HomeMy WebLinkAboutENERGY CONSERVATION PAPPERSh
Florida Building Code, Fifth Edition (2014) - Energy Conservation
EnergyGauge Summit@ Fla/Com-2015, Effective Date: June 30, 2015 -- Form 506-2014
IECC 2012 - Total Building Performance Compliance Option
Check List
SCANNED
BY
St. Lucie County
Applications for compliance with the Florida Building Code, Energy Conservation shall
include:
W This Checklist
11/1/2015
An Input report generated from the software just after completing compliance
calculations without any further changes
The full compliance report generated by the software that contains the project
summary, complaince summary, certifications and detailed component compliance
reports
Boxes appropriately checked in the Miscellanous report generated by the software at
the end of the compliance report
Lai 0_1 P
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
Page 1 of 13
it
PROJECT SUMMARY
Short Desc: Harbour Ridge Sales Description: Harbour Ridge Sales
Owner: Harbour Ridge
Addressl: 12600 Harbour Ridge Blvd City: Palm City
Addressl: State: FL
Zip: 34990
Type: Retail Class: New Finished building
Jurisdiction: MARTIN COUNTY, MARTIN COUNTY, Fl, (531000)
Conditioned Area:' 1112 SF Conditioned & UnConditioned Area: 1112 SF
No of Stories: I Area entered from Plans 1112 SF
Permit No: 0 Max Tonnage 4
If different, write in:
Component Design Criteria Result
Gross Energy Cost (in $) 700.0 846.0 PASSED
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
PASSES
PASSES
No Entry
PASSES
PASSES
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/I/2015 Page 2 of 13
.,
CERTIFICATIONS
I hereby certify that the plans a�pecifi fo s covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Doug Cooper PE
Building Official:o
Date: / / —Z —1S
Date:
certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida
Energy Efficiency Code
Architect:
Reg No:
Electrical Designer: Ryan Moms PE
Reg No: 5454 / 76459
Lighting Designer:
Reg No:
Mechanical Designer: Robert Davenport PE Reg No: 5454 / 31932
Plumbing Designer: Robert Davenport PE Reg No: 5454 / 31932
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
"P D. Mo",pry,,.,
`y
�..GENS�.
LUi _�ai
Q'4s`ry NAL
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/l/2015 Page 3 of 13
J
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEAFile: Miami.tmv)
Total
Building End Uses
1) Proposed 2) Baseline
44.90 63.60
$700 $996
ELECTRICITY(MBtulkWhl$)
44.90
13151
$.700
63.60
18610
$996
AREA LIGHTS.
9.40
14.00
2744
4102
$146
$219
MISC EQUIPMT
11.20
11.20
3281
3281
$175
$176
PUMPS & MISC 0.00 0.00
2 2
$0 $0
SPACE COOL 19.60
24.20
5739
7085
$305
$379
SPACE HEAT 0.00 0.10
4 18
5�5�tt882 ty[ $0 $1
VENT FANS a�g.�Qv ' a z t, Pr 4.70 14:10 .
1381. 4122
$73 $221•.
Credits Applied: None
Passing Criteria = 846 : Z,
Design (includ ng any credits)—..7 O. A G s .•.����.'
Passing'requires Proposed Building co'st'toe4at most 85% of
11 Basselineeoa4: This Proposed Building isat70.300
laiiin.ii"
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 4 of 13
n
.r
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 B Main entries Yes 30.00 3.0 90 32
Ext Light 1 B Other (doors) than main entries Yes 20.00 3.0 60 32
Tradable Surfaces: 64 (W) Allowance for Tradable: 900 (W) PASSES
All External Lighting: 64 (W)
Complicance check includes a excess/Base allowance of 750.00(W)
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEAFile: Miami.tmy)
Lighting Controls Compliance
Acronym Ashrae Description Area Design Min Compli-
ED (sq.ft) CP CP ance
101 EMP WKRM 16 Office - Open Plan 187 1 1 PASSES
102 CONF RM 15 Conference/meeting (Multiple 257 1 1 PASSES
Functions)
103 SALES DSK 25,001 Sales Area 172 1 1 PASSES
104 RECEPT 12 Lobby (General) - Reception and 365 1 1 PASSES
Waiting
105 RR 6 Toilet and Washroom 40 1 1 PASSES
106 BRK RM 9 Food Service - Bar/Lounge 91 1 1 PASSES
PASSES
M
r i L 6
EnergyGauge SummitO Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 5 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
System Report Compliance
PrOSyl System 1
Constant Volume
Packaged No. of Units
System
1
Component Category
Capacity
Design Eff
Design H'LV Comp-
Eff Criteria
IPLV Criteria liance
Cooling System Air Conditioners Air Cooled
48000
14.00 13.00
12.20 PASSES
0 to 65000 Btu/h Cooling
Capacity
Heating System Electric Furnace
25590
1.00 1.00
PASSES
Air Handling Air Handler (Supply) -
1600
0.35 0.82
PASSES
System -Supply Constant Volume
PASSES
Plant Compliance
Description installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
Non=:::::Ij
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEAFile: Miami.tmy)
Water Heater Compliance
D
Description Type
Design
Category
Min Design Max Comp
Eff
Eff Loss Loss liance
Water Heater 1 Electric water heater <= 12 [kW] 0.99
0.97 PASSES
PASSES
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/l/2015 Page 6 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] SF.F]
Domestic and Service Hot Water
0.50 True I10.00 0.25 1.00 0.50 PASSES
Systems
PASSES
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 7 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge
Sales
Type: Retail
(WEA File: MiamiAnny)
Mandatory Requirements (as applicable) Material Courtesy of PNNL
- COMCheck resources
Topic
Section
Component Description
Yes NIA
Ex
Air Leakage
C402.4.1,C402.4.2
Envelope
The building envelope contains a continuous air
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
approved manner.
Air Leakage
C402.4.3,C402.4.4
Envelope
Factory -built fenestration and doors are labeled as
❑
❑
meeting air leakage requirements.
Air Leakage
C402.4.7
Envelope
Vestibules are installed on all building entrances.
` ❑
Doors have self -closing devices.
Air Leakage
C402.4.1.1
Envelope
All sources of air leakage in the building thermal
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize
air leakage.
/e❑
Air Leakage
C402.4.6
Envelope
Weatherseals installed on all loading dock cargo
❑ F�
doors.
Air Leakage
C402.4.8
Envelope
Recessed luminaires in thermal envelope to limit
❑
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.❑
Fenestration
C303.1.3
Envelope
Fenestration products rated in accordance with
❑
NFRC.
Fenestration
C303.1.3
Envelope
Fenestration products are certified as to
performance labels or certificates provided.
Fenestration
C402.2.7
Envelope
U-factor of opaque doors associated with the
❑
❑
building thermal envelope meets requirements.
Insulation
C303.2
Envelope
Below -grade wall insulation installed per
❑ fy,
❑
manufacturer's instructions.
Insulation
C303.2
Envelope
Slab edge insulation installed per manufacturer's
❑
❑
instructions.
Insulation
C402.2.6
Envelope
Slab edge insulation depth/length. Slab insulation
extending away from building is covered by
pavement or>= 10 inches of soil.
Insulation
C403.2.7,C408.2.8,(
Envelope
Exterior insulation protected against damage,
sunlight, moisture, wind, landscaping and
equipment maintenance activities.❑
Insulation
C402.4.2.1
Envelope
Roof R-value. For some ceiling systems,
❑
verification may need to occur during Framing
Insulation
C303.2
Envelope
Inspection.
Roof insulation installed per manufacturer's
e❑
❑
instructions. Blown or poured loose -fill insulation
is installed only where the roof slope is <=3 in 12.
Insulation
C402.2.1
Envelope
Skylight curbs are insulated to the level of roofs
with insulation above deck or R-5.
Insulation
C402.2.1.1
Envelope
High-albedo roofs satisfy one of the following:
3-vear-aged solar reflectance >= 0.55 and thermal
emittance >= 0.75, 3-year-aged solar reflectance
index >=64.0, initial year solar reflectance >=
0.70 and thermal emittance >= 0.75, or initial year
Insulation
C303.2
Envelope
solar
Above -grade wall insulation installed per
❑ ❑
manufacturer's instructions.
Insulation
C303.2
Envelope
Floor insulation installed per manufacturer's
instructions.
Insulation
0303.1
Envelope
Building envelope insulation is labeled with
R-value or insulation certificate providing R-value
and other relevant data.
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Dale: June 30, 2015
11/1/2015 Page 8 of 13
Insulation C303.2.1 Envelope
Exterior insulation is protected from damage with
VyU❑
a protective material. Verification for exposed
foundation insulation may need to occur during
Foundation Inspection.
Insulation C402.2.1 Envelope
Insulation intended to meet the roof insulation
requirements cannot be installed on top of a
suspended ceiling. Mark this requirement
compliant if insulation is installed accordingly.
Plan Review C103.2 Envelope
Plans and/or specifications provide all information
with which compliance can be determined for the
building envelope and document where
. exceptions to the standard are claimed.
A
Controls C405.2.4 Exterior Lighting
Automatic lighting controls for exterior lighting
RV/[]
installed.
Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide
WO 0
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shout
Post Construction C408.3 Exterior Lighting Lighting systems have been tested to ensure
proper calibration, adjustment, programming, and
operation.
Wattage C405.6 Exterior Lighting Exterior grounds lighting over 100 W provides >60
1:1 WO
ImNV unless on motion sensor or fixture is exempt
from scope of code or from external LPD.
Wattage C405.6.2 Exterior Lighting Exterior lighting power is consistent with what is
❑
❑
'
shown on theapproved lighting plans, "
demonstrating proposed watts are less than or
equal to allowed watts.
Controls C405.2.2.1 Interior Lighting
Automatic controls to shut off all building lighting
installed in all buildings.
Controls C405.2.1.1 Interior Lighting
Independent lighting controls installed perV
approved lighting plans and all manual controls
readily accessible and visible to occupants.
Controls C405.2.1.2 Interior Lighting
Lighting controls installed to uniformly reduce the
ell 11
lighting load by at least 50%.
