NOTICE O
VEGETATION REMOVAL
PERMIT EXEMPTION
Permit#: 20140931 (Amended) . Fee: $0.00
SCANNEL,
Date Issued: 12/7/2015 BY
Property Owner: Savanna Club HOA, Inc. St. Lucie Comb
Date Expires:, Upon completion of work, or 12/7/2016, whichever occurs first.
Contractor: SLC Public Works
Parcel ID#: --A portion of PID-3425=7040015-000-3
Project Location: Lennard Road Connection to Bromeliad Circle
Project Size: 4:5.acres = s t
Project Description: APplicantiFr 1
requestsyegetation removal per-tM Lennard Road Connection to
Bromeliad:Circle Plans:=Multiple exotic` Brazilian pepper trees, earleaf acacia hand native slash pine
trees will be removed;-asoftthe roadl"construction. These activities•�will take place within
existing ROW. One Potentially Occupied Gopher Tprtoise burrow is present wrthln the project
area and will be_relocated prior to site w_ ork.�, L
Notes:
r,
1. HABITAT- I ( 1 r
a. Uplands: Residential
b. Wetlands: None observed by staff. Please note this. does not constitute a_state or
federal jurisdictional determination -and all formal wetland -delineations must be
obtained from appropriate state and/or federal agencies.
2. WILDLIFE: One Potentially Occupied Gopher Tortoise burrow.
3. SIGNIFICANT ARCHAEOLOGICAL OR HISTORIC FINDINGS: None identified.
Exemption #20140931 Authorizes the following: The removal of all vegetation within the existing
ROW to allow for the construction of the Lennard Road extention to Bromeliad Circle. No native
vegetation outside of the project boundary shall be removed at this time.
Mitigation: No mitigation is required, as this road construction project is an exempt activity.
General Conditions of Issuance:
• The following minimum standards for vegetation protection shall be applied to areas of
vegetation designated to be preserved:
• At a minimum distance of either ten (10) feet from the edge of groups of protected
vegetation or from the radius of the dripline from all protected trees, whichever is greater;
Protective barriers or protective designations shall remain in place until removal is
authorized by SLC ERD, or until issuance of a certificate of occupancy;
In the event that any protective barriers are removed or altered and clearing activities are
conducted within an area identified for preserve, SLC ERD is authorized to direct that all
land clearing and site alteration work at the site be stopped until the barriers are restored
and any necessary corrective actions taken to repair or replant any vegetation removed or
damaged as a result of these encroachments.
• The preserve areas and tree preservation areas shall be maintained in their natural state, so as
not to alter the water and oxygen content of the soil and impair its function;
• No grade changes or excavation of any sort may be made within the barricaded areas;
• If any excavation or other activities are expected outside of the preserve area or dripline, the
roots should first be pruned (to the depth of required excavation) to sever them cleanly;
• If underground utilities must be routed through a protected root zone area, tunneling under the
roots shall be required;
• If irrigation must be installed, it shall be installed outside of the dripline of all preserve areas and
protected trees;
• No fill material, construction material, concrete; paint, chemicals, or other foreign materials shall
be stored, deposited or disposed of within a vegetation preservation area;
• No signs, permits; wires, l—qr others attrachmentsl =-shall be affixed_ -or attached to protected
vegetation_
• No equipment including,pas�gervehicleshalhriven parked, o:stored or repaired within
designated vegetation preservation=areas.--_
PLEASE BE ADVISEDI THAT ANY'NATIV5 VEGETATION' DESTROYED OR DAMAGED OUTSIDE OF
THE LIMITS OF CLEARING DUE--TO]GONSTIRUCTION .ACTIVITIES OR FILL PLACEMENT SHALL BE
MITIGATED AT kRATIO' OF 4 1 (4 INCHES OF, REPLANTING FOR EACH, INCH DESTROYED OR
DAMAGED. �,
PLEASE NOTE: --- - e: _--- - - - -- --- - _ -
• THIS IS NOT AN AUTHORIZATION TO PLACE FILL ON OR RE -GRADE PROPERTY.
• PLEASE CONTACT A PROFESSIONAL SURVEYOR TO DETERMINE IF YOUR PROPERTY IS
AFFECTED BY OR LIES WITHIN A FLOODPLAIN.
• THE APPLICANT SHALL KEEP THIS EXEMPTION POSTED ON -SITE AT ALL TIMES DURING
LAND CLEARING.
• THE PROPERTY OWNER AND/OR AGENT SHALL BE RESPONSIBLE FOR OBTAINING ALL
APPLICABLE STATE AND/OR FEDERAL PERMITS.
94 Baleet
,S'e�riow Eui�oa�re7ta� Pean7e�
SCANNEV RECEIVED DEC o 3 1015
�au v BY
St Lucie Count%
NOTICE OF
VEGETATION REMOVAL
PERMIT EXEMPTION
Permit#: 20140031 Fee: $0.00
Date Issued: 9130/2014
Property Owner: Savanna Club HOA; Inc.
Date.Expires::Upon completion of work, or 9/30/2015, whichever occurs first.
