HomeMy WebLinkAboutPLANS 1General Note: For piping allowances, piping
maximums and nozzle position, refer to system
technical manual.
System installation shall conform to
requirements of NFPA 17 (Pre engineered Dry
Chemical Systems)
i
Note: Detection cond
the Paint Mixing Rom
.S
SCANNED
BY
St. Lucie County
34 ft.
Amerex
Industrial
Fire Suppression System
2 x IS45ABC, 2 x ISISABC
PAINT SPRAY BOOTH
Legend
—� Black - Main supply and
branch line 1", 3/4" galv.pipe
Red - Conduit 1/2" detection line
Ol Seepage-2 under items
TARLF FOR PAINT SPRAY RnOTN.1
Cylinder
Size
Maximum
Nozzle Quantity
Nozzle Type
Plping5ection
Length
Max.
Elbows
Max.
If of Tees
Allowed
1S45ABC
2
TFP
Cylinder to T1
36 ft.
4
1
TS to Nozzle
kS14ln.
10 ft.
2
0
Total V Pie
56 ft.
ISISABC
2
1.3-wa and
Cylinder to TS
36 ft.
4
1 D/P
T3 to Nozzle
16 ft.
$
1S45ABC CYLINDER
?T1
1S45ABC CYLINDER
2
T
IS18ABCCYLINDER I 1S18ABC CYLINDER
PAGE 1
11/34/15
Installer name and address:
Express Fire Protection, Inc.
rwe S�iw_r 5624 NW 8St.
Margate, FL 33063
Ph: 954-968.3149 Mobile: 954-756-4329
License Qualifier: Stefan lossifov
Customer name and address:
Chips Painting
38045t. lude Blvd.
Ft. Pierce, FL 34949
General Note: For piping allowances, piping
maximums and nozzle position, refer to system
technical manual.
System Installation shall conform to
requirements of NFPA 17 (Pre engineered Dry
Chemical Systems)
Amerex
Industrial
Fire Suppression System
2 x IS45ABC, 2 x IS I8ABC
PAINT SPRAY BOOTH
Max, nozzle
cove @ge-H
4pecilicallons maximum Paine wuruun Wnnm wagare ovate
ITEMS
TY.
L
W
Ht
Per Nozzle
ProtectionWa0 B
t Orientation
1,4
IS45ABC
2
,3
WRABC
2
5
Mech. Release
Moduleil
1
6
Manual Pull Station
1
7
286' detector- job
8
20
12
8
Paints ra booth
1
34ft,
16ft
12ft.
9
TFP- Module
Dimensions
4
1 13.6h.
16fL
12.5%
Volume 2,720 it?
Midpoint(+/-10%)of the
adjacent module edge
Vertical with the orifices
0"-6" painting downward
9
3-Wav
2
24
4
4
Volume 640f'
fence an of plenum; Conrad,
xldth of plenum; Cantered, height of
Plonum
Horawal, eaohslde brie aligned
pa,11,lw/plenum&aanduon ratio.
SOD/P
nozzle
2
(Round Duct
46 tn. diameter)
28
Centered at the duct entrance
0'-6' Polming of the direction of
the air Flow
SEQUENCE OF OPERATION
The system provides mechanical or electrical automatic actuation and can be manually
actuated through a mechanical control head pull / turn station. Upon actuation, the system discharges a
preEetermined amount of agent to the hazard area.
The shutdown of fuel and power to the hazard area Is required upon system actuation. Exhaust
fan(s) In the ventilation system must be shut off prior to system discharge to allow the proper
concentration of agent to build up in the hazard area.
PAGE2
11WIS
Installername and address:
Express Fire Protection, Inc,
5624 NW 8St.
Margate, FL 33063
Ph: 954-968-3149 Mobile: 954-756-4329
License Qualifier: Stefan lossifov
Customer name and address:
Chips Painting
3804 St.lude Blvd.
Ft. Pierce, FL 34949
ims and nozzle position, refer to system
31 manual.
Installation shall confomr to
nests of NFPA 17 (Pre engineered Dry
31 Systems)
Legend
O
9ft,
Black -Main supply line 3/4" Galy. Pipe
Red -Conduit 1/2" detection line
See page -2 under Items
Sit.
Amerex
Industrial
Fire Suppression System
IS 18ABC
PAINT MIXING ROOM
The plans reflect general layout. During installation, tank placement maybe repositioned to accommodatelob site
Such modification Is made within the system manufacturer specifications and does not effect piping and
placement specified In these drawings.
IS18ABC CYLINDER
1
-te: Detection Line Is connected
the main control bade of Paint Spray Booth
Module Perimeter Coverage, Total Flood IS45ABC
Cylinder Nozzle Nozzle Piping length Elbows
Size MY, Type Section Size Maxim. Maxim.
LSISABC 1 TF Cyl,to mu. 3f41n, 60 ft. 8
PAGE 3
tms and nozzle position, refer to system
A manual.
Installation shall conform to
ments of NFPA 17 (Pre engineered Dry
Amerex
Industrial
Fire Suppression System
ISISABC
PAINT MIXING ROOM
ITEMS
CITY.
Max. nozzle coverage"A"
L IN Ht
Specifications maximum
Nook location within
Protection tone"B"
Nozzle
Offset"•
Nozzle
Otientatlon
1
ISISABC
1
286'detector•lob
1
20 ft. 12 ft.
3
Paint mixing rm
1
9ft. 9ft, aft.
41
TF
1
1 15 120 ft' 20ft.
Volume 1440 ft.'
Center of protected area
1 0"-6"
Vertical pointing
1 downward
Note: Paint mixing room is connected to the main control head of the PamtSpray Booth
SEQUENCE OF OPERATION:
The system provides mechanical or electrical automatic actuation and can be manually
actuated through a remote mechanical pull station. Upon actuation, the system discharges a
pre -determined amount of agent to the hazard area.
The shutdown of fuel and power to the hazard area B required upon system actuation. Exhaust
fans) in the ventilation system must be shut off prior to system discharge to allow the proper
concentration of agent to build up in the hazard area.
PAGE 4