Volumetric
OWNER
YOUR MX DESIGN
MIX DESIGN
crete Dispenser Mix Design Worksheet
Mobil Crete Technologies Unit Serial # N91-85R
(This sheet must be filled out for each mix design)
5000
(max 8 characters)
Materials of one cubic yard:
Date 1=016
Cement 600 IBS. 100% Cement Discharge Speed 102 Counts per Bag of Cement
( In Percent)
Cemem 6.4 BAGS 1.61 Cubic Yard Discharge Time (Minute)
Aggregate Pounds of
Aggregate Name # Desired Aggregate Name Aggregate
(enter t, 2 3. ar 4;
1 Pea Rock Aggregate 1 2 Orton Sand 17"
2 Ortona Sand Aggregate 2 1 Pea Rode 900
3 Rocx #67
4 D
Color OUNCES Fiber Chopper
Low, Mid,
or High Sys Dilution Ozfbag
admix # 1 I I
Admix # 2 I I
Admix # 3 I I
(Mid Range available on 130. 150. d200 Series units only)
1. Determine the count per cubic yard.
Pounds per Yard
SCANNED
BY
St. LuciP Cnuno
6.4 bagslcubic yaTif x 102 counts per bag = 649 court per cubic yard.
2. AGGREGATE 1: divide the lbs. of fine aggregate per cubic yard by the count per cubic yard.,
1744 lbs. fine aggregate divided by 649 counts percu. yd = 2.69 lbs. per count.
GATE SETTING (from graph) 5.2
3. AGGREGATE 2: Divide theft. of coarse aggregate per cubic yard by the count per cubic yard.
Sao lbs. coarse aggregate divided by 649 counts per cu. yd = 1.39 lbs. per count
GATE SETTING (from graph) 2.9
Description 5000
Total _ 649 Counts l Cubic Yard
Cement 0.93 IbsJ Count Dial
Aggregate 1 2.69 ibsJ Count Setting OZIMin
Aggregate 2 1.39 IbsJ Count Admix # 1 ERROR D.D
'Water _ 037 Ibsd Count Admix # 2 ERROR 0.0 _
Aggregate 1 Gate 8.2 Admix # 3 ERRDR 0.0
Aggregate 2 Gate Lg Color ODIVM! _0.0
Water Meter_ _ 42 Fiber Chopper #DIV10! 0
At this point we recommend that you run a 114 yard yield test. You must have a box that is 114 cubic yard.
You can build one w th internal dimensions of W x 36'x V. You start the unit producing concrete. Stop
both the conveyor and mixer at fhe same instant. Set the 114 cubic yard yield box underthe discharge.
Start the mixer and conveyor at the same time. Run the unit to the ameum Indicated
for 1/4 cubicyard (14th of the meter count per cubic yard from step 1). Shut off the mixer and conveyor at the
same instant. The box should be full. It may be necessary to adjust the aggregate gates slightly to adjust
the yield.
114 Yard Count 162
` I1 you have a water recording meter your madCowMwi0 be approximately 1.0425.
5!0N OH-10