Loading...
HomeMy WebLinkAboutCSM PERMIT PACKAGEI f CIVIL - STRUCTURAL - MARINE E N G I N E E R I N G SCANNED BY CSM ENGINEERING, LLC I 20B I SE OCEAN DRIVE - SUITE I A t.Luck? County STUART. FLORIDA 34996 ISLAND CREST CONDOMINIUM PERMIT PACKAGE Located At: Island Crest Condominium 10680 S Ocean Dr. Jensen Beach, Florida 34957 Prepared For: Island Crest Condominium Management Attn: Diana Mann O: 772-229-1897 E: IsCrest@aol.com Inspected: May 2016 ST LUCIE COUNTY BUILDING DIVISION REVIEWED FOR COMPLIANd DATE MUST BE KEPT OWJOB OR NO INSPECTION WILL BE MADE THESE PLANS AND ALL PROPOSED WORK ARE SUBJECTTO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT NIAY BE NECESSARY IN LViEWn TO COUPLY V191Tfl ALL APPLICA-SSE CODES. Charles A. Darden'Je.1, Florida Registered Professional Engine #76910 PAGE I OF IS TABLE OF CONTENTS Title Page TScope of Work able of ContentsFIL COPY Scope of Work Attachments: Inspection Plan Section 1 - Concrete Repair Specifications Section 2 - Corrosion Inhibitor Specifications Section 3 — Waterproofing System Specifications Section 4 - Steel Reinforcement Protection Specifications Section 5 - Sacrificial Anode Specifications Section 6 - ICRI Standards Weather Wall Specification Drawings Restoration Location Drawings: Inspection Key 210 310 410 510 1201 1 2 3-4 5 6-8 9-10 11-12 13 & Attached 14 & Attached 15 & Attached Attached 1 Page Attached 6 Pages THESE PL'kl•J5 AidO ALL PROPOSHO V101M ARE SUBJx CT T O ANY COMM=, Oi lS RcGUIRED BY FIELD INSPECTORS THAT L;AY BE NECESSARY IN MM TO CO.-Mi Y t f{Trl ALL APPI-:0WEl E CODES. Charles A. Darden Jr. Florida Registered,P,eofessional E eer #T6910 -" -- -- PAGE 2 OF 1 5 SCOPE OF WORK CONTRACTOR shall provide all labor, supervision, parts, materials, testing, tools, equipment, utilities, permits, temporary facilities, sanitary facilities, swing stages, and scaffolding, required for completion of the below described WORK in accordance with the applicable drawings, specifications, codes and standards. The WORK to be performed by CONTRACTOR includes: 1) Mobilization LE[tyj COPY 2) Protection of Existing Conditions: a) Provide protection systems for existing site exterior components, including vegetation and private property of residents and visitors, which may be damaged as a result of CONTRACTOR'S performance of the WORK. Existing conditions of all site components that are in proximity to the WORK shall be surveyed and documented by CONTRACTOR prior to the commencement of work. 3) Railings and Screen, Shutter Systems, Sliding Glass Doors, Doors and Windows: a) Removal, protected storage and reinstallation of existing railings and screens, shutter systems, sliding glass doors, doors and windows as required for the WORK and as directed by ENGINEER. Where possible, the existing'enclosures shall be left in place, rather than removed. b) All permanently installed fastener materials shall be stainless steel and shall be approved by ENGINEER. c) Removal and disposal of existing railings and screens, shutter systems, sliding glass doors, doors and windows as required for the WORK and as directed by ENGINEER. 4) Weather Walls: a) Installation, maintenance and removal of weather walls and protection systems for exposed building interior spaces and surfaces as directed by ENGINEER. 5) Tile Removal: a) Removal and disposal of existing tile and other floor finishes, including adhesives, as required for the WORK and as directed by ENGINEER. 6) Concrete Repairs: a) Investigation and excavation of deteriorated concrete and reinforcing steel shown on the below listed attached Inspection Spreadsheets and Inspection Drawings, and as directed by ENGINEER. Estimated quantities shown on the attachments are subject to revision based on the results of such investigation and excavation. b) Surface preparation of excavated areas. c) Restoration of oxidized reinforcing steel. d) Installation of Sika Galvashield XP+galvanic sacrificial anodes as directed by ENGINEER. e) Patching and/or placement of concrete in the prepared areas to match adjoining surfaces. 7) Waterproofing System: a) Apply Degussa Protectosil (corrosion inhibitor) over the repaired concrete deck and edge on walkways and balconies that are not enclosed within a weather tight system. b) In locations specified by ENGINEER, install Sika Sikalastic, STO Decocoat, or BASF Sonoshield waterproofing system consisting of primer, base coat and top coat (aggregate and backroll) in accordance with manufacturer's specifications. 8) Stucco Repairs: a) Prepare all damaged stucco surfaces and apply stucco finish to match existing adjacent stucco surfaces. 9) Painting: a) Preparation and painting (prime coat plus one finish coat) in accordance with the manufacturer's recommendations of all repair areas and surfaces disturbed by CONTRACTOR to match the existing adjacent finish. 10) Demobilization -. PAGE 3 OF 1 5 f ATTACHED INSPECTION DRAWINGS Inspection Drawings: Key 210 — 1201 Damage Key Balcony Drawings (5 Pages) ATTACHED SPECIFICATIONS AND DRAWINGS The above WORK shall be performed in accordance with the following attached Specifications and Drawings: Section 1— Concrete Repair Specifications Section 2 — Corrosion Inhibitor Specifications Section 3 — Waterproofing System Specifications Section 3 — Steel Reinforcement protection Specifications Section 4 — Sacrificial Anode Specifications Section 5 — ICRI Standards Weather Wall Specification Drawings Restoration Drawings oil -- - '"- --- PAGE 4 OF 1 5 INSPECTION PLAN GENERAL A. ENGINEER shall review any work underway, as appropriate. All structural repairs, including reinforced concrete repairs at each location require specific engineering inspections and approvals. Non-structural work, such as stucco, overlays, waterproofing, and all non -reinforced concrete placements do not require inspections and approvals at each phase of work, but will be subject to ongoing engineering observations and approvals during the work. B. CONTRACTOR shall notify ENGINEER at least 2 business days prior to any required inspection. C. During the onsite inspections, ENGINEER shall review any work underway, regarding work locations, methods, shoring, forms, safety, property protection, concrete placements, proper curing of newly placed concrete, OWNER concerns, or any other items as appropriate. D. CONTRACTOR's site superintendent shall maintain a set of inspection drawings and spreadsheets marked up to indicate the current work status. Theses shall be available for review by ENGINEER and OWNER upon request. E. ENGINEER shall submit a written report to the Building Department at the end of construction. A. ENGINEER shall identify and mark out all areas to be investigated and / or excavated by contractor prior any excavation being performed. B. EXCAVATION LIMITS: ENGINEER shall inspect and approve, as required, all limits of concrete removal and all steel reinforcement repairs. ENGINEER shall verify contractor measurements and approve or disapprove, as required, all contract chargeable quantities for all repairs. C. APPROVAL TO PLACE CONCRETE: ENGINEER shall inspect all areas prior to concrete placement and give approval, as required, for all concrete placements. ENGINEER shall inspect all prep work, including forms, shoring, safety, steel bar repairs, sheathing installation and any adjustments to excavation limits. D. PLACEMENT OF CONCRETE: All design mix truck placements of concrete require on site engineering and shall be inspected by ENGINEER during placements. Approval of design mix placement based on slump results, environmental conditions, etc. shall be at the discretion of ENGINEER. ENGINEER may also require inspections of bag goods concrete placements. E. FINAL: ENGINEER shall inspect and approve, as required, the completion of all repairs, including any correction or punch list items for each work area as appropriate. ASSOCIATED WORK A. ENGINEER shall approve all removal of existing rail and screen enclosures, exterior and interior glass systems and doors, shutter systems, the and other floor coverings prior to any removal work being performed. B. ENGINEER, with OWNER'S approval, shall designate the disposition of all building components to be removed prior to its removal. C. CONTRACTOR shall document the condition and functionality of all building components to be removed and reinstalled and ENGINEER shall approve same prior to removal. D. ENGINEER shall inspect the reinstallation of existing building components to verify that it is in accordance with the manufacturer's recommendations and that the condition and functionality have not been degraded. ENGINEERING APPROVALS A. ENGINEER shall approve all work completed. B. ENGINEER shall approve or disapprove, as required, specifications for all contractor -supplied materials at least 7 days prior to planned material use or placement. C. ENGINEER shall determine any disputes regarding reasonableness of repairs involving structural integrity. END OF SECTION PAGE 5 OF 1 5 SECTION - 1 CONCRETE REPAIR SPECIFICATIONS PARTI- GENERAL 1.1 DESCRIPTION OF THE WORK: A The scope of work to be performed under the terms of this contract includes furnishing of all materials, labor, services, utilities, permit fees, supervision, tools and equipment, required or incidental to the demolition, repair and replacement of the deteriorated concrete. The work will include, but is not limited to, the following elements: 1 Demolition, removal and disposal of deteriorated concrete and reinforcing steel as identified by ENGINEER. 