HomeMy WebLinkAboutPROJECT INFORMATIONM L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
J n L
SCANNED
Vero Beach, Florida 32960
" i7 1
Phone (772) 569-1257
Fax (772) 569-4041
St. Lucie Count`
mlengineeringinc.com
Project No. 16-175 Report No. 7
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A DATE: December 23, 2016
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Building A — North Building Balcony repairs
Unit 1001
1. The one pt cable at the north east corner has been tensioned and the pocket where the
lock off was placed can be poured.
2. Two additional pt cables along the north slab edge required repair due continued
corrosion of the reinforcing bars behind the cables along the slab.
3. The reinforcing bars have been cleaned and coated with rust inhibitive primer. The cables
have been locked off and spliced.
The first pour at these to cables is approved in order to re-tension'the two.cables and will
allow the lock to be removed and then the final pour once the concrete has achieved a
minimum of 3500 psi
4. Once this pour is completed, the concrete water proofing and the final coating and stucco
can be finished. This will complete the repairs to this balcony.
m
= ysxtrtte„ti '
;.\G•,�\CENT• �.
..'v' °•
"Iwfs OF
CS D
• �(/;
,SS�ORIp:G���o�
�9NAL
P
1
berm 1,� ov, .-To �2—
M L Engineering, Inc. k- `
Consulting Engineers SCHIVNED
2030 37' Avenue
Vero Beach, Florida 32960 BY
Phone (772) 569-1257 St. Lucie County
Fax (772)569-4041
mlengineeringinc.com
PROJECT NAME:
CLIENT:
CONTRACTOR:
INSPECTED BY:
Projeci . 16-133A Report No. 5
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - B9DG.AAMzA 1
5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1606-0042
WORK INSPECTED:
Pre -pour inspection
Bryn Mawr —Bldg. A
Elliott Merrill Community Mgt.
Daniello & Assoc.
Mike Lue
DATE: October 12, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Overcast
6th Floor common walkway slab edge
The 1"oose.con6rete along the. slab edge in front of unit 605 has been chipped and corroded
reinfoiicing•exposed. The corrosion has been chased to clean bars. The bars are in progress of
being cleaned- and coated. The area of edge repair is approximately 3 cubic feet.
Concrete pout; �glscli,eduIed for Friday October 14th
Slab edge from top
OCT 19 2016
M L Engineering, Inc. - Prc,;=_ No. 16-175 Report No. 2
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 371h Avenue Bob Stark Structure -Can.
Vero Phone6(772) 569Florida 72960 Aff Carl Peterson SLC Bldg Dept
Fax (772)569-4041
mlengineeringinc.com FILL L;Up
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT l,Hltl
SLC BUILDING PERMIT NUMBJ
ER: 1608-0114 BY EV
PROJECT NAME: Ocean Harbor South Bldg A DATE: OJT10b1PWHMnti
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Lue
WEATHER:
Overcast slight rain
WORK INSPECTED:
Building A — North Building Balcony repairs
Unit 208
1. There are 3 post tension cables that ae completely corroded and broken in the upper
surface of the balcony slab. The pt anchors at the balcony edge are set back in about 12
inches from the slab edge with no pockets. The cables appear to have -been tensioned
from the other end of the building on the west side.
2. The anchors on the west elevation are to be located and the cables replaced. The slab
should be shored when excavating the balcony slab to place the new section of cable.
Unit 508
1. The reinforcing and post tension splice coupler have been coated and taped and are
approved for concrete placement at the repair areas.
2. Anchors for the shutter track and guard rail clip should be 1 maximum in length to avoid
the possibility of damaging pt cables or touching the column reinforcing.
Unit 808
1. There is a large ceiling spall at the underside of the 908 slab above that requires repair
that was not on our original list. The two 2 sq ft surface spalls on the list do not require
repairs. The edge crack on the southern edge needs as well as the column at the north side
needs excavation and repair.
Unit 1001
1. The spall at the door threshold has been excavated and found to be loose topping. The
concretemeeds to be chipped down further to allow a minimum repair mortar thickness of
about 3/8" for adequate bonding.