Controls C405.2.2.3 Interior Lighting
Daylight zones provided with individual controls
V❑
that control the lights independent of general area
lighting.
Controls C405.2.3 Interior Lighting
Sleeping units have at least one master switch at
the main entry door that controls wired luminaires
and switched receptacles.❑
Controls C405.2.2.2 Interior Lighting
Occupancy sensors installed in required spaces.
❑
Controls C405.2.2.3 Interior Lighting
Primary sidelighted areas are equipped with
❑
required lighting controls.
Controls C405.2.2.3 Interior Lighting
Enclosed spaces with daylight area under
skylights and rooftop monitors are equipped with
required lighting controls.
Controls C405.2.3 Interior Lighting
Separate lighting control devices for specific uses
wo
installed pera roved lighting lans.
Controls C405.3 Interior Lighting
Fluorescent luminaires within odd numbered lamp
'
configurations that are with 10 feet center to
center (if recess mounted) or are within 1 foot
edge to edge (if pendant or surface mounted)
shall be tandem wired.
Plan Review C103.2 Interior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shout
n❑
Post Construction C408.2.5.1 Interior Lighting
Furnished as -built drawings for electric power
❑
systems within 30 days of system acceptance.
.. A
Post Construction C303.3,C408.2.5.2 Interior Lighting
Furnished O&M instructions for systems�arld a"
kk
FI
Q,
equipment to the building owner or designatedc"a
representative. ti
H 1.1 1;
@" Fk1-1
U d u.:! l_4tl '�'Y tea✓
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 9 of 13
Post Construction C408.3 Interior Lighting
Lighting systems have been tested to ensure
proper calibration, adjustment, programm,no and
operation.❑
Wattage C405.4 Interior Lighting
Exit signs do not exceed 5 watts per face.
❑
Wattage C405.2.3 Interior Lighting
Additional interior lighting power allowed for
special functions per the approved lighting plans
_
and is automatically controlled and separated from
general lighting.
/>
Wattage C405.5.2 Interior Lighting
Interior installed lamp and fixture lighting power is
7
❑
❑
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
HVAC C403.2.4.5 Mechanical
less than or equal to allowed watts.
Freeze protection and snow/ice melting system
❑
sensors for future connection to controls.
HVAC C403.2.3 Mechanical
HVAC equipment efficiency verified.
T
Air Leakage C402.4.5.1 Envelope
Stair and elevator shaft vents have motorized
dampers that automatically close.
Air Leakage C402.4.5.2 Envelope
Outdoor air and exhaust systems have motorized
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
dampers where allowed.
HVAC C403.2.5.1 Mechanical
Demand control ventilation provided for spaces
❑
>500 ft2 and >25 people/1000 ft2 occupant
-
density and served by systems with air side
economizer, auto modulating outside air damper
control, or design airflow>3,000 cfm.
HVAC C403.2.8.1 Mechanical
Piping Insulation exposed to weather is protected
from damage due to sun, moisture wind etc..
HVAC C403.2.7 Mechanical
HVAC ducts and plenums insulated. Where ducts
or plenums are installed in or under slab,
verification may need to occur during Foundation
HVAC C403.2.8 Mechanical
Inspection.
Thermally ineffective panel surfaces of sensible
❑ n ❑
heating panels have insulation >= R-3.5.
HVAC C403.2.7 Mechanical
Ducts and plenums sealed based on static
,..y�
�/N
pressure and location.
�%
HVAC C408.2.2.1 Mechanical
Air outlets and zone terminal devices have means
❑
for air balancing.
HVAC C403.2.6 Mechanical
Exhaust air energy recovery on systems meeting
Table C403.2.6
HVAC C403.2.11 Mechanical
Unenclosed spaces that are heated use only
radiant heat.
HVAC C403.2.4.1 Mechanical
Heating and cooling to each zone is controlled by
W ❑
❑
a thermostat control.
HVAC C403.2.4.2 Mechanical
Thermostatic controls have a 5 °F deadband.
HVAC C403.2.4.2 Mechanical
Temperature controls have setpoint overlap
restrictions.
HVAC C403.2.4.3 Mechanical
Each zone equipped with setback controls using
0. ❑
❑
automatic time clock or programmable control
HVAC C403.2.4.3 Mechanical
system.
Automatic Controls: Setback to 55°F (heat) and
❑
❑
85°F (coop; 7-day clock, 2-hour occupant
override, 10-hour backup
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
vo
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering st
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
do
❑
all information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
sized per manufact
'
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 10 of 13
Post Construction C408.2.5.1 Mechanical
Furnished HVAC as -built drawings submitted
within 90 days of system acceptance.
Post Construction C303.3,C408.2.5.2 Mechanical
Furnished O&M manuals for HVAC systems within
vo
90 days of system acceptance.
Post Construction C408.2.5.3 Mechanical
An air and/or hydronic system balancing report is
provided for HVAC systems.
Post Construction C408.2.1 Mechanical
Commissioning plan developed by registered
design Professional or approved agency.
V"
Post Construction C408.24 Mechanical
Preliminary commissioning report completed and
certified by registered design professional or
approved agency.
Post Construction C408.2.5.4 Mechanical
Final commissioning report due to building owner
within 90 days of receipt of certificate of
Y
occupancy.
Post Construction C408.2.3.1 Mechanical
HVAC equipment has been tested to ensure
proper operation.
Post Construction C408.2.3.3 Mechanical
Economizers have been tested to ensure proper
operation.
SYSTEM —SPECIFIC C404.3 Mechanical
Temperature controls installed on service water
r
heating systems (110 °F for dwelling units and
lavatories in public restrooms and 90 OF for other
occupancies.)
SYSTEM —SPECIFIC C404.4 Mechanical
Automatic time switches installed to automatically
switch off the recirculating hot-water system or
SYSTEM —SPECIFIC C404.2 Mechanictal
heat trace.
Heat traps installed on non -circulating storage
water tanks.
SYSTEM —SPECIFIC C403.2.3 Mechanical
PTAC and PTHP with sleeves 16 in. by 42 in.
labeled for replacement only as per Footnote b to
SYSTEM —SPECIFIC C403.4.2 Mechanical
Table C403.2.3(3).
VAV fan >= 7.5 hp are driven by mechanical or
electrical variable speed drive, or driven by
vane -axial with variable speed blades, or operate
with motor demand <=30% design kW at 50%
design flow- calculations required
SYSTEM —SPECIFIC C403.2.8 Mechanical
HVAC piping insulation thickness. Where piping is
installed in or under a slab, verification may need
WWW
to occur during Foundation Inspection.
SYSTEM —SPECIFIC C403.2.7.1.3 Mechanical
Ductwork operating >3 in. water column requires
air leakage testing.
SYSTEM —SPECIFIC C403.3.1,C403.3.1_.1 Mechanical
Air economizers provided where required, meet
the requirements for design capacity, control
signal, ventilation controls, high -limit shut-off,
integrated economizer control, and provide a
means to relieve excess outside air during
operation.
SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical
Water economizers provided where required,
meet the requirements for design capacity.
maximum pressure drop and integrated
SYSTEM —SPECIFIC C403.4.1.4 Mechanical
economizer control.
Economizer operation will not increase heating
enerqV use during normal operation.
SYSTEM —SPECIFIC C403.4.5 Mechanical
Zone controls can limit simultaneous heating and
cooling and sequence heating and cooling to each
zone.
SYSTEM —SPECIFIC C403.4.3.1 Mechanical
Three -pipe hydronic systems using a common
return for hot and chilled water are not used.
SYSTEM —SPECIFIC C403.4.3.2 Mechanical
Two -pipe hydronic systems using a common
distribution system have controls to allow a
deadband >=15 OF, allow operation in one mode
for at least 4 hrs before changeover, and have
rest controls to limit heating and cooling supply
SYSTEM C403.4.3.3.1 Mechanical
temperature to <=30 OF.
Hydrronic heat pump systems connected fol�`
—SPECIFIC
common water loop meet heat reiectiori`and heat
d d t �-� n
addition requirements �` t�T,�"�
%i! `CL•li " il,
SYSTEM_ SPECIFIC C408.2.2.2 Mechanical
HVAC hydronic heating and cooling coils have—
meansto balance and have pressure test
connections.
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 11 of 13
SYSTEM —SPECIFIC C403.2.10.1
Mechanical HVAC fan systems at design conditions do not
exceed allowable fan system motor nameplate hp
or fan system bhp.
n
SYSTEM —SPECIFIC C403.2.10.2
Mechanical HVAC fan motors not larger than allowable limits.
c�7i-If
❑
❑
SYSTEM —SPECIFIC C403.4.2
Mechanical VAV fan motors >=7.5 hp to be driven by variable
speed drive, have a vane -axial fan with variable
pitch blades, or have controls to limit fan motor
demand.
n
SYSTEM C403.4.2.1
Mechanical VAV fans have static pressure sensors positioned
❑ p�
❑
—SPECIFIC
so setpoint <=1/3 total design pressure.
SYSTEM —SPECIFIC C403.4.2.2
Mechanical Reset static pressure setpoint for DDC controlled
VAV boxes reporting to central controllerbasedon
the zones requiring the most pressure.
SYSTEM —SPECIFIC C403.4.5.4
Mechanical Multiple zone HVAC systems have supply air
❑
temperature reset controls.
SYSTEM —SPECIFIC C403.4.3.4
Mechanical Hydronic systems greaterthan 300,000 Btu/h
_
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.3.5
Mechanical Reduce flow in pumping systems>10 hp to
multiple chillers or boilers when others are shut
down.
SYSTEM —SPECIFIC C403.4.3.4
Mechanical Temperature reset by representative building
❑ ell
loads in pumping systems for chiller and boiler
systems >300,000 Btu/h.
SYSTEM —SPECIFIC C403.4.3.3.3
Mechanical Two -position automatic valve interlocked to shut
off water flow when hydronic heat pump with
pumping system >10 hp is off.
SYSTEM —SPECIFIC C403.4.4
Mechanical Fan systems with motors >=7.5 hp associated
with heat resection equipment to have capability to
operate at 2/3 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection
device.