2 Surface preparation and installation of repair materials of the deteriorated concrete and reinforcing as identified by ENGINEER. 1.2 SUBMITTALS A Contractor shall submit to ENGINEER for review and acceptance, concrete mix designs, manufacturer's product information and manufacturer's installation instructions for all materials specified. B Certification of non -reactivity of all aggregate. 1.3 SITE OBSERVATIONS A Surface preparation of all repair areas shall be observed and accepted by ENGINEER prior to placement of the repair materials. B Concrete surfaces shall be observed and accepted by ENGINEER prior to placement of balcony tile or other finish materials. C Engineer shall be notified a minimum of 24 hours prior to all observations. 2.1 CONCRETE BAG MIX LE COPY PART2-PRODUCTS A MATERIALS I USE SIKACRETE 211 SCC Plus REPAIR MIX; STO Products are acceptable upon approval. 2 Water to be clean, clear, fresh water, with no additives. 2.2 ALTERNATE MATERIALS A Acceptance of alternate products and materials shall be considered at the sole discretion of ENGINEER. All repair materials shall be provided by a single manufacturer to the extent possible. PART 3 - EXECUTION 3.1 CONCRETE MIX A Follow instructions from manufacturer. This will be monitored by Engineer. 3.2 CONCRETE TESTING A CONTRACTOR shall perform and maintain records on the composition, quantity, and slump test results for each batch mixed. B CONTRACTOR shall prepare test cylinders and arrange for testing by a certified testing agency as requested by ENGINEER and approved by OWNER. If cylinders pass such tests, the OWNER shall reimburse contactor for cost of testing. 3.3 SHORING A Contractor shall provide jacking, shoring and bracing to accomplish the Work and for all existing structural elements to remain until all structural modifications have been completed and accepted for their intended use. Contractor shall submit shop drawings forjacking, shoring and bracing for approval by ENGINEER prior to commencing shoring work. B Shoring design shall prevent movement of adjacent slab areas from the existing conditions. 3.4 CONCRETE REPAIR A Concrete repairs shall be provided for those areas identified with spalling, deterioration, and unacceptable concrete. B Remove all concrete surface coverings (stucco, decorative coatings, etc) along with loose, spalled, and unsound concrete in the area of the deterioration. Removal shall be performed with small pointed tools rather than wide chisel edges to prevent micro cracking and continued spalling of the concrete which is to remain. C The area of concrete to be removed shall extend along the length of the reinforcing, beyond the limits of the reinforcing deterioration a minimum of 2" into sound concrete. D Concrete shall be removed completely around the reinforcing steel providing a minimum clearance of 3/4" between the reinforcing and the concrete to remain. E Provide a''/z" minimum depth saw -cut, perpendicular or slightly undercut to the concrete surface at the limits of the repair to prevent feathering of the patch material. Do not cut any reinforcing, except as accepted by ENGINEER. F Application of repair concrete shall not be less than %" in depth. G Prepare all concrete surfaces to receive the repair material, including the saw -cut, to achieve a minimum surface profile depth of 3 ", where possible, with a new fractured aggregate surface to adequately anchor the patch material. H Remove all rust and scaling of the reinforcing thoroughly by media blasting and/or mechanical wire brushing. PAGE 6 OF 1 5 3.5 3.6 r I Thoroughly clean the exposed concrete surface to receive the patch of all traces of dirt, grease, oil, dust, and other contaminants which may prevent proper bonding of the repair materials. J The prepared concrete surface shall be saturated surface dry (SSD), but free of standing water. Apply a bond coat of slurry, prepared with the repair concrete, with a stiff bristle brush covering all exposed steel and all concrete surface areas. K While scrub coat is still wet, place repair concrete mix design in accordance with ACI 301 in a continuous pour and in accordance with ICRI. CURING. A Apply water mist to repaired area (i.e. form work, patches) or burlap or carpet remnants to surface. Misting involves any method to maintain the exposed patch or repair area, in a wet condition to prevent surface cracks and reduce moisture loss during cure. B All concrete shall cure a minimum of 28 days prior to application of any coatings or finishes. C An observation shall be conducted by ENGINEER prior to application of any coatings on the concrete. Any cracks in the repair areas shall be repaired in accordance with the requirements for crack repairs. Repair of cracks shall be at no additional cost to the Owner. REPAIR MORTARS A Repair mortars may be used in lieu of ready mix concrete for partial depth repair areas of less than one (1) cubic foot of material and as accepted by ENGINEER. 1 The prepared concrete surface shall be saturated surface dry (SSD), but free of standing water. Apply a scrub coat of slurry prepared from the repair mortar to all surface areas, filling all pores and voids. 2 While scrub coat is still wet, apply acceptable polymer modified cementitious repair compound in maximum lifts of 3" and 1-1/2" for use on vertical and overhead surfaces, respectively. If forms are to be used, depths well in excess of these can be achieved in any one application. For large and/or deep repairs, mechanical anchors, studs, reinforcing dowels, etc., shall be provided where existing reinforcing does not provide mechanical anchorage. The top surface of each lift shall be scratched and reprimed with slurry prior to application of subsequent lifts. 3 The use of aggregate is not allowed except as otherwise recommended by the manufacturer. 4 The following repair mortars may be used: a Sika — Sika Full Depth 211 SCC Plus. STO products acceptable upon Engineer approval. PAGE 7 OF 1 5 - - - -- - - r - 3.7 REINFORCING PREPARATION AND REPLACEMENT A All reinforcing with deterioration of more than 15% of the original bar diameter, as determined by ENGINEER, shall be replaced. B To permit lapping of the new reinforcing steel, the concrete shall be removed along the length of the reinforcing, a minimum of 12" beyond the deterioration into sound concrete to permit splicing of the reinforcing. C After the reinforcing has been prepared, lap the new reinforcing beside the entire length of the exposed reinforcing, secure in place with tie wires. D Following all other procedures for the concrete repair as indicated. E Where the removal of concrete to achieve the required lap length is not practical as determined by ENGINEER, bar development can be achieved by embedding the reinforcing into existing sound concrete a minimum of 9" with: 1 Sika — Sikadur 32 (Preferred) 2 BASF - Concresive 1090 Liquid F Reinforcing steel shall be ASTM A615 grade 60 minimum. G Prime reinforcing steel prior to concrete placement with: 1 Sika —Armatec110EpoChem(Preferred) 2 BASF - EMACO P-24 3 BASF — ZincrichRebarPrimer 3.8 CRACK REPAIR A Crack repairs will be performed for all areas identified by ENGINEER. B Remove all loose and unsound concrete within and adjacent to the crack. C For all topside horizontal cracks, vee-notch the surface of the crack with a mechanical router or hand chipping tool to a maximum width of '/4". Remove loose debris. Substrate may be dry or damp prior to product application. Where accessibility to the underside of the concrete slab is available, seal all visible cracks with an epoxy resin adhesive paste or Portland cement -based quick setting compound to act as a dam to hold the liquid epoxy resin adhesive until cured. D Prime prepared substrate with neat Sikadur 35, Hi -Mod LV epoxy resin mortar. Strike off and level, finishing with a trowel. E Seal cured epoxy resin mortar with epoxy resin adhesive binder to provide additional moisture and chemical protection. F Maximum application thickness of epoxy resin mortar on interior substrates not to exceed 1 %" per lift. G Use pressure injection equipment to seal cracks on underside and vertical faces of concrete beams, columns and corbels with: 1 EUCO 452 M.V. Epoxy System or 2 Sikadur 35, Hi -Mod LV epoxy resin mortar or 3 Seal ports and cracks with Sikadur 31, Hi -Mod Gel, or Sikadur 33 or 4 Simpson Strong Tie ETI Epoxy Injection System 3.9 SURFACE APPLIED CORROSION INHIBITOR A Apply Sika Ferrogard 903 in accordance with SECTION 2 to 28 day cured, exposed concrete surfaces identified by ENGINEER. END OF SECTION 1 PAGE a OF 1 5 SECTION - 2 CORROSION INHIBITOR TREATMENT SPECIFICATIONS PARTI- GENERAL I.I SUMMARY A Section Includes: 1 Surface applied concrete steel reinforcement corrosion inhibitor: 2 Extended written warranty. 