Loading...
HomeMy WebLinkAboutENERGY CONSERVATION PAPPERSCheck List SCANNED BY St. Lucie County Applications for compliance with the Florida Building Code, Energy Conservation shall include: dThis Checklist [f An Input report generated from the software just after completing compliance calculations without any further changes [� The full compliance report generated by the software that contains the project summary, complaince summary, certifications and detailed component compliance reports dBoxes appropriately checked in the Miscellanous report generated by the software at the end of the compliance report RECEIVED MAR 2 9 2016 PERMiTnNG St. Lucie County, FL EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 1 of 12 PROJECT SUMMARY Short Desc: LUSO HOLDINGS LLC Description: LUSO HOLDINGS LLC Owner: Addressl: 7043 U.S. HIGHWAY 1 City: ST. LUCIE COUNTY Address2: SUITE #203 State: FL Zip: 0 Type: Office Class: New Finished building Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000) Conditioned Area: 1270 SF Conditioned & UnConditioned Area: 1270 SF No of Stories: 1 Area entered from Plans 0 SF Permit No: 0 Max Tonnage 2.9 If different, write in: Component Gross Energy Cost (in LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? Summary Design 749.0 Criteria Result 833.0 PASSED PASSES PASSES PASSES No Entry PASSES No Entry Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- --An input report of this design building must be submitted along with this EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 2 of 12 CERTIFICATIONS 1 hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: 6 V,,,.W ,Building Official: Date: Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (') that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: Mechanical Designer: '' 1^ Reg No: e rQ nci U i u Plumbing Designer: Reg No: (") Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 3 of 12 Project: LUSO HOLDINGS LLC Title: LUSO HOLDINGS LLC Type: Office Building End Uses 1) Proposed 2) Baseline Total 48.30 63.00 $749 $980 ELECTRICITY(MBtu/kWh 48.30 63.00 /$) 14130 18448 $749 $980 AREA LIGHTS 7.30 14.60 2144 4278 $114 $227 MISC EQUIPMT 19.10 19.10 5582 5582 $296 $296 PUMPS & MISC 0.10 0.10 22 27 $1 $1 SPACE COOL 10.40 12.80 3060 3760 $162 $200 SPACE HEAT 0.30 1.10 76 332 $4 $18 VENT FANS 11.10 15.30 3246 4469 $172 $237 Credits Applied: None PASSES Passing Criteria = 833 Design (including any credits) = 749 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 76.4% EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 4 of 12 Project: LUSO HOLDINGS LLC Title: LUSO HOLDINGS LLC Type: Office (WEAFile: DAYTONABEACH.TMY) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or It) East Light 1 Main entries Yes 30.00 20.0 600 25 Tradable Surfaces: 25 (W) Allowance for Tradable: 1350 (W) PASSES All External Lighting: 25 (VV) Complicance check includes a excess/Base allowance of 750.00(VV) Project: LUSO HOLDINGS LLC Title: LUSO HOLDINGS LLC Type: Office (WEAFile: DAYTONABEACH.TAM Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP once Pr0Zo1Sp1 17 Office - Enclosed L270 1 1 PASSES PASSES Project: LUSO HOLDINGS LLC Title: LUSO HOLDINGS LLC Type: Office (WEA File: DAYTONABEACH.TMY) System Report Compliance PrOSyl System 1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 35200 16.00 12.23 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 2700 1.00 1.00 PASSES Air Handling System Air Handler (Supply) - 1200 0.80 0.82 PASSES -supply Constant Volume PASSES EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 5 of 12 Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None Project: LUSO HOLDINGS LLC Title: LUSO HOLDINGS LLC Type: Office (WEAFile: DAYTONABEACH.TAM Water Heater