomeMy WebLinkAboutMISC EMAILSM L Engineering Inc. 2030 371 Ave Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 Threshold Inspections SCANNED BY Special Inspection Plan St. Lucie County September 16, 2015 Proj ect: Owner's Representative Structural Engineer of Record Bryn Mawr 5055, 5059,I. AlA Ft. Pierce, Florida Elliott Merrill Community Management Mr. Gene Ross 835 20 Place Vero Beach, Florida 32960 M L Engineering, Inc 2030 37a' Ave Vero Beach, Florida 32960 This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection Services applicable to this project as well as the name of the Special Inspector. The Special Inspector shall keep records of all inspections and shall famish inspection reports to the Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought to the attention of the Building Official and Structural Engineer of Record. The Special Inspector shall submit a final report to the Building Official documenting completion of all Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out quality control inspections and testing. Job site safety means and methods are solely the responsibility of the Contractor. n --- -^ - ichael A. Lue, P.E. lorida P.E. No. 47520 Special Inspector No.1061 M L Engineering, Inc. 2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257.(P) / (772) 569-4041(F) Special Inspection clan Bryn.Mawr — Building A, B & C 5055, 5059, 5061 N. Al Ft. Pierce, Florida General Notes 6GANNED BY St. Lucie County 1. The purpose of this special Inspection as required by the FBC, is to report and record the repair procedures highlighting those that are not in compliance with the Contract Documents. 2. The Special Inspector shall meet the requirements of the Board of Building Codes and Standards. The Special Inspector's Field Representative shall have a minimum of two years inspection experience and shall be either a: a. Graduate Engineer or Architect b. General Contractor c. Licensed Building Inspector 3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to provide other services or work, such as material or concrete testing on the same project. 4. The Contractor shall cooperate with and assist, however possible the Special Inspector in performing his inspections. The Contractor shall allow the Special Inspector access to the project at all times when work is in progress. The Contractor shall review this plan and coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special Inspector before the work that requires inspection is performed. 5. The Special Inspector shall be responsible to the Owner and Building Department having jurisdiction for the project. 6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections are being performed by his on -site representative in accordance with the Threshold Plan. 7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor shall immediately maker every effort to rectify said discrepancies or deviations. 8. Upon completion of the structural repairs, a signed and sealed statement by the Special Inspector must be submitted to the building department stating that the portion of the project under his inspection responsibilities and under the Threshold Plan was constructed in substantial conformance with the Contract Documents. 9. This document is in addition to the requirements of the standard building inspections as required by the Florida Building Code and is not meant to specify all inspections required by that Code. M L Engineering, Inc. 2030 37°i Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) Special Inspection clan Bryn Mawr Building A, B & C 5055, 5059, 5061 N. Al A Ft. Pierce, Florida Schedule of Special Inspection Services Scope of work 1. Repair of walkway railing posts 2. Repair of concrete spalls at walkways 3. Repair of concrete ceiling spalls 4. Repair of concrete beam and expansion joint at entry canopy 5. Repair of concrete slab edge at balconies 6. Repair of deck coating on walkway floors Concrete Repairs 1. Verify location and quantity of repairs 2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps. 3. Verify the use of the correct approved concrete mix designs 4. Continuous observation of concrete placement for repair areas in accordance with the Contract Documents. M L Engineering, Inc. 2030 37'h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) M L Engineering Inc. 2030 —37" Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772)569-4041 September 15, 2015 SCANNED St LuBY Cie County Mr. Joe Cicio, Plans Examiner St. Lucie County Building Department 2300 Virgina Ave. Ft. Pierce, Florida 34982 Re: Bryn Mawr Ocean Towers Bldg. A, B & C — Concrete Repairs 5055 N. AlA Ft. Pierce, Florida 34949 Project No: 15-145 Dear Mr. Cicio: Please be advised that M L Engineering, Inc. has been retained to provide Special Inspection services for the concrete balcony repairs as indicated on the design and repair plans dated June 5, 2015. Copies of all inspection reports and final certification will be forwarded to all respective parties including the St. Lucie County Building Department. If there are any questions, please contact our office. Respectfully, _ ( Michael-Lue; P.E..' Structural Engineer FL PE. 47520 Tlu io d`Inspector-S`1- 6 - - — - Cc: Chris Arias — Daniello & Assoc. Gene Ross - Elliot Merrill Joe Cicio From: Joe Cicio Sent: Wednesday, September 16, 2015 8:34 AM !