HomeMy WebLinkAboutENERGY CONSERVATION PAPPERSCheck List
SCANNED
BY
St. Lucie County
Applications for compliance with the Florida Building Code, Energy Conservation shall
include:
dThis Checklist
[f An Input report generated from the software just after completing compliance
calculations without any further changes
[� The full compliance report generated by the software that contains the project
summary, complaince summary, certifications and detailed component compliance
reports
dBoxes appropriately checked in the Miscellanous report generated by the software at
the end of the compliance report
RECEIVED
MAR 2 9 2016
PERMiTnNG
St. Lucie County, FL
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 1 of 12
PROJECT SUMMARY
Short Desc: LUSO HOLDINGS LLC Description: LUSO HOLDINGS LLC
Owner:
Addressl: 7043 U.S. HIGHWAY 1 City: ST. LUCIE COUNTY
Address2: SUITE #203 State: FL
Zip: 0
Type: Office Class: New Finished building
Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000)
Conditioned Area: 1270 SF Conditioned & UnConditioned Area: 1270 SF
No of Stories: 1 Area entered from Plans 0 SF
Permit No: 0 Max Tonnage 2.9
If different, write in:
Component
Gross Energy Cost (in
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
Summary
Design
749.0
Criteria Result
833.0 PASSED
PASSES
PASSES
PASSES
No Entry
PASSES
No Entry
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- --An input report of this design building must be submitted along with this
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 2 of 12
CERTIFICATIONS
1 hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By:
6 V,,,.W ,Building Official:
Date:
Date:
I certify that this building is in
compliance with the FLorida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (') that the system design is in compliance with the Florida
Energy Efficiency Code
Architect:
Reg No:
Electrical Designer:
Reg No:
Lighting Designer:
Reg No:
Mechanical Designer:
'' 1^
Reg No: e rQ nci U i u
Plumbing Designer:
Reg No:
(") Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 3 of 12
Project: LUSO HOLDINGS LLC
Title: LUSO HOLDINGS LLC
Type: Office
Building End Uses
1) Proposed
2) Baseline
Total
48.30
63.00
$749
$980
ELECTRICITY(MBtu/kWh
48.30
63.00
/$)
14130
18448
$749
$980
AREA LIGHTS
7.30
14.60
2144
4278
$114
$227
MISC EQUIPMT
19.10
19.10
5582
5582
$296
$296
PUMPS & MISC
0.10
0.10
22
27
$1
$1
SPACE COOL
10.40
12.80
3060
3760
$162
$200
SPACE HEAT
0.30
1.10
76
332
$4
$18
VENT FANS
11.10
15.30
3246
4469
$172
$237
Credits Applied: None
PASSES
Passing Criteria = 833
Design (including any credits) = 749
Passing requires Proposed Building cost to be at most 85% of
Baseline cost. This Proposed Building is at 76.4%
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 4 of 12
Project: LUSO HOLDINGS LLC
Title: LUSO HOLDINGS LLC
Type: Office
(WEAFile: DAYTONABEACH.TMY)
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or It)
East Light 1 Main entries Yes 30.00 20.0 600 25
Tradable Surfaces: 25 (W) Allowance for Tradable: 1350 (W) PASSES
All External Lighting: 25 (VV)
Complicance check includes a excess/Base allowance of 750.00(VV)
Project: LUSO HOLDINGS LLC
Title: LUSO HOLDINGS LLC
Type: Office
(WEAFile: DAYTONABEACH.TAM
Lighting Controls Compliance
Acronym Ashrae Description Area Design Min Compli-
ID (sq.ft) CP CP once
Pr0Zo1Sp1 17 Office - Enclosed L270 1 1 PASSES
PASSES
Project: LUSO HOLDINGS LLC
Title: LUSO HOLDINGS LLC
Type: Office
(WEA File: DAYTONABEACH.TMY)
System Report Compliance
PrOSyl System 1 Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr 1
Component Category Capacity Design Eff Design IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System Air Conditioners Air Cooled 35200 16.00 12.23 8.00 PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System Electric Furnace 2700 1.00 1.00 PASSES
Air Handling System Air Handler (Supply) - 1200 0.80 0.82 PASSES
-supply Constant Volume
PASSES
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 5 of 12
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
None
Project: LUSO HOLDINGS LLC
Title: LUSO HOLDINGS LLC
Type: Office
(WEAFile: DAYTONABEACH.TAM
Water Heater Compliance
Description Type
Category Design Min
Eff Eff
Design Max Comp
Loss Loss Rance
Water Heater 1 Electric water heater <= 12 [kW] 25.00 0.90
PASSES
PASSES
Piping System Compliance
Category
Pipe Din Is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] SF.F]
None
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 6 of 12
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of
Energy and Pacific Northwest National Laboratory.
