Loading...
HomeMy WebLinkAboutAPPLICATION AND CERTIFICATION FOR PAYMENTG702 APPLICATION AND CEI TOOWNER: Elliot Merril Community Mana 835 th Place Vero Beach, FL 32960 FROM CONTRACTOR: Danielle &Associates, Inc. PAYMENT St.Lu�eco mw VIA ENGINEER: ML Engineering Inc 2030 37thave 2708 N. Australian Ave., Ste 9 Vero Beach, FL 32960 West Palm Beach, FI 33407 CONTRACT: Concrete Restoration Repairs CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, In connection with the Contract Continuation Sheet Sheet G703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1 z 2) 4. TOTAL COMPLETED & STORED TO DATE (Column 12 on G703) S. RETAINAGE: a. 10 %of Completed Work $ b. % ofStored Material Total Reminage (Lines So * Sb or Total in Column 15 of G703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 Less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) B. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINA( (Line 3less Line 6) APPLICATION NO: RETAINAGE Application Date: PERIOD T0: NOT A LUMP SUM BID: The amount is based upon estimated quantities listed in Exhibit& Quantity Schedule. The amount paid will be based upon actual quantities/work performed at rates in Exhibit& CONTRACT DATE: The undersigned Contractor certifies that to the best of the Contractor's knowledge, Information and belief the Work covered by this Application for Paymenthas been completed in accordance with the Contract Documents, that all amounts have been paid by the Contactor for Work for which previous Certificates for Payment were Issued and payments received from the Owner, and that current payment shown herein is now due. PAGE 3 9 Distribution to: =OWNER 12/02/16 eENGINEER 12/02/16 CONTRACTOR 0 $ 12,856.50 $ 33,412.05 CONTRACTOR. $ 46,268.54 $ 46,268.54 By: Date: 12/02/16 State ob Florida County of: Palm Beach Subscribed and sworn to before me this Notary Public: My Commission expires: $ 0.00 ENGINEER'S CERTIFICATE FOR PAYMENT $ 46,268.54 In accordance with the Contract Documents, based on on -site observations and the dam comprising the application, the Engineer certifies m the Owner that to the best of the Engineers knowledge, information and belief the Work has progressed as Indicated, $ 42,881.77 the quality of the Work is in accordance with the Contract Documents, and the Contractor $ 3,386.77 is entitled to payment of the AMOUNT CERTIFIED. $ 0.00 AMOUNT CERTIFIED ........... $ CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner $35,907.50 $517.50 Total approved this Month $1,977.95 TOTALS $35,907.50 $2,495.45 NET CHANGES by Change Order $33,412.05 (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amountcertiffed.) ENGINEER: By: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance ofpayment are without prejudice to any rights of the Owner or Contractor under this Contract P.o. 2 , 5 CONTINUATION