� To: Patrica Salazar (info@concreterepairing.net) 9(;;ANNtL) Cc: juliet@elliottmerrill.com'; Joe Cido BY Subject: Review Comments for Permit Number 1508-0407 St. Lucie Countv Attachments: Report_FL_Review_Comments_Noncompliant-jrf.pdf Dear St. Lucie County Permit Applicant, Please see the attached plan review comments which have been generated for your permit. As soon as we receive the modified plans and any additional required documentation back from the design professional, contractor or owner we will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to permitting for permit issuance. Thank You, Plans Examiner II Standard Building Inspector Building Plans Examiner One and Two Family Dwelling Inspector One and Two Family Plans Examiner St Luz , Cow Platiwti.K.g a*,.& ServU4,k Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records .available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, pleasenotifythe-sender-by-reply e-mail :and delete all materials from -all -computers.- --- -- - -- - - -- - - -- Joe Cicio From: Joe Cido Sent: Thursday, September 24, 2015 8:50 AM To: Patrica Salazar (info@concreterepairing.net) Cc: juliet@elliottmerrill.com'; Joe Cicio SCANNED Subject: Re -Review Comments for Permit Number BY Attachments: Report _FL_ Review _ Comments_ Noncompliant�jrf.pdf $q, Lucie COuntV Dear St. Lucie County Permit Applicant, Please see the attached plan review comments which have been generated for your permit. As soon as we receive the modified plans and any additional required documentation back from the design professional, contractor or owner we will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to permitting for permit issuance. Thank You, %"CAd W. ciao Plans Examiner II Standard Building Inspector Building Plans Examiner One and Two Family Dwelling Inspector One and Two Family Plans Examiner Si' L- u i , Cnu4gy Ka*L&. r a+%& De ve 4r wee Servi ceY Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and! or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Threshold Inspections Special Inspection Plan September 16, 2015 Project: Owner's Representative Structural Engineer of Record Bryn Mawr 5055, 5059, 5061 N. AIA Ft. Pierce, Florida Elliott Merrill Community Management Mr. Gene Ross 835 20'h Place Vero Beach, Florida 32960 M L Engineering, Inc 2030 37'h Ave Vero Beach, Florida 32960 M L Engineering Inc. 2030 37" Ave Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569.4041 SCANNED BY St. Lucie County This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection Services applicable to this project as well as the name of the Special Inspector. The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shallkbe brought to the attention of the Building Official and Structural Engineer of Record. The Special Inspector shall submit a final report to the Building Official documenting completion of all Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out quality control inspections and testing. Job site safety means and methods are solely the responsibility of the Contractor. V411-411, Mic1 aei A:,Lue, P1E.- FloriP.E: No. 47520 Special Inspector'No: 1.061 SEP 2 8 REC'D M L Engineering, Inc. 2030 371h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) Special Inspection Plan Bryn Mawr — Building A, B & C 6056, 5059, 5061 N. Al Ft. Pierce, Florida General Notes SCANNED BY St. Lucie County 1. The purpose of this special Inspection as required by the FBC, is to report and record the repair procedures highlighting those that are not in compliance with the Contract Documents. 2. The Special Inspector shall meet the requirements of the Board of Building Codes and Standards. The Special Inspector's Field Representative shall have a minimum of two years inspection experience and shall be either a: a. Graduate Engineer or Architect b. General Contractor c. Licensed Building Inspector 3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to provide other services or work, such as material or concrete testing on the same project. 