Loading...
HomeMy WebLinkAboutMISC EMAIL'1 L � ; tJoe Cicio From: A. Thomas Const. Inc <atconst06@yahoo.com> Sent: Wednesday, December 14, 2016 10:50 AM To: Joe Cicio Subject: Porta Jon on Permits Bus Shelters Attachments: Masch Concrete Ticket S Rio Mar.pdf: Masch Concrete NORTH Rio .pdf, Masch July 1 Chase Prima.pdf ` December 14, 2016 SCANNED By y Joe: St. Lucie Count The bus shelter sites have been finished a few months. y The roadways could not be held up more than 15-20 minutes .for concrete slab. The installation of the pre-fab shelters ,took less than 1/2 hour. Today the benches will be secured down- r;;again -probably 15 minutes. we never had porta jons onsite <due to the locations. we are ready to final out but I cannot s because the porta jon inspection is listed (#1) prior to the k"�concrete tickets and also prior to the final. I have attached ._,the Maschmeyer docs for the 4000 psi. Is there anything we can do to satisfy code 427 Temp Toilet for all (4) permits? I would appreciate your assistance. `''°. Permit# 1605-0246 Permit# 1605-0210 Parmit4ff ien1;—n?AS e mr i[t#1�60;5202.1L5 :Thank you Faye Fitzpatrick :A.Thomas Const Inc .:atconst06@yahoo.com ;772-595-5261 (Chase Bank 132 Entrada) (North of Rio Mar Drive on U.S.1) Roadside (Prima vista - Gas station & Publix) Roadside (South of Rio Mar close to stoplight in median) Joe Cicio -From: A. Thomas Const. Inc <atconst06@yahoo.com> Sent: Wednesday, December 14, 2016 10:50 AM r. To: Joe Cicio Subject: Porta Jon on Permits Bus Shelters Attachments: Masch Concrete Ticket S Rio Mar.pdf, Masch Concrete NORTH Rio .pdf, Masch July 1 Chase Prima.pdf SCANNED December 14, 2016 BY St. Lucie County Joe: The bus shelter sites have been finished a few months. The roadways could not be held up more than 15-20 minutes for concrete slab. The installation of the pre-fab shelters took less than 1/2 hour. Today the benches will be secured down - again -probably 15 minutes. we never had porta jons onsite due to the locations. we are ready to final out but I cannot because the Aorta jon inspection is listed (#1) prior to the concrete tickets and also prior to the final. I have attached the maschmeyer docs for the 4000 psi. is there anything we can do to satisfy code 427 Temp Toilet for all (4) permits? I would appreciate your assistance. Permit# 1605-0246 (Chase Bank 132 Entrada) Permit#f1�fGS 02110 (North of Rio mar Drive on U.S.1) Roadside P e r m i t # i`504 0 4 (Prima Vista - Gas Station & Publix) Roadside Permit# 1605-0215 (South of Rio mar close to stoplight in median) Thank you Faye Fitzpatrick A.Thomas const Inc atconst06@yahoo.com ;,772-595-5261 1 Joe Cicio From: A. Thomas Const. Inc <atconst06@yahoo.com> SCANNED Sent: Wednesday, December 14, 2016 10:50 AM BYt St. Lucie County To: Joe Cicio y Subject: Porta Jon on Permits Bus Shelters Attachments: Masch Concrete Ticket S Rio Mar.pdf, Masch Concrete NORTH Rio .pdf, Masch July 1 Chase Prima.pdf December 14, 2016 Toe: The bus shelter sites have been finished a few months. The roadways could not be held up more than 15-20 minutes for concrete slab. The installation of the pre-fab shelters took less than 112 hour. Today the benches will be secured down - again -probably 15 minutes. we never had porta jons onsite due to the locations. we are ready to final out but I cannot because the porta jon inspection is listed (#1) prior to the concrete tickets and also prior to the final. I have attached the Maschmeyer docs for the 4000 psi. Is there anything we can do to satisfy code 427 Temp Toilet for all (4) permits? I would appreciate your assistance. Permit# (Chase Bank 132 Entrada) Permit# 1605-0210 (North of Rio Mar Drive on U.S.1) Roadside Permit# 1605-0245 (Prima Vista - Gas Station & Publix) Roadside Permit# 1605-0215 (South of Rio Mar close to Stoplight in median) Thank you Faye Fitzpatrick A.Thomas Const Inc atconst06@yahoo.com 772-595-5261 Fir ffl W1C9.1111Mv'f SK - * r,,-F. s9rmis Print sub eet RE: Addresses uire j � mq �tl for County Bus shatter sties From: Janet Merkt (merktj@s0ucieco.org) To: atconst06@yahoo.com; Cc: dcioj@stlucieco.org; ZampettiD@stludeco.org; Date: Monday, May 9, 2016 10:30 AM SCANNED BY . Lucie County Here are the bus shelter addresses and the corresponding parcel IDs for permit purposes Stop 8: Now in City of Fort Pierce. Please contact them for