Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORT6CAIVNED t y. BY STRUCTURAL INSPECTION REPORT St. Lucie Courgy ENGINEERING, INC. Project Number. 14 a66 Mo;A OLMLOVIL L Tc, CIMLo STRUMURAL- Suavcraao. ENVIRONMENTAL Project Name: Atrium I. Balconies 1835 20th Street. Vero. aeach, FL 32960 .Inspection Date: 2119P016 7,72,569.0035. Fax: 772.7783617 www.mbveng.co n -... 1P Weather: Sunny Owner: Atrium's Condo Association Permit #: 1601-0168 Contractor: Daniel)o and Associates Inspector: Rodoffo Villanl4ar, P.E. Project Address: 2900 N AIA Qualified By: Rodollfo Villamfzor, P.E. Balcony #: 4A Large Balcony at North Discipline: --Speci al-- Threshold Type of Inspection:—hiltial -. -Partial Final -Reinspeedon oundation Reinforcement oundation..Concrete Placement loor Slab (SOG) Reinforcing Steel Placement Poor Slab (SOG)-Concrete Placement levated Slab Concrete Placement levated Slab Reinfor. Steel Placement ;oncrete Columns, Walls Reinf. Steel.. Formwork, Embeds ;oncretePlacement :for column(s) ._ ;mu. wall Erection/Placement, Fill Cell Reber, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Remf. Steel, Formwork, Embeds, etc.. Concrete Placement for Beams) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall. Sheathing, Blocking, Vapor Barriers, etc. - Interior Framing and Firestopping as Noted Floor Decking ructuraLSteel Column(s)Erection suctural Steel Horizontal Framing ructural Steel Connections ................ fire. Lath / Hock lath sulation rywall,'type, Fastening, Rating, etc. ucco Application in -Progress :ucco Application Final rrerlor Veneers, Size, Type, Attachments r.M ,main Wall Framing & Glazing _ :orefrontFraming &Glazing endow & Door Bucks findow & Doors .ructural Final ther (Use Additional member /Area Below) Pending U Rejected All areas were inspected to ensure plans and specifications were followed. Approximately 6lineal feet of edge repair was needed on this balcony. VERBAL INSTRUCTIONS: Approved to pour concrete ENGINEERING, IN£. MA AaCLAUM CNIL- STRUCTURAL- SuaVerwG - ENVIRONnENTAL 1835 20th Street - Vera BeacK FL 329U 772,364:0035 - Fax: 772.778.3617 www.mbveng.wm Project Number: 14486 Project Name: Atrium) Balconies Inspection Date: 2/19/2016 Weather: Sunny Owner: Atrium I Condo Association Permit f#: 1601-0168 Contractor: Dantello and Associates Inspector, Rodolfo Viliamizdr, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villomizar, P.E. Balcony M 4A Large Balcony at North Discipline; e-e Threshold Type of Inspection:—#n#tiai— -ParEiai Final -Reinspeetien Reinforcement Slab (SOG) Reinforcing Steel Placement VSaab (SOG) Concrete Placement ded Slab Concrete Placement v ited SlabReinfor. Steel Placement retefiolumns, Walls Reim. Steel, Formwork, Embeds. rete Placement for columns) _ wall Erection/Placement, Fill Cell Rebar, Hprixl.R, rete Masonry Unit Fill Cell grouting rete Beam Reinf Steel, formwork, Embeds, etc. rete Placement for Beam(s) 'russes,:Systems, Bracing: Uplift Restraints; etc. ;hea' oung, Type, Fastening. Wail Framing, Blocking, Connections, etc. heathing, Blocking Vapor Barriers, etc. as Noted Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock lath Insulation Drywrall,Type, Fastening, Rating, etc. Stucco Application In -Progress _ - Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain t,Nall Framing & Glazing Storefront framing & Glazing Window s&Door Bucks Window &Doors Structural Final Other (Use Additional member Area Below) . M All areas were inspected to ensure plans and specifications were followed. Approximately 6•lineal feet of edge repair was needed on this balcony. VERBAL INSTRUCTIONS. Approved to pour concrete EMBV a ENGINEERING, INC. MOIA BOWLES.VILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street . Vero Beach. FL 32960 772.569.0035 . Fax:772.778.3617 www.mbveng com � L� STRUCTURAL INSPECTION REPORT Project Number: 14-486 Project Name: Atrium I.Balconies Inspection Date: 2/19/2016 Weather: Sunnv Owner: Atrium I Condo Association Permit #i 1601-0168 Contractor: Daniello and Associates Inspector: Terence Schlitt, El Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 4A Large Balcony at North Discipline: Special Threshold Type of Inspection: Initial Partial Final Rawlsl� I (Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement X lElevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting. Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems,Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) X❑Approved Approved as Noted ❑ Pending EJ Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure were followed. Approximately 6 lineal feet of edge repair was needed on this balcony. VERBAL INSTRUCTIONS: to oour concrete NOTES: All steel and repaired concrete was coated with "Sika FerroGard 903" at time:of nspecli'dA�1U5e '. y `s Contractor had repair mortar on site "Sikacrete 211". a N0. Ri!)nn r K ^'O„U INSPECTOR: Terence Schlitt. El1100015054 CERTIFIED BY: '`Rodo�fol[!;Nam�za k.}L•,,,,63000, 517021620 EMBV a ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CPAL • STRUCTURAL • SURVEYING - ENVIRONMENTAL 1835 20th Street . Vero Beach, FL 32960 772.569.0035 . Fax.772.778.3617 www-mbveng.com Owner: Atrium I Condo Association ft STRUCTURAL INSPECTION REPORT Project Number: 14-486 Project Name: Atrium I Balconies Inspection Date: 2/19/2016 Weather:.Sunny Permit #: 1601-0168 Contractor: Daniello and Associates Inspector: Terence Schlitt, El Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 4A Large Balcony at North Discipline: Special Threshold Type of Inspection: I..t'al— -Partial Final�'�^rt Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement - X Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placerent, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting - Concrete .Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing -and Firestopping Metal Floor Dec Metal Roof Dec Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath etc. I (Stucco Application Final Wall Framing & Glazing mt.Framing & Glazing v &-Door Bucks. v & Doors ral Final Jse Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ElApproved Approved as Noted Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. Approximately 6 lineal feet of edge repair was needed on this balcony. VERBAL INSTRUCTIONS: to Dour concrete NOTES: All steel and repaired concrete was coated with "Sika FerroGard 903" at tim!hin'speftn$31 Contractor had repair mortar on site "Sikacrete 211". INSPECTOR: Terence Schlitt. El1100015054 nh CERTIFIED BY: RoddffoiVilfam`iz. r,.,P)'C61000. S17021620 me on mMBV ENGINEERING, INC. MOIA 9CIWL0VW AMaAR w ASSOCIATES SCANNED By St. Lucie County RUCTURAL INSPECTION REPORT Project Number: 14-486 CML- STRUCTURAL- SURVEYING - ENVIRONMENTAL 1835 20th Street - Vero Beach, FL 32960 772.569.0035 - Fax: 772.778.3617 www.mbveng.com 0„ >. L Project Name: Atrium I Balconi s Inspection Date: 2/19/2016 Weather: Sunny Owner: Atrium I Condo Association Permit #: 7.016 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 4A Large Balcony at North Discipline: -special-- Threshold Type of Inspection:—...:�."'�'. -Partial Final 4lemspeefie:. idation Reinforcement idation Concrete Placement rSlab (SOG) Reinforcing Steel Placement Slab (50G) Concrete Placement led Slab Concrete Placement ted Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blacking, Vapor Barriers, etc. -- — ----- — .._ ..__.._ ....... Interior Framing and Firestopping a as Noted Metal Floor Decking Metal Roof Decking - _ - -----_-- — `-- - Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation - —� - -- - - - -------- Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress ..-- - ------------------- -- --'--'---------- Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window &Door Bucks----------- ------- Window&Doors ------ -----...