SYSTEM —SPECIFIC C403.4.6
Mechanical Condenser heat recovery system that can heat
.water to 85 OF or provide 60% of peak heat
rejection is installed for preheating of service hot
water in 24/7 facility, water cooled systems reject
>6 MMBtu, SHW load >=1 MMBtu.
SYSTEM —SPECIFIC C403.4.7
Mechanical Hot gas bypass limited to:
❑
<=240 kBtu/h — 50%
>240 kBtu/h — 25%
SYSTEM —SPECIFIC C404.2
Mechanical Service water heating equipment meets efficiency
requirements.
SYSTEM —SPECIFIC C403.2.4.2
Mechanical Heating and cooling to each zone is controlled by
a thermostat control. Minimum one humidity
control device per installed
humidification/dehumidification system.
SYSTEM —SPECIFIC C403.2.4.3.3
Mechanical Systems include optimum start controls.
SYSTEM —SPECIFIC C403.2.4.1.1
Mechanical Heat pump controls prevent supplemental electric
resistance heat from coming on when not needed.
SYSTEM —SPECIFIC C404.3
Mechanical Public lavatory faucet water temperature <=110"F.
❑
SYSTEM —SPECIFIC C404.5
Mechanical All piping in circulating system insulated
❑
❑
SYSTEM_SPECIFIC C404.5
Mechanical First 8 ft of outlet piping is insulated
IT'D
11
SYSTEM —SPECIFIC C404.5
Mechanical All heat traced or externally heated piping
insulated
SYSTEM —SPECIFIC C404.6
Mechanical Controls are installed that limit the operation of a
❑
recirculation pump installed to maintain
temperature of a storage tank.
SYSTEM —SPECIFIC C404.7.1
Mechanical Pool heaters are equipped with on/off switch and
� ❑
❑
no continuously burning pilot light.
SYSTEM —SPECIFIC C404.7.3
Mechanical Vapor retardant pool covers are provided for
13`
❑
heated pools and permanently installed spas.
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 12 of 13
SYSTEM —SPECIFIC C404.7.2
Mechanical
Time switches are installed on all pool heaters and
pumps.
SYSTEM —SPECIFIC C403.2.3
Mechanical
Centrifugal fan open -circuit cooling towers having
combined rated capacity>= 1100 qpm meets
minimum efficiency requirement: >=38.2 gpm/hp.
Testing C408.2.3.2
Mechanical
HVAC control systems have been tested to ensure
proper operation, calibration and adjustment of
Mandatory Additional C406
Project
controls.
Efficient HVAC performance, efficient lighting
system, or on -site supply of renewable energy
consistent with what is shown the approved plans.
Insulation C402.2.8
Project
Bottom surface of floor structures incorporating
rl
radiant heating insulated to >=R-3.5.
Plan Review C406
Project
Plans, specifications, and/or calculations provide
_
all information with which compliance can be
determined for the additional energy efficiency
package options.
Plan Review C402.3.2.2
Envelope
Skylights in office, storage, automotive service,
manufacturing, non -refrigerated warehouse, retail
store, and distribution/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight.
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 13 of 13
Project Name: Harbour Ridge Sales
Project Title: Harbour Ridge Sales
Address: 12600 Harbour Ridge Blvd
State: FL
Zip: 34990
Owner: Harbour Ridge
EnergyGauge Summit® v5.10
INPUT DATA REPORT
Proiect Information
Orientation: North
Building Type: Retail
Building Classification: New Finished building
No.of Stories: 1
GrossArea: 1112 SF
Zones
No Acronym Description Type
Area
lstl
Multiplier
Total Area
lsfl
I PrOZoI Zone 1 CONDITIONED
1112.0
1
1112.0 ❑
Spaces
No Acronym Description Type Depth
IN
Width Height Multi
lftl lftl plier
Total Area
lsfl
Total Volume
lcfl
11/2/2015
t
EnergyGauge Summit® v5.10
In Zone: PrOZol
1 101 EMP WKRMOI EMPLOYEE
Office - Open Plan
10.00
18.70
13.00
I 187.0
2431.0
WORKROOM -A
2 102 CONF RM 102 CONFERENCE
Conference/meeting
10.00
25.70
13.00
1 257.0
3341.0
ROOM -A
(Multiple Functions)
3 103 SALES DSPI03 SALES DESK -A
Sales Area
10.00
17.20
13.00
1 172.0
2236.0
4 104 RECEPT 104 RECEPTION -A
Lobby (General) - Reception
10.00
36.50
13.00
1 365.0
4745.0
and Waiting
5 105 RR 105 RESTROOM -A
Toilet and Washroom
10.00
4.00
10.00
1 40.0
400.0
6 106 BRK RM 106 BREAK ROOM
Food Service - Bar/Lounge
10.00
9.10
v 13.00
1 91.0
1183.0
-A
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
rW1
Ctrl pts
In Zone: PrOZol
In Space: 101 EMP WKRM
1 LED
General Lighting
4
32
128
Occupancy sensor without
1
❑
Daylighting
In Space: 102 CONE RM
1 LED
General Lighting
6
32
192
Occupancy sensor without
1
❑
Daylighting
In Space: 103 SALES DSK
1 LED
General Lighting
3
32
96
Occupancy sensor without
1
❑
Daylighting
In Space: 104 RECEPT
1 LED
General Lighting
10
32
320
Occupancy sensor without
1
Daylighting
In Space: 105 RR
1 LED
General Lighting
1
32
32
Occupancy sensor without
1
Daylighting
In Space: 106 BRK RM
1 LED
General Lighting
4
32
128
Occupancy sensor without
I
Daylighting
11/2/2015 EnergyGauge Summit® v5.10
Walls
No
Description
Type
Width
H(Effec)
Multi
Area
Direction
Conductance
Heat
Dens.
R-Value
[ft)
[ft]
plier
[sf]
[Btu/hr. A. F]
Capacity
[lb/cq
[h.sEFBtu)
]Btu/sf.F]
In Zone: PrOZ01
1
101 S
8" Block with ext
17.10
10.00
1
171.0
South
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
2
101 W
8" Block with ext
13.10
10.00
1
131.0
West
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
3
102 S
8" Block with ext
23.10
10.00
1
231.0
South
0.0641
5.653
37.15
15.6
❑
stucco & RI3
Insulation int
4
102 E
8" Block with ext
13.10
10.00
1
131.0
East
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
5
103 E
8" Block with ext.
19.10
10.00
1
191.0
East
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
6
103 N
8" Block with ext
10.70
10.00
1
107.0
North
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
7
104 N
8" Block with ext
18.75
10.00
1
187.5
North
0.0641
5.653
37.15
15.6
❑
stucco & RI
Insulation int
8
105 W
8" Block with ext
8.00
10.00
1
80.0
West
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
9
106 N
8" Block with ext
10.70
10.00
1
107.0
North
0.0641
5.653
37.15
15.6
❑
stucco & R13
Insulation int
10
106 W
8" Block with ext
11.10
10.00
1
111.0
West
0.0641
5.653
37.15
15.6
❑
stucco& R13
Insulation int
11/212015 EnergyGauge Summit® v5.10 3
r �
Windows
No
Description
Type
Shaded
U
SHGC
Vis.Tra
W
H(Effee)
Multi
Total Area
[Btu/hrsfF]
IN
[ft]
pier
(sl]
In Zone: PrOZol
In Wall:
101 S
1
PIOZolWalWil
User Defined
Yes
0.5000
0.48
0.50
7.20
4.33
1
31.2
❑
In Wall:
102 E
1
PrOZolWa12Wi1
User Defined
Yes
0.5000
0.48
0.50
3.00
7.00
1
21.0
In Wall:
102 S
1
PrOZolWalWil
User Defined
Yes
0.5000
0.48
0.50
7.20
4.33
1
31.2
In Wall:
103 E
1
PrOZo1Wal2Wi1
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
In Wall:
103 N
1
PrOZoiWal2Wil
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
In Wall:
104 N
1
PrOZo1Wal2Wi1
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
e
2
PrOZo1Wal2Wi1
User Defined
Yes
0.5000
0.48
0.50
3.00
7.00
1
21.0
In Wall:
106 N
1
PrOZo1Wal2Wi1
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
El
In Wall:
106 W
1
PrOZolWal2WH
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
❑
Doors
No Description
Type
Shaded?
Width
H (Effee)
Multi
Area
Cond.
Dens.
Heat Cap. R-Value
[ft]
[ft]
plier
[st] [Btu/hr. sf. F1
[lb/cf]
[Btu/sf. F] [h.sf.F/Btu]
In=Zone: r
11/2/2015 EnergyGauge Summit® v5.10
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond. Heat Cap
Dens. R-Value
Ift]
IN plier
]sf]
[deg] [Btu/hr. St. F] [Btu/st F]
[lb/ef] [h.stF/Btul
In Zone: PrOZol
1 Pr0ZolRfl
Metal Roofing on
74.70
10.00 1
747.0
0.00
0.0298 2.07
44.87 33.6
❑
3/4" Ply, Wood
Trusses, R30 Spray
Insul
Skylights
No Description Type
U
SHGC Vis.Trans
W
H(Effec) Multiplier
Area Total Area
[Btu/hrsfF]
[ft]
[ft]
[Sfl [Sf]
In Zone:
J
In Roof:
El
Floors
No Description
Type
Width
H (Effec) Multi
Area
Cond.
Heat Cap. Dens.
R-Value
[ft]
[ft] plier
Ist]
[Btu/hr. st F] [Btu/sf. F] [lb/cf]
Ih.sEFBtu]
In Zone: PrOZol
1 Pr0Zo1Fll
1 ft. soil, concrete
74.70
10.00 1
747.0
0.2681
34.00 113.33
3.73
❑
floor, carpet and
rubber pad
Systems
PrOSyl System 1
Constant Volume Packaged System No. Of Units 1
Component Category
Capacity Efficiency IPLV
111212015 EncrgyGauge Summit® v5.10
I Cooling System
2 Heating System
3 Air Handling System -Supply
48000.00
25590.00
1600.00
14.00 12.20
1.00
0.35
❑
❑
❑
Plant
Equipment
Category
Size
Inst.No Eff. IPLU
Water Heaters
W-Heater Description
CapacityCap.Unit
I/PRt.
