Loading...
HomeMy WebLinkAboutMANDATORY REQUIREMENTS` ,GHNNU) BY St. Lucie County Mandatory Requirements (as applicable) Mandatary requirements compled by US Department of Energy and Paciflic Northwest National Laboratory. Adopted with permission TOPIC Section Component Description Yes NIA Eft Fenestration C402.2.7 Envelope D-factor of opaque dcorsassodaled with the building thermal envelope meets requirements. Insulation C402.2.1.1 Envelope High-albedo roofs satisfy one of the following: 3-year-aged solar reflectance >= 0.55 and thermal emitmrrce>=0.75, 3-year-aged solar reflectance Index>=64.0, initial year solar reffectanco>= 0.70 and thermal amigance >- 0.75, or Initial year Wattage C406.6 Exterior LlghWg solar Exterior grounds lighting over 100 W provides>60 ❑ ❑ Im1W unless on motion sensor or rodure is exempt from scope of code or from extemal LPD. / Wattage C405.4 Interior lighting Extt signs do not exceed 5 watts per face. ❑ ❑ Wattage C405.23 Interior Lighting Additional interior lighting power allowedforEl special functions per the approved fighting plans and Is automatically controlled and separated from general lighting. HVAC C403.28 Mechanical Exhaust air energy recovery on systems meeting ❑ �❑ Table C403.2.6 SYSTEA7_SPECIFIC C403.3.1,C403.3,1.1 Mechanical Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizercontrol, and provide a means to relieve excess outside air during ' SYSTEM SPECIFIC C403.3.1.C403.4.1 Mechanlral operation. Water economizers provided where required, J EliJ ❑ . meet the requirements for design capacity, maximum pressure drop and Integrated SYSTEM SPECIFIC C403.4.1,4 Mechanical economizer control. Economizer operation will not Increase heating ❑ ❑ energy use during normal operation. SYSTEM —SPECIFIC C403.2.10.1 Mechanical HVAC fan systems at design conditions do riot exceed allowable fan system motornameplate hp SYSTENtiSPECIFIC C403.2.70.2 Mechanical or fen system bhp. HVAC ten motors not larger than allowable limits. g ❑ ❑ SYSTEM SPECIFIC C404.2 Mechanical Service water heating equipment meets efficiency 5TE] El requirements. SYSTEM SPECIFIC 0403.2.3 Mechanical Centrifugal fan open-clrwg cooling towers having El 5(o combined rated capacity>- 1100 gpm meets minimum efficiency requirement:>=36.2 gpmfhp. Air Leakage C402 4 7 Envelope Vestibules are Installed on a0 building enirencos 1:1 El Doors have self-Hosmg devices. � Insulation C40226 Envelope Slab edge Insulation daptllllength. Slab Insulation ry rEl extending away from buiding Is covered by pavement or>= 10 Inches of soil.' Plan Review C103.2 Envelope Plans and/or specifications provide all Information i] El with which compliance can be determined for the building envelope and document where exceo0ans to the standard are claimed. EnergyGauge Summit® FlalCom-2014. TAM 2014-1.0 Compliant Softwar E)YgClivs �alesJune 30 2015 6/29l201fi page 8 of 13 Plan Review Ci03.2 Exterior Lighting Plans. specifications, and/or calculations provide El Elall Information with which compliance ran be determined for the exterior lighting and electrical systems and equipment and document where exceptlons to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts. transformers and control devices. Wattage C405.6.2 Exterior Lighting Exterior lighting Power is consistent with what is shown on the approved lighting plena, demonstrating proposed wags are lase than or equal to allowed wags. Review C103.2 Inlerbr Lighting Plans, specifications, enNorcalculalions provide ❑ El El all Information with which compliance can be determined for the Interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include Interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. HVAC C403.2.5.1 Mechanical Demand control ventilation provided for spaces - >600 ft2 end >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside alydamper control, or design airflow>3,000 cfm. HVAC C403.2.4.3 Mechanical Each zone equipped with setback controls using El El 0 automatic time clock or programmable control system. Plan Review C103.2 Mechanical Plans, specifications. andlorralculetions provide ❑ ❑ all Information with which compliance son be determined forme mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Plan Review C103.2 Mechanical Plans, spaclllcalions, andlorceleuletions provide El ❑ El ell Information with which compliance can be determined for the service water heating systems and equlpmentand documentwhere exceptions to the standard are claimed. Hot water system sized per manufacturees sizing guide. SYSTEM SPECIFIC C403A.5 Mechanical Zone controls can gmitsimultaneous