1.2 SUBMITTALS A Substitution requests must be submitted 14 day prior to bid date. B Product Data: Manufacturer's specifications and technical data including the following: I Detailed specification of construction and fabrication. 2 Manufacturer's installation instructions. 3 Certified test reports indicating compliance with performance requirements specified herein. C Quality Control Submittals: 1 Statement of qualifications. 2 Statement of compliance with Regulatory Requirements. 3 Manufacturer's field reports. 1.3 QUALITY ASSURANCE A Manufacturer's Qualification: Not less than 5 years experience in the actual production of specified products. B Installer's Qualifications: Firm experienced in installation or application of systems similar in complexity to those required for this Project, plus the following: 1 Acceptable to or licensed by manufacturer. 2 Not less than 3 years experience with systems. 3 Successfully completed not less than 5 comparable scale projects using this system. C Product Qualifications: The corrosion inhibitor shall conform to the following characteristics: I Color: Slightly amber (fugitive dye may be added) 2 Density: 7.3 to 7.4 Ibs/gallon 3 Nitrite content: less than 1% 4 Chloride content: less than 20 ppm 5 pH: 6.5 to 8 6 Material must reduce total corrosion of heavily corroding concrete rebar by an average of 90%, at an internal concrete relative humidity of 75% or greater. 7 Must reduce corrosion by 90% or greater using FHWA RD-98-153 test protocol on crack slab black bars subjected to 48 weeks of cyclic salt water ponding. 8 Must increase the resistance ofchloride.ions using AASHTO T277 "Rapid Determination of the Chloride Permeability of Concrete" by 90% minimum. 9 Note: A qualified independent laboratory must perform all corrosion and chloride data. D Regulatory Requirements: Products shall comply with State and local regulations regarding Volatile Organic Content (VOC). 1.4 DELIVERY STORAGE AND HANDLING A Packing and Shipping: Deliver products in original unopened packaging with legible manufacturer's identification. B Storage and Protection: Comply with manufacturer's recommendations. 1.5 PROJECT CONDITIONS A Environmental Requirements: 1 Maintain ambient temperature above 40 degrees F during and 24 hours after installation. 2 Do not proceed with application on materials if ice or frost is covering the substrate. 3 Do not proceed with application if ambient temperature of surface exceeds 100 degree F. 4 Do not proceed with the application of materials in rainy conditions or if heavy rain is anticipated with 4 hours after application. PAGE 9 OF 1 5 1.6 SPECIAL WARRANTIES A The system manufacturer shall furnish the Owner a written single source performance warranty that the concrete reinforcement corrosion inhibitor will be free of defects related to workmanship or material deficiency for a ten (10) year period from the date of completion of the work provided under this section of the specification. The following performance standards shall be specifically covered under the warranty: Using a device which employs linear polarization with a guard ring (device should be certified under SHRP) the corrosion current of the treated concrete shall be less then 0.5 µA/cm- for the life of the warranty period. B The Corrosion Inhibitor Manufacturer shall be responsible for providing labor and material to retreat areas of the structure that does not comply with the warranty requirements. PART 2-PRODUCTS 2.1 MATERIALS A Inhibitor shall be ready -to -use, non -water -borne, surface applied product manufactured in an ISO 9002 certified facility, meeting or exceeding the physical and performance characteristics of the following approved product: 1 Sika Ferrogard 903 (Penetrating, corrosion inhibiting, impregnation coating for hardened concrete). PARTS - EXECUTION 3.1 EXAMINATION A Verification of Conditions: Examine areas and conditions under which Work is to be performed and identify conditions detrimental to proper or timely completion. l Do not proceed until unsatisfactory conditions have been corrected. 3.2 PREPARATION A Protection: 1 Unless inhibitor does not affect adhesion of sealants, paints and patching materials all adjacent surfaces shall be protected as necessary in accordance with the manufacturer's recommendations. 2 Follow the manufacturer's recommendations regarding condition of concrete surfaces before, during and after application. B Surface Preparation: l All caulking, joint sealants, repairing, and patching of concrete surfaces shall be installed and cured before application of inhibitor. If specified by ENGINEER, apply corrosion inhibitor to routed cracks prior to application of sealant. Confirm with Inhibitor Manufacturer compatibility of materials. 2 Prior to application of corrosion inhibitor, concrete surfaces shall be dry and cleaned of all dust, dirt, debris, grease, oil, grout, mortar, and other foreign matter. Concrete patches and all existing surfaces shall be prepared as recommended by the corrosion inhibitor manufacturer and acceptable to ENGINEER. 3.3 FIELD QUALITY CONTROL A Test Applications: Before application of inhibitor will be accepted, a test panel will be applied to the concrete to verify performance under the warranty provisions. 3.4 APPLICATION A Product shall be applied as supplied by the manufacturer without dilution or alteration. B Corrosion inhibitor shall be applied in accordance with the use of either spray, brush, or roller as per manufacturer's recommendations. Corrosion inhibitor shall be applied at a net coverage rate of 75-100 ft'-/gallon, in two or three equal coats, with a minimum one hour dry time between coats. C Follow manufacturer's recommendations concerning protection of glass, metal and other non -porous substrates. Contractor will be responsible to clean all surfaces that are contaminated by the corrosion inhibitor. D Follow manufacturer's recommendation concerning protection of plants, grass and other vegetation. Contractor will be responsible for replacing all plants, grass or vegetation damaged by the corrosion inhibitor. 3.5 CLEANING A As Work Progresses: Clean spillage and overspray from adjacent surfaces using materials and methods as recommended by corrosion inhibitor manufacturer. B Remove protective coverings from adjacent surfaces when no longer needed. 3.6 COMPLETION A Work that does not conform to ENGINEER's specifications shall be corrected and/or replaced as directed by the Owners Representative at the contractor's expense without extension of time. END OF SECTION 2 PAGE 1 0 OF 1 5 - - - - '- -- -- SECTION - 3 WATERPROOFING SPECIFICATIONS BASF SONOGUARD SONOSHIELD SYSTEM PART 1 - GENERAL 1.1 SUMMARY A Section Includes: 1. Waterproofing and decorative pedestrian traffic coating system for interior and exterior elevated decks as scheduled. 1.2 SYSTEM DESCRIPTION A A combined system providing a decorative pedestrian surface with the added benefit of a waterproofing membrane, with crack bridging capabilities. B The waterproofing membrane is a fluid -applied polyurethane waterproofing coating consisting of moisture curing mechanism. Materials have low odor and are VOC compliant. C The waterproofing system consists of the following components: 1. SONOGUARD BASE COAT, a one component, moisture -curing polyurethane. 2. SONOGUARD SECOND COAT, a one component aliphatic moisture -curing polyurethane. D System Performance Requirements: Provide material complying with the following requirements: 1. Hardness (Base Coat): Shore A (60) per ASTM D 2240. 2. Hardness (Top Coat): Shore A (89) per ASTM D 2240. 3. Tensile strength (Base Coat): 752 psi (5.2 MPa) per ASTM D 412. 4. Tensile strength (Top Coat): 2,500 psi (17.2 MPa) per ASTM D 412. 5. Elongation (Base Coat): 595 percent per ASTM D 412. 6. Elongation (Top Coat): 502 percent per ASTM D 412. 7. Tear strength (Base Coat): 74 PIT per ASTM D 1004. 8. Tear strength (Top Coat): 199 PIT per ASTM D 1004. 9. Weight loss (Base Coat): 16 percent. Max: 40. 10. Weight loss (Top Coat): 17 percent. Max: 40. 11. Low temperature flexibility and crack bridging: No Cracking of base or top coat. 12. Adhesion peel (Primer and Base Coat): Plywood 34 pli, Primed mortar 43 pli per ASTM C 957. 13. UL Class A Fire rating. E Weathering Performance Requirements: (ASTM C 957). 1. Elongation recovery: 94 percent. Minimum passing: 90 percent. 2. Tensile retention: 151 percent. Minimum passing: 80. 3. Elongation retention: 94 percent. Minimum passing: 90. 4. Abrasion resistance (CS-17 Wheel, 1,000 g load, 1,000 cycles): a l mg lost system passes. b Maximum oss: 50 mg. 1 5. Crack bridging (1,000 cycles): System passes. F Color and Texture Requirements PY 3 � E: 1. Color shall match adjacent surfaces �� L O 2. Texture shall match adjacent surfaces 1.3 SUBMITTALS A Product Data: Submit manufacturer's technical bulletins and MSDS on each product. B Quality Control Submittals: 1. Provide protection plan of surrounding areas and non -work surfaces. 