HomeMy WebLinkAboutCERTIFICATE FOR PAYMENTG702 APPLI(:ATION and CERTIFICATE for PAYMENT To: Turtle Reef Condominium 10800 S Ocean Drive Jensen Beach, Florida From: Blue coast Construction 2587 SE Monroe at Stuart, Florida 34997 Contract For: Concrete Restoration Project: Turtle Reef Stack No. 2 to 10 Engineer: Mathers Engineering APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet, G703, is attached. 1. ORIGINAL CONTRACT SUM 0.00 2. Net Change By Change Orders 161,382.90 3. CONTRACT SUM TO DATE 161,382,90 4. TOTAL COMPLETED AND STORED TO DATE 161,382.90 5. RETAINAGE: a. of Completed Work b. of Stored Material TOTAL RETAINAGE 6. TOTAL EARNED LESS RETAINAGE 0.00 0.00 0.00 161,382.90 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 141,563.20 B. CURRENT PAYMENT DUE 19-819.70 9. BALANCE TO FINISH, INCLUDING RETAINAGE 0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner 161,382.90 0.00 Total approval this Month 0.00 0.00 TOTALS 161,382.90 0.00 NET CHANGES by Change Order 161,382.90 Application No: 9 App. Date: October 12, 2018 Period to: Project No: Contract Date: Distribution to: ❑ OWNER ❑ CONSTRUCTION MGR. ❑ ARCHITECT ❑ CONTRACTOR ® ENGINEER The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. SCANNED CONTRACTOR: BY By: Date: St Lucie County State of: County of: Subscribed and swom before me this day of The above personally appeared before me, the undersigned notary public, and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief. Notary Public: My Commission expires: ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and on the Continuation Sheet that are changed to conform to the amount cerfified.) ENGINEER By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. vl O O W CAUTION: You should use an oricinal document which has this caution orinted in red. An oriainal assures that chances will not be obscured as may occur when documents are reproduced. CONTINUATION SHEET G703 PROJECT: Turtle Reef Stack No. 2 to 10 Blue coast Construction Page 1 of 1 Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification is attached. Use Column I on Contracts where variable retainage for line items may apply. Application No: 9 App. Date: October 12, 2018 Period to: Project No: A B C D I E F G H I Item # Description of Work Schedule of Values Work Completed Materials Stored & Used Prior+ Current Total Completed and Stored To Date % Balance to Finish Retainage From Previous Application(s) This Period 1 Edge Repair for Full Depth 0.00 43,171.20 0.00 43,171.20 ? -43,171.20 0.00 2 Half Deck repairs 0.00 8,679.30 0.00 8,679.30 ? -8,679.30 0.00 3 Full Depth Repair 0.00 16,643.70 0.00 16,643.70 ? -16,643.70 0.00 4 Ceiling Spalls (+/-3 inches) 0.00 16,606.80 0.00 16,606.80 ? -16,606.80 0.00 5 Beam Spalls (Lx6"x6") 0.00 569.70 0.00 569.70 ? -569.70 0.00 6 Column Spells (Lx6"x6") 0.00 4,494.201 0.00 4,494.20 ? -4,494.20 0.00 7 Rust Spots 0.00 0.00 0.00 ? 0.00 0.00 8 Anchor Removal 0.00 12,976.00 0.00 12,976.00 ? -12,976.00 0.00 9 Gardrail post Pocket repairs 0.00 0.00 0.00 0.00 ? 0.00 0.00 10 Concrete Beam Repair 0.00 0.00 0.00 0.00 ? 0.00 0.00 11 Concrete Column Repair 0.00 40,716.00 0.00 40,716.00 ? -40,716.00 0.00 12 Drip Edge Installation 0.00 0.00 0.00 0.00 ? 0.00 0.00 13 Cathodic Protection 0.00 0.001 0.00 0.00 ? 0.00 0.00 14 lKnee Wall Replacement 0.00 0.00 0.00 0.00 ? 0.00 0.00 15 Sika Ferroguard 903 0.00 13,876.00 0.00 13,876.00 ? -13,876.00 0.00 16 Dowels (Change order) 0.00 3,650.00 0.00 3,660.00 ? -3,650.00 0.00 17 MMFFX Steel (Change order) 0.00 0.00 0.00 0.00 ? 0.00 0.00 18 Flashpatching GRAND TOTAL: 1 0.001 161,382.901 0.001 1 161,382.90 ?-161,382.90 0.00 A=Line Item Number B=Brief Item Description C=Total Value of Item D=Total of D and E From PreviousApplication(s) (If Any) E=Total Work Completed For This Application F=Materials Purchased and Stored for Project G=Total of All Work Completed and Materials Stored for Project H=Remaining Balance of Amount to Finish 1=Amount Withheld from G