healing and cooling and sequence heating and cooling to each zone. SYSTEM SPECIFIC C403A.3.1 Moohanlcal Three -pipe hydronk systems using a common return for hat and chilled water are not used. SYSTEM SPECIFIC C403.4.3.2 Mechanical Two -pipe hydronk systems using a common distribution system have controls to allow a deadbend >=16 -F. allow operation In one mode for at Toast 4 hi before changeover, and have rest controls to limit hearing and cooling supply temperature to r30-F. SYSTEM —SPECIFIC C403.4.3.3.1 Mechanical Hydronlo heal pump systems connected to a common water loop meet heat rejection and heal addition requirements. SYSTEM —SPECIFIC C408.72.2 Mechanics! HVAC hydromc heating and wolmg eo5s have means to balance and have pressure lest connections. SYSTEM SPECIFIC C403.4.2 Mechanical VAV fan motors>-7.6 his to be driven by variable speed drive, have a vane -oriel fan with variable Pitch blades, or have controls to Ilmg fan motor demand. SYSTEM_SPECIFIC C403.4.2.1 Mechanical VAVfans have static pressure sensors positioned 1:1 El so setpolnt �113 total design pressure. SYSTEMLSPECIFIC C403.4.2.2 Mechanical Reset stage pressure setpoinl for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM —SPECIFIC 0403.4.6.4 Mechanical Multiple zone HVAC systems have supply air temperature resel controls. SYSTEk1 SPECIFIC C403A.3.4 Mechanical Hydronle systems greaterthan 300,000 Bluth designed for variable fluid flaw. EnergyGauge Summit® FWCom-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 6292016 Page 9 of 13 r SYSTEM SPECIFIC C403.4.3A SYSTEM_ SPECIFIC C403.4.4 Plan Review C406 Plan Review C4023.2.2 i Air Leakage Air Leakage AtrLeakage Mechanical Temperature reset by representative bustling loads in pumping systems for chller and boiler systems >300,000 noun. Mechanical Fan systems with motors>=7.6 hp associated with heat mjecllon equipment to have capability to operate at 2/3 of full -speed and auto speed controls to control the leaving fluid temperature or condensing templeressum of heat rejection device. Project Plans, specifications, andfor calculations provide all Information with which compliance can be determined for the additional energy efficiency package options. Envelope Skylights In ogles, storage, aulomogve service, manufacturing, non -refrigerated warehouse, retail atom, and distributlordsardng area have a measured haze value> 80 percent unless designed to exclude direct sunlight. C402.4.1,C402.4.2 Envelope C402.4.3.C402,4.4 Envelope C402.4.1.1 Envelope Air Leakage C4024.8 Envelope Air Leakage C4024.8 Envelope Fenesuallo0 C303.1.3 Envelope Fenestration C303.1.3 Envelope Insulation C303.2 Envelope Insulation C3e3.2 Envelope Insulation 0403.2.7,C408.2.8,C4, Envelope Insulation C402.4.2.1 Envelope Insulation C303.2 Envelope Insulation C402.2.1 Envelope Insulation C303.2 Envelope Insulatlan C3032 Envelope Insulation C303.1 Envelope Insulation C303.21 Envelope The balding envelope contains a continuous air harder that is sealed In an approved manner and either constructed or tested In an approved manner. Air baler penetrations are sealed in an approved manner. Factory-bulllfenesbaflon and doom are labeled as meeffng ail leakage requirements. All sources of air leakage In the building thenmal envelope are sealed, caulked. Brokered, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize' airleakage. Weathemeals installed on all loading dock cargo doom. Recessed luminaires in thermal envelope to limit fnfiltraffon and be IC rated and labeled. Seel between Interior finish and Iuminalm housing. Fenestration products rated In accordance with NFRC. Feneslraffon products are cerlifed as to performance labels or certificates provided. Below-grode wag Insulation Installed per manufacturer's instructions. Slab edge Insulation installed per manufacturer's Instructions. Exterior Insulation protected against damage, sun gibi. moisture, wind, landscaping and equipment maintenance activities. Roof R-value. For some caging systems, verification may need to occur during Framing Inspection. Roof insulation installed per manufacturer's instructions. Bloom crpoured lose fill insulaflon Is Installed only where the roof slope is <=3 in 12. Skylight curbs am insulated to the level of roofs with Insulation above deck or R-S. Above -grade wag insulation Installed per manufacWmis Instructions. Floor insulation installed per manufacturer's instm llons. Building envelope Insulation is labeled with R-value or Insulation ceniricale providing R-value and other relevant data. Exterior Insulation is protected from damage with 0 Protective