Efficiency Loss
1 Electric water heater
[Gal]
4 [kW]
0.9900 [Ef] [Btu/h]
❑
Ext-Lighting
Description
Category
No. of
Watts per
Area/Len/No. of units
Control Type
Wattage
Luminaires
Luminaire
[sf/ft/No]
[W]
1
Ext Light 1 B
Main entries
1
32
3.00 Astronomical Timer Comr-
32.00
❑
2
Ext Light 1 B
Other (doors) than main
1
32
3.00 Astronomical Timer Contri
32.00
❑
entries
Piping
Operating
Insulation
Nomonal pipe
Insulation Is Runout?
�-�= 1Vo
=5� --
Type
Temperature
Conductivity
Diameter
Thickness
[F]
[Btu-in/h.stF]
[in]
[in]
Domestic and Service Hot Water Systems
110.00
0.25
0.50
1.00
Yes
❑
11/2/2015 EnergyGauge Summit® v5.10
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Conductance
Panes [Btu/h.sLF]
Double Coated User Defined 2 0.5000 0.4800 0.5000 ❑
1/4"
Materials Used
Only R-Value
RValue
Thickness
Conductivity
Density
SpecificHeat
Mat No
Acronym
Description
Used
[h.sf.FBtu]
[ft]
[Btu/h.ft.F]
[lb/cf]
[Btu/lb.F]
187
Mat1187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
BOARD, 1/21N
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Matl265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Matl48
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
256
Mat1256
WOOD, SOFT, 1-112IN
No
1.8939
0.1250
0.0660
32.00
0.3300
❑
268
Mat1268
0.625" stucco
No
0.1302
0.0521 .•
0.4000
16.00
0.2000
❑
42
Matl42
8 in. Lightweight concrete
No
2.0212
0.6670
0.3300
38.00
0.2000
❑
block
4
Mat14
Steel siding
No
0.0002
0.0050
26.0000
480.00
0.1000
❑
80
Mat180
AIR LAYER, 41N OR
Yes
0.9200
❑
MORE, HORIZ. ROOFS
245
Mat1245
PLYWOOD, 5/81N
No
0.7894
0.0521
0.0660
34.00
0.2900
❑
1002
ApLbMat1002
R-13 Generic Insulation
Yes
13.0000
❑
1003
ApLbMat1003
R-30 Generic Insulation
Yes
30.0000
❑
Constructs Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/h.sf.F]
[Btu/sEF]
[Ib/cf]
]h.sf.FBtu]
1057
1 ft. soil, concrete floor, carpet and rubber pad
No
No
0.27
34.00
113.33
3.7
❑
11/2/2015 EnergyGauge Summit® v5.10 7
Layer
Material
Material
Thickmess
Framing
No.
[it]
Factor
1
265
Soil, 1 ft
1.0000
0.000
❑
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
178
CARPET W/RUBBER PAD
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No Name
Construct
Construct
[Btu/h.sLF]
[Btu/sf.Fl
[lb/ct]
[h.sf.F/Btu]
1060 8" Block with ext stucco & R13 Insulation int No
No
0.06
5.65
37.15
15.6
❑
Layer
Material
Material
Thickness
Framing
No.
IN
Factor
1
268
0.625" stucco
0.0521
0.000
❑
2
42
8 in. Lightweight concrete block
0.6670
0.000
❑
3
1002
R-13 Generic Insulation
0.1670
0.000
❑
4
187
GYP OR PLAS BOARD,1/2IN
0.0417
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No Name
Construct
Construct
[Btu/h.sLF]
[Btu/sLF]
[lb/cq
[h.sLFBtu]
1061 Metal Roofing on 3/4" Ply, Wood Trusses, No
No
0.03
2.07
44.87
33.6
❑
R30 Spray Insul
Layer
Material
Material
Thickness
Framing
No.
Ift]
Factor
LI - I
4
Steel siding
0.0050
0.000
❑
❑
2
245
PLYWOOD, 5/8IN
0.0521
0.000
�f 4 3
1003
R-30 Generic Insulation
0.5000
0.000
❑
=+ 4
80
AIR LAYER, 41N OR MORE, HORIZ.
0.000
❑
ROOFS
5
256
WOOD, SOFT, 1-1/2IN
0.1250
0.000
❑
11/2/2015 EnergyGauge Summit® v5.10
(Phis appendix is not part of this standard. it is merely informative and does not contain requirements necessary for
conformance to the standard. It has not been processed according to the ANSI requirements for a standard and may
contain material that has not been subject to public review or a consensus process. Unresolved objectors on informative
material are not offered the right to appeal to ASHRAE or ANSI)
APPENDIX A
RECOMMENDED ASHRAE/ACCA COMPLIANCE FORM FOR STANDARD 183
Building or Zone Name:
HARBOUR RIDGE SALES CENTER
Location or Address:
12600 HARBOUR RIDGE BLVD, PALM CITY, FL
Design Conditions:
Weather Data Used
Indoor Dry Bulb Design Temperature
Indoor Design Relative Humidity
Cooling
WPB, FL (92DB/79WB)
730F
50%RH
Heating
WPB, FL (45DB)
G80F
45%RH
Load Calculation Method: (indicate which of the following methods is used)
❑ CLTD/CLF—Cooling Load Temperature Difference/Cooling Load Factor methods
❑1HEI—Heat Balance methods
a TETD/TA—Total Equivalent Temperature DffferencelTime Averaging methods
❑ TFM—Transfer Function Methods
❑ RTS—Radiant Time Series methods
❑ OTHER (please specify)
The undersignel fJ[%tpfat4)e[.a,�bove Information is correct and that the procedures
used to aerfoOti, IS fiEaholllauyns comply with ANSIIASHRAE/ACCA Standard 183.
Signed: = : Date:
DA
d.'• P
�� Date : ;� Q•", i'nt rr"-�1�,
Submitted by.O� li, I' r.. `, `
ANSUASHRAFIACCA Standad 183-2007
15-1039
,`% %tt DAVF
G•. N
��•m�Q���G E N s 2 •:
- p : p10 3193
0: ; is
i_�.n'. STpiB Of
RGD CI
1232 W.
P v61-
•1 • Al ���
Engineers, Inc.
i Road, Suite 104
L 33458
F 561-743-0193
Location
Palm City, Florida
Building owner
Program user
RGD & Associates Inc
Company
RGD & Associates Inc
Comments
HARBOUR RIDGE
SALES CENTER
By
RGD
Dataset name
X:1 Active_Projects115-1039 Harbour Ridge Lifestyle
CenterlMEP_ProjectlMechanicallCooling Loads1HR Sales
Center.trc
Calculation time
09:20 AM on 10113/2015
TRACE® 700 version
6.3.2
Location
West Palm Beach, Florida
Latitude
26.7 deg
Longitude
80.2 deg
Time Zone
5
Elevation
15 ft
Barometric pressure
29.9 in. Hg
Air density
0.0760 Ib/cu ft
Air specific heat
0.2444 Btullb•°F
Density -specific heat product
1.1147 Btulh•cfm•°F
Latent heat factor
4,906.9 Btu•min/h•cu ft
Enthalpy factor
4.5604 Ib•min/hr•cu ft
Summer design dry bulb
92.3 °F
Summer design wet bulb
79.2 °F
Winter design dry bulb
45.0 °F
Summer clearness number
0.90 -
Winter clearness number
0.95
Summer ground reflectance
0.20
Winter ground reflectance
0.20
Carbon Dioxide Level
400 ppm
Design simulation period
January - December
Cooling load methodology
TETD-TA1
Heating load methodology
UATD
AW—
TRIINE' MACEm
MUMwm:.n"o-omi� .01w..uvm
Zone Checksums
By RGD
Zone -001
COOLING COIL PEAK
CLG SPACE PEAK
HEATING COIL PEAK
TEMPERATURES
Peaked at Time: Mo/Hr:
9 / 17
Mo/Hr:
11 116
Mo/Hr.
Heating Design
Cooling
Heating
Outside Air: OADBMIBIHR:
89/771119
OADB:
82
OADB:
45
SAD13
54.0
68.2
Ra Plenum
75.0
68.0
Space Plenum
Net
Percent:
Space
Percent:
Space Peak
Coil Peak Percent
Return
75.0
68.0
Sens. +Let Sens. +Let
Total
Of Total;
Sensible
Of Total;
Space Sens
Tot Sens Of Total
Ret/OA
76.9
64.8
Bluth Btu/h
Btu/h
(%);
Btu/h
(%)
:
Bluth
Btu/lb
(°/)
Fn MtrTD
0.0
0.0
Envelope Loads
: Envelope Loads
Fn 13IdTD
0.0
0.0
Skylite Solar
0 0
0
0
0
0
Skylite Solar
0
0 0.00
Fn Frict
0.1
0.0
Skylite Cond
0 0
0
0.,.
0
0:
Skylite Cond
0
0 0.00
Roof Cond
2,284 0
2,284
5,:
1,305
4
, Roof Cond
-756
-756 15.35
Glass Solar
9,423 0
9,423
22:
13,386
44'I
Glass Solar
0
0 0.00
AIRFLOWS
Glass/Door Cond
1,105 0
1,105
3:
541
21
Glass/Door Cond
-2,000
-2,000 40.60
Cooling
Heating
Wall Cond
1,550 0
1,550
4:
1,343
4:
Wall Cond
-1,523
-1,523 30.92
Diffuser
1,303
1,303
Partition/Door
0
0
0:
0
0:
Partition/Door
0
0 0.00
0.00
Terminal
1,303
1,303
Floor
0
0
0
0
0:
0.