1.4 QUALITY ASSURANCE A Qualifications: 1. Manufacturer Qualifications: Company with minimum 5 years of experience in manufacturing of waterproofing products and systems. 2. Manufacturer Qualifications: Company shall be ISO 9001:2000 Certified. 3. Applicator Qualifications: Company with minimum of 3 years experience in application of specified type products and systems on projects of similar size and scope, and is acceptable to product manufacturer. a Successful completion of a minimum of 3 projects of similar size and complexity to specified Work. - - - PAGE 1 1 OF 1 5 -- -- - - - B Field Sample: 1. Install at Project site or pre -selected area of building an area for field sample. a Provide mockup of at least 10 square feet to include surface profile, sealant joint, crack, flashing, and juncture details and allow for evaluation of slip resistance and appearance. b Apply material in strict accordance with manufacturer's written application instructions. 2. Manufacturer's representative or designated representative will review technical aspects; surface preparation, application, and workmanship. 3. Field sample will be standard for judging workmanship. Maintain field sample during construction for workmanship comparison. 4. Do not alter, move, or destroy field sample until Work is completed and approved by ENGINEER. 5. Obtain ENGINEER'S written approval of field sample before start of material application, including approval of aesthetics, color, texture, and appearance. 1.5 DELIVERY, STORAGE, AND HANDLING A Comply with manufacturer's ordering instructions and lead-time requirements to avoid construction delays. B Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. 1.6 PROJECT CONDITIONS A Environmental Requirements: 1. Minimum application temperature is 50 degrees F and rising. 2. Do not apply in rain or when rain is expected within 24 hours. Do not apply above 90 degrees F or when temperatures are expected to fall below 50 degrees F within 24 hours. PART2-PRODUCTS 2.1 MANUFACTURERS A Subject to compliance with requirements, provide products from the following manufacturer: 1. BASF Building Systems 889 Valley Park Drive Shakopee, MN 55379 Customer Service: 800- 433-9517 Technical Service: 800-243-6739 Direct Phone: 952-496-6000 Internet: wNxlv.BASFbuildinzsystems.com B Specifications and Drawings are based on manufacturer's proprietary literature from BASF Building Systems. Other manufacturers shall comply with minimum levels of material, color selection, and detailing indicated in Specifications or on Drawings. ENGINEER will be sole judge of appropriateness of substitutions. NNLT1_rYWOfill M A Acceptable Product: 1. Base Coat: Sonoguard Base Coat. 2. 3. 4. 5. 6. 7. 8. In V PART 3 — EXECUTION 7 i 3.1 EXAMINATION 3.2 SURFACE PREPARATION A Substrates must be sound and free of dust, dirt, laitance, paints, oils, grease, curing compounds, or any other contaminants. B Verify substrate has properly cured. If efflorescence is present, mechanically remove it before proceeding. For extreme cases where this is not adequate, contact Technical Service. Concrete should have a minimum compressive strength of 5,000 psi (21 MPa) and be cured for a minimum of 28 days or 80 percent of design strength. Second Coat: Sonoguard Second Coat Aggregate: Sonoguard Aggregate or equal. Cementitious and epoxy patching materials: BASF Building Systems Repair mortar and Epoxies. Sealant primer: Sonneborn Primer 733. Sealant: Sonneborn SL-2 or Sonneborn Ultra. Deep joint sealant: Sonneborn SL-2 or Sonneborn NP-2. Acryseal HS PAGE 1 2 OF 1 5 '- -- - -- --' - -- - • 0 SECTION 4 STEEL REINFORCEMENT PROTECTION SPECIFICATIONS See attached Product Data Sheet a 21110M INC Cli PAGE 1 3 OF 1 5 Revision no: 200� ;Revision no: 0 RG Identification No "; »t 01 03 02 01 001 0000001 �= SikaTop&Armatec 110 EpoCemO �;�SikaTop°-Armatec 110 EpoCem° N 1 Bonding Slurry and Anti -Corrosive Rebar Coating Product Cement -based expoxy-modified three -component anti corrosive coating and n Description bonding slurry. I Uses As an anti -corrosion coating for reinforcement steel: 0 For repairs to reinforced concrete where there is corrosion of the underlying reinforcement steel 0 For the preventive protection of reinforcement steel in thin reinforced concrete C o. sections As bondin slur for use on concrete mortar or steel: rY 9 a For repairs to concrete using SikaTop patching and repair mortars 0 For bonding of new and old concrete j Characteristics / 0 Excellent adhesion to steel and concrete Advantages €a Acts as an effective barrier against penetration of water and chlorides r M Contains corrosion inhibitors 0 Provides an excellent bonding coat for subsequent application of repair mortars, cement and epoxy based Pre measured, ready -to -use packs -- _ May be spray -applied 2 Frost- and de-icing salt resistant Ea Non-flammable Test certificates LPM, Laboratory for Preparation and Methclogy, Beinwil am See, Switzerland Ibac Aachen A 3119/3 Product Data 1 Technical Data Colours Mix: Grey Comp. A: White liquid "-a Comp. B: Coloudess liquid "I Comp. C: Dark grey powder 5 Packaging 20 kg units (A+B+C) Storage - Storage Conditions Store at temperatures between +5 °C and +25 'C. Comp. C must be protected from ' I humidity. _ Shelf life 12 months from date of production if stored properly in unopened original packing. LID I Mechanical/PI Properties Density (+23 °C) Comp. A 1.05 kg/I Comp. B 1.03 kg/I Comp. A+B+C 2.00 kg/I (density of slurry when mixed) Bond strength (+23°C) On concrete (sandblasted): 2-3 N/mrn On steel: 1 -2 N/mm E-Modulus (static) — 16.400 N/mm2 Index of resistance to ' •.': diffusion of water vapour — 700 ,,,,. (pH20) Index of resistance — 40.000 todiffusion of carbon dioxide (pCOZ) ° q Thermic coefficient of . expansion _ 18 10-' per °C r ^� Application Details Mix ratio Parts by weight : A: B: C = 1.14 : 2.86 : 16 ( Parts by volume: A : B : C = 1.14 : 2.86 : 10 E Pot life (8 kg) 3 hours (at an ambient temperature of +5 °C to +30 °C) Limitations Min. application temperature (ambient and substrate) : +5 °C Max. substrate temperature: +30 °C The recommended dosage must be strictly adhered to. On no account should water be added to the mix! a Coverage As an anti -corrosion coating — 2 kg/m2for 2 coats, depending on method of application As a bonding slurry: Depending on substrate conditions, not less than 1.5 — 2.0 kg/mZ il Surface preparation Concrete, mortar, stone: Substrate must be clean, sound and free from all traces of loose material, laitance, grease and oil. Min. substrate roughness 2mm Steel: Surface must be clean and free from all traces of grease and oil, rust and mill scale. -. Degree of cleaning SA2. Application �} Instructions Mixing Shake component A and B vigorously before opening. Pour both liquids into a suitable mixing pan and mix for 30 seconds. Add Component C slowly while continuing to stir. Mix mechanically for 3 minutes, using a slow -speed electric stirrer (250 RPM) in order to entrain as little air as possible. Rest for 5 —10 minutes, until the mixture exhibits a brushable low -dripping consistency. Apply a coating of approx. 0.5 thick to the cleaned and derusted reinforcement, using a stiff paintbrusliIIIIIIIIIIier or spray gun. Leave to dry for 2 — 3 hours (at an ambient temperature of +2 C), then apply a second coat of similar thickness. Leave to dry for a similar period of time before applying patching mortar. It is inevitable that the anti -corrosion coating is applied as well on the surrounding concrete; this is by no means a disadvantage. Y When used as a binding agent for repair mortar or concrete: Wet down the prepared substrate (concrete) to saturated surface dry condition. Then apply a bonding coat not less than 0.5 mm thick, using a paintbrush, roller or suitable spray gun. For best results, work the bonding slurry well into the substrate to ensure complete coverage of all surface irregularities. Apply the freshly mixed patching mortar wet on wet to the bonding slurry. The application of slurry coat or patching mortar or may be applied wet in wet or up to a maximum waiting time of 6 hrs at +30 *C 5 hrs at +20 °C 4 hrs at +5 *C Freshly applied SikaTop-Armatec 110 EpoCem should be protected from pollution and rain until next coat is applied. '4 d Cleaning Use water to remove uncured material from tools and mixing equipment. Once 9 cured, SikaTop-Armatec 110 EpoCem ran only be removed mechanically. imported Notes When SikaTop Armatec 110 EpoCem is used as bonding coat between old and new concrete, it is necessary to install connecting reinforcement for shear strength transfer as per the relevant guide lines. 1 .y Notes All technical data stated in this Product Data Sheet are based on laboratory tests. Actual measured data may vary due to circumstances beyond our control ;Local Restrictions Please note that as a result of specific local regulations the performance of this product may vary from country to country. Please consult the local Product Data Sheet for the exact description of the application fields. ., Health and Safety For information and advice on the safe handling, storage and disposal of chemical Information products, users should refer to the most recent Material Safety Data Sheet r.