Adopted with permission
Tooic Section Component Description Yes N/A Ex
Air Leakage
C4U2.4.1,C4U2.4.Z Envelope
I ne ommmg envelope contains a continuous air
U
U U
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
approved manner.
Air Leakage
C402.4.3,C402.4,4 Envelope
Factory -built fenestration and doors are labeled as
❑
0, ❑
meeting air leakage requirements.
/
Air Leakage
0402.4.7 Envelope
Vestibules are installed on all building entrances.
El[
r--��
Doors have selfclosing devices.
/j
Air Leakage
C402.4.1.1 Envelope
Al sources of air leakage in the building thermal
r��
u El
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize air
leakage.
/
Leakage
0402.4.6 Envelope
Weatherseals installed on all loading dock cargo
LJC.1 El
Air Leakage
C402.4.8 Envelope
doors.
Recessed luminaires in thermal envelope to limit
❑
-/
Ld ❑
17,0
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.
Fenestration
C303.1.3 Envelope
Fenestration products rated in accordance with
NFRC.
Fenestration
C303.1.3 Envelope
Fenestration products are certified as to
El
❑
performance labels or certificates provided.
Fenestration
C402.2.7 Envelope
U-factor of opaque doors associated with the
❑
building thermal envelope meets requirements.
Insulation
C303.2 Envelope
Below -grade wall insulation installed per
❑
1__I
manufacturer's instructions.
/
Insulation
C303.2 Envelope
Slab edge insulation installed per manufacturer's
1--�'
Eg ❑
instructions.
Insulation
C402.2.6 Envelope
Slab edge insulation deptMength. Slab insulation
❑
19'E3
extending away from building is covered by
pavement or >= 10 inches of soil.
Insulation
C403.2.7,C408.2.8,C Envelope
Exterior insulation protected against damage,
❑
�❑
sunlight, moisture, wind, landscaping and
equipment maintenance activities.
Insulation
C402.4.2.1 Envelope
Roof R-value. For some ceiling systems,
❑
�❑
verification may need to occur during Framing
Inspection.
Insulation
C303.2 Envelope
Roof insulation installed per manufacturer's
❑
❑
instructions. Blown or poured loose -fill insulation is
installed only where the roof slope is <=3 in 12.
Insulation
C402.2.1 Envelope
Skylight curbs are insulated to the level of roofs
13
❑
Insulation
C402.2.1.1 Envelope
with insulation above deck or R-5.
High-albedo roofs satisfy one of the following:
13
/
L.10
3-year-aged solar reflectance >= 0.55 and thermal
emittance >= 0.75, 3-year-aged solar reflectance
index >= 64.0, initial year solar reflectance >= 0.70
and thermal emittance >= 0.75, or initial year solar
Insulation
C303.2 Envelope
Above -grade wall insulation installed per
❑
❑
Insulation
C303.2 Envelope
manufacturer's instructions.
Floor insulation installed per manufacturer's
/
1 1 ❑
Insulation
C303.1 Envelope
instructions.
Building envelope insulation is labeled with R-value
❑
do
or insulation certificate providing R-value and other
relevant data.
Insulation
C303.2.1 Envelope
Exterior insulation is protected from damage with a
protective material. Verification for exposed
foundation insulation may need to occur during
Foundation Inspection.
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 7 of 12
Insulation
C402.2.1 Envelope
Insulation intended to meet the roof insulation
❑
U V
requirements cannot be installed on top of a
suspended ceiling. Mark this requirement compliant
if insulation is installed accordingly.
Controls
C405.2.4 Exterior Lighting
Automatic lighting controls for exterior lighting
❑
installed.