0
0
0:
0
Floor
Adjacent Floor
0
0
0
0 0.00
Main Fan
1,303
1,303
Adjacent Floor
Infiltration
0
0
0
01
0
0:
Infiltration
0
0 0.00
Sec Fan
0
0
Sub Total==>
14,362 0
14,362
33:
16,574
54:
Sub Total==>
-4,279
4,279 86.87
Nom Vent
179
179
AHU Vent
179
179
Internal Loads
,. Internal Loads
Infil
0
0
Lights
4,137 0
4,137
10 :
4,137
14
Lights
4,137
4,137
-83.99
MinStop/Rh
0
0
People
10,300 0
10,300
24:
5,850
191
People
5,850
5,850-118.77
Return
1,303
1,303
Misc
3,942 0
3,942
9:
3,942
13
I, Misc
3,942
3,942
-80.03
Exhaust
179
179
Sub Total ==>
18,379 0
18,379
43 :
13,929
46
Sub Total ==>
13,929
13,929-282.78
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
0 0
0
0:
0
0
Ceiling Load
0
0 0.00
Leakage own
0
0
Ventilation Load
0 0
9,956
23:
0
0
: Ventilation Load
0
-4,594 93.28
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0.
0
0
Adj Air Trans Heat
_ 0
0 0
Dehumid. Ov Sizing 0 0: :Ov/Untlr Sizing -9,981 -9,981 202.64
Ov/Untlr Sizing
0
0
0:
0
0:
Exhaust Heat
0 0.00
ENGINEERING CKS
Exhaust Heat
0
0
0;
: OA Preheat Diff.
0 0.00
Cooling
Heating
Sup. Fan Heat
251
1 �
RA Preheat Diff.
0 0.00
% OA
13.8
13.8
Ret. Fan Heat
0
0
0
O I
0:
Additional Reheat
L System Plenum Heat
0 0.00
0 0.00
cfm/ft'
1.17
1.17
Duct Heat Pkup
:.' 0
Underflr Sup Ht Pkup
-__ :=
0
0:
Undernr Sup Hit Pkup
0 0.00
cfm/ton
364.08
Supply Air Leakage
pr=- 0
0
0:
Supply Air Leakage
0 0.00
ft'Iton
309.87
Btulhr•fN
38.73
-4.44
Grand Total=�
32,7141't1 '._. 0
42,948
100.00
30,503
100.00'
Grand Total==>
-331
4.926 100.00
No. People
23
7 ( COOLING COIL SELECTION
AREAS
HEATING COIL SELECTION
Total
Capacity, Cap. Coil
Airflow
Enter DBIWB/HR
Leave DBIWB/HR
Gross Total
Glass
Capacity
Coil Airflow
Ent Lvg
ton
_ -Sens
MBh'' "'MBh
cfm
°F °F
grub
°F
°F grAb
w I%)
MBh
cfm
°F °F
Main Clg 3.6
43.0 _�-: y 31.3
1,303
76.9 63.8
67.9
53.8 52.7 57.5
Floor
1,109
Main Htg
4.9
1,303
64.8 68.2
Aux Cig 0.0
0:0✓-L � ,-- 0.0
0
0.0 0.0
0.0
0.0
0.0 0.0
Part
0
Aux Htg
0.0
0
0.0 0.0
Opt Vent 0.0
00 r_� 0.0
0
0.0 0.0
0.0
0.0
0.0 0.0
Int Door
0
Preheat
0.0
0
0.0 0.0
ExFlr
0
Total 3.6
43.0
Roof
1,109
0 0
Humidif
0.0
0
0.0 0.0
Wall
1,338
173 13
Opt Vent
0.0
0
0.0 0.0
Ext Door
0
0 0
Total
-4
Project Name: 15-1039 TRACE® 700 v6.3.2 calculated at 09:20 AM on 10/13/2015
Dataset Name: HR Sales Centertrc Alternative - 1 System Checksums Report Page 1 of 1
Florida Building Code, Fifth Edition (2014) - Energy Conservation
EnergyGauge Summit@ Fla/Com 2015, Effective Date: June 30, 2015 =- Form 506-2014
IECC 2012 - Total Building Performance Compliance Option
SCANNED
BY
Check List
Applications for compliance with the Florida Building Code, Energy Conservation shall
include:
W This Checklist
An Input report generated from the software just after completing compliance
calculations without any further changes
The full compliance report generated by the software that contains the project
summary, complaince summary, certifications and detailed component compliance
reports
Boxes appropriately checked in the Miseellanous report generated by the software at
the end of the compliance report
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 1 of 13
PROJECT SUMMARY
Short Desc: Harbour Ridge Sales Description: Harbour Ridge Sales
-, Owner: Harbour Ridge
Addressl: 12600 Harbour Ridge Blvd City: Palm City
Address2: State: Fl,
Zip: 34990
Type: Retail Class: New Finished building
Jurisdiction: MARTIN COUNTY, MARTIN COUNTY, Fl- (531000)
Conditioned Area: 1112 SF Conditioned & UnConditioned Area: 1112 SF
No of Stories: 1 Area entered from Plans 1112 SF
Permit No: 0 Max Tonnage 4
If different, write in:
Component Design Criteria Result
Gross Energy Cost (in $) 700.0 846.0 PASSED
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
PASSES
PASSES
No Entry
PASSES
PASSES
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 2 of 13
CERTIFICATIONS
I hereby certify that the plans and specifics
Florida Energy Code
overed by this calculation are in compliance with the
Prepared By:
Dou ooper PE
Building Official:
Date:
//` Z (r
Date:
I certify that this building is in
compliance with the
Florida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (*) that
the system design is in compliance with the Florida
Energy Efficiency Code
Architect:
Reg No:
Electrical Designer:
Ryan Moms PE
Reg No: 5454 / 76459
Lighting Designer:
Reg No:
Mechanical Designer: Robert Davenport PE Reg No: 5454 / 31932
Plumbing Designer: Robert Davenport PE Reg No: 5454 / 31932
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
,e �. ,v,o;-
go
r No.76459
P. is v 'A
i�9 'o ,r�• 2 a r'�,
,c'••, ORI '•
�4*`�%Q`F/ONAL E�G. cad
11/l/2015
,,,4Nn Iloilo#
",.• Pg J. COO,,
OJ. �\GE NSF • �t��':
73096 -
I:
TATEOF '4U:
' i, SIONAL %0*
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
Page 3 of 13
L
II Project: Harbour Ridge Sales II
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmv)
Total
Building End Uses
1) Proposed
44.90
2) Baseline
63.60
$700 $996
ELECTRICITY(MBtulkWhl$)
44.90
63.60
13151
18610
$700
$996
AREA LIGHTS
9.40
14.00
2744
4102
$146
$219
MISC EQUIPMT
11.20
11.20
3281
3281
$175
$176
PUMPS & MISC
0.00
0.00
2
2
$0
$0
SPACE COOL
19.60
24.20
5739
7085
$305
$379
SPACE HEAT
0.00
4
en
0.10
is
$1
N SbDD e+�el/e
VENT
FANS k;`>Ne3•,.4U ¢c?;
4.70
`1410, ..
+aC
;.. •�-, :L, .r
e�.�(�` 'p>`g�''9 *`'w
1381::
41.
�,t
��u i .�, ��
• ^ SEor�. ' '
$73
$221
0
Credits Applied: None u vt PASSE:
Pass>ikXriterii:y846
'. Design (including any credits,) � 700,,
E Passing.rdquires Proposed Bni1&1g;Cosh toP�efa host 85 /° of
Baseline c5•ost: This Proposed Buiiding€is'd t1tg70.3%
''r]l ID9 t1
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 4 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 B Main entries Yes 30.00 3.0 90 32
Ext Light 1 B Other (doors) than main entries Yes 20.00 3.0 60 32
Tradable Surfaces: 64 (W) Allowance for Tradable: 900 (W) PASSES
All External Lighting: 64 (W)
Complicance check includes a excess/Base allowance of 750.00(VV)
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEAFile: Miami.tmy)
Lighting Controls Compliance
Acronym
Ashrae Description
Area
Design
Min
Compli-
ID
(sq.ft)
CP
CP
ance
101 END WKRM
16 Office - Open Plan
187
1
1
PASSES
102 CONF RM
15 Conference/meeting (Multiple
257
1
1
PASSES
Functions)
103 SALES DSK
25,001 Sales Area
172
1
1
PASSES
104 RECEPT
12 Lobby (General) - Reception and
365 -
1
1
PASSES
Waiting
105 RR
6 Toilet and Washroom
40
1
1
PASSES
106 BRK RM
9 Food Service - Bar/Lounge
91
1
1
PASSES
PASSES
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 5 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEAFile: Miami.tmy)
System
Report
Compliance
PrOSyl System 1
Constant Volume
Packaged No. of Units
System
1
Component Category Capacity
Design Eff
Design IPLV Comp-
Eff Criteria
IPLV Criteria liance
Cooling System Air Conditioners Air Cooled
48000
14.00 13.00
12.20 PASSES
0 to 65000 Bm/h Cooling
Capacity
Heating System Electric Furnace
25590
1.00 1.00
PASSES
Air Handling Air Handler (Supply) -
1600
0.35 0.82
PASSES
System -Supply Constant Volume
PASSES
Plant Compliance
Description Installed Size Design Min Design
No Eff Eff IPLV
Min Category Comp
H'LV liance
NonE::::::::1J
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
Water Heater Compliance
Design
Min Design Max Comp
D
Description Type
Category
Eff
Eff Loss Loss liance
Water Heater 1 Electric water heater <= 12 [kW] 0.99
0.97 PASSES
PASSES
EnergyGauge Summer Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 6 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge Sales
Type: Retail
(WEA File: Miami.tmy)
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] SF.F]
Domestic and Service Hot Water
0.50 True 110.00 0.25 1.00 0.50 PASSES
Systems
PASSES
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
I1/1/2015 Page 7 of 13
Project: Harbour Ridge Sales
Title: Harbour Ridge
Sales
Type: Retail
(WEA File: Mianni.tmy)
Mandatory Requirements (as applicable) Material Courtesy of PNNL
- COMCheck resources
Topic
Section
Component Description
Yes NIA
Ex
Air Leakage
C402.4.1,C402.4.2
Envelope
The building envelope contains a continuous air
W❑
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
approved manner.