`, { _ containing physical ecological, toxicological and other safety -related data. Legal Notes h The information, and, in particular, the recommendations relating to the application and end -use of Sika products, are given in good faith based on Sika's current knowledge and experience of the products when properly stored, handled and applied under normal conditions in accordance with Sika's recommendations. In practice, the differences in materials, substrates and actual site conditions are such { that no warranty in respect of merchantability or of fitness for a particular purpose, ' nor any liability arising out of any legal relationship whatsoever, can be inferred either from this information, or from any written recommendations, or from any other advice offered. The user of the product must test the product's suitability for the I intended application and purpose. Sika reserves the right to change the properties of its products. The proprietary rights of third parties must be observed. All orders are accepted subject to our current terms -of sale and delivery. Users must always refer to the most recent issue of the local Product Data Sheet for the product concerned copies of which will be supplied on request. L-111., COPY i .0 Sika Yapi Kimyasallan A.$. gamge$me Mah. Sanayi Cad 34899 Kaynarca Pendik - -..--- 6 as Istanbul TOrkiye _ . a Tel +90 216 49419 90 Faks +90 216 49419 84 wvnv.sikaxtxn V SECTION 5 SACRIFICIAL ANODE SPECIFICiATION See attached Product Data Sheet !, I, MIE a Me rin� -' PAGE 1 4 OF 1 5 40 GALVANIC ANODE 2003Nva Award Nomination 12 Galvashield@ XP Embedded Galvanic Anode Galvashield XP is a patented sacrificial embedded galvanic anode that provides localized galvanic corrosion protec- tion in reinforced concrete structures. The anode consists of a zinc core surrounded by an active cementitious ma- trix. The 63mm diameter x 28mm high embedded anode is quickly and easily fastened to reinforcing steel. Once installed, the zinc core corrodes preferentially to the surrounding rebar, thereby providing galvanic corrosion protec- tion to the reinforcing steel. In the mid 1990s, Vector Corrosion Technologies, through research and development and in partnership with Fos - roc International Limited, a UK company, developed the Galvashield XP embedded anode as a breakthrough in the corrosion protection of concrete structures. The design philosophy behind the Galvashield XP embedded anode was to create a simple product that could be incorporated within a patch repair to minimize ongoing corrosion and extend the life of concrete repairs. Without protection, corrosion continues in the reinforcing steel immediately ad- jacent to the repair and results in premature failure. The anode has been designed to focus protection in the narrow zone directly adjacent to the repair. The size and discrete nature of the anode makes it convenient to install in a wide variety of repairs, and provides the specifier with complete control when targeting the areas that should receive protection. The anode is suitable for large or small repairs; a large repair will simply require the incorporation of multiple anodes. The convenience of the anode makes it a cost effective method of extending galvanic protection to repair scenarios that were not practi- cal just a few years ago. The Galvashield XP embedded anode is a non -hazardous product. Manufactured of common construction materials it is installed simply without complex equipment or processes. Depending upon a project's design parameters the anode will normally operate for a period of 10 to 20 years. Once installed its zinc is converted into a stable, non- hazardous zinc corrosion product. After its service life is complete, the anode remains are dormant and concealed within the concrete, having no maintenance or special disposal requirements. The Galvashield XP embedded anode has been in use in North America since 1998 in a wide variety of applica- tions: deck repairs, joint replacements, pre -stressed and post -tensioned repairs and interface applications between new concrete and existing chloride -contaminated concrete where accelerated corrosion can occur. The anode re- duces on -going corrosion activity and also reduces the effect of ring -anode corrosion commonly associated with concrete patch repairs in reinforced concrete. In order to verify the performance of the Galvashield XP embedded anode, periodic evaluation by various research and education foundations is conducted to provide an unbiased opinion of the effectiveness of this innovative tech- nology. In July 2001, following evaluation of the anode, The Concrete Innovations Appraisal Service issued CIAS Report 01-1 Galvashield Embedded Galvanic Anodes for Repair of Concrete. The principal use of this report is as neutral documentation to help technical committees of the American Concrete Institute (ACI) and users of the an- ode to better understand the technology. As stated in the report "The technology offers an easy -to -understand con- cept, which gives the client confidence in the capability of the repaired structure to perform its intended use." In July 2002, the ASCE/CERF Highway Innovative Technology Evaluation Center (HITEC) commenced evaluation of the Galvashield technology. For many contractors and engineers perhaps the greatest benefit of the Galvashield XP embedded anode is the fact that installation requires little or no change from existing concrete repair practices, and only a minimal addition in cost. Normal patching procedures simply shift the corrosion reaction to adjacent concrete areas, thus creating a continual battle in which repair crews chase the corrosion problem around the structure. The Galvashield XP em- bedded anode prevents this from occurring by mitigating the corrosion problem using a maintenance -free, cost- effective strategy. C"OPY Contact: David W. Whitmore • Vector Corrosion Technologies, Inc. • 417 Main Ave • Fargo, ND 58103 701-280-9697 • Fax 701-235-6706 • davidw@vector-corrosion.com • www.vector-corrosion.com Construction Innovation Forum • 43636 Woodward, Bloomfield Hills, MI 48302 •248409-1500 • Fax: 409-1503 • E-mail: info@CIF.org • www.ClRorg EMBEDDED GALVANIC ANODE 2003 Nova Award Nomination 12 A-ti" Galvashield@ XP Embedded Galvanic Anode &a3fio.l zin cn2 Cut Away of Galvashielr" APAnode Bridge Widening Project —Anodes tied to reinforcing steel at joint between new and old concrete Grrlvashleld lPReduces "Ring Anode" Corrosion Concrete Girder Repair —Anodes tied to steel inside girder repair Concrete Patch Repair —Anodes tied around perimeter of repair "RhgAnode"Corrosion (without Gal ashield�1P) Construction Innovation Forum • 43636 Woodward, Bloomfield Hills, MI 48302 •248409-1500 • Fax: 409-1503 • E-mail: info@CIF.org • www.CIF.org 0 See attached Product Data Sheet SECTION 6 ICRI STANDARDS PAGE 1 5 OF 15 - -- -- i 1 �4 5 � er , r - C 4b Guideline No.037 eeti Exposing and Undercutting of Reinforcing Steel Cleaning and Repair of Reinforcing Steel Edge and Surface Conditioning of Concrete 0 4b Technical Guldellnes COMMIttes C-ommiuce fnembers dunr': 1he-preparatiOn (�Ohe !.9'W edaion. Peter H. Emmons, Chairman Don Gardanic Structural Preservation Systems, Ina Facca Const scvon, Inc. Bal!iMore, Mary�and Ma;dstcne� Cntao, Canada Kermit D. Bright Robert Tracy Stnrc-ura; Eng!reminq Associates `racy Restoration Enc;rirte.-s Karas City, Nfta'ou^ Ann Amer, Wngan Richard P. Deargey Douglas G. Mfhfte Struc',wal Miairftenartce Systems. Inc, Thomas Oovmey, Ltd, Exton, Pennsylvania Arlington, Vitgimia (','vre,"i copn'miftee inernt'ws who '995, ediivr: Peter H. Emmons, Chairman Jack A. Men ow Structural Preservation Systems, Inc. jamcr Engineering sait!"no"a, Marytand Calgari, AS, Canada Tom Kline Ken Lozen Structure! RRservation Systems, Inc, N111' Cm!