HomeMy WebLinkAboutMANDATORY REQUIREMENTS`
,GHNNU)
BY
St. Lucie County
Mandatory Requirements (as applicable) Mandatary requirements compled by US Department
of Energy and Paciflic Northwest
National Laboratory.
Adopted with permission
TOPIC
Section
Component
Description
Yes NIA Eft
Fenestration
C402.2.7
Envelope
D-factor of opaque dcorsassodaled with the
building thermal envelope meets requirements.
Insulation
C402.2.1.1
Envelope
High-albedo roofs satisfy one of the following:
3-year-aged solar reflectance >= 0.55 and thermal
emitmrrce>=0.75, 3-year-aged solar reflectance
Index>=64.0, initial year solar reffectanco>=
0.70 and thermal amigance >- 0.75, or Initial year
Wattage
C406.6
Exterior LlghWg
solar
Exterior grounds lighting over 100 W provides>60
❑ ❑
Im1W unless on motion sensor or rodure is exempt
from scope of code or from extemal LPD.
/
Wattage
C405.4
Interior lighting
Extt signs do not exceed 5 watts per face.
❑ ❑
Wattage
C405.23
Interior Lighting
Additional interior lighting power allowedforEl
special functions per the approved fighting plans
and Is automatically controlled and separated
from general lighting.
HVAC
C403.28
Mechanical
Exhaust air energy recovery on systems meeting
❑ �❑
Table C403.2.6
SYSTEA7_SPECIFIC
C403.3.1,C403.3,1.1
Mechanical
Air economizers provided where required, meet
the requirements for design capacity, control
signal, ventilation controls, high -limit shut-off,
integrated economizercontrol, and provide a
means to relieve excess outside air during
'
SYSTEM SPECIFIC
C403.3.1.C403.4.1
Mechanlral
operation.
Water economizers provided where required,
J
EliJ ❑
.
meet the requirements for design capacity,
maximum pressure drop and Integrated
SYSTEM SPECIFIC
C403.4.1,4
Mechanical
economizer control.
Economizer operation will not Increase heating
❑ ❑
energy use during normal operation.
SYSTEM —SPECIFIC
C403.2.10.1
Mechanical
HVAC fan systems at design conditions do riot
exceed allowable fan system motornameplate hp
SYSTENtiSPECIFIC
C403.2.70.2
Mechanical
or fen system bhp.
HVAC ten motors not larger than allowable limits.
g ❑ ❑
SYSTEM SPECIFIC
C404.2
Mechanical
Service water heating equipment meets efficiency
5TE] El
requirements.
SYSTEM SPECIFIC
0403.2.3
Mechanical
Centrifugal fan open-clrwg cooling towers having
El 5(o
combined rated capacity>- 1100 gpm meets
minimum efficiency requirement:>=36.2 gpmfhp.
Air Leakage
C402 4 7
Envelope
Vestibules are Installed on a0 building enirencos
1:1 El
Doors have self-Hosmg devices.
�
Insulation
C40226
Envelope
Slab edge Insulation daptllllength. Slab Insulation
ry rEl
extending away from buiding Is covered by
pavement or>= 10 Inches of soil.'
Plan Review
C103.2
Envelope
Plans and/or specifications provide all Information
i] El
with which compliance can be determined for the
building envelope and document where
exceo0ans to the standard are claimed.
EnergyGauge Summit® FlalCom-2014. TAM 2014-1.0 Compliant Softwar E)YgClivs �alesJune 30 2015
6/29l201fi page 8 of 13
Plan Review Ci03.2
Exterior Lighting Plans. specifications, and/or calculations provide
El Elall
Information with which compliance ran be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptlons to the standard are claimed.
Information provided should include exterior
lighting power calculations, wattage of bulbs and
ballasts. transformers and control devices.
Wattage C405.6.2
Exterior Lighting Exterior lighting Power is consistent with what is
shown on the approved lighting plena,
demonstrating proposed wags are lase than or
equal to allowed wags.
Review C103.2
Inlerbr Lighting Plans, specifications, enNorcalculalions provide
❑ El
El
all Information with which compliance can be
determined for the Interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided should include Interior
lighting power calculations, wattage of bulbs and
ballasts, transformers and control devices.