Wattage
C405.6 Exterior Lighting
Exterior grounds lighting over 100 W provides >60
0❑
Im/W unless on motion sensor or fixture is exempt
from scope of code or from external LPD.
/
Wattage
C405.6.2 Exterior Lighting
Exterior lighting power is consistent with what is
❑
❑ u✓
shown on the approved lighting plans,
demonstrating proposed watts are less than or
equal to allowed watts.
Controls
C405.2.2.1 Interior Lighting
Automatic controls to shut off all building lighting
❑
❑
installed in all buildings.
Controls
C405.2.1.1 Interior Lighting
Independent lighting controls installed per approved
❑
]�
lighting plans and all manual controls readily
accessible and visible to occupants.
Controls
C405.2.1.2 Interior Lighting
Lighting controls installed to uniformly reduce the
❑
❑
lighting load by at least 50%.
Controls
C405.2.2.3 Interior Lighting
Daylight zones provided with individual controls that
control the lights independent of general area
Controls
C405.2.3 Interior Lighting
lighting.
Sleeping units have at least one master switch at
❑
Ef 13
the main entry door that controls wired luminaires
and switched receptacles.
Controls
C405.2.2.2 Interior Lighting
Occupancy sensors installed in required spaces.
El
Controls
C405.2.2.3 Interior Lighting
Primary sidelighted areas are equipped with
❑
❑
required lighting controls.
Controls
C405.2.2.3 Interior Lighting
Enclosed spaces with daylight area under skylights
❑
[' ❑
and rooftop monitors are equipped with required
Controls
C405.2.3 Interior Lighting
lighting controls.
Separate lighting control devices for specific uses
❑
installed per approved lighting plans.
Controls
C405.3 Interior Lighting
Fluorescent luminaires within odd numbered lamp
0
configurations that are with 10 feet center to center
(if recess mounted) or are within 1 foot edge to
edge (f pendant or surface mounted) shall be
tandem wired.
Wattage
C405.4 Interior Lighting
dt
6signs do not exceed 5 watts per face.
❑
i/ ❑
Wattage
C405.2.3 Interior Lighting
Additional interior lighting power allowed for special
❑
Or ❑
functions per the approved lighting plans and is
automatically controlled and separated from
general lighting.
Wattage
C405.52 Interior Lighting
Interior installed lamp and fixture righting power is
❑
Er ❑
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
less than or equal to allowed watts.
HVAC
C403.2.4.5 Mechanical
Freeze protection and snowfxce melting system
❑
sensors for future connection to controls.
HVAC
C403.2.3 Mechanical
HVAC equipment efficiency verified.
u7
Air Leakage
C402A.5.1 Envelope
Stair and elevator shaft vents have motorized
dampers that automatically close.
Air Leakage
C402.4.5.2 Envelope
Outdoor air and exhaust systems have motorized
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
dampers where allowed.
HVAC
C403.2.5.1 Mechanical
Demand control ventilation provided for spaces
El
❑
>500 ft2 and >25 people/1000 ft2 occupant density
and served by systems with air side economizer,
auto modulating outside air damper control, or
design airflow >3,0cfm.
/
HVAC
C403.2.6.1 Mechanical
Piping Insulation exposed to weather is protected
❑
rL71f ❑
from damage (due to sun, moisture, wind, etc.).
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 8 of 12
HVAC C403.2.7 Mechanical
HVAC ducts and plenums insulated. Where ducts
0
0 ❑
or plenums are installed in or under a slab,
verification may need to occur during Foundation
Inspection.
HVAC C403.2.8 Mechanical
Thermally ineffective panel surfaces of sensible
❑
❑
heating panels have insulation >= R-3.5.
HVAC C403.2.7 Mechanical
Ducts and plenums sealed based on static
❑
❑
pressure and location.
HVAC C408.2.2.1 Mechanical
Air outlets and zone terminal devices have means
❑
a ❑
for air balancing.
HVAC C403.2.6 Mechanical
Exhaust air energy recovery on systems meeting
❑
�.�(
IL.I
Table C403.2.6
HVAC C403.2.11 Mechanical
Unenclosed spaces that are heated use only
❑
radiant heat.