malarial. Verification for exposed foundation Insulation may need to occur during Foundation lnspecdon. E ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1111 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyGauge Summit®FIe/Corrr2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2016 6292016 Page 10 of 13 Insulation C402.2.1 Envelope Insulation Intended to meet the mot Insulation requirements cannot be installed on lop of a suspended caging. Mark this requirement compliant If Insulation Is installed accordingly. Controls C405.2.4 Exterior Lighting Automatic lighting controls for Wader lighting ❑ Installed. Controls C405.2.2.1 Interior Lighting Automagccontrols to shut off all building lighting installed in all buildings. Controls C405.2.1.1 Interior Lighting Independent lighting controls installed per approved Ilghgng plans and all manual controls readily accessible and visible to occupants. Controls C405.2.1.2 Inferior Lighting Lighting controls Installed to uniformly reduce the ❑ El 1:1 lighting load by at least SOW Controls C405.2.2.3 Interior Lighting Daylight zones provided with individual controls 0 El ❑ that control the lights independent of general area lighting. Controls 0405.2.3 Interior Lighting Sleeping units have at least one master much at the main entry door that controls wired luminaires and switched receptacles. Controls C405.2.2.2 Inferior Lighting Occupancy sensors Installed In required spaces. Controls C406.2.2.3 Interior Lighting Primary sldelighted areas are equipped with required lighting controls. Controls C405.2.2.3 Interior Lighting Encased spaces with daylight area under skylights and rooftop moniWrs are equipped with required lighting controls. Controls C405.2.3 Interior Lighting Separate lighting control devices for specific uses Installed per approved Ilghting plans. - Cunlrois C405.3 interior Lighting Fluorescent luminaires'wlthriodd numbered lamp ❑ El configurations that are with 10 feat writer to center(ff recess mounted)or-me within 1 foot edge to edge (if pendant or surface mounted) shall be tandem wired. Wattage C405.5.2 Interior Lighting Interior Installed lamp and 6ture lightinliower is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. HVAC C403.2.4.5 Mechanical Freeze protection and snownce melting system El 11 ❑ sensors for future connection to controls. HVAC 0403.2.3 Mechanical HVAC equipment elfiolency verified. El ❑ AU Leakage C402.4.5.1 Envelope Stair and elevator shaft writs have motorized dampers that outomatcary dose. Air Leakage 0402.4.6.2 Envelope Outdoor air and exhaust systems have motorizedEl El ❑ dampers Mat automatically shut when not In use and meet maximum leakage rates. Check gravity dampers where allowed. HVAC C403.2.8.1 Mechanical Piping Insulation exposed to weather is protected from damage (due to sun, moisture, wind, etc.). HVAC 0403.2.7 Mechanical HVAC ducts and plenums Insulated. Where ducts 1:1 El El or plenums are installed In or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.211 Mechanical Thermally Ineffective pawl surfaces of sensible El 0 El healing panels have Insulation >= R-3.5. HVAC C403.2.7 Mechanical Ducts and plenums seared based on stage pressure and location. HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means for air balancing. HVAC C403211 Mechanical Unenclosed spaces that are heated use only radiant heat. HVAC C403.2.4.1 Mechanical Healing and tooting to each zone Is controlled by ❑ a thermostat Control. - HVAC C403.2.4.2 Mechanical Thermostatic conols have a 5 •F deadband. ❑ El 1:1 EnergyGauge Sumltut® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2016 6292016 Page 11 of 13 HVAC C403.2.4.2 Mechanical Temperature controls have setpolnt ovedap ❑ ❑ ❑ restrictions. HVAC C403.2.4.3 Mechanical Automatic Controls: Setback to 55°F(heal) and El El D 85-F (cool; 7-day clock, 2-hour Occupant override, 10-hour backup SYSTEM_ SPECIFIC C404.3 Mechanical Temperature controls installed on service water 11 El El heating systems (110 OF for dwelling units and lavatories In public restrooms and 90 OF for other occupancies.) SYSTEM_ SPECIFIC C404.4 Mechanical Automatic llme switches installed to automatically ❑ ❑ switch off the recirculating hot-water system or heattroce. SYSTEM —SPECIFIC C404.2 Mechanical Heat traps Installed on non -circulating storage water tanks. SYSTEM SPECIFIC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 421n. labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM_ SPECIFIC C403.4.2 Mechanical VAV ran>= 7.6 hp are driven by mechanical or electrical variable speed drive, or driven by