Loading...
HomeMy WebLinkAboutKSM PAPPERSOCT = 2015 !i1 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTI.N.G.,-I_NC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSM ENGINEER] NG.NET ST. LUCIE (772) 229-9093 C.A.:5693 FAX (772) 589-6469 October 6, 2015 Aaron Wojcieszak Commercial Contracting Division, Inc. 709 S.E. 5th Street Stuart, Florida 34994 SCANNED BY Re: 4,000 s.f. Building St. LucieCounh, St. Lucie Nuclear Power Plant 6501 South Ocean Blvd. Jensen Beach, Florida KSM Project #: 152133-b Dear Mr. Wojcieszak: As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced .site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the site was fairly flat and cleared. B. Project Description: A one story, 4,000 s.f. metal building is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. QNe estimate the maximum loads will be less than 2,000 ounds per linear foot along the wall foundation and less than 30 kips for individual column loads.i Some additional site fill will be required to reach the desired grades. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 4,000 s.f. Building -2- October 6, 2015 St. Lucie Nuclear Power Plant 6501 South Ocean Blvd. Jensen Beach, Florida C. The scope of our study consisted of the following: Performed Standard Penetration Test Borings in the proposed construction area to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing four (4) Standard penetration test borings in the proposed construction area. The borings were terminated at depths of 10 to 14 feet below grade. The locations of the borings are indicated on the attached boring logs. The SPT borings were completed in accordance with procedures described in ASTM D-1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 4,000 s.f. Building -3- October 6, 2015 St. Lucie Nuclear Power Plant 6501 South Ocean Blvd. Jensen Beach, Florida E. Engineering Evaluation and Conclusions: Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: The boring logs indicate the subsurface conditions to be fairly uniform across the site. The soils consist mostly of fine-grained sand. Shell fragments were also found in the borings. "N" values recorded during the boring operation indicate the soil density is generally firm to medium dense. Please refer to the soil boring logs for specific information relative to the soil description. Based on the existing soil conditions, the proposed structure can be supported on a shallow foundation system provided that the site is properly prepared. The following sections provide recommendations for the site preparation and foundation design. F. Site Preparation: The proposed building area and areas to be paved, plus a minimum margin of five feet beyond the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. Stumps shall be removed entirely. The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill. Sufficient passes should be made during compaction operations to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D 1557) to a depth of two feet. After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. The fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact each lift to at least 95 percent of its modified dry Proctor value. After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 �_...1A "t KELLER, SCHLEICHER & MaCWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 4,000 s.f. Building -4- October 6, 2015 St. Lucie Nuclear Power Plant 6501 South Ocean Blvd. Jensen,Beach, Florida G. Foundation: Provided that our recommendations for site preparation are followed, the proposed structure may be supported on conventional concrete slab, steel -reinforced -footings designed for an allowable soil bearing pressure o ''2;00 pounds persq foot, of less With the foundation properly designed and the site properly prepared, we anticipate total settlements less than 1/2 of an inch and less than 1/4 of an inch of differential settlement. The majority of the settlement should occur during construction. H. Floor Slabs: A conventional slab -on -grade can be used in the "at grade" portion of the buildings. We recommend the disturbed subgrade below the floor slab be re -compacted to 95 percent of the modified Proctor maximum dry density (ASTM D 1557) prior to placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic inch (pci) can be used for design of the slab -on -grade. We recommend that expansion or control joints be incorporated between the floor slab and column or wall footings. Control joints should also be incorporated in the slab at frequent intervals to control shrinkage cracks. A moisture barrier is recommended beneath the floor slab to prevent moisture migration from the underlying soil resulting in dampness of the slab. I. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. We are,,0e'A*36 %,,be of assistance to you on this phase of your project. When we may be of furth{�1'°s �FaQi670.reshould you have any questions, please feel free to call. ENGW.