HVAC C403.2.4.1 Mechanical
Heating and cooling to each zone is controlled by a
IZI ❑
thermostat control.
HVAC C403.2.4.2 Mechanical
Thermostatic controls have a 5 °F deadband.
❑
HVAC C403.2.4.2 Mechanical
Temperature controls have setpoint overlap
❑
12f ❑
restrictions.
HVAC C403.2.4.3 Mechanical
Each zone equipped with setback controls using
automatic time clock or programmable control
system.
HVAC C403.2.4.3 Mechanical
Automatic Controls: Setback to 55°F (heat) and
❑
❑
85°F (cool); 7-day clock, 2-hour occupant override,
10-hour backup
SYSTEM —SPECIFIC C404.3 Mechanical
Temperature controls installed on service water
13
IZI ❑
heating systems (110 OF for dwelling units and
lavatories in public restrooms and 90 OF for other
occupancies.)
SYSTEM —SPECIFIC C404.4 Mechanical
Auto installed toautomatically
❑
El ❑
offthe recirculating hot-water ystem or
trace.
SYSTEM —SPECIFIC C404.2 Mechanical
Heat traps installed on non -circulating storage
❑
0 ❑
water tanks.
SYSTEM —SPECIFIC C403.2.3 Mechanical
PTAC and PTHP with sleeves 16 in. by 42 in.
❑
IN ❑
labeled for replacement only as per Footnote b to
Table C403.2.3(3).
SYSTEM —SPECIFIC C403A.2 Mechanical
VAV fan >= 7.5 hp are driven by mechanical or
�-�(
LJ
electrical variable speed drive, or driven by
vane -axial with variable speed blades, or operate
with motor demand <=30% design kW at 50%
design flow - calculations required
SYSTEM —SPECIFIC C403.2.8 Mechanical
HVAC piping insulation thickness. Where piping is
El6CA
1-�
❑
installed in or under a slab, verification may need to
occur during Foundation inspection.
/
SYSTEM —SPECIFIC C403.2.7.1.3 Mechanical
Ductwork operating >3 in. water column requires
❑m
❑
air leakage testing.
SYSTEM —SPECIFIC C403.3.1,C403.3.1.1 Mechanical
Air economizers provided where required, meet the
�.�(
E ❑
requirements for design capacity, control signal,
ventilation controls, high -limit shut-off, integrated
economizer control, and provide a means to relieve
excess outside air during operation.
/
SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical
Water economizers provided where required, meet
❑
�j ❑
the requirements for design capacity, maximum
pressure drop and integrated economizer control.
SYSTEM —SPECIFIC C403.4.1.4 Mechanical
Economizer operation will not increase heating
❑
IJ ❑
energy use during normal operation.
SYSTEM —SPECIFIC C403.4.5 Mechanical
Zone controls can limit simultaneous heating and
❑
Ef ❑
cooling and sequence heating and cooling to each
zone.
SYSTEM —SPECIFIC C403.4.3.1 Mechanical
Three -pipe hydronic systems using a common
❑
d/ El
return for hot and chilled water are not used.
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016
Page 9 of 12
SYSTEM —SPECIFIC C403.4.3.2
Mechanical Two -pipe hydronic systems using a common
distribution system have controls to allow a
deadband >=15 OF, allow operation in one mode
for at least 4 him before changeover, and have rest
controls to limit heating and cooling supply
temperature to <=30 OF.
SYSTEM —SPECIFIC C403.4.3.3.1
Mechanical Hydronic heat pump systems connected to a
❑
❑
common water loop meet heat rejection and heat
addition requirements.
SYSTEM —SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
❑
�--y
U
means to balance and have pressure test
SYSTEM —SPECIFIC C403.2.10.1
connections.
Mechanical HVAC fan systems at design conditions do not
1�1
exceed allowable fan system motor nameplate hp
or fan system bhp.
SYSTEM —SPECIFIC C403.2.10.2
Mechanical HVAC fan motors not larger than allowable limits.
SYSTEM —SPECIFIC C403.4.2
Mechanical VAV fan motors >=7.5 hp to be driven by variable
❑
0 ❑
speed drive, have a vane -axial fan with variable
pitch blades, or have controls to limit fan motor
demand.
