HomeMy WebLinkAboutFL CITY UTILITYS PAPPERSCITY OF PORT ST. LUCIE
SCANNED
St. Luce Coun
UTILITY SYSTEMS DEPARTMENT tV
900 SE Ogden Lane
Port St. Lucie, FL 34983
(772) 873-6400 — TDD Accessible
(772) 873-6405 — FAX Jesus A. Merejo, Director
ACCEPTANCE OF COMPLETION OF CONSTRUCTION FOR APPROVAL TO PLACE A DOMESTIC
WASTEWATER COLLECTION/TRANSMISSION SYSTEMS INTO OPERATION
Permittee: Nicholas Elliott
Palm Park Center, LLC
Address: 8569 S. US Highway 1
Port Saint Lucie, FL 34952
Permit Number: WW2016-014
Date of Issuance: 12/21/17
WWTF Connected To: Glades
RE: Coastal Floor and Granite File Number: 5112
Final Certification — This Wastewater Certification includes 268 LF of 8" PVC Gravity Sewer Main,
15 LF of 6" PVC Gravity Sewer service and 2 Manholes as shown on the As -built Plans stamped as
received by the City of Port Saint Lucie Utility Systems Department on 12/20/17.
We are in receipt of your Request for Approval to Place a Wastewater Collection/Transmission
System into Operation for the project authorized by the above referenced permit number the subject
wastewater collection/transmission system extension has been constructed, and tested in accordance with the
plans and related materials permitted by this agency, and is now ready for operation.
Based on your engineer's certification of construction completion, equipment operation testing, if applicable,
and the pressure & leakage test report for the above -referenced project, the project is hereby released for
service in substantial accordance with the approved plans with the understanding that the project will be
operated in compliance with Florida Administrative Code (F.A.C.) Chapter 62-604.
Approval of individual connections to a completed collection/transmission system must be obtained from the
City of Port St Lucie Utility Systems Department, separate of this notice by a Letter of Acceptance by the Utility
Director or his designee.
Laney Southerly, P.E.
Utility Engineering Manager
C: Jesus A. Merejo, Director, Utility Systems Department
Diana Spriggs, P.E., PSLUSD Project Manager
David C. Baggett, P.E., Engineer of Record
Project File
City of Port St Lucie
Utility Systems Department
auyroruH� PaUSO
Email: UtilEng@cityofpsl.com 900 SW Ogden Lane, Port St Lucie, FL 34983 Phone (772) 344-4320
Request for Approval to Place a Water Distribution and/or Wastewater
Collection/Transmission System into Operation
Instructions: The form must be completed and submitted to the PSLUSD with the Turnover Package. All
information shall be typed in ink and all blanks must be filled.
' (1) Project Information:
'PProject Name Coastal Floor
1Water Construction Permit No. N/A - FDEP Request is for ❑ Entire Project ❑Partial
flNastewater Construction Permit No. 2016-014 Request is for Entire Project Partial
p.
illf partial, describe the portion for which approval is being requested, (including the pipe length, total number of
-.,,manholes and pump stations if applicable).
Water
'Wastewater
{
(2) Certification by the Engineer -of -Record
,P
:I, the undersigned professional engineer registered in Florida, certify the following:
.V
• That this project has been constructed in accordance with the construction permit and engineering
V plans and specifications approved by the PSLUSD. The deviations noted herein will not prevent this
project from functioning compliance with the PSLUSD standards and applicable regulations of Florida
i Department of Environmental Protection;
f • That the as -built survey for this project is complete and includes substantial deviations* from the
approved engineering plans and specifications;
t • That the O&M manual for the project has been prepared or examined by me, or by an individual(s)
under my direct supervision, and that there is reasonable assurance, in my professional judgement,
that the facilities when properly maintained and operated in accordance with this manual, will function
4
as intended; and
• That, to the best of my knowledge and belief, all required tests have been performed and the new or
t' modified facilities met the specified requirements.
II•,
'Effective 02/07/17 Page 1 of 2 PSLUSD Doc. No. 132
This certification is based upon on -site observation of construction conducted by me or by a project
representative under my direct supervision and upon review of shop drawings, test results/records, and
record drawings performed by me or by a project representative under my direct supervision. The
following is a description and explanation of substantial deviations* from the approved plans and
specifications for the substantially completed portion of this project.
6" gravity service laterals off of the 8" gravity sewer main are approximately 23 linear feet shorter
n the approved plans. This is due to the limited space in which cover over the 8" gravity main could
graded back down to existing elevations at slopes not to exceed 4:1. The constructed cleanouts on
se laterals (points of service) are now located on the 15' utility easement boundary. This deviation is
expected to result in any adverse impacts to the operation of the gravity sewer system.
Date:
*� No.81375 201 / .1 2.2
Po_ 3�11AoF � 1 13:30:53 Signed
//�`,S''9 ti�N0 ��� _ ' ' Date 12/20/2017
05 00
Name: David C. Baggett, P.E. Florida Registration No.: 81375
Company Name: (Engineering Design & Construcion, Inc.
Address:
10250 SW Village Parkway, Suite 201, Port St. Lucie, Florida 34987
Telephone:772-462-2455 Fax:E-mail: davidbaggett@edc-inc.com
*Substantial deviations are construction deviations greater than 10% from plans or
specifications and any deviations which fall below the minimum standards established in the
PSLUSD Utility Standards Manual.
Effective 02/07/17
Page 2 of 2
PSLUSD Doc. No. 132