SHEET G703 Document G702 APPLICATION AND CERTIFICATE FOR PAYMENT, remaining APPLICATION NO: 9 Contractor's signed Certification Is attached. APPLICATION DATE: 12/2/2016 PERIOD TO: 12/2/2016 Use Column l on Contracts where variable retalnage for line items may apply PROIECTNO: Bryn Mawr 2016 2 3 4 5 6 ] 8 9 10 11 12 13 14 IS DESCRIPTION OF WORK SCHEDULED WORK COMPLETED Value Completed Total Completed % BALANCE RETAINACE FROM PREVIOB THIS PERIOD Tmal FROMPREVIOBS THIS PERIOD VALUE and Storage TO FINISH UFVARMELE APPLICATION APPLICATION UTEI Qty Uni Price 3.5 7a8 715 8-5 1D+11 6-12 $1,525.00 3.79 3.79 $1,155.05 $0.00 $1,155.05 76% $369.95 $115.50 Building A -Acres with Swing stage 5.00 CF $305.00 Column Spalls Surface Spalls(Partial) 15.00 SQ $79.00 $1,185.00 15.00 15.00 $1,185.00 $0.00 $1,185.00 1000/0 $0.00 $118.50 Ceiling Spalls 8.00 6Q. $93.00 $744.00 8.00 8.00 $744.00 $0.00 $744.00 100% $0.00 $74.40 Slab Edge Repair 15.00 LF. $115.00 $1,725.00 15.00 15.00 $1,725.00 $0.00 $1,725.00 100% $0.00 $172.50 Deck Coating 3.00 SQ. $6.50 $19.50 3.00 3.00 $19.50 $0.00 $19.50 300% $0.00 $1.95 Remove& Reinstall Guardrails TBD LF. $52.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sirocco Repair 30.00 SQ. $16.00 $480.00 0.00 $0.00 $0.00 $0.00 0.00% $480.00 $0.00 Paint Repaired Areas To Match Existing 6.00 SQ. $2.10 $12.60 6.00 6.00 $12.60 $0.00 $12.60 100% $0.00 $1.26 CHANGE ORDER No.3-BuildingA Slab Edge Repair 7.42 LF. $115.00 $853.30 7.42 $853.30 $0.00 $853.30 100% $0.00 $85.33 C.01 Remove Shutter 23.00 LF. $24.50 $563.50 23.00 $563.50 $0.00 $563.50 100% $0.00 $56.35 COl Remove SGD 22.00 LF. $52.50 $1,155.00 22.00 $1,155.00 $0.00 $1.155.00 100% $0.00 $115.50 C.01 Weather Wall 19.00 LF. $58.00 $1,102.00 19.00 $1,102.00 $0.00 $1,102.00 100% $0.00 $110.20 CO 1 Full Depth 9.71 LF. $80.00 $776.80 9.71 $776.80 $0.00 $776.80 100% $0.00 $77.68 CHANGE ORDER No. 4 Building $0.00 $0.00 Deck Coating 6.83 SQ. $6.50 $44.40 6.83 $44.40 $0.00 $44.40 100% $0.00 $4.44 C.01 Reinstall Shutter 23.00 IF. $24.50 $563.50 23.00 $563.SO $0.00 $563.50 100% $0.00 $56.35 C.01 Shutter bottom track 9.00 LF. $20.00 $180.00 9.00 $180.00 $0.00 $180.00 100% $0.00 $18.00 C.01 Remove SGD 15.00 LF. $52.50 $787.50 15.00 $787.50 $0.00 $787.50 100% $0.00 $78.75 C.01 Reinstall SGD 22.00 LF. $52.50 $1,155.00 22.00 $1,155.00 $0.00 $1,155.00 100% $0.00 $115.50 C.01 Weather wall 15.00 LF. $58.00 $870.00 15.00 $870.00 $0.00 $870.00 100% $0.00 $87.00 Surface Spalls(Partial) 10.23 SQ $79.00 $808.47 10.23 $808.47 $0.00 $808.47 100% $0.00 $80.85 CHANGE ORDER No.5 Building A $0.00 $0.00 Deck Coating 29.86 SO. $6.50 $194.09 29.86 $194.09 $0.00 $194.09 100% $0.00 $19.41 Slab Edge Repair 3.75 IF. $115.00 $431.25 3.75 $431.25 $0.00 $431.25 100% $0.00 $43.13 C.01 Weather wall 30.00 LF. $58.00 $1,740.00 30.00 $1,740.00 $O.DO $1,740.00 100% $0.00 $174.00 CO 