HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORT6CAIVNED
t y. BY STRUCTURAL INSPECTION REPORT
St. Lucie Courgy
ENGINEERING, INC. Project Number. 14 a66
Mo;A OLMLOVIL L Tc,
CIMLo STRUMURAL- Suavcraao. ENVIRONMENTAL Project Name: Atrium I. Balconies
1835 20th Street. Vero. aeach, FL 32960 .Inspection Date: 2119P016
7,72,569.0035. Fax: 772.7783617
www.mbveng.co n -... 1P Weather: Sunny
Owner:
Atrium's Condo Association
Permit #:
1601-0168
Contractor:
Daniel)o and Associates
Inspector:
Rodoffo Villanl4ar, P.E.
Project Address:
2900 N AIA
Qualified By:
Rodollfo Villamfzor, P.E.
Balcony #:
4A Large Balcony at North
Discipline:
--Speci al-- Threshold
Type of Inspection:—hiltial -. -Partial
Final
-Reinspeedon
oundation Reinforcement
oundation..Concrete Placement
loor Slab (SOG) Reinforcing Steel Placement
Poor Slab (SOG)-Concrete Placement
levated Slab Concrete Placement
levated Slab Reinfor. Steel Placement
;oncrete Columns, Walls Reinf. Steel.. Formwork, Embeds
;oncretePlacement :for column(s) ._
;mu. wall Erection/Placement, Fill Cell Reber, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
Concrete Beam Remf. Steel, Formwork, Embeds, etc..
Concrete Placement for Beams)
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall. Sheathing, Blocking, Vapor Barriers, etc. -
Interior Framing and Firestopping
as Noted
Floor Decking
ructuraLSteel Column(s)Erection
suctural Steel Horizontal Framing
ructural Steel Connections
................
fire. Lath / Hock lath
sulation
rywall,'type, Fastening, Rating, etc.
ucco Application in -Progress
:ucco Application Final
rrerlor Veneers, Size, Type, Attachments r.M
,main Wall Framing & Glazing _
:orefrontFraming &Glazing
endow & Door Bucks
findow & Doors
.ructural Final
ther (Use Additional member /Area Below)
Pending U Rejected
All areas were inspected to ensure plans and specifications were followed.
Approximately 6lineal feet of edge repair was needed on this balcony.
VERBAL INSTRUCTIONS:
Approved to pour concrete
ENGINEERING, IN£.
MA AaCLAUM
CNIL- STRUCTURAL- SuaVerwG - ENVIRONnENTAL
1835 20th Street - Vera BeacK FL 329U
772,364:0035 - Fax: 772.778.3617
www.mbveng.wm
Project Number: 14486
Project Name: Atrium) Balconies
Inspection Date: 2/19/2016
Weather: Sunny
Owner:
Atrium I Condo Association
Permit f#:
1601-0168
Contractor:
Dantello and Associates
Inspector,
Rodolfo Viliamizdr, P.E.
Project Address:
2900 N A1A
Qualified By:
Rodolfo Villomizar, P.E.
Balcony M
4A Large Balcony at North
Discipline;
e-e Threshold
Type of Inspection:—#n#tiai— -ParEiai
Final
-Reinspeetien
Reinforcement
Slab (SOG) Reinforcing Steel Placement
VSaab (SOG) Concrete Placement
ded Slab Concrete Placement v
ited SlabReinfor. Steel Placement
retefiolumns, Walls Reim. Steel, Formwork, Embeds.
rete Placement for columns) _
wall Erection/Placement, Fill Cell Rebar, Hprixl.R,
rete Masonry Unit Fill Cell grouting
rete Beam Reinf Steel, formwork, Embeds, etc.
rete Placement for Beam(s)
'russes,:Systems, Bracing: Uplift Restraints; etc.
;hea' oung, Type, Fastening.
Wail Framing, Blocking, Connections, etc.
heathing, Blocking Vapor Barriers, etc.
as Noted
Metal Floor Decking
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock lath
Insulation
Drywrall,Type, Fastening, Rating, etc.
Stucco Application In -Progress _ -
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain t,Nall Framing & Glazing
Storefront framing & Glazing
Window s&Door Bucks
Window &Doors
Structural Final
Other (Use Additional member Area Below)
. M
All areas were inspected to ensure plans and specifications were followed.
Approximately 6•lineal feet of edge repair was needed on this balcony.
VERBAL INSTRUCTIONS.
Approved to pour concrete
EMBV
a
ENGINEERING, INC.
MOIA BOWLES.VILLAMIZAR & ASSOCIATES
CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL
1835 20th Street . Vero Beach. FL 32960
772.569.0035 . Fax:772.778.3617
www.mbveng com �
L�
STRUCTURAL INSPECTION REPORT
Project Number: 14-486
Project Name: Atrium I.Balconies
Inspection Date: 2/19/2016
Weather: Sunnv
Owner: Atrium I Condo Association Permit #i 1601-0168
Contractor: Daniello and Associates Inspector: Terence Schlitt, El
Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E.
