Loading...
HomeMy WebLinkAboutANCHOR INFORMATIONSMITHBILT INDUSTRIES, INC. PORTABLE BUILDING ANCHORS BUILDING ANCHOR SCHEDULE BUILDING SIZE NO. OF ANCH. @� EA. END OF BLDG. NO. OF ANCH. ® EA. SIDE OF BLDG. TOTAL ANCH. PER BLDG. 6', 8', 10', 12' & 14' WIDE TO 24' LONG 2 NA 4 48, 2 1 6 50' 2 2 8 20', 22' & 24' WIDE TO 24' LONG 4 NA 8 48' 4 1 10 50' 4 2 12 BUILDING ANCHOR DATA MODEL LENGTH BAR EYE HELIX UPLIFT CAPACITY NUMBER DIAMETER DIAMETER DIAMETER IN NORMAL SOIL 36SHE34 30" 1 1/2" 1 1 1/2" 1 4" 2500 lbs. NOTE: THESE ANCHORS MEET THE WIND REQUIREMENTS OF THE FLORIDA 2014 BUILDING CODE, 5TH EDITION AND THE AMERICAN SOCIETY OF CIVIL ENGINEERS STANDARD CODE ASCE/SEI 7-10. WIND LOAD: 190 MPH SKID (TYP.) SIDE ANCH. DBL. WIDE ----- ----- ONLY \ END ANCH. ANCHOR SPACING PLAN J"2 LAG I J" WELDED C J"0 LAG BOLT w/LEAD OR J"O RAMSET RED H TRUBOLT WEDGE (CAT. WW-3826) OR EQUAL SCANNED BY t. Lucie Count, BOLT THRU ANCH. & 2x6 SKID OR HEADER BEAM w/j"0x4" LAG BOLT w/32 x 2110 WASHER CONCRETE ANCHOR BOLT DETAIL I _IX EARTH ANCHOR NOTE: REFER TO BUILDING ANCHOR NCH ♦H BY D BY SRRUDNRAL WNSIILTANI IMtE D, 1 gtANQM9D0 DRD — WD1M10. R 3 3 PRM (W) 61 939D CER161DA1E OF AUDIDRIIATDN No. 31208 SMITHBILT INDUSTRIES. INC. PORTABLE BUILDING ANCHORS BUILDING ANCHOR SCHEDULE BUILDING SIZE NO. OF ANCH. ® EA. END OF BLDG. NO. OF ANCH. ® EA. SIDE OF BLDG. TOTAL ANCH. PER BLDG. 6', 8'. 10'. 12' & 14' WIDE TO 24' LONG 2 NA 4 48, 2 1 6 50' 2 2 8 20', 22' & 24' WIDE TO 24' LONG 4 NA 8 48' 4 1 10 50' 4 2 12 BUILDING ANCHOR DATA MODEL LENGTH BAR EYE HELIX UPLIFT CAPACITY NUMBER DIAMETER DIAMETER DIAMETER IN NORMAL SOIL 36SHE34 1 30" 1/2" 1 1/2" 4" 2500 lbs. NOTE: THESE ANCHORS MEET THE WIND REQUIREMENTS OF THE FLORIDA 2014 BUILDING CODE, 5TH EDITION AND THE AMERICAN SOCIETY OF CIVIL ENGINEERS STANDARD CODE ASCE/SEI 7-10. WIND LOAD: 190 MPH SKID (TYP.) SIDE ANCH. DBL. WIDE -- ----- ONLY -- END ANCH.- ANCHOR SPACING PLAN J"0 LAG BOLT 4" WELDED CHAIN J" 0 LAG BOLT wAEAD INSERT OR J"0 RAMSET RED HEAD TRUBOLT WEDGE (CAT. NO. WW-3826) OR EQUAL BOLT THRU ANCH. & 2x6 SKID OR HEADER BEAM w/j"0x4" LAG BOLT w/n" x 2"0 WASHER EARTH ANCHOR 10 ° .. NOTE: • REFER TO BUILDING ANCHOR i_—m,=m-ri--r—r-n--'-�°,• SCHEDULE FORANCHOB BP! BY CONCRETE ANCHOR BOLT DETAIL W.J. -W 'R=13 AT N> ]1m