1 Non Impact SGD Remove 24.00 LF. $52.50 $1,260.00 24.00 $1,260.00 $0.00 $1,260.00 100% $0.00 $126.00 C.01 Full Depth 20.58 SF $80.00 $1,646.40 20.58 $1,646.40 $0.00 $1,646.40 100% $0.00 $164.64 C.01 Remove Shutter 37.00 LF. $24.50 $906.50 37.00 $906.50 $0.00 $906.50 100% $0.00 $90.65 C.03 Monthly swing stage rental (9/15/16- 10/12/16) 1.00 Ls. $1,200.00 $1,200.00 1.00 $1,200.00 $0.00 $1,200.00 100% $0.00 $0.00 C04 Dowels 8.00 ea $39.00 $312.00 8.00 $312.00 $0.00 $312.00 100% $0.00 $31.20 CHANGE ORDER No. 6 Building A Deck Coating 26.58 SQ- $6.50 $172.77 26.58 $172.77 $0.00 $172.77 100% $0.00 $17.28 Slab Edge Repair 16.00 LF. $115.00 $2,070.00 18.00 $2,070.00 $0.00 $2,070.00 100% $0.00 $207.00 Surface Spalls(Partial) 7.83 SQ $79.00 $618.57 7.83 $618.57 $0.00 $618.57 100% $0.00 $61.86 CO 1 Non Impact SGD Reinstall 39.00 LF. $52.50 $2,047.50 39.00 $2,047.50 $0.00 $2,047.50 100% $0.00 $204.75 CO 1 Reinstall Shutter 14.00 LR $24.50 $343.00 14.00 $343.00 $0.00 $343.00 100% $0.00 $34.30 Time and Material Walk Way 1.00 Ls. $1,290.67 $1,290.67 1.00 $1,290.67 $0.00 $1,290.67 100% $0.00 $0.00 P., 3 e. 5 CONTINUATIONSHEETG703 Document G702 APPLICA71ON AND CERTIFICATE FOR PAYMENT, containing APPLICATION NO: 9 Contractor's signed Certification is attached. APPLICATION DATE: 12/2/2016 PERIOD TO: 12/2/2016 Use Column 1 on Contacts where variable retalnage for line Items may apply PROJECT NO: Bryn Mawr 2016 2 3 4 5 6 7 B 9 10 11 12 13 14 IS DESCRIPTION OF WORK SCHEDULED WORKCOMPLEFED Value Completed Total Completed % BALANCE REFAINAGE VALUE FROM PREVI011 THIS PERIOD Tonl FROM PREVIOUS THISPERI00 and Stange TO FINISH (IF VARIABLE APPLICATION APPLICATION ARTS) Qty unii Price 3.6 (7+8) 17.5 8.6 10+11 6-12 C.03 Monthly swing stage rental (10/13/16- 11/9/16) 1.00 is. $1,200.00 $1,200.00 1.00 $1,200.00 $0.00 $1,200.00 100% $0.00 $0.00 CO 5 Relocated swing stage BldgA 1.00 B. $695.00 $695.00 1.00 $695.00 $0.00 $695.00 100% $0.00 $0.00 Credit edge($2,07OX25%) 1.00 Is. $517.50 ($517.50) 1.00 ($517.50) $0.00 ($517.50) 100% $0.00 $0.00 Permit Bldg. A 16060042 1.00 LS. $100.00 $100.00 1.00 1.00 $100.00 $0.00 $100.00 100% $0.00 $0.00 Permit Bldg. A 16060042 and Not, 1.00 B. $229.77 $229.77 1.00 1.00 $229.77 $0.00 $229.77 100% $0.00 $0.00 Column Spalls 5,00 CF $305.00 ($369.95) ($369.95) Stucco Repair 30.00 Sit $16.00 ($480.00) ($480.00) TOTAL BUILDINGA. �' " $291640.63. $29,640.63 Building B. Acces through common walkway Column Spalls CF $305.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surface Spalls 4.00 SQ. $79.00 $316.00 4.00 4.00 $316.00 $0.00 $316.00 100% $0.00 $31.60 Ceiling Spalls 8.00 SQ. $93.00 $744.00 8.00 8.00 $744.00 $0.00 $744.00 100% $0.00 $74.40 Slab Edge Repair LF. $115.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Deck Coating 560 $6.50 $36.40 5.60 5.60 $36.40 $0.00 $36.40 100% $0.00 $3.64 Remove& Reinstall Guardrails TBD LF. $52.