SYSTEM —SPECIFIC C403.4.2.1
Mechanical VAV fans have static pressure sensors positioned
so setpoint <=I13 total design pressure.
SYSTEM —SPECIFIC C403.4.2.2
Mechanical Reset static pressure setpoint for DDC controlled
13
❑
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
SYSTEM —SPECIFIC C403.4.5.4
Mechanical Multiple zone HVAC systems have supply air
❑
❑
temperature reset controls.
SYSTEM —SPECIFIC C403.4.3.4
Mechanical Hydronic systems greater than 300,000 Blum
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.3.5
Mechanical Reduce flow in pumping systems >10 hp to multiple
chillers or boilers when others are shut down.
SYSTEM —SPECIFIC C403.4.3.4
Mechanical Temperature reset by representative building loads
13
❑
in pumping systems for chiller and boiler systems
SYSTEM —SPECIFIC C403.4.3.3.3
>300,000 Bluth.
Mechanical Two -position automatic valve interlocked to shut off
11
water flow when hydronic heat pump with pumping
system >10 hp is off.
SYSTEM —SPECIFIC C403.4.4
Mechanical Fan systems with motors >=7.5 hp associated with
❑
EJ
heat rejection equipment to have capability to
operate at 213 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection device.
SYSTEM —SPECIFIC C403.4.6
Mechanical Condenser heat recovery system that can heat
El
❑
water to 85 OF or provide 60% of peak heat
rejection is installed for preheating of service hot
water in 2417 facility, water cooled systems reject
SYSTEM —SPECIFIC C403.4.7
>6 MMBtu, SHW load>=1 MMBtu.
Mechanical Hot gas bypass limited to:
<=240 kBWM — 50%
>240 kBWM — 25%
SYSTEM —SPECIFIC C404.2
Mechanical Service water heating equipment meets efficiency
❑
10 ❑
requirements.
SYSTEM —SPECIFIC C403.2.4.2
Mechanical Heating and cooling to each zone is controlled by a
thermostat control. Minimum one humidity control
device per installed humidification/dehumidification
system.
SYSTEM —SPECIFIC C403.2.4.3.3
Mechanical Systems include optimum start controls.
❑
❑
SYSTEM —SPECIFIC C403.2.4.1.1
Mechanical Heat pump controls prevent supplemental electric
❑
12
resistance heat from coming on when not needed.
SYSTEM —SPECIFIC C404.3
Mechanical Public lavatory faucet water temperature <=110°F.
11Ur[3
SYSTEM —SPECIFIC C404.5
Mechanical All piping in circulating system insulated
❑
SYSTEM —SPECIFIC C404.5
Mechanical First 8 It of outlet piping is insulated
11d
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 10 of 12
Post Construction
C303.3,C408.2.5.2 Interior Lighting
Furnished O&M instructions for systems and
❑
❑
equipment to the building owner or designated
representative.
Post Construction
C408.3 Interior Lighting
Lighting systems have been tested to ensure
0
❑
❑
proper calibration, adjustment, programming, and
operation.
Post Construction
C408.2.5.1 Mechanical
Furnished HVAC as -built drawings submitted within
0
0❑
90 days of system acceptance.
Post Construction
C303.3,C408.2.5.2 Mechanical
Furnished O&M manuals for HVAC systems within
90 days of system acceptance.
Post Construction
C408.2.5.3 Mechanical
An air andfor hydronic system balancing report is
0
0❑
provided for HVAC systems.
Post Construction
C408.2.1 Mechanical
Commissioning plan developed by registered
0
0
0
design professional or approved agency.
Post Construction
C408.2.4 Mechanical
Preliminary commissioning report completed and
0
0❑
certified by registered design professional or
approved agency.
Post Construction
C408.2.5.4 Mechanical
Final commissioning report due to building owner
❑
❑
❑
within 90 days of receipt of certificate of
occupancy.
Post Construction
C408.2.3.1 Mechanical
HVAC equipment has been tested to ensure proper
0❑
operation.
Post Construction
C408.2.3.3 Mechanical
Economizers have been tested to ensure proper
0
0
operation.