Contractor: SLC Public Works
Project Location Lennard Road Connection to Bromeliad Circle
lq,qProject S�ie:Y 4Sacs-4
71
to
will
project
area and,will b.relocatedxprio:o site work 5°
:Notes: r,,�^'*tt-' C.*a
1 HABITAT:-`1z
L�
'obtained from appropriate state arid/or federal agencies.
Z. WILDLIFE: One. Potentially Occupied Gopher Tortoise burrow.
3. SIGNIFICANT ARCHAEOLOGICAL OR HISTORIC FINDINGS: None identified.
Exemntion.420140931 Authorizes the following: The removal of all vegetation within the existing
ROW to allow for the construction of the Lennard Road extention'to Bromeliad Circle. No native
vegetation outside of the project boundary shall be removed at this time.
Mitigation: No mitigation is required, as this road construction project is an exempt activity.
General Conditions of Issuance:
• The following minimum standards for vegetation protection shall be applied to areas of
vegetation designated to be preserved:
• At a minimum distance of either "ten (10) feet from the edge of groups of protected
vegetation or from the radius of the dripline from all protected trees, whichever is greater;
• Protective barriers or protective designations shall remain in place until removal is
authorized by SLC ERD, or until issuance of a certificate of occupancy;
• In the event that any protective barriers are rernoved.or altered and clearing activities are
conducted within an area identified for preserve, SLC ERD is authorized to direct that all
land clearing and site alteration work at the site be stopped until the barrier's are restored
and any necessary' corrective actions taken to repair or replant any vegetation removed or
damaged as a, result of these -encroachments.
• The -preserve areas and tree preservation areas shall be maintained in their natural state, so as
not to alter the water and oxygen content of the soil and impair its function;
• No grade changes. or excavation of any sort may be made within the barricaded -areas;
• If any excavation or other activities are expected outside.of the preserve area or dripline, the
roots should first be pruned' (to the depth of required excavation) to sever them cleanly;.
• If underground utilities must be routed through a, protected root zone area, tunneling under the
roots shall be required;
• if irrigation must be.installed., it shall be installed outside of the dripline of all preserve areas and
all
ad
iin
)F
3E
)R
IS
THE APPLICANT SHALL KEEPTHIS EXEMPTION POSTED ON -,SITE AT ALL'TIMES DURING
LAND CLEARING.
THE -'PROPERTY OWNER ANDIOR AGENT SHALL BE RESPONSIBLE FOR OBTAINING ALL
AaeLMABLE STATEAND/OR FEDERAL'PERMITS.
I
BOARD
OF COUNTY
COMMISSIONERS
September11,20L4
Brian Good, P.E.
Y.inley ltem
445 24 ° Sweet t1200
Vero Beach, FL 32960
COUNTY
ADMINISTRATION
RE: AWfication for Stormwater Permit: Intersection of Lennard Road & Brozndliad Extension
Dear Mr. Good:
Fee
conditions:
Upon_ completion of the project and prior to requesting a Final Paving and Drainage Inspection, please
submit three (3) copies of signed and scaled record plans with a signed and sealed letter of completion
from the project engineer. Tice plans must depict at a minimum the location and finished grades of all
buildings and paving; critical spot clevatlons, pavement marl ngs, traffio siguage, the loch6n, ype, size,
materW and inverts of all drainage structure improvements and the location of any, stormwater
management facilities.
Please be advised, operators of construction activities that propose to clear, excavate or fiii'l.0 acre of
Iand or more over the life ofthe project am required to obtaincoverage under the Florida Department of
Environmental Protection's National Pollutant Discharge Elimination System "Generic Permit' for
$Wrmwatec Discharge from' Large and -Small Construction, Activities' anda vegetation removal permit
prior to any construction activity on site A copy of the Notice of Intearto file for coverage tinder this
permit must be submitted to this office asYequired'to discharge to the County's Municipal Separate Storm
Sewer System (MS4). A Stormwater Pollution Prevention Plan must be developed and implemented to
be in compliance with the permit, Elements of a SWPPP include Best Management Practices that willbe
utilized to-minimizo soil erosion and sodiurentatzon from degrading the water quality of downstream
water bodies. For more.informaiion, please contact the.FDEP NPDES Stormwater'Sec6n and•relder to.
section 1-7 7 of the e.of ordinauces of St. iucie.Caunty. Florida:
If you have any questions or concerns regarding this matter, please do uotheesitate to contact me directly
at (02) 462-2719,
Sincerely,
lw,f icbael,Halter P,E.
Storm Water Engineer lPlaus Examiner
cc: Ble$4Savrt,watuP6mi611mnmd BiDmmetiadEd.doc
t,?
ql?R OLlUOYStT.4h2krNa] toorowrauoWff0 o.z +..iAV1A tEHnLW�klNa1 tGNNIE N6ECHHISON, IX,AkiNa �D �1 Um 1OHNOKW.M.1 Na.5
2300 Virginla Avenue . Fort Pierce, FL 34981-5652 . Phone (772j462-1453--------
MD (772)462-1428' • Fax (772)462=2131 • email: pent4ftlucleco.org
webslte: wwwM1u, cleco.org