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Stucco, Repair 12.00 St. $16.00 $192.00 0.00 $0.00 $0.00 $0.00 0.00% $192.00 $0.00 Paint Repaired Areas To Match Existing 1128 SQL $2.10 $23.69 11,28 11.28 $23.69 $0.00 $23.69 100% $0.00 $2.37 Permit Bldg B 1606-0041 and Noc 1.00 LS. $181.89 $181.89 1.00 1.00 $181.89 $0.00 $181.89 100% $0.00 $0.00 Permit Bldg B 1606-0041 1.00 LS. $300.0D $100.00 1.00 1.00 $100.00 $0.00 $100.00 100% $0.00 $0.00 CHANGE ORDER No.7 C.01 R/R Shutter bottom track Bldg B 9.00 LF. $20.00 $180.00 9.00 $180.00 $0.00 $180.00 100% $0.00 $18.00 Additional Deck Coating Bldg. A 26.95 SQ. $6.50 $175.18 26.95 $175.18 $0.00 $175.18 100% $0.00 $17.52 Additional Paint Repaired Areas TO March Existing 26.95 SQ. $2.10 $56.60 26.95 $56.60 $0.00 $56.60 100% $0.00 $5.66 C.0 6 Relocated construction material from BldgA to NVV 1.00 I.S. $525.00 $525.00 1.00 $525.00 $0.00 $525.00 100% $0.00 $0.00 CO 5 Relocated swing stage Bldg to Bldg B 1.00 Ls. $695.00 $695.00 1.00 $695.00 $0.00 $695.00 100n/o $0.00 $0.00 Surface Spalls 1.60 SQ. $79.00 $126.40 1.60 $126.40 $0.00 $126.40 100% $0.00 $12.64 Ceiling Spalls 0.81 SQ. $93.00 $75.33 0.81 $75.33 $0.00 $75.33 100% $0.00 $7.53 CHANGE ORDER No.8 Ceiling Spalls Buldg B 5.60 SQ. $93.00 $520.80 5.60 $520.80 $0.00 $520.80 100% $0.00 $52.08 Paint Repaired Areas To Match Existne 2.89 $2.10 $6.07 j,Q.Q $6.07 $0.00 $6.07 100% $0.00 $0.61 T/M Bdlg B Parkin lot Storm drain 1.00 LS. $2,219.15 $2,219.15 1.00 $2,219.15 $0.00 $2,219.15 100% $0.00 $0.00 Stucco Repair 12.00 SQ. $16.00 ($192.00) ($192.00) TOTALHUILDINGH.- '$5,981.50 $5,981;50 Building C-Acces through common walkway Column Spalls CF $305.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surface Spalls 10.00 sq. $79.00 $790.00 10.00 10.00 $790.00 $0.00 $790.00 100% $0.00 $79.00 Ceiling SpallS 8.00 Sit $93.00 $744.00 0.00 $0.00 $0.00 $0.00 0.00% $744.00 $0.00 Slab Edge Repair LB $115.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 P., 4 5 CONTINUATIONSHEETC703 Document G702 APPLICATION AND CERTIFICATE FOR PAYMENT. containing APPLICATION NO: 9 Comactor's signed CertlBradon is attached. APPLICATION DATE: 12/2/2016 PERIODTO: 12/2/2016 Use Column l on Contacts when variable retainagefor line items may apply PROIECTNO: Bryn Mawr 2016 2 3 4 5 6 7 8 9 10 11 12 13 14 i6 DESCRIPTION OFWORK SCHEDULED WORRCOMPLETED Value Completed Total Completed SS BALANCE RETAINAGE VALUE and Storage TOFINISH (IFVARIABLE FROM PREVIOU THISPERIOD To.) FROM PREVIOUS THISPERIOD APPLICATION APPLICATION MTE) Qty yrii Price 3•$ (7r8) (7.5 8-5 10.11 6-12 Deck Coating 68.27 SO. $6.50 $443.76 68.27 68.27 $443.76 $0.00 $443.76 100% $0.00 $44.38 TED Remove& Reinstall Guardrails LF. $52.