Compliance Description Type Category Design Min Eff Eff Design Max Comp Loss Loss Rance Water Heater 1 Electric water heater <= 12 [kW] 25.00 0.90 PASSES PASSES Piping System Compliance Category Pipe Din Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.F] None EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 6 of 12 Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Tooic Section Component Description Yes N/A Ex Air Leakage C4U2.4.1,C4U2.4.Z Envelope I ne ommmg envelope contains a continuous air U U U barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.4.3,C402.4,4 Envelope Factory -built fenestration and doors are labeled as ❑ 0, ❑ meeting air leakage requirements. / Air Leakage 0402.4.7 Envelope Vestibules are installed on all building entrances. El[ r--�� Doors have selfclosing devices. /j Air Leakage C402.4.1.1 Envelope Al sources of air leakage in the building thermal r�� u El envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize air leakage. / Leakage 0402.4.6 Envelope Weatherseals installed on all loading dock cargo LJC.1 El Air Leakage C402.4.8 Envelope doors. Recessed luminaires in thermal envelope to limit ❑ -/ Ld ❑ 17,0 infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Fenestration C303.1.3 Envelope Fenestration products rated in accordance with NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to El ❑ performance labels or certificates provided. Fenestration C402.2.7 Envelope U-factor of opaque doors associated with the ❑ building thermal envelope meets requirements. Insulation C303.2 Envelope Below -grade wall insulation installed per ❑ 1__I manufacturer's instructions. / Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's 1--�' Eg ❑ instructions. Insulation C402.2.6 Envelope Slab edge insulation deptMength. Slab insulation ❑ 19'E3 extending away from building is covered by pavement or >= 10 inches of soil. Insulation C403.2.7,C408.2.8,C Envelope Exterior insulation protected against damage, ❑ �❑ sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C402.4.2.1 Envelope Roof R-value. For some ceiling systems, ❑ �❑ verification may need to occur during Framing Inspection. Insulation C303.2 Envelope Roof insulation installed per manufacturer's ❑ ❑ instructions. Blown or poured loose -fill insulation is installed only where the roof slope is <=3 in 12. Insulation C402.2.1 Envelope Skylight curbs are insulated to the level of roofs 13 ❑ Insulation C402.2.1.1 Envelope with insulation above deck or R-5. High-albedo roofs satisfy one of the following: 13 / L.10 3-year-aged solar reflectance >= 0.55 and thermal emittance >= 0.75, 3-year-aged solar reflectance index >= 64.0, initial year solar reflectance >= 0.70 and thermal emittance >= 0.75, or initial year solar Insulation C303.2 Envelope Above -grade wall insulation installed per ❑ ❑ Insulation C303.2 Envelope manufacturer's instructions. Floor insulation installed per manufacturer's / 1 1 ❑ Insulation C303.1 Envelope instructions. Building envelope insulation is labeled with R-value ❑ do or insulation certificate providing R-value and other relevant data. Insulation C303.2.1 Envelope Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 7 of 12 Insulation C402.2.1 Envelope Insulation intended to meet the roof insulation ❑ U V requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Controls C405.2.4 Exterior Lighting Automatic lighting controls for exterior lighting ❑ installed. Wattage C405.6 Exterior Lighting Exterior grounds lighting over 100 W provides >60 0❑ Im/W unless on motion sensor or fixture is exempt from scope of code or from external LPD. / Wattage C405.6.2 Exterior Lighting Exterior lighting power is consistent with what is ❑ ❑ u✓ shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Controls C405.2.2.1 Interior Lighting Automatic controls to shut off all building lighting ❑ ❑ installed in all buildings. Controls C405.2.1.1 Interior Lighting Independent lighting controls installed per approved ❑ ]� lighting plans and all manual controls readily accessible and visible to occupants. Controls C405.2.1.2 Interior Lighting Lighting controls installed to uniformly reduce the ❑ ❑ lighting load by at least 50%. Controls C405.2.2.3 Interior Lighting Daylight zones provided with individual controls that control the lights independent of general area Controls C405.2.3 Interior Lighting lighting. Sleeping units have at least one master switch at ❑ Ef 13 the main entry door that controls wired luminaires and switched receptacles. Controls C405.2.2.2 Interior Lighting Occupancy sensors installed in required spaces. El Controls C405.2.2.3 Interior Lighting Primary sidelighted areas are equipped with ❑ ❑ required lighting controls. Controls C405.2.2.3 Interior Lighting Enclosed spaces with daylight area under skylights ❑ [' ❑ and rooftop monitors are equipped with required Controls C405.2.3 Interior Lighting lighting controls. Separate lighting control devices for specific uses ❑ installed per approved lighting plans. Controls C405.3 Interior Lighting Fluorescent luminaires within odd numbered lamp 0 configurations that are with 10 feet center to center (if recess mounted) or are within 1 foot edge to edge (f pendant or surface mounted) shall be tandem wired. Wattage C405.4 Interior Lighting dt 6signs do not exceed 5 watts per face. ❑ i/ ❑ Wattage C405.2.3 Interior Lighting Additional interior lighting power allowed for special ❑ Or ❑ functions per the approved lighting plans and is automatically controlled and separated from general lighting. Wattage C405.52 Interior Lighting Interior installed lamp and fixture righting power is ❑ Er ❑ consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. HVAC C403.2.4.5 Mechanical Freeze protection and snowfxce melting system ❑ sensors for future connection to controls. HVAC C403.2.3 Mechanical HVAC equipment efficiency verified. u7 Air Leakage C402A.5.1 Envelope Stair and elevator shaft vents have motorized dampers that automatically close. Air Leakage C402.4.5.2 Envelope Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. HVAC C403.2.5.1 Mechanical Demand control ventilation provided for spaces El ❑ >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,0cfm. / HVAC C403.2.6.1 Mechanical Piping Insulation exposed to weather is protected ❑ rL71f ❑ from damage (due to sun, moisture, wind, etc.). EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 8 of 12 HVAC C403.2.7 Mechanical HVAC ducts and plenums insulated. Where ducts 0 0 ❑ or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.2.8 Mechanical Thermally ineffective panel surfaces of sensible ❑ ❑ heating panels have insulation >= R-3.5. HVAC C403.2.7 Mechanical Ducts and plenums sealed based on static ❑ ❑ pressure and location. HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means ❑ a ❑ for air balancing. HVAC C403.2.6 Mechanical Exhaust air energy recovery on systems meeting ❑ �.