HVAC C403.2.5.1
Mechanical Demand control ventilation provided for spaces
-
>600 ft2 end >25 people/1000 ft2 occupant
density and served by systems with air side
economizer, auto modulating outside alydamper
control, or design airflow>3,000 cfm.
HVAC C403.2.4.3
Mechanical Each zone equipped with setback controls using
El El
0
automatic time clock or programmable control
system.
Plan Review C103.2
Mechanical Plans, specifications. andlorralculetions provide
❑ ❑
all Information with which compliance son be
determined forme mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering standards and
handbooks.
Plan Review C103.2
Mechanical Plans, spaclllcalions, andlorceleuletions provide
El ❑
El
ell Information with which compliance can be
determined for the service water heating systems
and equlpmentand documentwhere exceptions
to the standard are claimed. Hot water system
sized per manufacturees sizing guide.
SYSTEM SPECIFIC C403A.5
Mechanical Zone controls can gmitsimultaneous healing and
cooling and sequence heating and cooling to each
zone.
SYSTEM SPECIFIC C403A.3.1
Moohanlcal Three -pipe hydronk systems using a common
return for hat and chilled water are not used.
SYSTEM SPECIFIC C403.4.3.2
Mechanical Two -pipe hydronk systems using a common
distribution system have controls to allow a
deadbend >=16 -F. allow operation In one mode
for at Toast 4 hi before changeover, and have
rest controls to limit hearing and cooling supply
temperature to r30-F.
SYSTEM —SPECIFIC C403.4.3.3.1
Mechanical Hydronlo heal pump systems connected to a
common water loop meet heat rejection and heal
addition requirements.
SYSTEM —SPECIFIC C408.72.2
Mechanics! HVAC hydromc heating and wolmg eo5s have
means to balance and have pressure lest
connections.
SYSTEM SPECIFIC C403.4.2
Mechanical VAV fan motors>-7.6 his to be driven by variable
speed drive, have a vane -oriel fan with variable
Pitch blades, or have controls to Ilmg fan motor
demand.
SYSTEM_SPECIFIC C403.4.2.1
Mechanical VAVfans have static pressure sensors positioned
1:1
El
so setpolnt �113 total design pressure.
SYSTEMLSPECIFIC C403.4.2.2
Mechanical Reset stage pressure setpoinl for DDC controlled
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
SYSTEM —SPECIFIC 0403.4.6.4
Mechanical Multiple zone HVAC systems have supply air
temperature resel controls.
SYSTEk1 SPECIFIC C403A.3.4
Mechanical Hydronle systems greaterthan 300,000 Bluth
designed for variable fluid flaw.
EnergyGauge Summit® FWCom-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
6292016 Page 9 of 13
r
SYSTEM SPECIFIC C403.4.3A
SYSTEM_ SPECIFIC C403.4.4
Plan Review C406
Plan Review C4023.2.2
i Air Leakage
Air Leakage
AtrLeakage
Mechanical
Temperature reset by representative bustling
loads in pumping systems for chller and boiler
systems >300,000 noun.
Mechanical
Fan systems with motors>=7.6 hp associated
with heat mjecllon equipment to have capability to
operate at 2/3 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing templeressum of heat rejection
device.
Project
Plans, specifications, andfor calculations provide
all Information with which compliance can be
determined for the additional energy efficiency
package options.
Envelope
Skylights In ogles, storage, aulomogve service,
manufacturing, non -refrigerated warehouse, retail
atom, and distributlordsardng area have a
measured haze value> 80 percent unless
designed to exclude direct sunlight.
C402.4.1,C402.4.2 Envelope
C402.4.3.C402,4.4 Envelope
C402.4.1.1 Envelope
Air Leakage C4024.8 Envelope
Air Leakage C4024.8 Envelope
Fenesuallo0
C303.1.3
Envelope
Fenestration
C303.1.3
Envelope
Insulation
C303.2
Envelope
Insulation
C3e3.2
Envelope
Insulation
0403.2.7,C408.2.8,C4, Envelope
Insulation C402.4.2.1 Envelope
Insulation C303.2 Envelope
Insulation
C402.2.1
Envelope
Insulation
C303.2
Envelope
Insulatlan
C3032
Envelope
Insulation
C303.1
Envelope
Insulation C303.21 Envelope
The balding envelope contains a continuous air
harder that is sealed In an approved manner and
either constructed or tested In an approved
manner. Air baler penetrations are sealed in an
approved manner.