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
3/17/2016 Page 12 of 12
Proje6t Name: LUSO HOLDINGS LLC
Project Title: LUSO HOLDINGS LLC
Address: 7043 U.S. HIGHWAY 1
SUITE #203
State: FL
Zip: 0
Owner:
EnergyGauge Summit® v5.10
INPUT DATA REPOR
Proiect Information
Orientation: North
Building Type: Office
Building Classification: New Finished building
No.of Stories: 1
GrossArea: 1270 SF
Zones
No Acronym Description Type
Area
[sf[
Multiplier
Total Area
[sf[
I PrOZol Zone I CONDITIONED
1270.0
1
1270.0 ❑
Spaces
No Acronym Description Type Depth
[ft]
Width Height Multi
[ft] [ft] plier
TotalAroa
[sf]
Total Volume
[ct]
3/17/2016 EnergyGauge Summit® v5.10 1
In Zone: PrOZol
1 PrOZolSol
Zo0SP1 Office - Enclosed
31.75
40.00
10.00
1 1270.0
12700.0 El
Lighting
No
Type Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[W]
Ctrl pts
In Zone: PrOZol
In Space: Pr0Zo1Sp1
1
Compact Fluorescent General Lighting
28
25
700
Manual On/Off
1
Walls
No Description
Type Width H (Effec) Multi
Area DirectionConductance
Heat
Dens. R-Value
[ft]
[ft] plier
[sf]
[Btu/hr. sf. F]
Capacity
[lb/cf] ]h.sCFBtu]
[Btu/sEF]
In Zone: Pr0Zo1
1 PrOZolWal
Stucco, 8" BLock, 31.75
10.00 1
317.5
East
0.1110
7.751
41.32 9.0 ❑
R-4.1, 1/2" Gyp.
Brd.
2 Pr0Zo1Wa2
Stucco, 8" BLock, 40.00
10.00 1
400.0
North
0.1110
7.751
41.32 9.0 ❑
R-4.1, 1/2" Gyp.
Brd.
Windows
No
Description Type Shaded U SHGC Vis.Tra
W
H (Effec)
Multi
Total Area
[Btu/hr sf F]
[ft]
[ft]
plier
[sf]
In Zone: Pr0Zol
In Wall: EAST
1
PrOZolWalWil User Defined No
1.2500 0.82 0.76
3.00
5.00
2
30.0 ❑
3/17/2016 EnergyGauge Summit® v5.10
Doors
No Description
Type
Shaded? Width H (Effec) Multi
Area
Cond. Dens. Heat Cap.
R-Value
IN [ft]
plier
[sf]
[Btu/hr. sf F] [lb/cl] [Btu/sf. F]
[h.sf.FBtu]
In Zone: PrOZol
In Wall: EAST
1 PrOZolWaID[I Solid core flush
No 6.00 8.00
1
48.0
0.3504 0.00
0.00
2.85 ❑
(2.25)
Roofs
No Description
Type
Width H (Effec) Multi
Area
Tilt
Cond. Heat Cap
Dens.
R-Value
[it] [ft] plier
[sf]
[deg]
[Btu/hr. SE F] [Btu/sf. F]
[lb/cf]
[h.sf.FBtu]
In Zone: PrOZol
1 PrOZOIRfI
Conc Tile/l/2"WD
40.00 31.75 1
1270.0
0.00
0.0491 2.47
28.76
20.4 ❑
Deck/WD Truss/Icy.
foam/Gyp
Skylights
No Description Type
U SHGC Vis:Trans
W
H(Effec)Multiblier
Area
TotalArea
[Btu/hr sf F]
[ft]
fit]
[St]
ISt]
In Zone:
In Roof:
El
Floors
No Description
Type
Width H (Effec) Multi
Area
Cond. Heat Cap. Dens.
R-Value
[ft] [ft] plier
[sf]
[Btu/hr. A F] [Btu/sf. F] [lb/c1]
[h.sf.FBtu]
In Zone: PrOZol
3/17/2016 EnergyGauge Summit® v5.10
Piping
No Type Operating Insulation Nomonal pipe Insulation Is Runout?