�( IL.I Table C403.2.6 HVAC C403.2.11 Mechanical Unenclosed spaces that are heated use only ❑ radiant heat. HVAC C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by a IZI ❑ thermostat control. HVAC C403.2.4.2 Mechanical Thermostatic controls have a 5 °F deadband. ❑ HVAC C403.2.4.2 Mechanical Temperature controls have setpoint overlap ❑ 12f ❑ restrictions. HVAC C403.2.4.3 Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system. HVAC C403.2.4.3 Mechanical Automatic Controls: Setback to 55°F (heat) and ❑ ❑ 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup SYSTEM —SPECIFIC C404.3 Mechanical Temperature controls installed on service water 13 IZI ❑ heating systems (110 OF for dwelling units and lavatories in public restrooms and 90 OF for other occupancies.) SYSTEM —SPECIFIC C404.4 Mechanical Auto installed toautomatically ❑ El ❑ offthe recirculating hot-water ystem or trace. SYSTEM —SPECIFIC C404.2 Mechanical Heat traps installed on non -circulating storage ❑ 0 ❑ water tanks. SYSTEM —SPECIFIC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in. ❑ IN ❑ labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM —SPECIFIC C403A.2 Mechanical VAV fan >= 7.5 hp are driven by mechanical or �-�( LJ electrical variable speed drive, or driven by vane -axial with variable speed blades, or operate with motor demand <=30% design kW at 50% design flow - calculations required SYSTEM —SPECIFIC C403.2.8 Mechanical HVAC piping insulation thickness. Where piping is El6CA 1-� ❑ installed in or under a slab, verification may need to occur during Foundation inspection. / SYSTEM —SPECIFIC C403.2.7.1.3 Mechanical Ductwork operating >3 in. water column requires ❑m ❑ air leakage testing. SYSTEM —SPECIFIC C403.3.1,C403.3.1.1 Mechanical Air economizers provided where required, meet the �.�( E ❑ requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. / SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical Water economizers provided where required, meet ❑ �j ❑ the requirements for design capacity, maximum pressure drop and integrated economizer control. SYSTEM —SPECIFIC C403.4.1.4 Mechanical Economizer operation will not increase heating ❑ IJ ❑ energy use during normal operation. SYSTEM —SPECIFIC C403.4.5 Mechanical Zone controls can limit simultaneous heating and ❑ Ef ❑ cooling and sequence heating and cooling to each zone. SYSTEM —SPECIFIC C403.4.3.1 Mechanical Three -pipe hydronic systems using a common ❑ d/ El return for hot and chilled water are not used. EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 9 of 12 SYSTEM —SPECIFIC C403.4.3.2 Mechanical Two -pipe hydronic systems using a common distribution system have controls to allow a deadband >=15 OF, allow operation in one mode for at least 4 him before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 OF. SYSTEM —SPECIFIC C403.4.3.3.1 Mechanical Hydronic heat pump systems connected to a ❑ ❑ common water loop meet heat rejection and heat addition requirements. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ �--y U means to balance and have pressure test SYSTEM —SPECIFIC C403.2.10.1 connections. Mechanical HVAC fan systems at design conditions do not 1�1 exceed allowable fan system motor nameplate hp or fan system bhp. SYSTEM —SPECIFIC C403.2.10.2 Mechanical HVAC fan motors not larger than allowable limits. SYSTEM —SPECIFIC C403.4.2 Mechanical VAV fan motors >=7.5 hp to be driven by variable ❑ 0 ❑ speed drive, have a vane -axial fan with variable pitch blades, or have controls to limit fan motor demand. SYSTEM —SPECIFIC C403.4.2.1 Mechanical VAV fans have static pressure sensors positioned so setpoint <=I13 total design pressure. SYSTEM —SPECIFIC C403.4.2.2 Mechanical Reset static pressure setpoint for DDC controlled 13 ❑ VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM —SPECIFIC C403.4.5.4 Mechanical Multiple zone HVAC systems have supply air ❑ ❑ temperature reset controls. SYSTEM —SPECIFIC C403.4.3.4 Mechanical Hydronic systems greater than 300,000 Blum designed for variable fluid flow. SYSTEM —SPECIFIC C403.4.3.5 Mechanical Reduce flow in pumping systems >10 hp to multiple chillers or boilers when others are shut down. SYSTEM —SPECIFIC C403.4.3.4 Mechanical Temperature reset by representative building loads 13 ❑ in pumping systems for chiller