Factory-bulllfenesbaflon and doom are labeled
as meeffng ail leakage requirements.
All sources of air leakage In the building thenmal
envelope are sealed, caulked. Brokered, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize'
airleakage.
Weathemeals installed on all loading dock cargo
doom.
Recessed luminaires in thermal envelope to limit
fnfiltraffon and be IC rated and labeled. Seel
between Interior finish and Iuminalm housing.
Fenestration products rated In accordance with
NFRC.
Feneslraffon products are cerlifed as to
performance labels or certificates provided.
Below-grode wag Insulation Installed per
manufacturer's instructions.
Slab edge Insulation installed per manufacturer's
Instructions.
Exterior Insulation protected against damage,
sun gibi. moisture, wind, landscaping and
equipment maintenance activities.
Roof R-value. For some caging systems,
verification may need to occur during Framing
Inspection.
Roof insulation installed per manufacturer's
instructions. Bloom crpoured lose fill insulaflon
Is Installed only where the roof slope is <=3 in 12.
Skylight curbs am insulated to the level of roofs
with Insulation above deck or R-S.
Above -grade wag insulation Installed per
manufacWmis Instructions.
Floor insulation installed per manufacturer's
instm llons.
Building envelope Insulation is labeled with
R-value or Insulation ceniricale providing R-value
and other relevant data.
Exterior Insulation is protected from damage with
0 Protective malarial. Verification for exposed
foundation Insulation may need to occur during
Foundation lnspecdon.
E
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
1111 ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
EnergyGauge Summit®FIe/Corrr2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2016
6292016 Page 10 of 13
Insulation
C402.2.1
Envelope
Insulation Intended to meet the mot Insulation
requirements cannot be installed on lop of a
suspended caging. Mark this requirement
compliant If Insulation Is installed accordingly.
Controls
C405.2.4
Exterior Lighting
Automatic lighting controls for Wader lighting
❑
Installed.
Controls
C405.2.2.1
Interior Lighting
Automagccontrols to shut off all building lighting
installed in all buildings.
Controls
C405.2.1.1
Interior Lighting
Independent lighting controls installed per
approved Ilghgng plans and all manual controls
readily accessible and visible to occupants.
Controls
C405.2.1.2
Inferior Lighting
Lighting controls Installed to uniformly reduce the
❑ El
1:1
lighting load by at least SOW
Controls
C405.2.2.3
Interior Lighting
Daylight zones provided with individual controls
0 El
❑
that control the lights independent of general area
lighting.
Controls
0405.2.3
Interior Lighting
Sleeping units have at least one master much at
the main entry door that controls wired luminaires
and switched receptacles.
Controls
C405.2.2.2
Inferior Lighting
Occupancy sensors Installed In required spaces.
Controls
C406.2.2.3
Interior Lighting
Primary sldelighted areas are equipped with
required lighting controls.
Controls
C405.2.2.3
Interior Lighting
Encased spaces with daylight area under
skylights and rooftop moniWrs are equipped with
required lighting controls.
Controls
C405.2.3
Interior Lighting
Separate lighting control devices for specific uses
Installed per approved Ilghting plans. -
Cunlrois
C405.3
interior Lighting
Fluorescent luminaires'wlthriodd numbered lamp
❑
El
configurations that are with 10 feat writer to
center(ff recess mounted)or-me within 1 foot
edge to edge (if pendant or surface mounted)
shall be tandem wired.
Wattage
C405.5.2
Interior Lighting
Interior Installed lamp and 6ture lightinliower is
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
less than or equal to allowed watts.
HVAC
C403.2.4.5
Mechanical
Freeze protection and snownce melting system
El 11
❑
sensors for future connection to controls.