address. q9q-% ' Stop 9: In ROW adjacent to parcel ID 3419-505-0007-99" 7261 S. US Highway 1, Port St Lucie, 34952 ckA54 5k'-� V, Stop 10: In ROW adjacent to 3419-525-0001-2006 132 SE Entrada Ave, Port St Lucie, 34952 Stop 41: In ROW adjacent to parcel ID 3422-858-0002-0004` i rr, t� ijt S d`& l 203 Prima Vista Blvd, Port St Lucie, 34952 C_ i Stop 42:3422-522-0001-0005 l 7160 S. US Highway 1, Port St Lucie, 34952 Please contact me should you have any questions or concerns. Janet Merlr< GIS Team St Lucie County 2300 Virginia Ave Ft Pierce, FL aba itblark Joe Cicio From: Joe Cicio Sent: Thursday, May 26, 2016 1:48 PM To: atconst06@yahoo.com Cc: Joe Cicio Subject: Review Comments for Permit Number 1605-0215 SCANNED Attachments: Report_FL_Review_Comments_Noncompliantjrf.pdf BY St. Lucie County Dear St. Lucie County Permit Applicant, Please see the attached plan review comments which have been generated for your permit. As soon as we receive the modified plans and any additional required documentation back from the design professional, contractor or owner we will perform the additional reviews as necessary in order to complete the plan review process. Once the plans have been signed, by all applicable plan reviewers, we will move the permit forward either to the Fire Department or back to permitting for permit issuance. Thank you, Plans Examiner II Standard Building Inspector Building Plans Examiner One and Two Family Dwelling Inspector One and Two Family Plans Examiner St Loci, Cov*4y Ft4*wAZ" &+%& Develap'wwew! Serv- ec,� • c , Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Joe Cicio From: A. Thomas Const. Inc <atconst06@yahoo.com> Sent: Friday, May 27, 2016 11:31 AM To: Joe Cicio Subject: Fw: St Lucie County Permitting May 27, 2016 Re: Permits for Bus shelter sites JOL I received your email engineer on record for on his email for your Thank you Faye Fitzpatrick A.Thomas Const Inc atconst06@yahoo.com 772--595-5261 request. I asked Gary ]ones, the the information. I have forwarded review. On Friday, May 27, 2016 9:04 AM, Gary Jones <gjones@gocaptec.com> wrote: SCANNED BY St. Lucie County Faye, Which locations is St. Lucie County providing the permits for? I believe you told me Fort Pierce provided permits for #2, #4, #43 and #8 correct? That would leave, 42,141 and 10 for St. Lucie County, correct? Site 42 — The shelter is constructed 2' behind back of the sidewalk providing for a 96" clear bus stop pad. It is concrete meeting all ADA Criteria for slopes and cross slopes. — firm and stable. Accessible route, connected to the curb at the edge of pavement. Existing Bus stop sign remains. (Stop details are shown on Sheet 13) Site 9 — rovides an accessible route to the north where there is a 96" clear bus pad. It is concrete meeting all ADA Criteria for slopes and cross slopes. — firm and stable. Accessible route, connected to the curb at the edge of pavement. Existing Bus stop sign remains. (Stop details are shown on Sheet 14) Site 41 — The shelter is constructed behind back of the sidewalk providing for a 96" clear bus stop pad and an accessible route from the shelter. It is concrete meeting all ADA Criteria for slopes and cross slopes. — firm and stable. Accessible route, connected to the curb at the edge of pavement. Existing Bus stop sign remains. (Stop details are shown on Sheet 15) Site 10 — The shelter is constructed behind back of the sidewalk providing for a 96" clear bus stop pad and an accessible route from the shelter. It is concrete meeting all ADA Criteria for slopes and cross slopes. — firm and stable. Accessible route, connected to the roadway with detectable warning device at the edge of pavement. Existing Bus stop sign will be relocated. (Stop details are shown on Sheet 16) All these sheet were provided for submittal to the County and they demonstrate that the 4 locations comply with FBC 810 - 810.4. If he needs any additional information please have him contact me. Thank you, Gary From: A. Thomas Const. Inc [mailto:atconst06@yahoo.coml Sent: Thursday, May 26, 2016 3:10 PM To: Gary Jones Subject: St Lucie County Permitting May 26, 2016 Gary: Joe Cicio sent me a notice that he needs a plan for bus boarding and alighting areas to the shelter per FBC accessibility 810 up to 810.4 for each site. Thank you Faye Fitzpatrick A. Thomas Const Inc atco nst06(5Vahoo. com 772-595-5261