4. The Contractor shall cooperate with and assist, however possible the Special Inspector in performing his inspections. The Contractor shall allow the Special Inspector access to the project at all times when work is in progress. The Contractor shall review this plan and coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special Inspector before the work that requires inspection is performed. 5. The Special Inspector shall be responsible to the Owner and Building Department having jurisdiction for the project. 6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections are being performed by his on -site representative in accordance with the Threshold Plan. 7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor shall immediately maker every effort to rectify said discrepancies or deviations. 8. Upon completion of the structural repairs, a signed and scaled statement by the Special Inspector must be submitted to the building department stating that the portion of the project under his inspection responsibilities and under the Threshold Plan was constructed in substantial conformance with the Contract Documents. 9. This document is in addition to the requirements of the standard building inspections as required by the Florida Building Code and is not meant to specify all inspections required by that Code. M L Engineering, Inc. 2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) Special Inspection Plan Bryn Mawr — Building A, B & C 5055, 6059, 5061 N. Al A Ft. Pierce, Florida Schedule of Special Inspection Services Scope of work 1. Repair of walkway railing posts 2. Repair of concrete spalls at walkways 3. Repair of concrete ceiling spalls 4. Repair of concrete beam and expansion joint at entry canopy 5. Repair of concrete slab edge at balconies 6. Repair of deck coating on walkway floors Concrete Repairs 1. Verify location and quantity of repairs 2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps. 3. Verify the use of the correct approved concrete mix designs 4. Continuous observation of concrete placement for repair areas in accordance with the Contract Documents. M L Engineering, Inc. 2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) 3 Bryn Mawr Ocean Towers Condominium Association C/O Elliott Merrill Community Management 835 20th Place _ Vero Beach, FL 32960 772-466-2630 September 24, 2015 St. Lucie County Planning & Development 2300 Virginia Ave. Ft. Pierce; FL 34982 Attn. Joe Cicio RE: Bryn Mawr Ocean Towers 5055 -5061 N. AlA, Ft. Pierce, FL 34949 1508-0406,1508-0407, 1508-0405 Dear Mr. Cicio, SCANNED BY St Lucie County Bryn Mawr Ocean Towers has entered into a contractual agreement with ML Engineering, Inc. to provide onsite inspections for the site above. ML Engineering, Inc. has agreed that they will monitor, enforce and inspect guidelines as set forth by St. Lucie County and the Florida Building Codes. The Association has hired and will pay all costs of employing a special inspector. On Christine Prandy, Presiden Bryn Mawr Ocean Towers E t/ IED V EE SEP 2 8 RECD WLa.6 (�4n 17c t I �ctLUiL (�YILD t?9 rl JULIE A BAIgRETT °y""•.cc�''�..jiij++ �c, MY COMMISSION #FF132752 s4s'�Y" � •5 �?,3%� 15 EXPIRES Se to (ao7) ase.e�� P m6er 28, 2018 Ff-"dtl "OWYSemi .com M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinawm Project No. 15-145A Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Coast Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER. 1508-0407 PROJECT NAME: Bryn Mawr — Bldg. A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue SCANNED BY St. Lucie Countv DATE: November 20, 2015 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Partly Cloudy WORK INSPECTED: Ceiling spall demo @ Unit 101, 103 & 301 Concrete beam demo @ south & north end of entry way canopy We inspected the demo areas at the units listed above. We found the following: The ceiling spall areas at Unit 101 & 103 have been chipped of all loose concrete and corroded reinforcing exposed. The corrosion in the bars was "chased" until clean bars found. The corrosion in the bars is minimal and will not require replacing. The (2) reinforcing bars (shown in picture below) at Unit 301 are heavily corroded and will require replacing. Use a new #4 bar with 4" epoxy embed each end with 24" lap splice. Keep a minimum edge clearance of 1 V2". The total area of ceiling spalls is 18.5 square feet which is 4.5 more than estimated in the original design documents. Ceiling Spall @ ' ECEIVE I "An t M L Engineering, Inc. Project No. 15-145A Report No. 2 Consulting Engineers ce: Gene Ross Elliott Merrill 203037ih Avenue Chris Arias Danielle Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringinc.com The concrete beams at the entry way canopy has been chipped of all loose concrete and corroded reinforcing exposed. The contusion in the bars is minimal and will not require replacing. The total area of beam repairs is 14 square feet which is 2 less than anticipated. The expansion joint at the north and south ends of the canopy has been removed of all debris. Repair of the joints will start after the beams are repaired. �•.