Balcony #: 4A Large Balcony at North Discipline: Special Threshold
Type of Inspection: Initial Partial Final Rawlsl�
I (Foundation Reinforcement
Foundation Concrete Placement
Floor Slab (SOG) Reinforcing Steel Placement
Floor Slab (SOG) Concrete Placement
Elevated Slab Concrete Placement
X lElevated Slab Reinfor. Steel Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting.
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
Roof Trusses, Systems,Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
Metal Floor Decking
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window & Door Bucks
Window & Doors
Structural Final
Other (Use Additional member / Area Below)
DISPOSITION OF INSPECTION (all pending inspections require a re -inspection)
X❑Approved Approved as Noted ❑ Pending EJ Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
All areas were inspected to ensure
were followed.
Approximately 6 lineal feet of edge repair was needed on this balcony.
VERBAL INSTRUCTIONS:
to oour concrete
NOTES:
All steel and repaired concrete was coated with "Sika FerroGard 903" at time:of nspecli'dA�1U5e '. y `s
Contractor had repair mortar on site "Sikacrete 211". a N0. Ri!)nn
r K ^'O„U
INSPECTOR: Terence Schlitt. El1100015054 CERTIFIED BY: '`Rodo�fol[!;Nam�za k.}L•,,,,63000, 517021620
EMBV
a
ENGINEERING, INC.
MOIA BOWLES VILLAMIZAR & ASSOCIATES
CPAL • STRUCTURAL • SURVEYING - ENVIRONMENTAL
1835 20th Street . Vero Beach, FL 32960
772.569.0035 . Fax.772.778.3617
www-mbveng.com
Owner: Atrium I Condo Association
ft
STRUCTURAL INSPECTION REPORT
Project Number: 14-486
Project Name: Atrium I Balconies
Inspection Date: 2/19/2016
Weather:.Sunny
Permit #: 1601-0168
Contractor: Daniello and Associates Inspector: Terence Schlitt, El
Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E.
Balcony #: 4A Large Balcony at North Discipline: Special Threshold
Type of Inspection: I..t'al— -Partial Final�'�^rt
Foundation Reinforcement
Foundation Concrete Placement
Floor Slab (SOG) Reinforcing Steel Placement
Floor Slab (SOG) Concrete Placement
Elevated Slab Concrete Placement -
X
Elevated Slab Reinfor. Steel Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
Cmu wall Erection/Placerent, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting -
Concrete .Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing -and Firestopping
Metal Floor Dec
Metal Roof Dec
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
etc.
I (Stucco Application Final
Wall Framing & Glazing
mt.Framing & Glazing
v &-Door Bucks.
v & Doors
ral Final
Jse Additional member / Area Below)
DISPOSITION OF INSPECTION (all pending inspections require a re -inspection)
ElApproved Approved as Noted Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
All areas were inspected to ensure plans and specifications were followed.
Approximately 6 lineal feet of edge repair was needed on this balcony.
VERBAL INSTRUCTIONS:
to Dour concrete
NOTES:
All steel and repaired concrete was coated with "Sika FerroGard 903" at tim!hin'speftn$31
Contractor had repair mortar on site "Sikacrete 211".
INSPECTOR: Terence Schlitt. El1100015054
nh
CERTIFIED BY: RoddffoiVilfam`iz. r,.,P)'C61000. S17021620
me
on
mMBV
ENGINEERING, INC.
MOIA 9CIWL0VW AMaAR w ASSOCIATES
SCANNED
By
St. Lucie County RUCTURAL INSPECTION REPORT
Project Number: 14-486
CML- STRUCTURAL- SURVEYING - ENVIRONMENTAL
1835 20th Street - Vero Beach, FL 32960
772.569.0035 - Fax: 772.778.3617
www.mbveng.com 0„
>. L
Project Name: Atrium I Balconi s
Inspection Date: 2/19/2016
Weather: Sunny
Owner:
Atrium I Condo Association
Permit #:
7.016
Contractor:
Daniello and Associates
Inspector:
Rodolfo Villamizar, P.E.
Project Address:
2900 N A1A
Qualified By:
Rodolfo Villamizar, P.E.
Balcony #:
4A Large Balcony at North
Discipline:
-special-- Threshold
Type of Inspection:—...:�."'�'. -Partial
Final
4lemspeefie:.
idation Reinforcement
idation Concrete Placement
rSlab (SOG) Reinforcing Steel Placement
Slab (50G) Concrete Placement
led Slab Concrete Placement
ted Slab Reinfor. Steel Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blacking, Vapor Barriers, etc.
-- — ----- — .._ ..__.._ .......