HVAC
0403.2.3
Mechanical
HVAC equipment elfiolency verified.
El
❑
AU Leakage
C402.4.5.1
Envelope
Stair and elevator shaft writs have motorized
dampers that outomatcary dose.
Air Leakage
0402.4.6.2
Envelope
Outdoor air and exhaust systems have motorizedEl
El
❑
dampers Mat automatically shut when not In use
and meet maximum leakage rates. Check gravity
dampers where allowed.
HVAC
C403.2.8.1
Mechanical
Piping Insulation exposed to weather is protected
from damage (due to sun, moisture, wind, etc.).
HVAC
0403.2.7
Mechanical
HVAC ducts and plenums Insulated. Where ducts
1:1 El
El
or plenums are installed In or under a slab,
verification may need to occur during Foundation
Inspection.
HVAC
C403.211
Mechanical
Thermally Ineffective pawl surfaces of sensible
El 0
El
healing panels have Insulation >= R-3.5.
HVAC
C403.2.7
Mechanical
Ducts and plenums seared based on stage
pressure and location.
HVAC
C408.2.2.1
Mechanical
Air outlets and zone terminal devices have means
for air balancing.
HVAC
C403211
Mechanical
Unenclosed spaces that are heated use only
radiant heat.
HVAC
C403.2.4.1
Mechanical
Healing and tooting to each zone Is controlled by
❑
a thermostat Control. -
HVAC
C403.2.4.2
Mechanical
Thermostatic conols have a 5 •F deadband.
❑ El
1:1
EnergyGauge Sumltut® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2016
6292016 Page 11 of 13
HVAC C403.2.4.2
Mechanical
Temperature controls have setpolnt ovedap
❑ ❑
❑
restrictions.
HVAC C403.2.4.3
Mechanical
Automatic Controls: Setback to 55°F(heal) and
El El
D
85-F (cool; 7-day clock, 2-hour Occupant
override, 10-hour backup
SYSTEM_ SPECIFIC C404.3
Mechanical
Temperature controls installed on service water
11 El
El
heating systems (110 OF for dwelling units and
lavatories In public restrooms and 90 OF for other
occupancies.)
SYSTEM_ SPECIFIC C404.4
Mechanical
Automatic llme switches installed to automatically
❑
❑
switch off the recirculating hot-water system or
heattroce.
SYSTEM —SPECIFIC C404.2
Mechanical
Heat traps Installed on non -circulating storage
water tanks.
SYSTEM SPECIFIC C403.2.3
Mechanical
PTAC and PTHP with sleeves 16 in. by 421n.
labeled for replacement only as per Footnote b to
Table C403.2.3(3).
SYSTEM_ SPECIFIC C403.4.2
Mechanical
VAV ran>= 7.6 hp are driven by mechanical or
electrical variable speed drive, or driven by
vane-atdal with variable speed blades, or operate
with motor demand ev30% design kW at 50%
design flow- calculations required
SYSTEM —SPECIFIC C403.2.8
Mechanical
HVAC piping insulation thickness. Where piping
❑
Is installed in or under a slab, verification may
need to occur during Foundation Inspection.
SYSTEM —SPECIFIC C403.2.7.1.3
Mechanical
Ductwork operating>3 in. water column requires
11 ❑
El
air leakage testing.
SYSTEM_SPECIFIC C403.4.3.5
Mechanical
Reduce flow In pumping systems>10 hp to
El ❑
El
multiple chillers or ballem when others are shut
dawn.
SYSTEM —SPECIFIC 0403.4.3.3.3
Mechanical
Two -position automatic valvefnlerlocked to shut
off water flow when hydronle heat pump with
pumpingsystemhp off.yst ..
SYSTEM -SPECIFIC C403.4.6
Mechanical
heat eris
Condenser heat recovery system that can heal
❑ ❑
❑
water to 85 OF Or provide 60%of peak heat.
rejeelicn Is Installed for preheating of serylce hot
water in 2417 facility, water cooled systems reject
>6 MMBtu, SHIN load >=1 MMBW. ...
