HomeMy WebLinkAboutWASTEWATER CONSTRUCTION PERMITSE 0 voRrsCITY C'rrJORT ST. LUCIE SLNIVNEL)
UTILITY SYSTEMS DEPARTMENT BY
900 Port St. Ogdt. en Lane FL 34983 St Lucie Couniv
(772) 873-6400 — TDD Accessible
<oRIop (772) 873-6405 — FAX Jesus A. Merejo, Director
WASTEWATER CONSTRUCTION PERMIT
Permittee: Nicholas Elliott
Palm Park Center, LLC
Address: 1497 SW Marin Downs Blvd.
Palm City, FL 34990
RE: Coastal Floor and Granite
Permit Number: WW2016-014
Date of Issuance: 07/07/2016
Date of Expiration: 07/07/2021
WWTF Connected To: Glades
File Number: 5112
This wastewater construction permit includes 268 LF of 8" gravity sewer, 38LF of 6" PVC gravity
line, and 2 manholes as shown on the construction plans stamped by PSLUSD on 6/13/2016 with
page 5 dated 7/01/2016.
The City of Port St Lucie Utility Systems Department has received authorization from the Florida Department of
Environmental Protection (FDEP), under section 403.1815, Florida Statutes, F.S. per Final Order OGC Case
Number 09-2886, to independently regulate the construction of sewage collection/transmission systems with
mains of 12" or less. Therefore, a permit is not required by FDEP for this project.
The referenced project was constructed prior to the above referenced FDEP permit expiring, however it was
never certified. Therefore, the referenced project is hereby approved for construction of sewage
collection/transmission systems facilities.
Please be advised that this wastewater construction permit is subject to General Conditions of FDEP Rule 62-
4.160. F.A.C, as applicable and City of Port St Lucie Utility Systems Department (PSLUSD) (see page 2) and the
following requirements:
1. If the sewage collection/transmission system being constructed under this construction permit was
designed under the responsible charge of a professional engineer, then the permittee shall also retain a
Florida -licensed professional engineer to take responsible charge of inspecting construction of the
sewage collection/transmission system for the purpose of determining, in general, if the construction
proceeds in compliance with this construction permit.
2. The permittee shall have complete as -built survey drawings produced for the sewer
collection/transmission being constructed under this construction permit. The as -built drawings shall
include the surveyor data of bell separation of all conflicts, as shown in the attached detail, along with
pipe separation information and other pertinent data. An AutoCAD version of the as -built drawings shall
be submitted with the certification package.
3. Upon completion of construction of the collection/transmission systems project, and before placing the
facilities into operation for any purpose other than testing for leaks or testing equipment operation, the
permittee shall obtain approval or clearance from the PSLUSD.
Page 1 of 2
Permittee: Nicholas Elliott, Pal . 3rk Center, LLC Pe, No. WW2016-014
General Conditions
A. The construction permit does not convey any vested rights or any exclusive privileges. Permits and/or
approvals required by all state or local agencies must be obtained prior to the start of construction.
B. The construction permit does not relieve the permittee from liability and penalties when the
construction of the permitted activity causes harm or injury to human health or welfare; causes harm or
injury to animal, plant or aquatic life; or causes harm or injury to property. It does not allow the
permittee to cause pollution in contravention of Florida Statues and FDEP.
C. The construction permit does not constitute a waiver from the requirements of the PSLUSD Utility
Standards Manual and FDEP Regulations. All applicable sections from FDEP 62-604 shall be adhered to.
D. The construction permit is valid only for the specific activity indicated. Deviations to the approved
construction plans shall not be made without prior written approval of the PSLUSD.
E. The permittee agrees in using the construction permit to make every reasonable effort to conduct the
specific activity or construction authorized by the construction permit in a manner that will minimize any
adverse effects on the adjacent property or on public use of the adjacent property, where applicable,
and on the environment, including fish, wildlife, natural resources of the area, water quality or air
quality.
F. The permittee agrees in allowing required PSLUSD inspections as outlined in the PSLUSD Utility
Standards Manual.
G. The permittee agrees to maintain any permitted facility, or activity in good condition and in accordance
with the plans submitted to PSLUSD as outlined in FDEP Rule 62-4.530 (1) F.A.C. and PSLUSD Utility
Standards Manual.