Air Leakage
C402.4.3,C402.4.4
Envelope
Factory -built fenestration and doors are labeled as
❑
❑
meeting air leakage requirements.
Air Leakage
C402.4.7
Envelope
Vestibules are installed on all building entrances.
Doors have self -closing devices.
Air Leakage
C402.4.1.1
Envelope
All sources of air leakage in the building thermal
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize
air leakage.
/�
Air Leakage
C402.4.6
Envelope
Weatherseals installed on all loading dock cargo
� L�
doors.
Air Leakage
C402.4.8
Envelope
Recessed luminaires in thermal envelope to limit
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.
/�❑
Fenestration
C303.1.3
Envelope
Fenestration products rated in accordance with
rCX4�!
❑
NFRC.
Fenestration
C303.1.3
Envelope
Fenestration products are certified as to
erformance labels or certificates Provided.
Fenestration
C402.2.7
Envelope
U-factor of opaque doors associated with the
building thermal envelope meets requirements.
Insulation
C303.2
Envelope
Below -grade wall insulation installed per
13 IV
❑
manufacturer's instructions.
Insulation
C303.2
Envelope
Slab edge insulation installed per manufacturer's
❑
❑
instructions.
Insulation
C402.2.6
Envelope
Slab edge insulation depth/length. Slabinsulation❑
,
❑
extending away from building is covered by
pavement or >= 10 inches of soil.
Insulation
C403.2.7,0408.2.8,( Envelope
Exterior insulation protected against damage,
❑ e
o
sunlight, moisture, wind, landscaping and
equipment maintenance activities.❑
Insulation
C402.4.2.1
Envelope
Roof R-value. For some ceiling systems,
❑
verification may need to occur during Framing
Insulation
C303.2
Envelope
Inspection.
Roof insulation installed per manufacturer's
eo
❑
instructions. Blown or poured loose -fill insulation
is installed only where the roof slope is <=3 in 12.
Insulation
C402.2.1
Envelope
Skylight curbs are insulated to the level of roofs
with insulation above deck or R-5.
Insulation
C402.2.1.1
Envelope
High-albedo roofs satisfy one of the following:
3-year-aged solar reflectance >= 0.55 and thermal
emittance >= 0.75, 3-year-aged solar reflectance
index >=64.0, initial year solar reflectance >=
0.70 and thermal emittance >= 0.75, or initial year
Insulation
C303.2
Envelope
solar
Above -grade wall insulation installed per
❑ ❑
manufacturer's instructions.
Insulation
C303.2
Envelope
Floor insulation installed per manufacturers
13 '
instructions.
Insulation
C303.1
Envelope
Building envelope insulation is labeled with
R-value or insulationcertificate providing
and other relevant data.
EnergyGauge Summit® Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 8 of 13
Insulation C303.2.1 Envelope
Exterior insulation is protected from damage with
a protective material. Verification for exposed
foundation insulation may need to occur during
Foundation Inspection.
Insulation 0402.2.1 Envelope
Insulation intended to meet the roof insulation
requirements cannot be installed on too of a
suspended ceiling. Mark this requirement
compliant if insulation is installed accordingly.
Plan Review C103.2 Envelope
Plans and/or specifications provide all information
WLI
11
with which compliance can be determined for the
building envelope and document where
Controls C405.2.4 Exterior Lighting
exceptions to the standard are claimed.
Automatic lighting controls for exterior lighting
installed.
Plan Review C103.2 Exterior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shoul
Post Construction C408.3 Exterior Lighting
Lighting systems have been tested to ensure
led' El
0
_
proper calibration, adjustment, programming, and
Wattage C405.6 Exterior Lighting
operation.
Exterior grounds lighting over 100 W provides >60
Im/W unless on motion sensor or fixture is exempt
from scope of code or from external LPD.
Wattage C405.6.2 Exterior Lighting
-Exterior lighting power is consistent with what is
N,f
_
- `shown on the approved lighting plans,
b—
demonstrating proposed watts are less than or
equal to allowed wafts.
Controls C405.2.2.1 Interior Lighting
Automatic controls to shut off all building lighting
installed in all buildings.
Controls C405.2.1.1 Interior Lighting
Independent lighting controls installed per
approved lighting plans and all manual controls
readily accessible and visible to occupants.
Controls C405.2.1.2 Interior Lighting
Lighting controls installed to uniformly reduce the
eo
El
lighting load by at least 50%.
Controls C405.2.2.3 Interior Lighting
Daylight zones provided with individual controls
that control the lights independent of general area
lighting.
Controls C405.2.3 Interior Lighting
Sleeping units have at least one master switch at
the main entry doorthat controls wired luminaires
and switched receptacles.
C405.2.2.2 Interior Lighting
Occupancy sensors installed in required spaces.
eo
El
Controls C405.2.2.3 Interior Lighting
Primary sidelighted areas are equipped with
required lighting controls.
Controls C405.2.2.3 Interior Lighting
Enclosed spaces with daylight area under
skylights and rooftop monitors are equipped with
required lighting controls.
Controls C405.2.3 Interior Lighting
Separate lighting control devices for specific uses
wo
installed pera roved lighting lans.
Controls C405.3 Interior Lighting
Fluorescent luminaires within odd numbered lamp
❑ wo
_
configurations that are with 10 feet center to
center (if recess mounted) or are within 1 foot
edge to edge (if pendant or surface mounted)
shall be tandem wired.
�,j
Plan Review C103.2 Interior Lighting
Plans, specifications, and/or calculations provide
�,{
_
all information with which compliance can be
Y"
determined for the interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shout
/>❑
Post Construction C408.2.5.1 Interior Lighting
Furnished as -built drawings for electric power
❑
systems within 30 days of system accetance.
Post Construction C303.3,C408.2.5.2 Interior Lighting
Furnished O&M instructions for systems and
_
equipment to the building owner or designated
representative.
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
I1/1/2015 Page 9 of 13
Post Construction C408.3
Interior Lighting
Lighting systems have been tested to ensure
proper calibration adjustment programming and
operation.
Wattage C405.4
Interior Lighting
Exit signs do not exceed 5 watts per face.
�p "
O
❑
Wattage C405.2.3
Interior Lighting
Additional interior lighting power allowed for
❑
special functions per the approved lighting plans
and is automatically controlled and separated from
general lighting.
/j
Wattage C405.5.2
Interior Lighting
Interior installed lamp and fixture lighting power is
P
❑
❑
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
HVAC C403.2.4.5
Mechanical
less than or equal to allowed watts.
Freeze protection and snow/ice melting system
sensors for future connection to controls.
HVAC C403.2.3
Mechanical
HVAC equipment efficiency verified.
. ❑
❑
Air Leakage C402.4.5.1
Envelope
Stair and elevator shaft vents have motorized
dampers that automatically close.
Air Leakage C402.4.5.2
Envelope
Outdoor air and exhaust systems have motorized
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
dampers where allowed.
HVAC C403.2.5.1
Mechanical _
Demand control ventilation provided for spaces
>500 112 and >25 people/1000 ft2 occupant
density and served by systems with air side
economizer, auto modulating outside air damper
control, or design airflow>3,000 dim.
HVAC C403.2.8.1
Mechanical
Piping Insulation exposed to weather is protected
from damage due to sun moisture wind etc.).
HVAC C403.2.7
Mechanical
HVAC ducts and plenums insulated. Where ducts
or plenums are installed in or under a slab,
verification may need to occur during Foundation
HVAC C403.2.8
Mechanical
Inspection.
Thermally ineffective panel surfaces of sensible
01V
heating panels have insulation >= R-3.5.
HVAC C403.2.7
Mechanical
Ducts and plenums sealed based on static
�t/X
pressure and location.
V'
HVAC C408.2.2.1
Mechanical
Air outlets and zone terminal devices have means
for air balancing.
HVAC C403.2.6
Mechanical
Exhaust air energy recovery on systems meeting
Table C403.2.6
HVAC C403.2.11
Mechanical
Unenclosed spaces that are heated use only
radiant heat.
HVAC C403.2.4.1
Mechanical
Heating and cooling to each zone is controlled by
' ❑
a thennostat control.
HVAC C403.2.4.2
Mechanical
Thermostatic controls have a 5 °F deadband.
w❑
HVAC C403.2.4.2
Mechanical
Temperature controls have setpoint overlap
❑
❑
restrictions.
HVAC C403.2.4.3
Mechanical
Each zone equipped with setback controls using
automatic time clock or programmable control
HVAC C403.2.4.3
Mechanical
system.
Automatic Controls: Setback to 55°F (heat) and
/> ❑
p�
❑
85°F (cool): 7-day clock. 2-hour occupant
override, 10-hour backup
Plan Review C103.2
Mechanical
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering st❑
Plan Review C103.2
Mechanical
Plans, specifications, and/or calculations provide
❑
all information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
sized per manufact
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 10 of 13
Post Construction C408.2.5.1 Mechanical
Furnished HVAC as -built drawings submitted
within 90 days of system acceptance.
Post Construction C303.3,C408.2.5.2 Mechanical
Furnished O&M manuals for HVAC systems within
90 days of system acceptance.
Post Construction C408.2.5.3 Mechanical
An air and/or hydronic system balancing report is
El 1:1
Provided for HVAC systems.
Post Construction C408.2.1 Mechanical
Commissioning plan developed by registered
design Professional or approved agency.
Y'
Post Construction C408.2.4 Mechanical
Preliminary commissioning report completed and
certified by registered design professional or
Post Construction C408.2.5.4 Mechanical
approved agency.
Final commissioning report due to building owner
within 90 days of receipt of certificate of
occupancy.
Post Construction C408.2.3.1 Mechanical
HVAC equipment has been tested to ensure
proper operation.
Post Construction C408.2.3.3 Mechanical
Economizers have been tested to ensure proper
operation.
SYSTEM —SPECIFIC C404.3 Mechanical
Temperature controls installed on service water
heating systems (110 OF for dwelling units and
lavatories in public restrooms and 90 OF for other
occupancies.)