Interior Framing and Firestopping
a
as Noted
Metal Floor Decking
Metal Roof Decking - _ - -----_-- — `-- -
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation - —� - -- - - - --------
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
..-- - ------------------- -- --'--'----------
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window &Door Bucks-----------
-------
Window&Doors ------ -----...------ ---
Structural Final
Other (Use Additional member/Area Below)
Pending U Rejected
items
All areas were inspected to ensure plans and specifications were followed. r --
Approximately 6 lineal feet of edge repair was needed on this balcony. 11 n r
VERBAL INSTRUCTIONS:
to pour concrete
NOTES:
All steel and repaired concrete was coated with "Sika
Contractor had repair mortar on site "Sikacrete 211".
is
JINSPECFOR: Rodolfo Villamizar, P.E. 61000, SI 7021620 1
61000, SI
usMBV
ENGINEERING, INC.
MOIA BOWLES VILLAMIZAR & ASSOCIATES
CIVIL . STRUCTURAL • SURVEYING • ENVIRONMENTAL
1835 20th Street . Vero Beach, FL 32960
772.569.0035 . Fax. 772.7783617
www.mbvettg.com �»
STRUCTURAL INSPECTION REPORT
Project Number: 14-486
Project Name: Atrium I Balconies
Inspection Date: 2/19/2016
Weather: Sunny
Owner: Atrium I Condo Association Permit #: 1601-0168
Contractor: Daniello and Associates Inspector: Terence Schlitt, El
Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E.
Balcony #: 2A & 3A Large Balconies at North Discipline: Speeia; Threshold
Type of Inspection: ' teal PaPtlai Final Re w______t'_c
Foundation Reinforcement
Foundation Concrete Placement
Floor Slab (SOG) Reinforcing Steel Placement
Floor Slab (SOG) Concrete Placement
Elevated Slab Concrete Placement
X
Elevated Slab Reinfor. Steel Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
ns
roved as Noted
Metal Floor Decking
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress -
StuccoApplication Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window & Door Bucks
Window & Doors
Structural Final
Other (Use Additional member / Area Below)
a re -inspection)
Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
All areas were inspected to ensure plans and specifications were followed.
3rd floor had 1 LF of edge repair.
2rd floor had 2 LF of edge repair.
VERBAL INSTRUCTIONS:
ADoroved to pour concrete
NOTES: 4�ptw..
All steel and repaired concrete was coated with "Sika FerroGZa d "d te of in ion.
Contractor had repair mortar on site "Sikacrete 211".o�Z
Gasfl'(j c �'�; per, Z iD
Terence Schlitt. El1100015054 r Villamiz r, I.t. 151000, S17021620
MBV
ENGINEERING, INC.
MOIA BOWLES MLLAMIZAR & ASSOCIATES
CIVIL. STRUCTURAL. SUWEYING • ENmRONMENTAL
1835 20th Street• Vero Beach, FL. 32960
772569.0035 . Fawc 772.7783617
www.mhveng.com
STRUCTURAL INSPECTION REPORT
Project Number: 14-486
Project Name: Atrium I Balconies
Inspection Date: 2/19/2016
Weather: Sunny
Owner:
Atrium I Condo Association
Permit #: 1601-0168
Contractor:
Daniello and Associates
Inspector: Terence Schlitt El
Project Address:
2900 N AIA
Qualified By: Rodolfo Villamizar, P.E.
Balcony #:
4A Large Balcony at North
Discipline: Special Threshold
Type of Inspection: lR t;al— Partal
Final-Reiaspectien
Foundation Reinforcement
Metal Floor Decking
Foundation Concrete Placement
Metal Roof Decking
Floor Slab (SOG) Reinforcing Steel Placement
Structural Steel Column(s) Erection
Floor Slab (SOG) Concrete Placement
Structural Steel Horizontal Framing
Elevated Slab Concrete Placement
Structural Steel Connections
Elevated Slab Reinfor. Steel Placement
Wire Lath / Hock Lath
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
linsulation
Concrete Placement for column(s)
Drywall, Type, Fastening, Rating, etc.
Cmu wall Erection/Placement, Fill Cell-Rebar, Horiz J.R.
Stucco Application In -Progress
Concrete Masonry Unit Fill Cell grouting
Stucco Application Final -
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Exterior Veneers, Size, Type, Attachments
Concrete Placement for Beam(s)
Curtain Wall Framing & Glazing
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Storefront Framing & Glazing
Roof Sheathing, Type, Fastening
Window & Door Bucks
Exter. Wall Framing, Blocking, Connections, etc.
Window & Doors
Wall Sheathing, Blocking, Vapor Barriers, etc.
Structural Final
Interior Framing and Firestopping
Other (Use Additional member / Area Below)
DISPOSITION
lApproved
OF INSPECTION (all pending inspections require a re -inspection)
Approved as Noted ❑ Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
All areas were inspected to ensure plans and specifications were followed.
Approximately 6 lineal feet of edge repair was needed on this balcony.
VERBAL INSTRUCTIONS:
Approved to pour concrete
..t11111H//.
NOTES:
All steel and repaired concrete was coated with "Sika FerroG "at time o /e,j:tion.
Contractor had repair mortar on site "Sikacrete 211". �; ,�' Zy
wz
0
9
INSPECTOR: Terence Schlitt. El1100015054
"
NED-BY:- 1i6 alb Villamiza , P.ET6'100d
S17021620