SYSTEM —SPECIFIC C403.4.7
Mechanical
Hot gas bypass limited to:
El El
0
c240 k8tuln — 50%
>240 kBtWh —25%
SYSTEM_SPECIFIC C403.2.4.2
Mechanical
Heating and coaling to each zone is controlled by
11 ❑
El
athennosmtcontrol. Minimum one humidity
control device per installed
humldificalbnldehumidffcation system.
SYSTEM_SPECIFIC C403.2.4.3.3
Mechanics[
Systems Include optimum sled controls.
SYSTEM —SPECIFIC C403.2.4.1.1
Mechanical
Heal pump controls pravenl supplemental electric
resistance heat from coming an when not needed.
SYSTEM -SPECIFIC C404.3
Mechanical
Public lavatory faucet water temperature �110-F.
11 ❑
11
SYSTEM —SPECIFIC C404.5
Mechanical
Ali prying In circulating system Insulated
❑ ❑
❑
SYSTEM —SPECIFIC C404.5
Mechanical
First8 ft of outlet piping is insulated
11 ❑
SYSTEM —SPECIFIC C404.5
Mechanical
Ali heat traced or andemally heated piping
❑ ❑
Ej
Insulated
SYSTEM —SPECIFIC C404.6
Mechanical
Controls are installed that limit the opera on or
recirculation pump installed to maintain
temperature of a storage tank.
SYSTEM SPECIFIC C404.7.1
Mechanical
Pool heaters are equipped with onfolf switch and
❑
no continuously burning pilot light
SYSTEM SPECIFIC C404.7.3
Mechanical
Vapor retardant pool covers are providedfor
heated pools and permanently Insisted spas.
SYSTEM SPECIFIC C404.7.2
Mechanical
Time switches are installed on all pod heaters
and pumps.
-
EnergyGauge Summlt®FlalC6m-2014. TAM 2014-1.0 Compliant Software. Effedive Dale: June 30, 2015
W292016 Page 12 of 13
Testing C408.2.3.2 Mechanical HVAC control systems have been tested to
❑
ensure proper operation, calibration and
adjustment or controls.
MandatoryAdditional EH C408 Project Efficient HVAC performance, efficient lighting
system, or on -site supply of renewable energy
consistent with what is shown the approved plans.
Insulation C402.2.8 Project Bottom surface of floor structures incorporating
radiant heating Insulated to s=R-3.5.
Post Construction
C408,3
Exterior Lighting
Lighting systems have been tested to ensure
U u
u
proper calibration, adjustment, programming, and
operation.
Post Construction
C408.2.6.1
Interior Lighting
Furnished as-bu8t drawings for electric power
systems within 30 days of system acceptance.
Post Construction
C303.3,C408.2.5.2
interior Lighting
Furnished O&M Instructions for systems and
equipment to the building owneror designated
representative.
Post Construction
C408.3
Interior Lighting
Lighting systems have been tested to ensure
propercaiibration, adjustment programming, and
operation.
Post Construction
C408.2.5.1
Mechanical
Furnished HVAC as-bugt drawings submitted
within 90 days of system acceptance.
Post Construction
C303.3,C40525.2
Mechanical
Fumished O&M manuals for HVAC systems
❑ ❑
El
within 90 days of system acceptance.
Post Construction
C406.2.5.3
Mechanical
An air and/or hydronic systambalancing report is
❑ El
D
provided for HVAC systems,;,.,
Post Construction
C408.2.1
Mechanical
Commissioning plan developed by registered
design professional of approved agency.
Post Construction
C408.2.4
Mechanical
Preliminary commissioningreport completed and
❑ ❑
El
certified by registered design professional or
approved agency... ` ; .e •,.'.
Post Construction
C408.2.5.4
Mechanical
,
Final commissioning report due to building owner
within 9D days of receipt of certificate of
occupancy. _.
Post Construction
C408.2.3.1
Mechanical
HVAC equipment has been tested to ensure
proper operation.
Post Construction
C408.2.3.3
Mechanical
Economlzers have been tested to ensure proper
El ❑
operation.
EnergyGauge Surnmil®fla/Cofff2014, TAM 2014.1.0 CompllanlSDftware. Effective Dale: June 30, 2015
6/29/2016 Page 13 of 13