•`PNTHONy�G.,. Nl- _ IdF a* LuS;`F.E. T M L Engineering, Inc. Project No. 15-145A Report No. 2 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37'Avenue Chris Arias Daniello Const. Vero Beach, Phone (772) 569-Flori 2572960 File Peterson SLC Bldg Dept Fax (772)569-4041 mlengineeringinc.com FILt vupy BRYN MAWR CONDOMINIUMS - BLDG. A SCANNED 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA SCAENN THRESHOLD INSPECTION REPORT St. Lucie Count SLC BUILDING PERMIT NUMBER: 1508-0407 y PROJECTNAME: Bryn Mawr —Bldg.A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: November 20, 2015 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Partly Cloudy WORK INSPECTED: Ceiling spall demo @ Unit 101, 103 & 301 Concrete beam demo @ south & north end of entry way canopy We inspected the demo areas at the units listed above. We found the following: The ceiling spall areas at Unit 101 & 103 have been chipped of all loose concrete and corroded reinforcing exposed. The corrosion in the bars was "chased" until clean bars found. The corrosion in the bars is minimal and will not require replacing. The (2) reinforcing bars (shown in picture below) at Unit 301 are heavily corroded and will require replacing. Use a new #4 bar with 4" epoxy embed each end with 24" lap splice. Keep a minimum edge clearance of 1 %z". The total area of ceiling spalls is 18.5 square feet which is 4.5 more than estimated in the original design documents. Ceiling Spall @ Unit 301 EIV NOV 3 0 RECD y t M L Engineering, Inc. Consulting Engineers 203037' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 ntlengineeringinacom Project No. 15-145A Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Danielle, Const. Carl Peterson SLC Bldg Dept File The concrete beams at the entry way canopy has been chipped of all loose concrete and corroded reinforcing exposed. The corrosion in the bars is minimal and will not require replacing. The total area of beam repairs is 14 square feet which is 2 less than anticipated. The expansion joint at the north and south ends of the canopy has been removed of all debris. Repair of the joints will start after the beams are repaired. .y iaad4�.LuC PLO', a� . 2 i 1VI L Engineering, Inc. Project No. 15-145A Report -No. I Consulting Engineers cc: Gene Ross Elliott Merrill 203037'"Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone nceri ginc.c 57 FILt File Fax (772)569-4041 mlengineeringinacom BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA SCANNED THRESHOLD INSPECTION REPORT BY SLC BUILDING PERMIT NUMBER: 1508-0407 St Lucie County PROJECT NAME: Bryn Mawr — Bldg. A DATE: November 17, 2015 CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue WORK INSPECTED: Concrete walkway demo @ Units 301/302 and Unit 701 Ceiling spall demo @ Unit 103 Concrete beam demo @ south end of entry way canopy LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias :WEATHER: NOV 3 0 REC'D We inspected the demo areas at the areas listed above. We found the following: Concrete walkways have been chipped of all loose concrete and corroded reinforcing exposed. The corrosion in the bars was "chased" until clean bars found. The corrosion in the bars are minimal and will not require replacing. The reinforcing at the spalling areas do not have proper clearance from the top of the slab and possibly the reason for the spalling. All exposed bars shall be power tool cleaned and primed. Walkway Concrete Spalls Ceiling spall at the walkway slab edge is in progress of being demo. We found corroded reinforcing bars at the edge and the corrosion is being_ chased. The extent of repair is unknown until all corroded reinforcing is exposed. 