-qu'.ranrs,Ltd. �flbens, Minoi5 Farmington HPis, Miciiigan James E. McDonald Robert R. Coin 'Waterways Ex-Pefirlem Station K9C Assecta,,es Vicksevg' Mississippi MilfcTd, oho International Concrete Repair lrottittite • 4b This docur-acra is the result ol'a procc,s of diitribuion. Conmicatary. :,nd revision tv th-Tectimcal Ui`&-Iines Commiuce and ifle member- ship of the intemational Concre,t Repair Institute- It was subrn;ned to ,he votin, menlbes ofthe Asocialioll ro, Lppro- a! on -August 1, 1989, and approvej !,'}f owr of LhezeSpondcnls. S%evcrwl offhc cononents ofille, votim,: inemNrs, `dill fronl those SX!,G voted for approvai and those wllo alralr,5t approval- are worth noting and are reprinted belaw. L-,,za though a guideline exists for dcto minin-tire amountof allowable to consliftastructural erl if any corrosion e?,ists. r buried electrical conduits or prestressing or post- tensioning lendonswIten peril'orm- Ing ;:e-movals, CudinIg ul-lo either can be a life threaluning situ ation, LI I rxtercuttm,-, the rebar should not be counted on to secure tire repair street vurally-in Neu of proper methodsof bending a repairlo the exis-ing A sal%cut call and, possibly ,houU be fireater thm the im 13 ,nr.q) ncrcd. as Icing as the reinfarcing steel is, not cut into, Tibs durumt is raerdcdas a volenrar' zoi&iine for the nwr<r. Itisnot hnendcd u) relieve, el -le profeOorlal Or eny r-Lsporsibility I �,q' ofcomme rep lirraclilcAk, rnawrniali or pracoces- While we bzli,--te the inf�matioc conizuried helern itt=sznea the proper lncan5 to a-chieve q:iLjtr results. the Co,,,,clete Repair fnstitute triust di,aclaim any liability cx� w thf>,e whomav cbxlw to rely on all or wry par*. of thispi&lino- Surface Preoaiatiorr Guide 03730-1 ft Removal Geometry PY G3-11 CO Elevation Cautica! Before staning ranwval.q, rav�vtj affscr v' er.,,vals on stuawral r!egray. Provgaz sha.,-ng Q4 m P a', s2atibearn con necficas =o cc!umns, Eievation Section Beam or Rib Column Connor Slat) or Wail Partial Dep1h j Slab or Wall Full Depth 03730-2 tr,ternational Concrete Repair Institute Exposing and Undercutting of Reinfoycing In , Steel Then je-abi ere cpPlic"ible to horizomal, -,er6caL and mer head locations. are "Aw appNcahle to removal by hydro,tierno!inon, hv ro-milliag and elee- ,ric, vnwumttie or hydraulic i ripact h-:eakers, Remov,,'Wosc or c,,nlccre ahk)se cor- olded e to utt- steel. Once ft";T411 Ternovak. arc madProceed With Lie undcrcunOqg of ail expt)xd cnia<led bars. Under- Qlubn, will provi& clearance for und,2r bar ciew- ink, and Cull Oar circtunfcrence bondina to surroundin.g concretc. and wili secure tile repair structuralh, Pgovide minin"Urn 'A, blell (19 aims Clearance betwcen, expo:scd rebar5 and surrounchnIg Concrete o, = inch (6 ami) larger than kirgest aggmgato ul repair malleTrial, widchcver;5 greater. Conerve rcinu% ak shall extend along thbars to ion aEkms alon2 the bar free of hond inhibiting k:orroNion, and where the hnr is wcll bonded to surrounding concrete, If non -corroded reinforcing steel is expowd dur- ing the undercamng process, care shall he taxeo not 10 lour age tilt: bar's bond to surmunding conm7tc, If bond between bar and cum:rcte is broken. undercuttinIg of the bar shall be required. Any reinforcernem which is loon shah be secured it,, place by lying to other secured bars or by other approved mclilods. � H2, COPY Surface Preparation Guide 03730-3 Meaning and Repair of Reinforcing Steel Cleaning of Reinforcing Steel Ali heavy ,,:,orrn,xkni and scale sltouid be removed Front the hfiras necessary to promoe -,nax'mum "I bond of r,�,-)Iacernent matcrial, Oil Ire a")rSIve blast is the prcfcr cd rnethod. A tilghdY honded light msi build-up on nic, Surfto:o i«, usutfflv no� dotiiinarnul to bond_ units& a coat, ,mg Ls rs b,em, arctliM cc) Th,d bar surface. in which I -a -se -A manufacuirer's lould be follo%ed. Ir nice preparazion S" bib ILRE225' COPY Rej)air of Reinforcing Steel Due to Less of Section lfr,:;nfoieinv ^tecl has lost 4orbilicant CT0SI',,SeCn0o.p strucunal en incar ggi should be consulted. ffPr:paks are required a) the one of the fbjiowing repair rnethod,; should I ne ased: Complete bar replacement. or Addition of s5u pplen -,eni.,] bar over effected S-Icdon. Ne,,v bars may be rnec h a n i ca I I y s p I ic ed to old bas or placed parafle-i zoand approxittiately,11, in. {, 19 nura) Freon existing bars, I-als lengtio; shal I be determined in accordance tvi c h ACT -- 18 : alsis refer to CRS I and AASHTO manual, Affected Length Low of Seaton suppiernental Bar Required Lap Required Lap Affected Length 03730-4 Intemational Concrete Repair Institute i,4�� �Ub%, za4u WU34QEPK,- U1 10UNUiVIVO These details Lre applicable to holizontaL vertical, and overhead loLfions. They are also applicable to zndelec- tric, idicumadc or hydraofic impact fro nor use ihese dCfails Y-epairs refer 'e, A Cf 66 Prelvara- Guidel;,Ies, R,-noove delamirwed concreje. uodercut rem- foncing steel frelerto -Exposing and, Undercut - zinc ofl Reinforcift, Steel all pac ge i), remove additional cone rcieas required to provide ntini- mom required thickness of repair material, prov idC right ang 1,-, Cuts to zha c0acrete !,Urfice with ei-dier, of the followhig 11101hodiv: Sawcku L'-2- 03 try,-,) or less as, required to avoid cuttin- ­mforeir- steel. • or impact hrcLk*crs. Avoid feather edges. impl, as possible, pry fembly with squared corners, 0, After removals and edge conditioniniz are c()rn- pleic, remove bond inhibiting materials (din, concrete siurrv, foosetv bonded 3 pre xatcs bV abTaSiVe blUSIbiLhi4yh Or ptesSnye %�--ajerji - C _JaSting with or without abrasive. Check the concrete surfaces after cleaning, to insure that surface is frce frorn additional loose aglue�a!:L, or that ad- difional delannnationa are no. present. CD V i ydmdemoiihon is Loed, cernent and parricu, hite I shirry mLsz be removed from the p-,epareds,,jj-aCcS lxlibne slurry hardens, Boundary of loose and detantulated Concrele Recor-Mended Surface Preparation Guide 03730-5 n CC UJ < qg VII z z LL w WIM 0 ett ---= - ---------- Guideline No. 03731 r', Dry -mix sctcrete General description: Repair na:rterdJ s ptaead dty or >1ighily damp into %hoicretc machine and mixed with ogijarec,ed air. Tlar mixii:re 1� =N'p�-4t d via hoSC to the. C R nozzic Rliera ',viuvi ij,,jjjdadrfIt mikes. it Jr1R, are inLOduce(i. -me ingre'di, its are propelled 'waL'j Unto the ple.pareil suhstnrtc by the ford of the cony pre`"I'd air. Best application: [..arcs vertical and overhead ur:rLs with seaalt bari. No. 6 i 19 mmf `i tar less. and minimal cou'esti€tn of enthedded r6tiforccment, Material requirements: FG'eii,radecl a gregate _ 7.rrybinderstusuall;perziandcculentt.'Mix- uu� T r;l be ?ry mrzioncd it) compewi ate for rebound lcso� a Admit Tres arL frequ,ndy uscd .0 shoncu set tins. andfor to allow thicker la-vrn: to bcr built-up in a Reference: ACI 506.2. '•(7uide to 3hcacrete" Ge0eral deSC411011; Pre -batched and titor(aul!lily inixed repair material is placed into a concrete pump and uamporwd via pump line to ur cxn txxrJe wherr cornpr vc:-dairandadrniaturc,, ifany are introduced, The repair material is propelled onto Ow surtace by the cornpre; "fed air. Best application, Large vertical areas with small bars. �- No. 6 i 19 mm}t'' or Ics,. and minims conuebtion of emhedded rein€orcemmm. Material requirements: Pumpabie. low -slump mix- ture: Much floes not San when ilupacted on th, pra- pared �uostrate- i � Reference: AC'1 5()6.2- ••tinida to Shoterets" -� ---- —a' i=i A.y aRcre arc ^rescrdy no ,feveraliv ae. p •u ccaticrM0". PSuna.I- tis fnrre;rforcing <roel. t1w ASTVA6i 5 Nh haN hcen rounded w the ncarcat millimeter Va f . `arr.� air r. an'fog 03731.6 GUIDE F013 SELECTING APPLICATION MET NODS FOR THE REPAIR OF CONCRETE SURFACES V14 to INTERNATIONAL I T U T E 1323 Shepard Drive, Suite D Sterling, VA 2 0 14 6 4 —44 2 8 Phone 703-450-0116 Fa x 703-450-0119 E-mail concrepair�aaolxom as m m Prepared by the International Concrete Repair Institute February 1992 lreissued April 1996) Guide for Seiacting Application Methods for the Repair of Concrete Surfaces G"ideline No. 03731 ZIOE E"J'am, I , g: 1-:�rTN Hagan (;,,,zphie Karin Mercy Copyd-chit,) 1496 lnwi na,WmA Courreze Relmir lnsfinuw All nghts reN'rvcd. I ' '3 Sh,,-.pard Drive. Smic D. Sterling. Virgirwi 20 1 Phoic '03-450-01 l6 Fax '01-4� -01 19 r J2 •wu i.:,; r:.ix xt f rrnprou, ll.." n,"urrzlrii3to (ia<+ 1's; 1J7iLtr.e'e t;S ltttlxs,l, srriif ziZ'li=l'$f;{%, FIR,, jd'ol Pl7cwii"P, devcd.,polew. aniip rrrrlliio'i 0.ibe llr,ril lJr,+JRieltijj xite?}at1:(2 (UZd !Iiu F, Ytfl } Pt it)°:;r;tfrrt irhlt is WV';P;r.JrM.=t <. t'ttrt<: t�i tiJrtrr,r fC;itt ,n:•:rttr' �. ?ta;'e 1%rx P°1!n' trr, 'Id' r( 11 heS'` 0171 to C"-.9 UT1)teFP & iii-Orm vlQ liq, pni"liCe aJi'i", etlrf<tp pel?ESIP t pi L"it?a r i`G'i "inii nr of 7!ILS ij)'o'rt i, w ln';':: care- ri!.:E "YdR'E?e'Lf tiliU rllT[71tr1R 0t3 pfi1X?i(aJ;d n'j}CS:F SF¢th Jt'r 15 r, sifJr ncct's',cible rr Z!ecision viliAers, Oaring rk�, dJa.�; sc rerca decades, winch "iris been reporwd in Me fiacraiwe on correrrre repair "net tod..i alizi nuzu rl- uL� ar €i.r',` iulve beevl decel"ped Hind relined.:Vecer- tttecs.3,dF hay been (!,if ull lo., i7nderizh' u!1V' rc'1'irgn','I irtjorrrz<edir,.=l errl the state offhe ar, colidensvrd halo eirse to ;arc, 61riiuvts, Yi, ;hcu arzeL 10?1 orals+ettaea err "re- nared 1"uncnoned rusk grv„rps jnttt t4i1rda'a<7 bY tiro 1' R1 Ice raucal Artnviiiet Ce,lvndtu,c, tarsi: 2n.='detinc Kill ilr s.+_ts r,n <u`eu of pruuu 1, reco, t t e z7 as�e.t:<.euria1 to rtwavlbi iwnen! of durabie repairs. Aft iCRt rddr- 113te s`ocuurenis arc cables:' 10 conNnuni re;wi -." b, ;he a f Mbershio anal mov be retired as appn vil hv the It chni.-W Acliti;?tYa C.urlawLce. ' TRa :&»:1:mes1 :w in1 rnlcd a,. a .c}unt.:rJ' ag=�c?etx: ;nr tltc Hal anS c<:n� rate'c�ic£in;E;iCttn: It is � ta[�c --tilt ih•pn icn k..+.€tr `e-ion:: r'n7 �5 x 1uz.rr.'Irirc11 ,.,.ne_nts a! o;x.tnn;r �_ ,E:iv,. yttakitr r re..u,t., tltt tnaana�:J^ai lion. ret.; ftri :.xr Et:-ctza:r, nns.t Jis." Ft :t �]airsuary'.iab�iay..r:aapinahil¢c tnthase s�h..