2. Concrete has been chipped out at the edge spalls on the north and east balcony edges.
There are 2 pt anchors on the east and 1 pt anchor on the north balcony edge. There is
some corrosion of the pt anchors and bursting bars. The existing reinforcing bars
perpendicular to the slab edges were too long and are corroded.
3. Continue cleaning the concrete from the top of the bursting bars just enough to verify if
the extent of corrosion and without affecting the live anchors.
M L Engineering, Inc. Prc - : No. 16-175 Report No. 2
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37's Avenue
Bob Stark Structure -Con.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772)569-4041
mlengineeringinc.com
4. If there is less than 20% loss of section, the bars and anchors can remain and repaired,
if not, the cables are to be locked off, de -stressed and replaced per the specs.
6SIn1111112881',
�\C ElVS;�;�1
A
A\
RI�P�\�
[E0IEUVca
OCT 2 0 AECD
Pic 2
Unit 208
Anchors of the three cables at the
balcony edge
Note how that these anchors are set
back in from the slab edge, and
cables may have been pulled from
the other end.
2
M L Engineering, Inc.
Consulting Engineers
2030 371° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Proj�.t No. 16-175 Report No. 2
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 3
Unit 508
Bars coated and ready for concrete
repair mortar
Pic 5
Unit 1001
East balcony edge
Two corroded pt anchors and
bursting bars.
Note the ends of the cables are too
long and not encapsulated back.
F.
M L Engineering, Inc.
Consulting Engineers n1
203037' Avenue jGANNED
Vero Beach, Florida 32960 BY
Phone (772) 569-1257
Fax (772)569-4041 St. Lucie County
041
mlengineeringinc.com
Project No. 16-133A Report No. 4
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. A
5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER 1606-0042
PROJECT NAME: Bryn Mawr—Bldg.A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED:
In progress concrete repairs
DATE: Sept 1, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
Surface Spalling @ Balconies
Units 705 & 806
All loose concrete has been chipped and corroded reinforcing exposed. The corrosion has been
chased to clean bars. The bars have been power cleaned and coated. Balconies are ready for
concrete pour.
Pic 1 Unit 705 surface spall @ balcony
SEP - 8 RECD
1
M L Engincering, Inc.
Consulting Engineers
2030 37ih Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringine.com
Project No. 16-133A Report No. 4
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Surface spall at unit 504 has been chipped of all loose concrete and corroded reinforcing
exposed. The corrosion appears to continue under the door track. The contractor shall chip under
the track as far as possible without damaging the door or interior tile. Once the corrosion stops
clean and coat as per specifications.
Column spalling
Unit 201 column is on the final phase of repair, which is the northeast corner. The corrosion has
been chased up the column and all bars have been cleaned and coated. The other 2 sides have
been poured and concrete cured. Column is ready for concrete pour.
M L Engineering, Inc.
Proji
, ;10. 16-133A
Report No. 3
Consulting Engineers ,
SCANNED
cc: Gene Ross
Elliott Merrill
2030 37is Avedue
BY
Chris Arias
Daniello Const.
Vero Beach, Florida 32960
Carl Peterson
SLC Bldg Dept
Phone (772) 569-1257
St. Lucie Coun4 (
File
Fax (772)569-4041
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. A
5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBE � . 6'-0092-
PROJECT NAME: Bryn Mawr —Bldg. A DATE: Aug 17, 2016
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
In progress concrete balcony repairs
Column Spalling
Unit 201 (Northwest & Northeast columns) - The corrosion has been chased to the underside on
the balcony slab and appears to stop below the second floor slab. The reinforcing has some
surface corrosion and will require power tool cleaning and coating with a corrosion inhibitor.
Unit 601 (Northwest column) — Hurricane shutter and bottom track has been temporally
removed. The concrete has been chipped at the top of slab and corrosion in reinforcing has been
chased to clean bars. The reinforcing bars shall be cleaned and coated as per specifications.