John Eason, PE
Permit Manager
C: Jesus A. Merejo, Director, Utility Systems Department
Laney Southerly, P.E., Utility Engineering Manager
Diana Spriggs, P.E., PSLUSD Project Manager
Roderick J. Kennedy, P.E., FOR
Project File
Page 2 of 2
VoRr.ST,
CITY Ur ?ORT ST. LUCIE
�' ,UANNEL)
0
UTILITY SYSTEMS DEPARTMENT
BY
900 SE Ogden Lane
St. Lucie Counti,
Port St. Lucie, FL 34983
(772) 873-6400 — TDD Accessible
�oRI
(772) 873-6405 — FAX
Jesus A. Merejo, Director
WASTEWATER CONSTRUCTION PERMIT
Permittee:
Nicholas Elliott
Palm Park Center, LLC
Permit Number: WW2016-014
Date of Issuance: 07/07/2016
Date of Expiration:07/07/2021
Address:
1497 SW Marin Downs Blvd.
Palm Oty, FL 34990
VA TF Connected To: Glades
RE:
Coastal Floor and Granite
File Number: 5112
This wastewater construction permit includes 268 LF of 8" gravity sewer, 38LF of 6" PVC gravity
line, and 2 manholes as shown on the construction plans stamped by PSLUSD on 6/13/2016 with
page 5 dated 7/01/2016.
The City of Port St Lucie Utility Systems Department has received authorization from the Florida Department of
Environmental Protection (FDEP), under section 403.1815, Florida Statutes, F.S. per Final Order OGC Case
Number 09-2886, to independently regulate the construction of sewage collection/transmission systems with
mains of 12" or less. Therefore, a permit is not required by FDEP for this project.
The referenced project was constructed prior to the above referenced FDEP permit expiring, however it was
never certified. Therefore, the referenced project is hereby approved for construction of sewage
collection/transmission systems facilities.
Please be advised that this wastewater construction permit is subject to General Conditions of FDEP Rule 62-
4.160. F.A.C, as applicable and City of Port St Lucie Utility Systems Department (PSLUSD) (see page 2) and the
following requirements:
1. If the sewage collection/transmission system being constructed under this construction permit was
designed under the responsible charge of a professional engineer, then the permittee shall also retain a
Florida -licensed professional engineer to take responsible charge of inspecting construction of the
sewage collection/transmission system for the purpose of determining, in general, if the construction
proceeds in compliance with this construction permit.
2. The permittee shall have complete as -built survey drawings produced for the sewer
collection/transmission being constructed under this construction permit. The as -built drawings shall
include the surveyor data of bell separation of all conflicts, as shown in the attached detail, along with
pipe separation information and other pertinent data. An AutoCAD version of the as -built drawings shall
be submitted with the certification package.
3. Upon completion of construction of the collection/transmission systems project, and before placing the
facilities into operation for any purpose other than testing for leaks or testing equipment operation, the
permittee shall obtain approval or clearance from the PSLUSD.
Page 1 of 2
Permittee: Nicholas Elliott, P� ,'ark Center, LLC P. A No. WW2016-014
General Conditions
A. The construction permit does not convey any vested rights or any exclusive privileges. Permits and/or
approvals required by all state or local agencies must be obtained prior to the start of construction.
B. The construction permit does not relieve the permittee from liability and penalties when the
construction of the permitted activity causes harm or injury to human health or welfare; causes harm or
injury to animal, plant or aquatic life; or causes harm or injury to property. It does not allow the
permittee to cause pollution in contravention of Florida Statues and FDEP.
C. The construction permit does not constitute a waiver from the requirements of the PSLUSD Utility
Standards Manual and FDEP Regulations. All applicable sections from FDEP 62-604 shall be adheredto.
D. The construction permit is valid only for the specific activity indicated. Deviations to the approved
construction plans shall not be made without prior written approval of the PSLUSD.
E. The permittee agrees in using the construction permit to make every reasonable effort to conduct the
specific activity or construction authorized by the construction permit in a manner that will minimize any
adverse effects on the adjacent property or on public use of the adjacent property, where applicable,
and on the environment, including fish, wildlife, natural resources of the area, water quality or air
quality.
F. The permittee agrees in allowing required PSLUSD inspections as outlined in the PSLUSD Utility
Standards Manual.
G. The permittee agrees to maintain any permitted facility, or activity in good condition and in accordance
with the plans submitted to PSLUSD as outlined in FDEP Rule 62-4.530 (1) F.A.C. and PSLUSD Utility
Standards Manual.
John Eason, PE
Permit Manager
C: Jesus A. Merejo, Director, Utility Systems Department
Laney Southerly, P.E., Utility Engineering Manager
Diana Spriggs, P.E., PSLUSD Project Manager
Roderick J. Kennedy, P.E., FOR
Project File
Page 2 of 2