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Stucco Repair 12.00 SO. $16.00 $192.00 0.00 $0.00 $0.00 $0.00 0.00% $192.00 $0.00 Paint Repaired Areas To Match Existing 6B.27 5O. $2.10 $143.37 68.27 68.27 $143.37 $0.00 $143.37 100% $0.00 $14.34 1.00 Mobilization and General Conditions LS. $4,200.00 $4,200.00 1.00 1.00 $4,200.00 $0.00 $4,200.00 100% $0.00 $0.00 CHANGE ORDER No.1 Permits and NBC Permit Bldg C 1606-0040 and Noc 1.00 I.S. $181.89 $181.89 1.00 1.00 $181.89 $0.00 $181.89 100% $0.00 $0.00 Permit Bldg C 1606-0040 1.00 LS. $100.00 $100.00 1.00 1.00 $100.00 $0.00 $100.00 100% $D.00 $0.00 CHANGE ORDER No.2 Building C Surface Spalls 60.60 SO. $79.00 $4,787.40 60.60 $4,787.40 $0.00 $4,787.40 100% $0.00 $478.74 CHANGE ORDER No.9-credits Ceiling Spalls 8.00 SO. $93.00 ($744.00) ($744.00) Stucco Repair 12.00 SO. $16.00 ($192.00) T ($192.00) TOTAL• . BUILDING .--. $30,646.4T' $10,646.41. GRAND TOTALS $46,268.54 $46,268.54 $0.00 $46,268.54 0.00% $0.00 $3,386.77 SCANNED BY St. Lucie County TUUANh.NI �I IHamfl,nafnnvUly Rlem H]Sts Pt.. Yrfn gxvrh bAlNgA I tulW CUVflW IUkt Ir I14 F4awk�[e�.lw f NItN LouN I:m Avod Ar+r 4t, nahn f4-+:1,11 41W Ih1NTRM?e tblu'tHr ke3'tnfiof:QlalVOla Veyk Nawiombxafekvu MPUGM1TUNNUI ""AINAGF 4NR rne. t tpVUU'il If• V4F RNQ14L1.UI,Rn;l xerfrtp ln. JI'm IH( MIT AVK SVM UIU fR LtlI R..d Ym+gaa f+.At-'!J!tuU I ...lye+Y.lA. do HlnLti?alaU al•M14hwak M—pul wl N1krr W �xY gPrtn F'luil Y uuX((irVk•niftilivrnlx•>h i'mFahAKa PINlml YlMTk � 111.Inlna'iuuio; =0100 t3(nXllR CRWNItw 1Z1UA(la �CU R1M1W;i1)K CONTRACTOR'S APPI.ICATION,FOR PAYMENT au:nle,4 YWnm'.jrnU.wlaq r,. n„umwm-, nyG�.N.,(.1 k...... r11 kr j! 1 hf1yN LNa sltdr•k-In,nnl'f N wrgY tfinp:ink 61rIN16 g I u IM'){prkx ,IGflblke}It LF l k�' iFu! •nuftWPSw •4}ptl Ynml, In,�{I 1n +� q+lvSrtll M ravllk llM. 1` I1 Ilb t L41111 t i f 14 i iy{IY ,$e kIMIRnGd �nH Lhlrz✓w1+d'faovV.Y 1mdx.w+IN Len uui»ror nfwa..d.l Y^(gM.(:y Ynl lrnipt6clr tlb]f pli.w INYYYC1ti .huyu L• Ylrynim Q�F. I. IAk(7NM+YpA:RAtYi11M1) f_,�12&5w, 44p I N l y ho I p tF In. S I�f IIw 7A1S7AL5 f?S`t IHOUIIq c 11 lKf11M�R'1l IT}3EAb (UYvI r tl 1 111rn1 dlFtl'; 4RU hJ.rflUpU'Iil 3� t u in _.'6054 4hzrytt SA � �'�"'— 1 IMI ('a ntl i2 tt61! •h M1 y�� �� �t8•,;..w wnO7 iU'rt. i._i !+I 1 CeaFA hrrrn t'daw4s.L �4��� 1 .SunrvlS+rt�Iwl �_' YM I.j IaN J 71n li+uhpwa'nllf+�. "" 't T•+fsl Yletnbfll lAfn.-r ^Nrgh+n . Teeaigt r. mn IS:J"t.Tnil s U31U INWNFkfl2tX,11riY1GtY•PllgPAVHCYT '" _. b nIYAt R"f�ky13+3}.4ti ktSLAlKh4k S ,�lif hl�i altL as'tilllnde{finlM '1mt4nAni�iye+al nrolr .I..p.n....... • IT, 'U',I i.riUAa O'c", rvrervNJ. xkiR• 4'.. ft lo-rrrx 1.geI I111wlrvM1'1LrI IAry 0 1Fat 11WiV(4V.r.tl3Tffe A41F nIR Erganef'.R nvlt .m!mm rn amJhdrllf,,ye rk Ua+PngV-,•nJ .