�e-�a r`: x=ct t<. in, Vart41 1111s i;utJrlinC- Test Group members for 1992 editiew Peter H. Emmons, Chairman Kermit D. Bright Micnar", r Delaryey Don Gard.nio Robert Trar"r Douglas G. White Approved for reissue by the Technical Activities Committee: Jack A. Morrow, Chairman Peter H. Emmons Robert J. Gulyas Thomas R. One Kenneth M. Loren James E. McDonald Randall W. Poston April 1996 GUIDE FOR SELECTING APPUCATION METHODS FOR THE REPAIR OF CONCRETE SURFACES BMW The, cause c# many conc teic repair failures and fit - stances of cost over —runs can be tractal to the Bela tion of ufzparopli t : giuk aaaetEtt &. This dtrcuna t has t, tt seemsdtoh0ptvilaudirefile awdlocl oonlatonl} used ul the snrfsi..;'.'aud (o survcy the applications "or which each is consifJor'..0 to be taaost surmicle. It is nor inletttdn! At txe a eleu fled and rannpreheuive "hon-ro"guidefrsrthe varmies rated od" described, or or Substitute for the rec ow- mc'udaEeauas es€rxr exarrierrer, anj gfealifaed repern, 57)echnis:. " ntsyu ilbd ine sutrutaari zescurreiat pracdce; for piac- irg cernenybased repair tnaternbs. ttprov de,,raren, cnginccrs, material suppiter.. and repair vontr« cu rs woh, a quick reference h) assist its the sclectiou of suatablc niethodf, of x,iacenaenc. While this guideline covers only the selection of sunabie application anvth- 06 ohm guidelines covering related repair subjects are u'riLAN front z' 11, kConSs iti tit31?t'. recognition that each repair situation is defined by a unique coanhinadoaofcircu€ou.uieesAtoned b enci- neeria�,c:xp u•e.cairscacti€iilitv'_cos€.and 1inxsecan- Sid,crnlions. Wa It this is it, tru nd, iuu s ofthis guide are encouraged to make the tea€ use of industry iestifnecs by bringing the experbic rid cxpanea cc of she ` - ..c ring conanunny,producttlunnifiaurer,.:ndquaill- fied conta'ixcfcoi's info the planning process. Considerations Tim tat:diadonn.coradrialnde?k 1cleis nun al to rise a nfafird st.iinime w€eh prod LLhle re5,.'.ts_ The popndes o repair ntet nds twi sm7y specifled ale C{svpr:.ssi've tt agdt'ouvd'o r.:t.lhf shear sifen gih. and titosepnipert ws which inlu,..ace c-otu€arc change . such as drviing s;a txth age, nttsdzrltas cif i• .>€fe- Sr �ndcc�i'FicsenttsfUaerirtespatssiau.C}tftr.rpr<ilkr- be' such as Psim: awe to frecrfnz, and fhuu;itag. !blew rcinicabiiity. or sulfa€c rs astance €nay he. 4rfec i;ied. ,11t4' repliir na ti' kh rumt. Lail; mc;apsafatc t'xpmed rebilorciig steel, achieve 5;:tit=="fir.€ct,str4 tacand cybb € ra sahstrtte.a;ndfill the Prclncdc vit,.u..chout e'regia- ing. if those rcquireuicats are act achisIoed. the repair 011 no lsetWar its himodeu puwcse. Bonding of :ire repair nvat_ri«J with the aai,4,ai, substratc depends upon the repw ruaterial reacting with, and inteFiacks`ng, to chv ;profile of the prepared con' rete s€iri e.c.. Jt:n1L material: ataxy requirea line E- ng agent to ctastae imers fe cote€ac; with prepared surfaces. If ¢he is sclf bondlag, it must have sufficzertbindcr(e.p.certentPasta, appxyresin) to thoroughly wet Out the s.thstra tt. Fp , e iatus* be applied cea driv'c the repair neat; rani into inbinata contact with the prepared Surface- "The type cif force WiH very with the application ; ct'h d. Er tr€ w: i applied systcn%l, she material is forced into dic lrrctaa ed staef.c;c by the pr,vsiurc appliad to the troweibythetinsli rorcenaeatnaason.meant-ir-place }scums, We pressure is pro,,, ed by imlo—€ai vibration. trc Ifyoviraad c Pressure developed by rhe concrete Of mi phnap. High Velocity pnetantdic pl'€cmcaT a wch- Taques th:ougliunpect the cLuta-ckinglirece„s;cncra eifrcSou ew}tetrtileroddisix nod pours thr_ material agabctritc suhse:ate. IN rctlstireertmir iliai repair . overaaln be adoieet and applied wi€hoe g tregaling is equally important, Any septegation of era edai Eta!a paw ifs will after physical p 7;)p rrim and reduce or n £.its' the abtsny of the repair to fulfill. it+ pranary iunctisna to rcsntrt; the st:act:xc in its orS4` ual cowRion to ihli f :?Last extent posaibft. H chew' nualtl.fng the selemio€4 of tide Claoo m ti. ds! and to .ai;`:ic.it rkut procedure. check Avo sFSt rows corattru,t rn; s}' ho c=,ernE€ cernsrra. €t� ss€j, ate;txd- o.s i t< questions should ife a .dre's ed: - f; atriiaebarc.�;�at;ra cr.sr,aiar*stcif'iedtSetfar Coy! I nvdr and that rnn trzf%f Wl , "be ahar r onto€< in.x+r t.u,.ineg :z < pique allow ate r o.oajirs io go w at sen t,.e When tfrr rhne speryied? �• '���! r t7y 5 V GUIDE FOR SELECTMG APPLICATION METHODS FOR THE REPAM OF CONCRETE SURFACES 1373 S -1 78'he z•orkinx ermir ivnenl runehaci,t w ae,Sp€ri- f?e r ;Wald 1WM tec%,•ry'n":' • .ire c s�.eaza:ac ed e:rrYtYnc:?raa-a• av aiaah e for ;he Ete=a{rr: E( flt, an,c zo any of ahese cpwsIions v,e no €r S3$b then the chtyicc of repair ;as ot4 ial n zslallmmn tnefhod Should be reasscssed. Selection 1-he selection of asuhabie refnlir maverial and applica titter ni lhod shaald pe€uacd in this �qucace: S Select the spa it Trateriai rro idia; lbe sW nath auci durabilii, propce tics -which best resmrcthe =nteg:64v- of tix on -inal deli;,:. 2 Select a mclhod of plae£m n Which will , tccess- .irl3y ps tcc Ifie repair mate r,nl unto the pr gar d Wacraie. 3 rRevieae the phy.si-rd p operies' and placeaatYnt ra- quirenents for file r':,,pair majetia, t i Cn ttrc Iole t'ttnsEzuCtYhFtltti pf tl se elezut3 rcpatr ti;;S;eS3 s, � {:har>r.6e�autersHlist'.�plzat+ai+ar.Tshtctasar:yn+c�€i a provide a constrae ible repair, .`?;cit!s`aci':a=+<;nee<i[ofattnaci .tom«tm..r-icmad!rza�iiit;. of t#€e. rt,pnsr�t-stena isfar:xtc,-t' It2 p�auifhall their^,u€: o`=. alga Fculien. Li Quality Assurance and Quality Control t ° sv t=€at,asiiczia of z€.c. wcirnt€ o - ausitssan. tE~e n�pais ,aQfl ac.nr. i};t Cm.,,Ungcczacr tc ittalurjaj. ida-,Wec ure deslaat and the repair tr:atc.a.a3, s< unique to eve—, P-0jecL Much can 20 wrong withottt proper quala :i<s ran e tfr€:utrealu.r[ity «ntrcai.St:e hE,zf £fittw a girrii£ied contrarrtor ai,t: t:au t3a•nxrnsirtty sesaeessi u( lair-T; rtn relxtirs trkaa � tfte ir't tilec;i:fcwli.tticln snetlat ci. iP any questions renuen unans;,aered ra aztfin the 4Aintracroc's qu lilicanoes, the repair nxateriai, or Ilae inst:alUitin technique, cony 'Ider a pilaf pivject. During th"- Lccw l rc anirs, &Nelop ;a Piet back a s- ien2. Feytelit}'Compliance -with lhc eng nezr:azrequm- mtisccacsu(a(sytae:eff+rrt.Eevrojvzl phsicslpropertic, Hof Lilo malarial' can bc confirmed hpsampling at thr: esmel of pl :>r::rnetit. by €s ,t,.slcz €:.sciuc;, o, by using care sampls n" techmq: ev. Bond st. t n;ahs c'Ln ha: t urttsc;ti ba WriR', through the Eepnir and .nuy_ 010 Suhstr;tte, fol- loueubyagaalyinaarnsilefarce tome cure''- dative of ilte mate2ts can be verified aith ciiva C?`JS .rt;}ISU%Y� fti i.Ntl„cted tii3ri ,End In- pince'e,,bn1,- a San-ub ai.rl.c. _cap= .e te4s f!a' v n dl�,,h-,J in .ACt >Ir:7R xlrxh d.`.; iR tsE nlG 4RSa 6tC?�:3x 2a 0373 Y -2 GUIDE FOS SELECTING APPLICATION METHODS FOR THE REPAffl Of CONCRETE SURFACES TrowelLoRtm C G Generai description: Repair t1 atcrita is mixed 'into a iron ci;ah"e. noar-siic� ccaasiatcncv.'lb; wels nroiher>uit- ahte pi, wing tools arc tined it, trari,p ort dic repair ram rial to the prepared Subitnaic, 3'ttt repair iaterial is p:ressed mitt the sub,trrrrc to tievelitp istst.rzter�xnact wt€tioua voids, Best application: Suriaec rQwwatioa khen reiniorc- inE steel ;3 not encounterCd, Material requirements: Fine-grained material easiiv finished, with aotl-sag pmpernti s to ,tav in placo in vertfcaf of overhead apphcntioaN. K General description: Repair rna_riai is mixed into a ❑n.ibrr'n. cchcmve plastic ntaic. then IrunsporiLd to a cottoned space and compacted with rodding ttxlln to produce a dcnsc repair material. Best application: Post-tcn,ionina7 grout pockets: tie Iailes: par: joist hottomsi waff7c pan jcoi;rs: verlical. ovet'lread anti horizontal 10catxirts. Material requirements: h5orwr with - onsistcncV ca- pable of"neing rnaided into a hail ivititout>agging. Reference: Headquarters. Linter States Army Corte of Engineers t 095). 95). " Eivaltumon and Repair or Con- crete Structures:' i :Nf 1110-2-20)22 '%Vashimnou. U.C. GUIDE FOR SELECTING APPLICATION I41ETti0OS FOR THE REPAIR OF CONCRETE SURFACES 03731.3 General description: The placen'tenrof repair matcri: l intt� a contined spate with foi-.n wom de Lung all cxlrcneci boundaries. Repair maicrials are dcisosited tnio ;he tvraoxork and eon ol'sdated lbv roddina or come ntonnl vibrullon. Best application: Coiumns, walls, and exterior slab edges, Material requirements: Castahie cnacrcze or inortar with proper hand properties, low shrinkaa;C, low wa- terkmwnt dance and a highly fiolcalle mixture. Reference: ACi 104R!" Gutdefor MeaysLrinL Mix- ing. Vr;n spoitin,t. and Placin- coat-ne General description: to lieu of parlial-depth rcpairs. Ille tnentixr in question cart he removed and rapl,aced in total. Placeinetn methods ahould fol(om' food con- rreld praci;cc. Beat application: When dewrioni6or is cstensi�c :hrou,>hout the niemhet.. Material requirements: conven=.ional cast -in -place co atreic with tow ,hrinkage, Iota wat cerren( ratio. acid a highly workable rnisturc. Reference: A('I 344R. "Guide for Miei.,rnn,..kIixm1,. Transportin+e. and Pineal- Concreic ` 121 Rulrescc+ cneti in iila manner are 'rein ;ha A0 Nlmms it of C'onc;etc Practwc . Anwncan ('mcrete Itlntime, t},Broil. %Lehman. `J QD"+Lev.r 61 r:�vrprt .