%'" Email To: Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KSM Engineering L-`,:-°an9P.O. BORING NUMBER B-1 Box 78-1377 KSM S bast an, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Commercial Contracting Division, Inc. PROJECT NAME St. Lucie Nuclear Power Plant, 4,000 s.f. Building PROJECT NUMBER KSM # 152133-b PROJECT LOCATION _6501 S. Ocean Blvd., Jensen Beach, Florida DATE STARTED 10/5/15 COMPLETED 10/5115 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 3.92 ft LOGGED BY MS & MH CHECKED BY JEK AT END OF DRILLING -- NOTES N.E. Section of Proposed Building AFTER DRILLING — ul o - z ♦ SPT N VALUE A U >- � w >- � ^ rn w I- �Z� w o_ I- 20 40 60 80 PL MC LL a r CL o_O O MATERIAL DESCRIPTION wm a� wO O� m0> r� H x� z o c �60 �80 pv U' Z v V? 20 4t 0 N Lu p o O FINES CONTENT (%) ❑ Dark Gray Sand with Roots ...... �.......:...............:.. .....:.......:...... .......:.. ......:.......:.......:.......:.. ..... :....... :....... :....... :.. ......:.. .....:.......:.......:.. ...... ........ :....... :.......:.. ...... .....:...... .......:.. ..............:.......:.......:.. ....... .................... ...... ........:.......:.......:.. Brownish Gray Sand with Shell and Some Clay 17 SS 6-7-6 (13) SS 2-2-3 (5) SS 2-3-7 (10)' Light Brown Sand with Some Rock SS (2 213-10 (23) Gray Slightly Silty Sand SS 9-4-12 (16) SS 15-12-12 (24) SS 10-9-10 (19> Bottom of borehole at 14.0 feet. KSM Engineering ing BORING P.O. Box 78-1377 NUMBER B-2 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Commercial Contracting Division Inc PROJECT NAME St. Lucie Nuclear Power Plant 4,000 s f. Building PROJECT NUMBER KSM # 152133-b PROJECT LOCATION 6501 S. Ocean Blvd., Jensen Beach Florida DATE STARTED 10/5/15 COMPLETED 1015/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample SZAT TIME OF DRILLING 3.33 ft LOGGED BY MS & MH CHECKED BY JEK AT END OF DRILLING — NOTES S.E. Section of Proposed Building AFTER DRILLING — w o rr A SPT N VALUE c) a} > w a S 20 40 60 80 'L 0�L w Q O MATERIAL DESCRIPTION � g j d O j Q w W Z 0 ❑ mOZ v" }" 20 40 60 80 2z 0 ❑ FINES CONTENT (%) ❑ < W a o 0 20 40 60 80 ..... Dark Gray Sand with Roots Brownish Gray Sand with Shell and Some Clay ':?..;. 5-6-5 SS s SS 3-3-2 5 Brownish Gray Sand with Traces of Shell 2_3_4 ...................................... ...... SS Light Brown Sand with Some Rock 6-8-8 :.:.,.. SS "6 Ss 19-24-16 Bottom of borehole at 10.0 feet. m M N K W K W N m Y_ N U O O N W m Y 7 r ro O N h O F O U' 0 5 m 0 m r z u m F O 'a x m x U W F O w u KSM Engineering&_, , 19 ' BORING NUMBER B-3 P.O. Box 78-1377 KSM PAGE 1 OF 1 S basstian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Commercial Contracting Division Inc. PROJECT NAME St. Lucie Nuclear Power Plant 4,000 s.f. Building PROJECT NUMBER KSM # 152133-b PROJECT LOCATION 6501 S. Ocean Blvd., Jensen Beach. Florida DATE STARTED 1015115 COMPLETED 10/5/15 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample a AT TIME OF DRILLING 3.25 ft LOGGED BY MS & MH CHECKED BY JEK AT END OF DRILLING — NOTES S.W. Section of Proposed Building AFTER DRILLING — W _ tt ♦ SPT N VALUE O a.X cog w 5 20 40 60 80 PL MC LL =O ~ ui wo �z� F� �—� I=-,-. a ul d p MATERIAL DESCRIPTION Co > d O� 0 ¢ w 12 z 20 40 60 80 <� 0— m0Z ❑ FINES CONTENT (%) ❑ U' d X N 0 20 40 60 80 Dark Gray Sand with Roots :..... :....... :....... :...... Brownish Gray Sand with Shell and Some Clay 5-5-5 ............... SS (10) ..............:....... : :..:.:: Brownish Gray Sand with Traces of Shell 3-2-2 - SS ........ ...... .:..... SS 2-1-2 .. , ... ...:.: SS 2-2-3 .. .. _ .. .. 10 ! Gray Slightly Silty Sand SS 4-4-9 ' ..:as;, a :a Rock (13) .. .......:.... .. .. ' SS 33-34-27 :...... .... 61 ....... :....... :.............. . SS 17-18-15 ...................................... 33 w Bottom of borehole at 14.0 feet. w N Y_ N U O a N N W m > H m O m UI t2 O F O U m 5 m 0 r m z L, N r O a 2 m x U W 0 O w U' KSM Engineering r .;;;ngP.O. BORING NUMBER B-4 Box 78-1377 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Commercial Contracting Division, Inc. PROJECT NAME St. Lucie Nuclear Power Plant 4,000 s.f. Building PROJECT NUMBER KSM # 152133-b PROJECT LOCATION 6501 S. Ocean Blvd., Jensen Beach Florida DATE STARTED 1015/15 COMPLETED 1015115 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUNDWATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 3.75 ft LOGGED BY MS & MH CHECKED BY JEK AT END OF DRILLING — NOTES N.W. Section of Proposed Building AFTER DRILLING — w o ♦ SPT N VALUE A ~� � 1: CD >- c ~m > Of W W �z� W ~� zo ao so ao PL MC LL p- 0-0 9 � MATERIAL DESCRIPTION ) d O D Q m0Z Fa-c w w Z 0 I �� pv �z �� V`" }`� 20 40 60 80 N W a0 0 ❑ FINES CONTENT (%) El 0 20 40 60 80 Dark Gray Sand with Roots Brownish Grey Sand with Shell and Some Clay 5-0-5 ....................................... SS .. 4 SS 3-3-2 ............................. 5 Brownish Gray Sand with Traces of Shell 2-2-2 ...... SS ....... SS 6-6-7 ............... .. .. Gray Slightly Silty Sand (13) ....:.......:.......:.......:....... ... 4-6-7 SS 10 (13) Bottom of borehole at 10.0 feet. m w x w w N Y_ m U O O N N W LL N Y > F 0 m N O F m m 5 N J O F N F 2 U N H O a x m x U W H W L7