SYSTEM —SPECIFIC C404.4 Mechanical
Automatic time switches installed to automatically
switch off the recirculating hot-water system or
yr
SYSTEM —SPECIFIC C404.2 Mechanical
heat trace.
Heat traps installed on non -circulating storage
water tanks.
SYSTEM —SPECIFIC C403.2.3 Mechanical
PTAC and PTHP with sleeves 16 in. by 42in.
labeled for replacement only as Per Footnote b to
Table C403.2.3(3).
SYSTEM C403.4.2 Mechanical
VAV fan >= 7.5 hp are driven by mechanical or
—SPECIFIC
electrical variable speed drive, or driven by
vane -axial with variable speed blades, or operate
with motor demand <=30% design kW at 50%
design flow - calculations required
SYSTEM —SPECIFIC C403.2.8 Mechanical
HVAC piping insulation thickness. Where piping is
installed in or under a slab, verification may need
WWW
to occur during Foundation Inspection.
SYSTEM —SPECIFIC C403.2.7.1.3 Mechanical
Ductwork operating >3 in. water column requires
13V
air leakage testing.
SYSTEM —SPECIFIC C403.3.1,C403.3.1.1 Mechanical
Air economizers provided where required, meet
the requirements for design capacity, control
signal, ventilation controls, high -limit shut-off,
integrated economizer control, and provide a
means to relieve excess outside air during
operation.
SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical
Water economizers provided where required,
V
meet the requirements for design capacity,
maximum pressure drop and integrated
SYSTEM —SPECIFIC C403.4.1.4 Mechanical
economizer control.
Economizer operation will not increase heating
enerqV use during normal operation.
SYSTEM —SPECIFIC C403.4.5 Mechanical
Zone controls can limit simultaneous heating and
cooling and sequence heating and cooling to each
zone.
SYSTEM —SPECIFIC C403.4.3.1 Mechanical
Three -pipe hydronic systems using a common
return for hot and chilled water are not used.
SYSTEM —SPECIFIC C403.4.3.2 Mechanical
Two -pipe hydronic systems using a common
distribution system have controls to allow a
deadband >=15 OF, allow operation in one mode
for at least 4 hrs before changeover, and have
rest controls to limit heating and cooling supply
temperature to <=30
SYSTEM —SPECIFIC C403.4.3.3.1 Mechanical
Hydronic heat pump systems connected to a
sy
❑ ❑
common water loop meet heat resection and heat
addition requirements.
SYSTEM —SPECIFIC C408.2.2.2 Mechanical
HVAC hydronic heating and cooling coils have
❑ WO
means to balance and have Pressure test
connections.
EnergyGauge Summit® FWCom-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 11 of 13
SYSTEM —SPECIFIC C403'. 1A 1
Mechanical HVAC fan systems at design conditions do not
exceed allowable fan system motor nameplate hp
or fan system bhp.
SYSTEM —SPECIFIC C403.2.10.2
Mechanical HVAC fan motors not larger than allowable limits.
❑ ❑
SYSTEM —SPECIFIC C403.4.2
Mechanical VAV fan motors >=7.5 hp to be driven by variable
speed drive, have a vane -axial fan with variable
pitch blades, or have controls to limit fan motor
SYSTEM —SPECIFIC C403.4.2.1
demand.
Mechanical VAV fans have static pressure sensors positioned
❑ se
so setpoint <=1/3 total design pressure.
SYSTEM —SPECIFIC C403.4.2.2
Mechanical Reset static pressure setpoint for DDC controlled
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
SYSTEM —SPECIFIC C403.4.5.4
Mechanical Multiple zone HVAC systems have supply air
0I
temperature reset controls.
SYSTEM —SPECIFIC C403.4.3.4
Mechanical Hydronic systems greater than 300,000 Btu/h
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.3.5
Mechanical Reduce flow in pumping systems>10 hp to
multiple chillers or boilers when others are shut
SYSTEM —SPECIFIC C403.4.3.4
down.
Mechanical Temperature reset by representative building
loads in pumping systems for chiller and boiler
systems >300,000 Btu/h.
SYSTEM —SPECIFIC C403.4.3.3.3
Mechanical Two -position automatic valve interlocked to shut
off water flow when hvdronic heat pump with
pumping system >10 hp is off.
SYSTEM —SPECIFIC C403.4.4
Mechanical Fan systems with motors>=7.5 hp associated
with heat rejection equipment to have capability to
operate at 213 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensingtemp/pressure of heat rejection
device.
SYSTEM C403.4.6
Mechanical Condenser heat recovery system that can heat
—SPECIFIC
water to 85 °F or provide 60% of peak heat
rejection is installed for preheating of service hot
water in 2417 facility, water cooled systems reject
>6 MMBtu, SHW load >=1 MMBtu.
SYSTEM —SPECIFIC C403.4.7
Mechanical Hot gas bypass limited to:
❑ ❑
<=240 kBtulh — 50%
>240 kBtu/h — 25%
SYSTEM —SPECIFIC C404.2
Mechanical Service water heating equipment meets efficiency
❑
requirements.
W
SYSTEM —SPECIFIC C403.2.4.2
Mechanical Heating and cooling to each zone is controlled by
a thermostat control. Minimum one humidity
control device per installed
humidification/dehumidification system.
SYSTEM —SPECIFIC C403.2.4.3.3
Mechanical Systems include optimum start controls.
SYSTEM C403.2.4.1.1
Mechanical Heat pump controls prevent supplemental electric
`
—SPECIFIC
resistance heat from coming on when not needed.
SYSTEM —SPECIFIC C404.3
Mechanical Public lavatory faucet water temperature <=110°F.
SYSTEM —SPECIFIC C404.5
Mechanical All piping in circulating system insulated
SYSTEM —SPECIFIC C404.5
Mechanical First 8 ft of outlet piping is insulated
SYSTEM —SPECIFIC C404.5
Mechanical All heat traced or externally heated piping
insulated
SYSTEM —SPECIFIC C404.6
Mechanical Controls are installed that limit the operation of a
recirculation pump installed to maintain
temperature of a storage tank.
SYSTEM —SPECIFIC C404.7.1
Mechanical Pool heaters are equipped with on/off switch and
❑ ❑
no continuously burning pilot light.
SYSTEM —SPECIFIC C404.7.3
Mechanical Vapor retardant pool covers are provided for
,--
heated pools and permanently installed spas.
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 12 of 13
SYSTEM —SPECIFIC C404.7.2
Mechanical
Time switches are installed on aii pool heaters and
pumps.
SYSTEM —SPECIFIC C403.2.3
Mechanical
Centrifugal fan open -circuit cooling towers having
combined rated capacity >= 1100 gpm meets
minimum efficiency requirement: >=38.2 gpm/hp.
Testing C408.2.3.2
Mechanical
HVAC control systems have been tested to ensure
proper operation, calibration and adjustment of
controls.
Mandatory Additional C406
Project
Efficient HVAC performance, efficient lighting
❑ V ❑
system, or on -site supply of renewable energy
consistent with what is shown the approved plans.
Insulation C402.2.8
Project
Bottom surface of floor structures incorporating
radiant heating insulated to >=R-3.5.
Plan Review C406
Project
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the additional energy efficiency
package options.
Plan Review C402.3.2.2
Envelope
Skylights in office, storage, automotive service,
11W o
manufacturing, non -refrigerated warehouse. retail
�Y
store, and distribution/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight.
EnergyGauge Summit@ Fla/Com-2014. Section 506.4 Compliant Software. Effective Date: June 30, 2015
11/1/2015 Page 13 of 13
EnergyGauge Summit® v5.10
INPUT DATA REPORT
Project Name:
Project Title:
Address:
State:
Zip:
Owner:
Harbour Ridge Sales
Harbour Ridge Sales
12600 Harbour Ridge Blvd
FL
34990
Harbour Ridge
Project Information
Orientation:
Building Type:
Building Classification:
No.ofStories:
GrossArea:
North
Retail
New Finished building
]
1112 SF
Zones
No Acronym Description Type
Area
[sfl
Multiplier
Total Area
[st]
1 PrOZoI Zone 1 CONDITIONED
1112.0
1
1112.0 ❑
Spaces
No Acronym Description Type Depth
[ft]
Width Height Multi
[ft] [ft] plier
Total Area
1811
Total Volume
[cf1
I1/2/2015 EnergyGauge Summit®v5.10
In Zone: PrOZol
1 101 EMP WKP3101 EMPLOYEE
Office - Open Plan
10.00
18.70
13.00
1 187.0
2431.0
WORKROOM -A
2 102 CONF RM 102 CONFERENCE
Conference/meeting
10.00
25.70
13.00
1 257.0
3341.0
ROOM -A
(Multiple Functions)
3 103 SALES DSB103 SALES DESK -A
Sales Area
10.00
17.20
13.00
1 172.0
2236.0
4 I04 RECEPT 104 RECEPTION -A
Lobby (General) - Reception
10.00
36.50
13.00
1 365.0
4745.0
and Waiting
5 105 RR 105 RESTROOM -A
Toilet and Washroom
10.00
4.00
10.00
1 40.0
400.0
❑
6 106 BRK RM 106 BREAK ROOM
Food Service - Bar/Lounge
10.00
9.10
13.00
1 91.0
1183.0
El
-A
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[WI
Ctrl pts
In Zone: Prozol
In Space: 101 EMP WIG M
I LED
General Lighting
4
32
128
Occupancy sensor without
I
Daylighting
In Space: 102 CONF RM
1 LED
General Lighting
6
32
192
Occupancy sensor without
I
El
Daylighting
In Space: 103 SALES DSK
I LED
General Lighting
3
32
96
Occupancy sensor without
I
Daylighting
In Space: 104 RECEPT
1 LED
General Lighting
10
32
320
Occupancy sensor without
1
❑
Daylighting
In Space: 105 RR
I LED
General Lighting
I
32
32
Occupancy sensor without
1
El
Daylighting
In Space: 106 BRK RM
1 LED
General Lighting
4
32
128
Occupancy sensor without
1
❑
Daylighting
11/2/2015 EnergyGauge Summit® v5.10
Walls
No Description Type Width H (Effec) Multi Area Direction Conductance Heat Dens. R-Value
[ft] [ft] plier [sf] ]Btu/hr. sf. F] Capacity [lb/cf] [h.sf.F/Btu]
In Zone:
1 101 S
2 101 W
3 102 S
4 102 E
5 103 E
6 103 N
7 104N
8 105 W
9 106 N
10 106 W
PrOZol
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int
8" Block with ext
stucco & R13
Insulation int.