�.� r, &pni t If h 03731-4 GUIDE FOR SELECTING APPLICATION METHODS FOR THE REPAIR OF CONCRETE SURFACES • to Form and pump Gener2l description: Repair nlcttt:rIa' 11 111eaj and L'OII_I.IC M11A 0 �11� 'PI i -d 131r. ;7 1eTnj to M Best apok'ation: he.Itl vVoi"ai npf,hC;u"ll, 01 Material requirements: flulnpablt:. 'zood tlu"k ch'_'rac- '1�111111FC.�.'IW "k ith 'I/C and .pace hclNeI:n bars. Reference: A0 30J.2R. -'Placma Conurvc !,,, Pump - ill,,, Meptk�';�­ General d?scripfloa. (;ap-grwIcd is placed inio fonncd cavity. (from I, th,',n pumped wl(form I, I;, em'Urplim") uluri all Voids av i11ed and rNS,,urvtki, shrinkac' is millultal becau'e af:lt"9:tiw colv1)dact:1V Best application: Vertical and oaerh-cad applications v,,hLr,- extreln-ly low shrinkage of repair material i, required. colunin Material requirements: Gap-grzidcd Lg-rc,pu S(Fwill ratio), purnpable P"I'E Jand cen-mit or resin -based biader. 0iil: Inch (25 nani or lay-ger wl—recate typically used in cmimtitiou, appheations. Rafarence:ACI 304. 1 R.­GuidlrPrk!placcd for SIructurd anti "fass Conurcu, Applications" L, fly "Mkis I mrm." " KNOWtl GUIDE FOR SELECTING APPLICATION METHODS FOR THE REPAIR OF CONCRETE SURFACES 03731-5 WEATHER WALL SPECIFICATION STACH 2z4 TOP LEDGER 0 CONCRETE WITH 1) 1/4'00-1/2' MIN. EMBEDMENT TIEN CONCRETE SCREWS ® 32' O.C. '.X4 WOOD STUDS 0 16' ON CENTER OE NAILED TO EACH LEDGER 'ITH (2) 10-d NAILS INFINISHED INTERIOR WALL MIL PLASTIC WRAP OVER 1/2' DX PLYWOOD. TAPE ALL SEAM JOINTS 1 6 MIL PLASTIC WRAP 'X4 WQ ATTAC�iE,D TO SLAB VITH 174 0z1-1/2 MIN. EMBEDMENT ITEN NCRETE SCREWS ® 32 O.C. IN, FLOOR ,.ONT. CAULK BEAD ALONG BOTTOM TYP. STANDARD FLOOR WEATHER WALL S TUTS. 2X4 WO ATTACTi�D TO SLAB WRH 1 40z1-1 12 MIN. EMBEDMENT TREN CONCRETE SCREWS ® 32" O.C. -TYP. TOP AND BOTTOM 1/2' CDX PLY -WOOD ATTACHED TO FRAMING W/ #10 WD. SCREWS AT 12' O.C. AT FIELD AND 6' O.C. AT EDGES OPTIONAL ATTACHMENT FOR 1/2' CDX PLY -WOOD ATTACHED TO FRAMING W/ 10-d NAILS AT If O.C. AT FIELD AND O.C. AT EDGES 6 MIL PLASTIC OVER CDX PLYWOOD TAPE ALL SEAMS 2z4 TOP LEDGER GENERAL NOTES: ALL 2X4 STUDS, SILL PLATES, AND PLANKING TO BE SOUTHERN YELLOW PINE, GRADE 2. DIMENSIONS SHOWN PROVIDED AS A GUIDE TO CONTRACTOR. ACTUAL FIELD CONDRIONS AND LOCATION MAY VARY. INSTALL ALL WEATHER WALLS MIN. 24" FROM THE AREA OF REPAIR. SUITABLE PROTECTION AGAINST DAMAGE BY WEATHER, CONSTRUCTION DEBRIS, AND TRAFFIC SHALL ALSO BE PROVIDED (INSTALLATION AND REMOVAL) FOR EXPOSED INTERIOR SURFACES, SUCH AS TILE FLOORS, DRYWALL, ETC, AS REQUIRED AND IS INCLUDED IN THE UNIT PRICING FOR WEATHER WALLS. DAMAGE TO INTERIOR SURFACES BY INSTALLATION OF WEATHER WALLS SHALL BE AVOIDED. SHOULD DEVIATIONS FROM STRUCTURAL ATTACHMENTS SHOWN ON PLANS BE REQUIRED, THE ENGINEER SHALL BE NOTIFIED AND SHALL APPROVE SUCH DEVIATIONS. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING ALL DAMAGES TO UNIT INTERIORS AS A RESULT OF THE REMOVAL OF EXISTING COMPONENTS (DOORS, WINDOWS, ETC.) AND/OR THE INSTALLATION AND REMOVAL OF WEATHER WALLS. WALL STUD PER PLAN 6° y 2z4 BOT. LEDGER) CONT. CAULK BEAD ALONG -"'� DBL STUD J BOTTOM AT EACH END STANDARD WALL ELEVATION a KEY: 1.2-3.4 1 -AMOUNT OF DAMAGE CRACKS = LINEAR FEET OVERHEAD SPALL = SQUARE FEET DECK SPALL = SQUARE FEET EDGE SPALL = SQUARE FEET COLUMN SPALL = CUBIC FEET BEAM SPALL = CUBIC FEET WALL SPALL = CUBIC FEET 2 - LOCATION OF DAMAGE B = BEAM C = COLUMN D = DECK E = EDGE 0 = OVERHEAD DECK PH = PIN HOLE RUST STAIN 3 -TYPE OF DAMAGE C = CRACK S = SPALL 4 - HEIGHT OF DAMAGE (COLUMN AND WALL ONLY) OP M = MIDDLE B = BOTTOM EXAMPLE: 5-C-5-M = 5 CUBIC FEET - COLUMN - SPALL - MIDDLE 10-0-C = 10 LINEAR FEET - OVERHEAD DECK - CRACK 8-W-S-M = 8 CUBIC FEET - WALL - SPALL - MIDDLE DECK SPALL = OVERHEAD SPALL = CRACK = ISLAND CREST STRUCTURAL INSPECTI❑ 10680 SOUTH OCEAN DRIVE JENSEN BEACH, FL 31957 CIVIL - STRUCTURAL - MARINE E N G I N E E R I N G CSM ENGINEERING, LLC 2001 BE OCEAN BOULEVARD - SUITE 1 STUART, FLORIDA 34996 o: 772-220- 601 c xx..CSu-End CUM MATE OF AMURZISM 2W57 TIE ou.m xwraonmr xmlm to aeol was :u aom Rapti Daps ne xxa MVaaS uammx: xxmrm xwean mxm. a rvaen m xrc oaa wor x xr mal an wvm xwmau xnoln IW ®woc nE oiav xmw xxessol xo mmn ar m Dloma¢ ue ra omeaE, x Lai xD ®w xnxwxlm xmt n r MSO1YIa Y x6i59]W 9MZ 81B'{WI6 BI aeat]{lE. w YO alalm Hl®.xxY[O.x xN IO1 MT WO: xDIa man x maI xxom�ml ar wl OpFWet uc m Onmµ w tmmrt,mle u mamavwL eexamxoE mnettxxwaw m wlwGm a xsomE w a mxmwu au Dams u axa xrum xael m esmr xas :nvlan - Amzk � O. fb4lU ••' ' • STATF L, .G�j�: CHAAIFS A� bWei� ~ ATE m LOW >am wx sack KEY x ISLAND CREST LJCTLIRAL INSPECTIO 10680 SOUTH OCEAN DRIVE JENSEN BEACH, FL 31957 CIVIL -STRUCTURAL - MARINE csm E N G I N E E R I N G CEM ENGINEERING, LLC 2081 BE OCEAN BOULEVARD' SUITE 1 STUART, FLORIDA 34996 o: 772-220-460 x:..05a-E,,.i CMnWE OF AAWWATOk 2057 0[dutn xmHr m9�Y11Ni(IH oww tml i xa mxnlmwrc mla nos RNa IlHulm /a HrmH xlxml®. auKm. ona a A®fn m wr Iwm Rxrc x wr wll a IV:1U tlxmam xlwa � alvltla IH raHn mlw xW6m1 Na 06:P a d aC1QWa, IIG Ta W]IOP.IIE UK YO �Ja M9FVYm RWl K M e®uoT a RYE4lYt H91H a ICY a ca alm[L04 uc NaaMllm Hla➢.tl IHL IXtl pK fUI AW OGB VdBT IIAgR 4E ttlnll KYWAn]I a BI f1OQ1N' aC WI pIJFIDIf' IIC lm(An tAll I YL H06068W1HKb6xM HN A'lIF N10PL1R IIE oavuna a Rsal®t nl of ommwol au HEloia lu xuo arum Raw m umr xan IVV. /O�IV A STATE OF. �(() i (\ '•, F O i Raa Hmmao 66d11 Inm sm wlE amk 210 POUT. A ISLAND CREST STRUCTURAL INSPECTIO 10680 SOUTH OCEAN DRIVE JENSEN BEACH, FL 31957 CIVIL - STRUCTURAL - MARINE Immsm E N G I N E E R I N G CSM ENGINEERING, LEE 2081 BE OCEAN BOULEVARD - SUITE 1 STUART, FLORIDA 34996 o: 772-220-4601 w.. a .CSM-Enel OlMlIC TE ff AMIORP IM 29W7 nE xoKn ffffa mamr xmAa IxGm/,m oWxx w orlmo xo ww RaWmr Kxa n�RxG rxaslK xamff xxaaKu. owrm. oWa a Ki]G1 m xrc nom wnr x Kr RHI a IVIImI MI4Y1W nnour xW oawaG W; mws xnlw RA6911 xx O]6M a m oKuvy w ➢K W]YIP. YE IW NO ®J6 MFWim IOUI K IN IOW YK a IRiCS'IW SATE 8 PAWYa tlI0mO1Nt IIC MOOlxlmffl6➢.NIYLaMIYA IW KY 04Q A71$ IIIIWl4E NIFII WYWAO]I a CL OOFFlYl11G Ctl Diame6f1'IILO ms ML af16WS 9lLLff1WIDMC[RLI A'W: tlMOW.T¢ M OINMId B KTI®E fG➢E 0iW1K1 a.LL v9®.4 K. vHK Im.® eumx m dmr xvrs _ o STATE z -• C(A� F 310 A ISLAND CREST R UCTURAL INSPECTIO 10680 SOUTH OCEAN DRIVE JENSEN BEACH, FL 31957 CIVIL - STRUCTURAL - MARINE rm s E N G I N E E R I N G CSM ENGINEENING, LLC 2081 BE OCEAN BOULEVARD - SUITE 1 STUART, FLORIDA 34996 o: 772-220-4601 ....CSM-Enei CORrATE OF APNOIdNM 2W REDUCED IOA! D1R8Y 0.mM.9 NS,IFP NWN W W'h911 xo oem RnmR mllc m!¢nxa MO amsxa lmma OIWWI N�IP� 611YIUf � W WM M F#�dN9' �Nllp RA®ll ND 0]�T R dl OOFFlEE. UG ➢6IX011M. M 6\t RO ®]ANOeV.N➢109DOW1 E1E ADD �msIYI DIN OWE I®[OI NfOlf ➢E N11R11 NNWAIDI6 C91 OWFP.Iq IIL I BI DMR YL O➢MlR [DII I IIL OE0Yf 94LHeWmNM1UO 6Y➢E 0RY1R OE D,1R'L'Id E h4VRB! WP➢E 0l4®wv16 Ml OO®6 NL 91O e00101 R9WI N 61111' RDS SWEOF ljt• DLL. WIE: 9m e 410 4 ROW, ISLAND CREST t STRUCTURAL INSPECTIO 10680 SOU,N OCEAN DRIVE JENSEN BEACH, FL 31957 I I I I a CIVIL - STRUCTURAL - MARINE DOOR 00i Csm I E N 0 1 N E E R I N 0 B-C-S-B I CBM ENGINEERING, LLC B-C-S-T "' " -__- _"' 3001 BE OCEAN BOULEVARD - SUITE 1 { STUART, FLDRIPA 34996 — o. 772-220-4601 4: M.I.Qti-[.Mr L CfltilFiGlE OF N111A1Po7A1Kt2 2d157 UNIT: 51 ❑ i ,. L..-oDRm xae mRmr xamv owxx. ownr l Roa a stun Axn oEc xxamwewa Aa orAa COWYN SPALL .26 6-C-S-T I—i__--.. RTamrm. aw+m wmaLvomAun oam xmxurc C COWYN RAO( m00 4-C-S-B j I ��� x�ulmx6Rm ��xoE�� IXCK COWUN .66 —i I momLDa, nt ms xo uma mum xmLUAr DECK CRACK . 00 Y — mroa rc ImLaTaa �ay. a RmAr a' aI mxw�o. uc 0 E*M SPALL =106 1 _�. -...__ mq°aimiaml Rmov�mla mi�au�mx�q u�c OVOM6A0 CRACK . 00 WALL SPALL = 00 a oatGam, ue ammaT �mR DOOR = 34 II .L mDDa 9WLExwB1Ya[Rm e11E a>IwDw. ➢E �'I misxlm a RSG®E ra ce ananm vu mm¢ R1 YA'O IQAxa NAW A 6Y111' M9 —1— I 61 __.......... - _ r i i 0. RjUlCl Q STATE -OF w =LES A DV --j'-- --- RaabWr►11 mA 510 ISLAND CREST ? UCTURAL INSPECTI❑ 10680 SOUTH OCEAN DRIVE JENSEN BEACH, FL 31957 CIVIL - STRUCTURAL - MARINE C s m TT..I E N G I N E E R I N G CSM ENGINEERING, LLC STUART,9E OCEAN 34NLEVARt) • SUITE 1 SIIIA-4601FLORIDA 34996 w: 772 CSM-{WI ttxnRraa OF xmammalc zsmT E UNIT:1201 Mxw•xml Ixil9fp YxSRhxx m°.„ wxxmox xxuIlffll IZIM MWMI10 w w "wrma NIImL®.OW®. QIm, 01 Ad]m m.N! xW xH! M YI! __ _I �I x1iE911M xBlSa`Q �x@NxMG114]S HIIEY COLAM SPP1L -00 na wuma.Mmt uo ama umlwtaM COLUMN CRACK - 00 owm�ou s• R15p91Y! sx+c x RtlRMI a ml xlxmw, uc xoxxnm amm.xxaEaxxxl xn xrc alEexmx , DECK = 00 xmxrt M xmd xmameoox a ml axmsw, uc --- .. - OEO� CRAG RM SPALL - 00 . 36 al olxF!»S m osrono lmle I — OYEiBEAL) CRACK. 00 00 WALL SPALL = 00 —I_— xL W19M WLLfi[1W1mxMIOUmM Wlmiwlpl.M I r GMf.YLid BA9Y1lS(id Mxl0lVW 6/LL xM1mTa � i 4AV6 �m.Y0 RAxN mC3il1'x115 l Ir FF ... i !I Icy........ ..— �� '•. STATE'kft 'RCHARL6 A OA�I Rpp IWIO 9@xYC Mt. 1201