++wo-,p-y VAVMUNyIbm aln.n+p9nI IAYkA+b;•1 S �i21 U1 I sm(mfLlynf llrc M14.r.nin+F rk I.WURIGu'. AU Iuyr[jm frt ,nranm N nglkNNl'PnVMgN'I'. Wit S Y.i86.TF .nnAL.h l yry.n of dlrvdAIDUNTcR1YIP11U1 n. 14M1Idf�f;NTi1BIN49Ik INt «t1U1p+9tAfA1NA1 Illlvab+IJ+Io»I f II IIU =MINHft'i9liYbi:+l a A�. �f A •R 314.77 ,e PIANI IIflon "UTIAky A11111"'I" I •f)F.VIq fll) Y !A1 :yM .NM+FnI nlr iQ I.NJfp� tlh d .rflO t n+l fk» itpf 1,1AFl fMp Yr..It (pq.YH jenti�dA mfyafN4+f] ql lflm4l S %� pd.i'avki0•,+1. »Yxs ncpaxll4•Tb•,tpII11N'(9;fit If76UbNialda.n(r l+n(n 4•ml•.li•4 pi}y.�p11l.lattl X+.Iv{Y`^itl.eNl.}: e{n xiq lyrlhA.M1elr. wtilxh_1 (impxRr^tlmyiTkr-nt9wU q GgladlrsauMfllnr BtiiYirn 1. tVN r nnlba In U«Iev 5.1 7AU b pSU P�1 Vlm}I nh iltf AlV %1 �'SV75U i2 iy5.{4 - 5STCYiPNY.FS4 lL+n'olRvivY. EY3A 120U 7079.so V,c I Ni cmrrmiMnaxsnrzPnat pabrupinYi92APk`fACflYON M1NP 6knTIFICAY'R COA VAYNEM.atlnikmm� AtlVIdCAYIORflO: 9 G,nOmvn'aaSrvA Wrtlnatiw lurru•Ted. API'l iYAt@YOAtY: 12JX7tt116 1'AOIE'^TItM P1RATMOI Y2¢(E016 I�fi,N,ronirm CnmraaaTemeultm(e laain"Arl wr4nenm+vuyn41'U' arYn He'.,=Y016 f�L PPSf.IePIORAF WO(IR 6CIIknlll Eti 4{UXtl IMNNJ.mfiA' _ Yd4,e Grn w .TM�11Sn^I4,nMl 46 111,5<Z 4A4fIIrAtt 'CUNPPatl41V YNa1 LNQtlViNI01 F" T516 PAtlUn 4'ALUM YnI..M:r6Y,! }ONk4W jIYV21rN41Af Ll-,�a•s AVIW'AiKVi A!'IYYAf10M P..\i61 t 7.e 1.s R•s I 1m,$g_ .0 S1,S25.D0 3.79 3.79 51,155,95 $0,00 $1.155,05 76% $.7lfl.95 S115S0 nmidTlan.M:e.wthsvAuaxlad0: 5.1!01`s' S305.00 ';FluweSry lls ulFite Siwlis{IMnla11 15.00 im S70.0n $t,105A0 15.00 15.00 $1,185.00 WAO $J,1arU0 10(1% $040 $119.50 �::e01A01y,:01a MOO $9:1.00 $741A) Roo R,00 5744.00 $a0D $*,00 1O0% j0mn $74AO MA, Earn Neryur 15,00 $1,725A0 15,00 15.00 $1,725.00 5D.On $1,725,00 100% $OA0 $1725O lhe9 rf ,iq 3.00 w SA50 $191A i 3.00. IN $I9.CO $Oma $1'1.50 IOa% Soma $1.05 Rnm,riv R. R.J.Tt,m r,.nilr.•ih Ilia u. $52A0 $0.00 0.00 Saba Soma $0.00 $0,00 WAO Sta.RATair 30.00 `9 $16.00 1400,00 0AO Soma $n.0n $0.00 0,00% SAW soon Noll Rep91«d Amnia Mal. h WItTI$ 6Atl `Q $2.10 x3oug9 512.60 $ane 6.00 &00 9.00 $120 Sn±lo $0.00 $aaa $12.60 $0.00 100% SOAD $apD $1.26 $0.00 RaiN11nA IL Arcea XAmu&T rmnm0n w:dhway LPli.mn SpAllx 5drlmre S{inlly 4.110 s9 S79.00 $316.00 4.00 400 $316.00 SOAO' x316.00 N)9% $Mo 53160 CeAing5P0UA 0.00 ^a�� Solon $74Aa0 0,01) 890 $74400 $0.0 $744,00 106% Tana ' $74.40 Il T odge lteP t IA I Si L,01) $0.00 ODO $&am SOAn $0,00 $0,00 $0.00 D&S4 amn Sfjfl 5A� $(t50 S:36.40 5.60 560 $36.40 Soma 06,40 1001% soma $164 Rees ve&HOO uODnarAi:dk TBD a S52.00 Soma 0.00 Soma Soma $0.09 $0,00 $0.00 $IUGn a0luiir 12,00 lI $16mo $192.00 0,00 $OmO $OAO Wan OAO➢n S102.00 IMA0 pelulDrATiUeaAm.TnN ia�P,l.Ylrry 1178 '! $219 cV $305.110 $7369 10.09 1128 11.28 a00 5b169 Ya00' soma .SODO WOO Stl.11a 100'm $0.00 50.00 V37 SOAO WrauP.T av amnn walNwuv _ Ut.,,nUC•.Aaars CnTunn SPYl;n 511r(nre Sm014 1¢A0 W S'79A0 $700.00 t0,011 IO00 $790,00 So.nn $790.00 100% $nmo $79mo CeIWipSpnlH _ ROO ra. S93,00 $744AO moo $0:00 SODo $nAD O.00W, $ "Ad Soma Slnh4d7}•R.,ft u. 51 MAO $0,00 0.00 Moo SON $AAO $n.00 $000 11erk C.rwlil,g sP $a50 5443.i,6 60.27 6027 $44.1.76 X $41K376 100% $0,00 34430 L�nviveWiledn+irn 6na,rfraili '@D 1+ $52.00 $0.00 0.00 $OAD. Soon SOPU. lano 50,00 no NfPAir 17,00 q. $16,00 $192.00 0.00 Soma imam $"a moo,% $19200 Wn r I, lo,'fi'd X-. TO Mavh ulal, k= w S.:10 S14= AM27 68.27 $14117 $101. $143.37' 100% $0,00 $14,34 MTL01ea0nn and fvlttral 6ndaw, "a " $4,Ma no $4,20OAO I10 IAO $4,MO0D $0.011 $4,201TQa 100% Soma Soon GRANGE nNnER N.1 Permlln Ma NOC Purnat Haig. A 16060042 and NK 1.00 Is $229,77 $229.77 ]Am IAO $224.77 $OAII $229.77 100% $00 $0.00 PdnnO RNlg 0160"041 nml loN 1.00 IS S101.09 $1mA9 1A0 1.00 Yf0IA9 Soma $181A9 100% $O.Iro 0.00 PPmdi Ridg C 1606-0040 irnd Nm S.no Is S1n1.M SIBtA9 1A0 600 $101-49 $0,00 $101.69 100% soma $0.00 P.Imal 0ldg. A 1606004Z loo isl Sl0000 $100Aa 1.00 1.01) $Ia9.DD $DAO $1D0.o0: 100% Wo $0.00 Permit Ohio Ii 16060041. 1.00 Is S1nomo $100Aa 1,00 IAD WOOD Soma, $loomil dolt# $MO Sa.m hmoli 11LIgC 160"D40 1,00 la $IDOAO $1o0.00 1.00 1.00 slan.aD MOO $1011.00 100% Sabo "Am CIIANOE ORDER Nu2 RvildlNg C SNdk,slwtlb 60,60 Is9. S7910 $4.707.40 WOO $4,787.141,1 $0.00 $4.787.40:, 100% $"a $1711,74 1vtl,3w5 mNTm[LI in1Y SNF6T6701 Mms: qXCtlf1Ap0.1JG11YPNANp{I'AllF1fATEip0.pAYM5hT,mnghtlny API�IAG1111M APe tnlrivtlohalgnvd rsn10o5on lyanvl4M1 AM WATION PAW, 1373(I016i VAROIB ob. 12/2/2016 1W fm4mmInn'n,XnenwN.rse varWElere[afgeF::L,rlhmk-moYoPOY ITOFUK ft"n Mm,201, 2 3 1 $ 6 7 8 4 to 11 13 13 14 � l$ tlk$CAIk'GONnPWO(lK SY.riElNnl6 WPRRrYtYPIA514P }-1,-y e_1 Tholfmmplin'il {i q,U.nY }F'LxIN.4:f VAUIK .11Mbn,M1T itlN491 rYE11GIN. IIMPMM ,axRAri1: ",.A" 1 vIn IMce 3'S He �P b}__, U'5 10>.11 6•.13 QIANtOS ORO6AN9,3 �Bul1dlR8A ' 0a1, Up Rapalf 1A2 11, SIISBO $115330 7A2 $0.Uo $0.00 SWIM 100% $0,00 $8533 '1A I RPQ,,, 95Wger 23,00 M, $24S0 $S635O 23.00 $%3$0 $0.00 $56150 100% Soon $56.35 KIWI il4mara5Gp 22,00 Ir, $5250 $1,Moo _ 22A0 S1,155.00 $GAD $1,155,00 100% SOAO 511550 COI wmlwwA 11,00 1+• S50.00 $1,102,00 19.00 51,107A0 $0.00 S1,102,00 100% 50Af0 SlID20 CAI r"ll M,lh 9.71 ¢ $8000 VMS(] 9.74 Mkin) SDAO S776110 iUU%, SON 377A0 Co4NGKCRDMINa4 BR01Ih1SA Soon SODO Mu4C B, 6.113 s0. sr50 $0.40 6,R3 $44.40 $GAO WAD IOU% SDAO $4.44 C,O I ReIvman s1mHvr 11,00 In, $24150 $563.50 29.0 a $$6150 Woo $563.0 100% So.na $5635 no 15hu0er lwprvR back 9100 11 Won 3180.00 9.00 S10000 $0.00' $10000 100% $0.00 $18.00 COl R.mr SGD Vigo IA Msa S787.50 I5,00 S1n7,50 $0.00 $711730 IUO% MOO $70.75 Cal Relm[ASCO 27.00 O. SSL50 $1,1KOD 22.00 $1,155.00 - $0.00 $1,1540o Hum St1A0 5115S0 COI vVem er.11 13An o_ $59,00 $070.01) ISAO S070.00 - .Soon 587000 IN% $0,00 $07.00 SXrrc $l tRe Han641 1023 S0 $74.00 3008,47 1023 SBOR47 $0.00 $1109,42 100% Soon $30.BS CNASGN timm N05B U'U'r,A 1000 $0,00 oalACnaring 29116 s0 56,50 $104.09 29,06 $114.09. $0,00 $19409 BUM SIWO $19.41 filet car 0ePv1e 3.YS I.t,-� .