vane-atdal with variable speed blades, or operate with motor demand ev30% design kW at 50% design flow- calculations required SYSTEM —SPECIFIC C403.2.8 Mechanical HVAC piping insulation thickness. Where piping ❑ Is installed in or under a slab, verification may need to occur during Foundation Inspection. SYSTEM —SPECIFIC C403.2.7.1.3 Mechanical Ductwork operating>3 in. water column requires 11 ❑ El air leakage testing. SYSTEM_SPECIFIC C403.4.3.5 Mechanical Reduce flow In pumping systems>10 hp to El ❑ El multiple chillers or ballem when others are shut dawn. SYSTEM —SPECIFIC 0403.4.3.3.3 Mechanical Two -position automatic valvefnlerlocked to shut off water flow when hydronle heat pump with pumpingsystemhp off.yst .. SYSTEM -SPECIFIC C403.4.6 Mechanical heat eris Condenser heat recovery system that can heal ❑ ❑ ❑ water to 85 OF Or provide 60%of peak heat. rejeelicn Is Installed for preheating of serylce hot water in 2417 facility, water cooled systems reject >6 MMBtu, SHIN load >=1 MMBW. ... SYSTEM —SPECIFIC C403.4.7 Mechanical Hot gas bypass limited to: El El 0 c240 k8tuln — 50% >240 kBtWh —25% SYSTEM_SPECIFIC C403.2.4.2 Mechanical Heating and coaling to each zone is controlled by 11 ❑ El athennosmtcontrol. Minimum one humidity control device per installed humldificalbnldehumidffcation system. SYSTEM_SPECIFIC C403.2.4.3.3 Mechanics[ Systems Include optimum sled controls. SYSTEM —SPECIFIC C403.2.4.1.1 Mechanical Heal pump controls pravenl supplemental electric resistance heat from coming an when not needed. SYSTEM -SPECIFIC C404.3 Mechanical Public lavatory faucet water temperature �110-F. 11 ❑ 11 SYSTEM —SPECIFIC C404.5 Mechanical Ali prying In circulating system Insulated ❑ ❑ ❑ SYSTEM —SPECIFIC C404.5 Mechanical First8 ft of outlet piping is insulated 11 ❑ SYSTEM —SPECIFIC C404.5 Mechanical Ali heat traced or andemally heated piping ❑ ❑ Ej Insulated SYSTEM —SPECIFIC C404.6 Mechanical Controls are installed that limit the opera on or recirculation pump installed to maintain temperature of a storage tank. SYSTEM SPECIFIC C404.7.1 Mechanical Pool heaters are equipped with onfolf switch and ❑ no continuously burning pilot light SYSTEM SPECIFIC C404.7.3 Mechanical Vapor retardant pool covers are providedfor heated pools and permanently Insisted spas. SYSTEM SPECIFIC C404.7.2 Mechanical Time switches are installed on all pod heaters and pumps. - EnergyGauge Summlt®FlalC6m-2014. TAM 2014-1.0 Compliant Software. Effedive Dale: June 30, 2015 W292016 Page 12 of 13 Testing C408.2.3.2 Mechanical HVAC control systems have been tested to ❑ ensure proper operation, calibration and adjustment or controls. MandatoryAdditional EH C408 Project Efficient HVAC performance, efficient lighting system, or on -site supply of renewable energy consistent with what is shown the approved plans. Insulation C402.2.8 Project Bottom surface of floor structures incorporating radiant heating Insulated to s=R-3.5. Post Construction C408,3 Exterior Lighting Lighting systems have been tested to ensure U u u proper calibration, adjustment, programming, and operation. Post Construction C408.2.6.1 Interior Lighting Furnished as-bu8t drawings for electric power systems within 30 days of system acceptance. Post Construction C303.3,C408.2.5.2 interior Lighting Furnished O&M Instructions for systems and equipment to the building owneror designated representative. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure propercaiibration, adjustment programming, and operation. Post Construction C408.2.5.1 Mechanical Furnished HVAC as-bugt drawings submitted within 90 days of system acceptance. Post Construction C303.3,C40525.2 Mechanical Fumished O&M manuals for HVAC systems ❑ ❑ El within 90 days of system acceptance. Post Construction C406.2.5.3 Mechanical An air and/or hydronic systambalancing report is ❑ El D provided for HVAC systems,;,., Post Construction C408.2.1 Mechanical Commissioning plan developed by registered design professional of approved agency. Post Construction C408.2.4 Mechanical Preliminary commissioningreport completed and ❑ ❑ El certified by registered design professional or approved agency... ` ; .e •,.'. Post Construction C408.2.5.4 Mechanical , Final commissioning report due to building owner within 9D days of receipt of certificate of occupancy. _. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure proper operation. Post Construction C408.2.3.3 Mechanical Economlzers have been tested to ensure proper El ❑ operation. EnergyGauge Surnmil®fla/Cofff2014, TAM 2014.1.0 CompllanlSDftware. Effective Dale: June 30, 2015 6/29/2016 Page 13 of 13