------ --- Structural Final Other (Use Additional member/Area Below) Pending U Rejected items All areas were inspected to ensure plans and specifications were followed. r -- Approximately 6 lineal feet of edge repair was needed on this balcony. 11 n r VERBAL INSTRUCTIONS: to pour concrete NOTES: All steel and repaired concrete was coated with "Sika Contractor had repair mortar on site "Sikacrete 211". is JINSPECFOR: Rodolfo Villamizar, P.E. 61000, SI 7021620 1 61000, SI usMBV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL . STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street . Vero Beach, FL 32960 772.569.0035 . Fax. 772.7783617 www.mbvettg.com �» STRUCTURAL INSPECTION REPORT Project Number: 14-486 Project Name: Atrium I Balconies Inspection Date: 2/19/2016 Weather: Sunny Owner: Atrium I Condo Association Permit #: 1601-0168 Contractor: Daniello and Associates Inspector: Terence Schlitt, El Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 2A & 3A Large Balconies at North Discipline: Speeia; Threshold Type of Inspection: ' teal PaPtlai Final Re w______t'_c Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement X Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping ns roved as Noted Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress - StuccoApplication Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Below) a re -inspection) Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. 3rd floor had 1 LF of edge repair. 2rd floor had 2 LF of edge repair. VERBAL INSTRUCTIONS: ADoroved to pour concrete NOTES: 4�ptw.. All steel and repaired concrete was coated with "Sika FerroGZa d "d te of in ion. Contractor had repair mortar on site "Sikacrete 211".o�Z Gasfl'(j c �'�; per, Z iD Terence Schlitt. El1100015054 r Villamiz r, I.t. 151000, S17021620 MBV ENGINEERING, INC. MOIA BOWLES MLLAMIZAR & ASSOCIATES CIVIL. STRUCTURAL. SUWEYING • ENmRONMENTAL 1835 20th Street• Vero Beach, FL. 32960 772569.0035 . Fawc 772.7783617 www.mhveng.com STRUCTURAL INSPECTION REPORT Project Number: 14-486 Project Name: Atrium I Balconies Inspection Date: 2/19/2016 Weather: Sunny Owner: Atrium I Condo Association Permit #: 1601-0168 Contractor: Daniello and Associates Inspector: Terence Schlitt El Project Address: 2900 N AIA Qualified By: Rodolfo Villamizar, P.E. Balcony #: 4A Large Balcony at North Discipline: Special Threshold Type of Inspection: lR t;al— Partal Final-Reiaspectien Foundation Reinforcement Metal Floor Decking Foundation Concrete Placement Metal Roof Decking Floor Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Floor Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Slab Concrete Placement Structural Steel Connections Elevated Slab Reinfor. Steel Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds linsulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. Cmu wall Erection/Placement, Fill Cell-Rebar, Horiz J.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final - Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Storefront Framing & Glazing Roof Sheathing, Type, Fastening Window & Door Bucks Exter. Wall Framing, Blocking, Connections, etc. Window & Doors Wall Sheathing, Blocking, Vapor Barriers, etc. Structural Final Interior Framing and Firestopping Other (Use Additional member / Area Below) DISPOSITION lApproved OF INSPECTION (all pending inspections require a re -inspection) Approved as Noted ❑ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. Approximately 6 lineal feet of edge repair was needed on this balcony. VERBAL INSTRUCTIONS: Approved to pour concrete ..t11111H//. NOTES: All steel and repaired concrete was coated with "Sika FerroG "at time o /e,j:tion. Contractor had repair mortar on site "Sikacrete 211". �; ,�' Zy wz 0 9 INSPECTOR: Terence Schlitt. El1100015054 " NED-BY:- 1i6 alb Villamiza , P.ET6'100d S17021620