Temperature Conductivity Diameter Thickness
[F] [ Btu-in/h.sf.F] [in] [in]
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Panes Conductance
[Btu/h.sf.F]
ASHULSglClrAll User Defined 1 1.2500 0.8200 0.7600 ❑
Frm
Materials Used
Mat No Acronym Description Only R-Value RValue Thickness Conductivity Density SpecilicHeat
Used [h.sf.FBtu] [ft] [Btu/h.ft.F] [lb/cf] [Btu/Ib.F]
BOARD,1/2IN
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Mat148
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
123
Mat1123
CONC BLOCK
No
1.7227
0.6667
0.3870
53.00
0.2000
❑
MW,8IN,HOLLOW
267
Mat1267
0.75"stucco
No
0.1563
0.0625
0.4000
16.00
0.2000
❑
244
Mat1244
PLYWOOD, 1/21N
No
0.6318
0.0417
0.0660
34.00
0.2900
❑
185
Mat1185
CLAY TILE, PAVER, 3/8IN
No
0.0301
0.0313
1.0410
120.00
0.2000
❑
11
Matl11
2 in. Insulation
No
6.6800
0.1670
0.0250
2.00
0.2000
❑
1002
ApLbMat1002
CLAY TILE, PAVER, 3/81N
No
0.0301
0.0313
1.0410
120.00
0.2000
❑
3/17/2016 EnergyGauge Summit® v5.10 5
Right -Suite® Universal 2015 Load Summary Job:
- wrightsotV OFFICE ey e: Mar03, 2016
QUICK CALCS, INC.
317 ST. LUCIE LN., Fr. PIERCE, FL34946 Phone: 772-46"799 Fez 772-4666796 Emoll: QUICKOILCS@OOL.COM
For. LUSO HOLDINGS LLC
7043 US HIGHWAY 1#203, ST. LUCIE COUNTY, FL
Zone: OFFICE
1.
DESIGN CONDITIONS at Jul 1800 LDT
Peak load
at Jul 1800 LDT
Inside: 75 OF Outside: 89 OF
TD:
14 OF
RH: 62 % MoistDiff: 61.5 gr/lb
Mult:
1.0 Ins.wb
63 OF
Sensible
Latent
2.
SOLAR RADIATION THROUGH GLASS
3213
-
3.
TRANSMISSION GAINS Sensible
5557
Walls: 3728
-
-
Glass: 514
-
-
Doors: 187
-
-
Partitions: 0
-
-
Floors: 0
-
-
Ceilings: 1127
-
-
4.
INTERNAL HEAT GAIN Sensible
Latent
7028
3200
Occupants: 4000
3200
-
-
Lights: 3028
-
Motors: 0
-
Appliances: 0
0
-
-
5.
INFILTRATION: Outside air cfm:
100
1486
4183
6.
SUBTOTAL: Space load Sensible
Latent
17283
7383
Envelope 17283
7383
-
-
Less external 0
-
Redistribution 0
0
-
7.
SUPPLYDUCT
5105
-
S.
SUBTOTAL: Space load + supply duct
22388
Actual cfm: 1173 at supply TD:
20
-
9.
VENTILATION- Make-up air cfm:
0
0
0
10.
RETURNAHILOAD: Lighting+ plenum (net)
0
-
11.
RETURN DUCT
3201
-
12.
TOTAL LOADS ON EQUIPMENT
25589
7383
HEATING-LOAD-
13.
DESIGN CONDITIONS
Mult:
Inside: 70 OF Outside:
42 OF TD:
14.
TRANSMISSION LOSSES
Walls:
5587
Glass:
1067
Doors:
388
Partitions:
0
-Floors:
1053
Ceilings:
522
15.
INFILTRATION: Outside air cfm: 134
16.
SUBTOTAL: Space load
Envelope
12750
Less external
0
Less transfer
0
Redistribution
0
17.
SUPPLYDUCT:
19.
VENTILATION: Make-up air cfm: 0
19.
HUMIDIFICATION
Piping
20.
RETURN DUCT
21.
TOTAL HEATING LOAD ON EQUIPMENT
+ wrightsofC fthtSu@e® Universal 2015 15.0.19 RSUD8101
...ers\Qukk Cake\Dowments\LUSO HOLD NGS LLC.rup Calc=CLTD FroM1borfao3s N
1.0
28 OF
8617
4133
12750
2620
0'
1526
0
653
17549
2016-Mar-17 15:49:28
Page 1