Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATE• Termite Inspection Je505 Christ is _, 7 2-323-7921 • Termite Pretreatment ErrictA-Bug Toll Free: 1-877-36S-9990 • Pest Control • Rodent Service Termite & �' Pest Fax: 772-340-5990 • Fire Ant Lawn Service Control, Email: Evictabug@gmail.com • Whitefly Treatment Inc' 2373 SW Woodridge St. • Licensed & Insured Lic. JB175775 Port St. Lucie, FL 34953 Notice of Preventative Treatment for Termites (as required by Florida Building Code,(FBC) 104.26 and Broward County Chapter FBC 105.2.2) PEST PREVENTION 11 FIRE NT SERVICE I TERMITE SERVICE I RODENT EXCLUSION & REMOV C I DATE OF SERVICE 2 d i . TIME 3 — J7 77-97 ,Z 11 Y J DEVELOPMENT NAME (PROJECT) ,5 CONTRACTOR'S NAME CONTACT PERS N ST. Lucie County, I D-� . S6 p a+CO Ii1A4 Perm STRUCTURE ADDRESS (LO LOCK) CITY, STATE 3Zo �,nr-�Q-7. COUNTY 41A NrES I) � ` I f. I�� 'OO"J� U�/ ZIP CODE �-J4, ❑ FLOATING ONOLITHIC ❑ CUTOUTS ❑ FOOTER ❑ TAMP &TREAT TREAT ONLY 79pATIO ,e RONT ENTRY ❑ FINAL PRODUCTS ❑ BASELINE ADOMINION 2LACTIVE INGREDIENT ❑ OTHER ACTIVE INGREDIENT ❑ GARAGE ❑ DRIVEWAY ❑ STEM WALUFOOTERS ADDITION ❑ RETREAT ❑ BORA CARE TREATMENT ❑ PLUMBING CUTOUTS ❑ SIDEWALKS ❑ POOLDECK ❑ OTHER BY ❑ TERMIDOR SC ❑ BORACARE ❑ PREMISE ❑ TALSTASt Lucie County CCIMIDACLAPRID 0BIFENTHRIN ❑ DISODIUM OCTABORATE TETRAHYDRATE CONCENTRATION ❑ .06% ❑ .12% p ❑ .25%/ .05% ❑ 23% ❑ 0/6 ❑ OTHER GALLONS APPLIED SQUARE FOOTAGE DS/� LINEAR FOOTAGE AYES ❑ NO �LI MEASURED OR VERIFIED PER PLANS JOB READY CONDITIONS MET AES ❑ NO DETAILS As per 1042.6 FBC- If soil chemical barder method for termite prevention is used. Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer. Services. (Per the Florida Building Code.) _ fbl If this notice is for the final exterior treatment, initial and date this line FINAL STICKER ❑ ELECTRICAL PANEL ❑ WATER HEATER Payment Terms: Payment due at fime of service. Zo J� Date ,4 ❑OTHER Applicator: (EvictA Bug Termite and Pest Control, Inc.) EC Date Customer (Property Owner or Agent) —4===zii www.evictabugpestcontrol.com Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT SCANNED BY St. Lucie Counti, 3Yygl PERMIT #: r' � 1l rz Z OB ADDRESS: _3Zf�5 Gamsm BUILDER/CONTRACTOR: !'log — MAA-e.o $- 19A4o PEST CONTROL CONTRACTOR: EVICT-p.-BUG TERMITE& PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. ilk Square feet if area treated: 8 Percentage of solution:.05% Date of Treatment: 'i Footing 1st Treatment Re -Treat Driveway 1st Treatment ,p Rg,Treat Othe 7bkio/1�1ah '00{ 'Cmty ist Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: & Time of Treatment: :? — Is — Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter fZRI Inspection ou LU ignature of Exte'rminaW D to Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each Inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certif sate of Protective Treatment for prevention of termites A weather rest ntjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit is issued to and another copy for the building permit fifes: The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of die treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment if the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. .St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014