1 tM L Engineering, Inc. Consulting Engineers 203037' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc.com Project No. 15-145A Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Ceiling Spall @ Unit 103 The demo at the entry way canopy south beam is in progress. There are (3) areas of repair along the beam, each is approximately 1 cubic feet. The reinforcing bars have minor corrosion and will only require cleaning and priming. Entry Way Canopy Beam o NCHOM �•� P• • Y<G'• Q G ic�iaid �. LCal u6 .E. '•.,FSSI�ONP �.. M L Engineering, Inc. Project Ao. 15-145C Report No. 1 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue Chris Arias Daniello Const. Beach,Vero Fle 960 Peterson SLC Bldg Dept Phone(772) 569- 257 Fax (772) 569-4041 mlengineeringinc.com FILE GOPY BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY ALA, FT. PIERCE, FLORIDA SCANNED ;. THRESHOLD INSPECTION REPORT BY SLC BUILDING PERMIT NUMBER: 1508-0405 St. Lucie Countv PROJECT NAME: Bryn Mawr —Bldg. C DATE: December 8, 2015 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Danielle, & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Sunny WORK INSPECTED: All railing posts and caps specified in the repair documents at Building C have been removed and are in progress of being replaced. All of the railing caps have deteriorated reinforcing which was replaced as per repair documents. Walkway concrete spall at Unit 504 has been demo and all loose concrete has been removed. There is some minor corrosion on the exposed reinforcing bars. The bars will only need to be power tool cleaned and primed as per specifications. The bars do not have proper concrete coverage -and are too close to the surface. Daniello Contractors was informed of this and will move the bars as best as they can to provide the maximum clearance. Damaged railing top cap 1 Surface spall at Unit 504 DEC 1 1 REC'D M L Engineering, Inc. Project No. 15-145A Report No. 3 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue r-�p Chris Arias Daniello Const. Vero Beach, Florida 32960 SVI"rNivti.i Carl Peterson SLC Bldg Dept Phone (772) 569-1257 SG File Fax (772)569-4041 BY n lengineeringinc.com St. Lucie COUrltt BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1508-0407 PROJECT NAME: Bryn Mawr- Bldg. A DATE: December 11, 2015 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Overcast WORK INSPECTED & COMPLETED: Building A - 5061 1. Railing posts (11 total) a. I' Floor @ Unit 102 Kitchen & North Stairwell b. 4d' Floor @ Elevator Lobby c. 5d' Floor @ Unit 504 Kitchen d. 6th Floor @ Unit 604 Kitchen & between Units 604/605 e. 86' Floor @ Unit 802 Door & Bedroom f. 9d' Floor @ Unit 904 Door & Bedroom & between Units 904/905 2. Walkway Concrete Spalling a. 3`d Floor between Units 301/302 b. 7d' Floor @ Unit 701 bedroom 3. Ceiling Spall a. lst Floor @ Unit 101 Balcony & Unit 103 Walkway b. 3`d Floor @ Unit 301 Balcony 4. Concrete Beam & Expansion Joint Repair - -- a. -North & South ends ofentry way canopy a. 1st Floor @ Unit 102 Door & between Units 101/102 b. 2nd Floor @ Unit 203 Door & between Units 204/205 c. 3`d Floor @ Unit 303 Door ,%.w 11I1're ��.•`PNTHONy�%,� � G••.SF•'GF�': �q1� 0• •i�c.�ty `ac52 �i _:d = M L Engineering Inc. 2030 37a Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax:(772) 5694041 December 14, 2015 Mr. Carl Peterson, Building Official St. Lucie County Building Department 2300 Virginia Avenue Ft. Pierce, Florida 34982 Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repiars 5061 North Hwy. AIA "Building A" Ft. Pierce, Florida 34949 Engineer's Project No. 15-145A I.R.C. Bldg. Permit No. 1508_040T Dear Mr. Peterson: SCANNED BY St. Lucie County This letter shall serve as certification that to the best of our knowledge, the structural repairs have been constructed in substantial conformance with the design documents and specifications and as duly noted in our field reports. Threshold inspections for the above referenced project were performed from November 17a', 2015 through December 1 lb, 2015. Copies of all field reports were distributed to the Property Management, Engineer of Record, General Contractor and to the St. Lucie County Building Department. If you have any questions, please call our office. Respectfully, Threshold Inspector Cc: Daniello & Associates Inc. Joe Cicio From: Danielo & Associates <info@concreterepairing.net> Sent: Friday, December 18, 2015 9:32 AM To: Joe Cido Cc: Chris Arias Subject: FW: Bryn Mawr - Bldg A Attachments: Bryn Mawr A Report 3 12-11-15.pdf, final certif letter bldg A.pdf Good morning Joe, please let me know how much will be a fee to close out this permit. Thank you and have a great day. Patricia Salazar Secretary/Treasurer Daniello & Associates, Inc. SCANNED BY St. Lucie Countv From: Todd Rhoten[mailto:todd@mlengineeringinc.com] Sent: Thursday, December 17, 2015 11:56 AM To: Geno Ross <gener@elliottmerrill.com>; Danielo & Associates <info@concreterepairing.net> Cc: Chris Arias <carias@concreterepairing. net>; Julie Barrett <juliet@elliottmerrill.com> Subject: Bryn Mawr - Bldg A Please see attached Report #3 and Final Letter of Certification for Building A for your files. We will mail the reports to the St. Lucie County Bldg. Dept. as requested by them. Todd Rhoten M L Engineering, Inc. 2030 371h Ave. Vero Beach, FL 32960 772-569-1257 p 772-569-4041f _www.miengineeringinc.com -- M L Engineering, Inc. Project No. 15-145A Report No. 3 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37t° Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringinc.com _ BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1508-0407 PROJECT NAME: Bryn Mawr — Bldg. A DATE: December 11, 2015 CLIENT: Elliott Merrill Community MgL. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Overcast Building A — 5061 SCANNED 1. Railing posts (I 1 total) BY a. IS1 Floor @ Unit 102 Kitchen & North Stairwell St. Lucie County b. 41h Floor @ Elevator Lobby c. 51h Floor @ Unit 504 Kitchen d. 6th Floor @ Unit 604 Kitchen & between Units 604/605 e. 8th Floor @ Unit 802 Door & Bedroom f. 91h Floor @ Unit 904 Door & Bedroom & between Units 904/905 2. Walkway Concrete Spalling a. 3`d Floor between Units 301/302 00 7 h Floor @ Unit 701 bedroom 3. Ceiling Spall a. 151 Floor @ Unit 101 Balcony & Unit 103 Walkway b. 3`d Floor @ Unit 301 Balcony 4.- Concrete Beam-& Expansion Joint Repair a. North & Soutli ends of entry way canopy. 5. Deck Coating on Walkway Floors a. lst Floor @ Unit 102 Door & between Units 101/102 b. 2ad Floor @ Unit 203 Door & between Units 204/205 c. 3`d Floor @ Unit 303 Door M L Engineering Inc. ® : (7 Avenue Vero Beach, Florida 32960 FILE Phone: (772) 2) 569-1257 Fax: (772) 5694041 December 14, 2015 Mr. Carl Peterson, Building Official SCANNED St. Lucie County Building Department St. Luce County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repiars 5061 North Hwy. AIA "Building A" Ft. Pierce, Florida 34949 Engineer's Project No. 15-145A I.R.C. Bldg. Permit No. 1 g--i 4 Dear Mr. Peterson: This letter shall serve as certification that to the best of our knowledge, the structural repairs have been constructed in substantial conformance with the design documents and specifications and as duly noted in our field reports. Threshold inspections for the above referenced project were performed from November 17°i, 2015 through December 1 lth, 2015. Copies of all field reports were distributed to the Property Management, Engineer of Record, General Contractor and to the St. Lucie County Building Department. If you have any questions, please call our office. Respectfully, Consulting Engineer Threshold Inspector Cc: Daniello & Associates Inc. DEC 2 1 AECD ti M L Engineering Inc. 2030 37" Avenue LU G LA In y Vero Beach, Florida 32960 FI: Phone: (772)569-1257 Fax: (772) 5694-4041041 December 14, 2015 SCANNED Mr. Carl Peterson, Building Official BY St. Lucie County Building Department St. Lucie County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Re: Bryn Mawr Ocean Towers Condominiums — Concrete Repairs 5061 North Hwy. AIA "Building A" Ft. Pierce, Florida 34949 Engineer's Project No. 15-145A S.L.C. Bldg. Permit No. - 0.7 Dear Mr. Peterson: This letter shall serve as certification that to the best of our knowledge, the structural repairs have been constructed in substantial conformance with the design documents and specifications and as duly noted in our field reports. Threshold inspections for the above referenced project were performed from November 17t', 2015 through December 11`h, 2015. Copies of all field reports were distributed to the Property Management, Engineer of Record, General Contractor and to the St. Lucie County Building Department. If you have any questions, please call our office. Respectfully, Consulting Engineer Threshold Inspector Cc: Daniello & Associates Inc. APR 1 1 RECD Joe Cicio From: Sent: To: Cc: Subject: Good Morning Joe, Please see below the breakdown: Liliana Gopalakrishna <gliliana@concreterepairing.net> Tuesday, April 12, 2016 8:37 AM Joe Cicio Danielo & Associates FW: Permits, Building $7,530.97(1508-0407) Building B $2,945.00 (1508-0406) Building B $2,042.96 (1512-0197) Building C $11,017.47 (1512-0196) Building C $ 5,560.88 (1508-0405) Thank you, Lidlana kjopadagriSRNa Daniello & Associates Inc Phone (561) 835-4788 Fax (561) 833-3573 2708 N. Australian Ave., Suite 9 West Palm Beach, FL 33407 From: Joe Cicio [mailto:cicioj@stlucieco.org] Sent: Monday, April 11, 2016 4:40 PM To: Liliana Gopalakrishna Subject: RE: Permits, Can you break the fees to the 5 permits we; have issued SCANNED BY St. Lucie County --Thanks- -Joe - — From: Liliana Gopalakrishria [mailto:gliliana(aconcretereoairing.net] Sent: Monday, April 11, 2016 4:18 PM To: Joe Cicio <cicioi(dstlucieco.org> Cc: Danielo & Associates <info@concretereoairing.net> Subject: FW: Permits, Attached is the G702 a little bit more clear but does not have the engineer signature, however has the same numbers. Please see below the breakdown: Building B Building A $4,987.96 $7,530.97 1