$11SA 5491.25 175 $411.25 30.00 $431.15-. 1DO% Soon 543:13 CB I R160th. WW1 Moo 11- Man $1,740AD Moo $1,74040 500D $1,740AU+ ID(M. 51400 S174.00 CD 1 Nonllnpzlr 6Y0 R... 200 $52..5A S060AO 24,09 41.260,00 Sun 57,260A0! IM. SOAP $126.00 COI WI"'n0, 2050 s $90,00 51,646AO 2W58 S1AM40 $0.00 SI,646,410 1005E $DAO 5164.64 CA I IIclwvn5hminr Won tp W.W. $90650 37.00 SWIM MAD MA 90 100% $0.00 $90.65 CA3 Manlhly string Moon t2Plal(11/15/1¢ 10/12JI63 "a Is. $1 OOZO 11,20BOO LAD 3L2001OD SU,DO 57200.00 100% $POD $0.00 CA Duw+A Pon.. $39M smiono ROO 5,112AO $0.00 $012D0 INo WIN) $3L20 CHANGE OkOER N.6 BPild7ng A Urtc$f.WunK 2A58 96:5o $172.77 26511 SM.77 Soon $172,77: 1000 $0.00 417.2B 81411 Y,dge ltxpalr 10.00 I? $11500 12,070,00 ik00 $2,07Q00 S0.00 $2.0"D0 100% $DAB'. MUD SuHv1w 57rt0tA (nn!4a0 7,m 'R S79.00 S61857 7.83 S610.57 WAD S61857 1(" $0,00 S61.06 ^td I NnPlinRn+t'U Rn6lscdl 39,00 Is, $52.50 S2.047.50 39.00 S2,04750 50.00 S2,04250 100% $0.00 $204.75 ,F) 1 R13nI"Q5hunpr Moo (I S21.50 $143.00 Man 530..00 50.0o .$143.00 IMA $U80 $3430 -'me nnrlmme,hl W."k Mg, IAO IS 51,29067 $1,290.67 1.00 $1,290A7 $0.00 A'490A7 100% Soon 5000 ¢0351610h1ysvlogs3ag4' npWl(101 i5/1b 11/9/16) 1,00 m 51,20100 $1,200,01) 1.00 $1,20AO $0.00 $1,200A0 100M, vlDo SOO CA$ Aekiwied nWngstagr, 11110A 1.00 m 5696.00 $695Ao 1.00 $695.00 $0.00 $69SiID 100% S000 $0.00 Cmlll WV(S2,070R25%) LOD m $517,50 (S5L750} 1,00 ($S79§0) $0.00 [$517,50) IW% $D,00 50,00 CHANGE BIDDER Nm 7 CA 1R/k ShuUer n9Dom 0,,Ick Bldg D 9,00 ir4. S20A0 A Ddoo 9.OU JBWAO Moo $1811.00 100% Soon $1000 Addh16au1 Beck r,.,Mg Sidg. A 2(195 sQ, VISO f17$:19 2695 517,5,10 $0.00 $175,18 100% soon $17.52 A0d?0MIal Paint ltepaind A.vT. Malcn 6 Nlin, 20S % $2.10 WAD 26.95 $5(160 $0.00 $S6.60 100% Soon $5,66 CO Rpluo" mnslructtm matcl'tal Rom Bld9A to NW I310 n $525AO S521,00 1.00 S521A0 $0.00 $525.00 100% $0.00 $0.00 CA 5 Refutated awing stage U143 a W W490 IAO u. $693.00 109S.00 IDD $695.00 $0.00 $695.00 I(Wl% Sono $0.00 KnHA[d SPnll4 1.60 50 $79.00 5126.40 1.6D .$I25.40 50.00 $126AO 100% $D.00 $12,64 ITH)R PTA 17171014 MR1,41M PROUT W W, _3 T 5 b T H 9 1 a 13 11 Is mcpwm Of WORK w.fiUmmu— W0RKMwlRrK0— VR., T.WM.'k.d `4 VAIM 11P.M, t.m fMNegYlmlA TINP44w Mul sh—yT. Oly 0.81 $9340 $75.33 wit S75.33 so.na $7533 100% so no $7.53 �;HANGE ORDER N% 0 ening's"Als 9.4j, 0 5.60 $93 on $520.00 10 $'sZoDo $0.00 $520.110 I(W% Soon $52.08 jBq a 17.10 $6D7 2134. 5407 $0.00 $07 t00% soon $0,61 T/M not& 9 Patko, btst-m dmlo 1.130 . U219,15 $2,219.15 1.00 S2,210,15 $0.00 $7J.19,15 OR)% soon $0.0a CHAWA bJU`E9 N.2ctvdftR C m% qlll, SAO OUR Mu"R lk,l, 3t1.118 W WIN ($480,80) slpuv R,pl, 12.110 11600 (s)92no) (sliufl) all V).i.00 (971400) (4714,00) Swat R,,d, 12,00 v $16oa (slizorol I 1 ($192A0) GRANDIOTAIS ---- $IV, I -1 $46.260.54 $0.00 1 S46,269,54,1 9.0o%j salon 77M