and boiler systems SYSTEM —SPECIFIC C403.4.3.3.3 >300,000 Bluth. Mechanical Two -position automatic valve interlocked to shut off 11 water flow when hydronic heat pump with pumping system >10 hp is off. SYSTEM —SPECIFIC C403.4.4 Mechanical Fan systems with motors >=7.5 hp associated with ❑ EJ heat rejection equipment to have capability to operate at 213 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM —SPECIFIC C403.4.6 Mechanical Condenser heat recovery system that can heat El ❑ water to 85 OF or provide 60% of peak heat rejection is installed for preheating of service hot water in 2417 facility, water cooled systems reject SYSTEM —SPECIFIC C403.4.7 >6 MMBtu, SHW load>=1 MMBtu. Mechanical Hot gas bypass limited to: <=240 kBWM — 50% >240 kBWM — 25% SYSTEM —SPECIFIC C404.2 Mechanical Service water heating equipment meets efficiency ❑ 10 ❑ requirements. SYSTEM —SPECIFIC C403.2.4.2 Mechanical Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. SYSTEM —SPECIFIC C403.2.4.3.3 Mechanical Systems include optimum start controls. ❑ ❑ SYSTEM —SPECIFIC C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric ❑ 12 resistance heat from coming on when not needed. SYSTEM —SPECIFIC C404.3 Mechanical Public lavatory faucet water temperature <=110°F. 11Ur[3 SYSTEM —SPECIFIC C404.5 Mechanical All piping in circulating system insulated ❑ SYSTEM —SPECIFIC C404.5 Mechanical First 8 It of outlet piping is insulated 11d EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 10 of 12 Post Construction C303.3,C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and ❑ ❑ equipment to the building owner or designated representative. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure 0 ❑ ❑ proper calibration, adjustment, programming, and operation. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted within 0 0❑ 90 days of system acceptance. Post Construction C303.3,C408.2.5.2 Mechanical Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air andfor hydronic system balancing report is 0 0❑ provided for HVAC systems. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered 0 0 0 design professional or approved agency. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and 0 0❑ certified by registered design professional or approved agency. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner ❑ ❑ ❑ within 90 days of receipt of certificate of occupancy. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure proper 0❑ operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper 0 0 operation. EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 3/17/2016 Page 12 of 12 Proje6t Name: LUSO HOLDINGS LLC Project Title: LUSO HOLDINGS LLC Address: 7043 U.S. HIGHWAY 1 SUITE #203 State: FL Zip: 0 Owner: EnergyGauge Summit® v5.10 INPUT DATA REPOR Proiect Information Orientation: North Building Type: Office Building Classification: New Finished building No.of Stories: 1 GrossArea: 1270 SF Zones No Acronym Description Type Area [sf[ Multiplier Total Area [sf[ I PrOZol Zone I CONDITIONED 1270.0 1 1270.0 ❑ Spaces No Acronym Description Type Depth [ft] Width Height Multi [ft] [ft] plier TotalAroa [sf] Total Volume [ct] 3/17/2016 EnergyGauge Summit® v5.10 1 In Zone: PrOZol 1 PrOZolSol Zo0SP1 Office - Enclosed 31.75 40.00 10.00 1 1270.0 12700.0 El Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pts In Zone: PrOZol In Space: Pr0Zo1Sp1 1 Compact Fluorescent General Lighting 28 25 700 Manual On/Off 1 Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] Capacity [lb/cf] ]h.sCFBtu] [Btu/sEF] In Zone: Pr0Zo1 1 PrOZolWal Stucco, 8" BLock, 31.75 10.00 1 317.5 East 0.1110 7.751 41.32 9.0 ❑ R-4.1, 1/2" Gyp. Brd. 2 Pr0Zo1Wa2 Stucco, 8" BLock, 40.00 10.00 1 400.0 North 0.1110 7.751 41.32 9.0 ❑ R-4.1, 1/2" Gyp. Brd. Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] [ft] [ft] plier [sf] In Zone: Pr0Zol In Wall: EAST 1 PrOZolWalWil User Defined No 1.2500 0.82 0.76 3.00 5.00 2 30.0 ❑ 3/17/2016 EnergyGauge Summit® v5.10 Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value IN [ft] plier [sf] [Btu/hr. sf F] [lb/cl] [Btu/sf. F] [h.sf.FBtu] In Zone: PrOZol In Wall: EAST 1 PrOZolWaID[I Solid core flush No 6.00 8.00 1 48.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [it] [ft] plier [sf] [deg] [Btu/hr. SE F] [Btu/sf. F] [lb/cf] [h.sf.FBtu] In Zone: PrOZol 1 PrOZOIRfI Conc Tile/l/2"WD 40.00 31.75 1 1270.0 0.00 0.0491 2.47 28.76 20.4 ❑ Deck/WD Truss/Icy. foam/Gyp Skylights No Description Type U SHGC Vis:Trans W H(Effec)Multiblier Area TotalArea [Btu/hr sf F] [ft] fit] [St] ISt] In Zone: In Roof: El Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. A F] [Btu/sf. F] [lb/c1] [h.sf.FBtu] In Zone: PrOZol 3/17/2016 EnergyGauge Summit® v5.10 Piping No Type Operating Insulation Nomonal pipe Insulation Is Runout? Temperature Conductivity Diameter Thickness [F] [ Btu-in/h.sf.F] [in] [in] Fenestration Used Name Glass Type No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] ASHULSglClrAll User Defined 1 1.2500 0.8200 0.7600 ❑ Frm Materials Used Mat No Acronym Description Only R-Value RValue Thickness Conductivity Density SpecilicHeat Used [h.sf.FBtu] [ft] [Btu/h.ft.F] [lb/cf] [Btu/Ib.F] BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 123 Mat1123 CONC BLOCK No 1.7227 0.6667 0.3870 53.00 0.2000 ❑ MW,8IN,HOLLOW 267 Mat1267 0.75"stucco No 0.1563 0.0625 0.4000 16.00 0.2000 ❑ 244 Mat1244 PLYWOOD, 1/21N No 0.6318 0.0417 0.0660 34.00 0.2900 ❑ 185 Mat1185 CLAY TILE, PAVER, 3/8IN No 0.0301 0.0313 1.0410 120.00 0.2000 ❑ 11 Matl11 2 in. Insulation No 6.6800 0.1670 0.0250 2.00 0.2000 ❑ 1002 ApLbMat1002 CLAY TILE, PAVER, 3/81N No 0.0301 0.0313 1.0410 120.00 0.2000 ❑ 3/17/2016 EnergyGauge Summit® v5.10 5 Right -Suite® Universal 2015 Load Summary Job: - wrightsotV OFFICE ey e: Mar03, 2016 QUICK CALCS, INC. 317 ST. LUCIE LN., Fr. PIERCE, FL34946 Phone: 772-46"799 Fez 772-4666796 Emoll: QUICKOILCS@OOL.COM For. LUSO HOLDINGS LLC 7043 US HIGHWAY 1#203, ST. LUCIE COUNTY, FL Zone: OFFICE 1. DESIGN CONDITIONS at Jul 1800 LDT Peak load at Jul 1800 LDT Inside: 75 OF Outside: 89 OF TD: 14 OF RH: 62 % MoistDiff: 61.5 gr/lb Mult: 1.0 Ins.wb 63 OF Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 3213 - 3. TRANSMISSION GAINS Sensible 5557 Walls: 3728 - - Glass: 514 - - Doors: 187 - - Partitions: 0 - - Floors: 0 - - Ceilings: 1127 - - 4. INTERNAL HEAT GAIN Sensible Latent 7028 3200 Occupants: 4000 3200 - - Lights: 3028 - Motors: 0 - Appliances: 0 0 - - 5. INFILTRATION: Outside air cfm: 100 1486 4183 6. SUBTOTAL: Space load Sensible Latent 17283 7383 Envelope 17283 7383 - - Less external 0 - Redistribution 0 0 - 7. SUPPLYDUCT 5105 - S. SUBTOTAL: Space load + supply duct 22388 Actual cfm: 1173 at supply TD: 20 - 9. VENTILATION- Make-up air cfm: 0 0 0 10. RETURNAHILOAD: Lighting+ plenum (net) 0 - 11. RETURN DUCT 3201 - 12. TOTAL LOADS ON EQUIPMENT 25589 7383 HEATING-LOAD- 13. DESIGN CONDITIONS Mult: Inside: 70 OF Outside: 42 OF TD: 14. TRANSMISSION LOSSES Walls: 5587 Glass: 1067 Doors: 388 Partitions: 0 -Floors: 1053 Ceilings: 522 15. INFILTRATION: Outside air cfm: 134 16. SUBTOTAL: Space load Envelope 12750 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLYDUCT: 19. VENTILATION: Make-up air cfm: 0 19. HUMIDIFICATION Piping 20. RETURN DUCT 21. TOTAL HEATING LOAD ON EQUIPMENT + wrightsofC fthtSu@e® Universal 2015 15.0.19 RSUD8101 ...ers\Qukk Cake\Dowments\LUSO HOLD NGS LLC.rup Calc=CLTD FroM1borfao3s N 1.0 28 OF 8617 4133 12750 2620 0' 1526 0 653 17549 2016-Mar-17 15:49:28 Page 1