Unit 201 NW column @ underside of slab
M L Engineering, Inc. - Proje�._1o. 16-133A Report No. 3
Consulting Engineers + cc: Gene Ross Elliott Merrill
2030 37' AveNne Chris Arias Daniello Const.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772)569-4041
mlengineeringinc.com
Surface Soalling
JUnit 901— Additional area has been chipped of loose concrete and corrosion has been chased
until clean reinforcing was found. This required removing the hurricane shutters and bottom
track at the west facing sliding glass door. The reinforcing bars have been cleaned and coated as
per design documents and area is ready for concrete pour.
Unit 901 Surface spall
Concrete pour is scheduled for tomorrow, Thursday August 18, 2016 at 9am
°°o°u 1.11 n 881h
E e
:• v���5 �0 • • ' c1
Vj1.L. `•
O
SSI OVO °•
� r
M L Engineering, Inc.
Consulting Engineers
Vero Bea h,'Florida 32960 DUANNED
Phone (772) 569-1257 BY
Faz (772) 569-4041 U(;�Q County
mlengineeringinc.com 1- ly It
r I
11
Project No. 16-133A Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. A
5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: i 6y,0b=404*2'
PROJECTNAME: Bryn Mawr —Bldg.A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED:
DATE: Aug 11, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
In progress concrete balcony & walkway repairs
Units 201 & 601 column spalling @ balconies Temporary 3weather barrier walls are in lace but further demjth�
s re y
corroded reinforcing bars have been exposed to the floor level and corrosion continues down into
the slab. The contractor shall continue to chase the corrosion until clean reinforcing is found.
This may require demolition to the column at the unit below.
Pic 1 Unit 201 NE comer column (south view)
Pic 2 Unit 201 NW comer column (south view)
The northwest column shall be done in 3 phases. The first phase is to chase the corrosion, clean,
coat and repair the south comer of the column. Phase II would be to demolition and repair the
northeast corner and the final phase to repair the northwest comer.
[ECIEDVE
AUG /-4' UD
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringine.com
Project No. 16-133A Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Phase III Phase II
N)
Unit 601 will require removing and re -installing the bottom track of the hurricane shutters and
door buck to continue demolition. Corrosion shall be chased until clean bars are found. This may
require demolition to the column at the unit below.
Pic 5 Unit 601 NW column (north view)
M L Engineering, Inc. Project No.
Consulting Engineers
2030 371h Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.com
Units 201 & 901 surface sDalls
All loose concrete has been chipped and corroded reinforcing exposed.
minor and the reinforcing will require power tool cleaning and coating.
Pic 6 Unit 201 surface spall @ north balcony
16-133A Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
The corrosion found was
Unit 301 slab edge repair
All loose concrete has been chipped from the east edge of the balcony. The transverse bars and
perimeter bars have surface corrosion. The corrosion has been chased on the perimeter bars to
clean reinforcing. The transverse bar corrosion shall be chased, which will require temporary
removing the top track of the hurricane shutters at the unit below.
-z
M L Engineering, Inc.
Consulting Engineers
2030 371h Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
8GANNED
BY
St. Lucie Countv
Project No. 16-133A Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. A
5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1606-0042
PROJECT NAME: Bryn Mawr —Bldg. A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED:
In progress concrete balcony repairs
Units 201 & 601
201 NW & NE comer columns
DATE: Aug 2, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
�,riECEIVE
AUG 1 5 RX0
601 NW column
Excavation of the concrete columns are in progress. The two vertical bars closest to the door
jambs are corroded and require repairs. Further demolition is required to expose and clean and
prepare the vertical bars and ties. Removal of the door panels and doorjambs are required. The
contractor will try to leave the door tracks in place at all possible. If the door tracks have to be
removed or is damaged during the repairs, the door assemblies would require replacement.
Temporary weather walls will be required as well as removal of the interior gypsum behind the
repair areas. Re -inspection required after all reinforcing have cleaned and coated.
Pic 1 Unit 201 NW corner column (north view)
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
phone (772) 569-1257
Fax (772)569-4041
Pic 3 Unit 201 NE Corner column (north view)
Pic 4 Unit 601 NW column (north view)
Project No. 16-133A Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
It appears that the water is being trapped between sliding glass doors and the shutter tracks, and
this may be contributing to moisture migration to the column at the floor wall intersection.
Contractor to provide estimate for change order for additional work for approval.