17.10
10.00
1
171.0
South
0.0641
5.653
37.15
15.6
❑
13.10
10.00
1
131.0
West
0.0641
5.653
37.15
15.6
❑
23.10
10.00
1
231.0
South
0.0641
5.653
37.15
15.6
❑
13.10
10.00
1
131.0
East
0.0641
5.653
37.15
15.6
❑
19.10
10.00
1
191.0
East
0.0641
5.653
37.15
15.6
❑
10.70
10.00
1
107.0
North
0.0641
5.653
l
37.15
15.6
❑
18.75
10.00
1
187.5
North
0.0641
5.653
37.15
15.6
❑
8.00
10.00
1
80.0
West
0.0641
5.653
37.15
15.6
❑
10.70
10.00
1
107.0
North
0.0641
5.653
37.15
15.6
❑
11.10
10.00
1
111.0
West
0.0641
5.653
37.15
15.6
❑
11/2/2015 EnergyGauge Summit@ v5.10 3
Windows
No
Description
Type
Shaded
U
SHGC
Vis.Tra
- W
H (Effee)
Multi
Total Area
[Btu/hrsfF1
IN
IN
plier
[sff
In Zone: PrOZol
In Wall:
101 S
1
PrOZO1WalWil
User Defined
Yes
0.5000
0.48
0.50
7.20
4.33
1
31.2
In Wall:
102 E
1
PrOZolWal2Wil
User Defined
Yes
0.5000
0.48
0.50
3.00
7.00
1
21.0
In Wall:
102 S
1
PrOZolWalWil
User Defined
Yes
0.5000
0.48
0.50
7.20
4.33
1
31.2
In Wall:
103 E
1
PrOZolWa12Wi1
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
❑
In Wall:
103 N
1
PrOZolWa12Wil
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
In Wall:
104 N
1
PrOZolWal2Wil
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
2
PrOZolWa12Wil
User Defined
Yes
0.5000
0.48
0.50
3.00
7.00
1
21.0
e
In Wall:
106 N
1
PrOZolWal2Wil
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
❑
In Wall:
106 W
1
PrOZolWal2Wil
User Defined
Yes
0.5000
0.48
0.50
2.70
4.30
1
11.6
Doors
No Description
Type
Shaded?
Width
H (Effec)
Multi
Area
Cond.
Dens.
Heat Cap. R-Value
IN
IN
plier
[sf] [Btu/hr. sf. Ff
[lb/cff
[Btu/sf. Ff [h.sf.F/Btuf
In Zone:
In Wall:
EJJ
11/2/2015 EnergyGauge Summit® v5.10
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond. Heat Cap
Dens. R-Value
[ft]
[ft] plier
[st]
[deg] [Btu/hr. SE Fl [Btu/sf. F]
[lb/cf] [h.sf.FBtu]
In Zone: PrOZol
❑
1 Pr0ZolRfl
Metal Roofing on
74.70
10.00 1
747.0
0.00
0.0298 2.07
44.87 33.6
3/4" Ply, Wood
Trusses, R30 Spray
Insul
Skylights
No Description Type
U
SHGC Vis.Trans
W
H-(Effec) Multiplier
Area Total Area
[Btu/hrsfF]
[ft]
[ft]
[Sf] [Sf]
In Zone:
In Roof:
Floors
No Description
Type
Width
H (Effec) Multi
Area
Cond.
Heat Cap. Dens.
R-Value
[ft]
[ft] plier
[sf]
[Btu/hr. sG FI [Btu/sf. Fl [lb/cf]
[h.sEF/Btu]
In Zone: PrOZol
I Pr0Zo1F11
I ft. soil, concrete
74.70
10.00 1
747.0
0.2681
34.00 113.33
3.73
❑
floor, carpet and
rubber pad
Systems
PrOSyl System 1 Constant Volume Packaged System No. Of Units 1
Component Category Capacity Efficiency IPLV
11/2/2015 EnergyGauge Summit@ v5.10
I Cooling System
2 Heating System
3 Air Handling System -Supply
48000.00
25590.00
1600.00
14.00 12.20
1.00
0.35
❑
Plant
Equipment
Category
Size
Inst.No Eff.
IPLV
Water Heaters
W-Heater Description
Capacity Cap.Unit
I/P Rt.
Efficiency
Loss
1 Electric water heater
[Gal]
4 LkW]
0.9900 [Ef]
[Btu/h] ❑
Ext-Lighting
Description
Category
No. of
Watts per
Area/Len/No. of units
Control Type
Wattage
Luminaires
Luminaire
[sf/ft/No]
[W]
1 Ext Light 1 B
Main entries
1
32
3.00 Astronomical Timer Comm,
32.00
❑
2 Ext Light 1 B
Other (doors) than main
1
32
3.00 Astronomical Timer Contn
32.00
❑
entries
Piping
Operating
Insulation
Nomonal pipe
Insulation Is Runout?
No Type
Temperature
Conductivity
Diameter
Thickness
[p]
[ Btu-in/h.sCE]
[in]
[in]
I Domestic and Service Hot Water Systems
110.00
0.25
0.50
1.00
Yes
11/2/2015 EnergyGauge Summit® v5.10
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Conductance
Panes [Btu/h.sLF]
Double Coated User Defined 2 0.5000 0.4800 0.5000 ❑
1/4"
Materials Used
Only R-Value
RValue
Thickness
Conductivity
Density
SpeciTicHeat
Mat No
Acronym
Description
Used
[h.sLF/Btu]
IN
[Btu/h.ft.F]
[lb/cf]
[Btu/Ib.F]
187
Mad187
GYP ORPLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
BOARD,1/2IN
178
Mad178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Matl265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Matl48
6 in. Heavyweight concrete
No
0,5000
0.5000
1.0000
140.00
0.2000
❑
256
Mat1256
WOOD, SOFT, 1-1/2IN
No
1.8939
0.1250
0.0660
32.00
0.3300
❑
268
Mat1268
0.625" stucco
No
0.1302
0.0521
0.4000
16.00
0.2000
❑
42
Mat142
8 in. Lightweight concrete
No
2.0212
0.6670
0.3300
38.00
0.2000
❑
block
4
Matl4
Steel siding
No
0.0002
0.0050
26.0000
480.00
0.1000
❑
80
Mat180
AIR LAYER, 41N OR
Yes
0.9200
❑
MORE, HORIZ. ROOFS
245
Mat1245
PLYWOOD, 5181N
No
0.7894
0.0521
0.0660
34.00
0.2900
❑
1002
ApLbMat1002
R-13 Generic Insulation
Yes
13.0000
❑
1003
ApLbMatl003
R-30 Generic Insulation
Yes
30.0000
❑
Constructs Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/h.sf.F]
[Btu/sLF]
[lb/cf]
[h.sfT/Btu]
1057
1 ft. soil, concrete floor, carpet and rubber pad
No
No
0.27
34.00
113.33
3.7
❑
11/2/2015 EnergyGauge Summit® v5.10 7
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
265
Soil, 111
1.0000
0.000
1:1
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
178
CARPET W/RUBBER PAD
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEF]
[Btu/sf.F]
[lb/ct]
[h.sEF/Btu]
1060
8" Block with ext stucco & R13 Insulation int No
No
0.06
5.65
37.15
15.6
❑
Layer
Material
Material
Thickness
Framing
No.
Ift]
Factor
1
268
0.625" stucco
0.0521
0.000
❑
2
42
8 in. Lightweight concrete block
0.6670
0.000
❑
3
1002
R-13 Generic Insulation
0.1670
0.000
❑
4
187
GYP OR PLAS BOARD, 1/2IN
0.0417
0.000
❑
Simple
Massless
Conductance'
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEF]
[Btu/sEF]
[lb/ct]
[h.sf.F/Btu]
1061
Metal Roofing on 3/4" Ply, Wood Trusses, No
No
0.03
2.07
44.87
33.6
❑
R30 Spray Insul
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
4
Steel siding
0.0050
0.000
❑
2
245
PLYWOOD, 5/81N
0.0521
0.000
❑
3
1003
R-30 Generic Insulation
0.5000
0.000
❑
4
80
AIR LAYER, 41N OR MORE, HORIZ.
0.000
❑
ROOFS
5
256
WOOD, SOFT, I-I/21N
0.1250
0.000
❑
11/2/2015 EnergyGauge Summit® v5.10
03/24/2014 13:51 561-4932701 ECM PAGE 01
I a�ri'5;�j
1A) -
ZU10
F
FLORIDA ENERGY CONSERVATION CODE
Mandatory must lnspoction Certification for I-IVA.0 change -out
For use when Fart of the duc'tauftr HVAC system has been replaced (Section 101.4.7.1,.1 A FS 553.912)
Owner. }{ax�l ( VICA Contractor name: EAST COAST MECHANiCAI,
Street addross: J
ZO�^• � L'.Li � Jutisdxction: ' L��.l�• '
Permit No;:,
• � - ' 3 � 5��- —Final inspection date: '
1 certify that 1.have inspected the ductwork associated with the HVAC unit iefercnced by the permit listed
above and found it complies with, the requirements of Section 101.4.711.1 as indicated bclow:
d"Vdbcte needed, the existing ducts have been seated using reinforced mastic or code -approved
equivalent.
The joints or scams. are already scaled with fabric and mastic (Section 101.4.7.11 exception 2)
Sigoalure
Printed Name:
Contrn:tor License 1h C
Data:
i 7 have t eel the replaccdtair'distribution systent(s) referenced by the permit listed above at a
3iffer6" tal of25 rascals (0.10
Date:
dame:
11nS+Q2�D� ' a
FCIM roirbn due; March 18. 2n11
/, h
._ti �---
C�_, All a 71,,