Loading...
HomeMy WebLinkAboutAPPLICATION AND CERTIFICATION FOR PAYMENT6702 APPLICATION AND CERTIFICATION FOR PAYMENT PAGE TODWNERI Princess Condominium Unit 203 APPLICATION NO: d Distribution to: 9650 South Ocean Dr. RETAINAGE •J Jensen Beach, FL 34957 = OWNER FROM CONTRACTOR: 08/17/16 ENGINEER 08/17/16 =CONTRACTOR Damello &Associates, Inc. 2081SE Ocean Dr. Suite IA NOT LUMP SUM BID: The amount is based 2709 N. Australian Ave., Ste 9 Stuart, FL 34996 upon estimated quantlties listed in Ekhiblt A Quantity Schedule. The amount paid West Palm Beach, FI 33407 will be based upon actual quan8ties/work performed at rates In Hxblbit A. CONTRACT: Concrete Restoration Repairs CONTRACT DATE: CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that totile best ofthe Contractor's knowledge, Application is made for payment; as shown below, in connection with the Contract Information and belief the Work covered by this Application for Payment has been S�`pNN Continuation Sheet Sheet G703,1sattached completed In accordance with the Contract Docu th II I. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1 t 2) 4. TOTAL GOMPLETED & STORED TO DATE (Column 12 on G703) S. RETAINAGE: a. 10 %of Completed Work Jr. —. %of Stored Material Total Reminage (Lines So s Sir or Total in Column 15 of0703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 Less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. OALANGE TO FINISH, INCLUDING RETAINAI (Linn 3less Line 6) Applicatlon Date: PERIOD TO: VIA ENGINEER! CSM Engineering menrs, ata amounts have been paid by C� the Cpntractar for Work for which previous Certificates for Payment ware issued and { B Payments received from the Owner, and that current payment shown herein is now due. Sl. Lu $. 5,187.DD cre 06 unfv $; ,(1,033.35) CONTRACTOR: $ 4,153.65 - $, 4,153.65/ Ey Dam: OB/17/16 State of: ,e yet `. .riif:+dlP.f,OiRs: `�S4F!A Suhseribed andaWorn to before me this .I s�� r I : �•o Ida County of: Palm Beach )w,_ -? 1a? MY ; %? •.ISS. )\ + F L"73 _ Notary Public; MY Commission expires: a. 4,153.65 In accordance With the Contract Documents, hosed on on -site observations and the data comprising the application, the Engineee certifies to the Owner that to the best of the Engineer's knowledge, Information and belief the Work has progressed as indicated, $ 3,940.05 the quality of the Work is in accordancd with the Contract Documents, and the Contractor $. 2,13.60 Is entitled to payment of the AMOUNT CERTIFIED. $ 0.00 AMOUNT CERTIFIED........... $ CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved In ptevinils months by Owner $300.17 Total approved this Month $1,333.52 TOTALS $300.11 $1.333.52 NET CHANGES by Change Order ($1,033,35) (Attach Pxplonatfon Ifamount certified dtTers from the amount applied, Iniffal ngffgures on this Applieatfan and on the Continuation Sheet that are changed to conforfra wffh the amount certified.) ENGINEER: By: This CerUUcate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. N I 4 E E 7 2 9 l0 11 la 13 14 1s 16 Si 19 19 20 21 22 23 24 2s 26 2i 28 29 30 31 32 33 34 35 6 14 CONTINVATiONSBEEr6703 PAGE 1 Document G702 APPLICATIONgND CERTIFICATE FOR PAYMENT, containing DF WAGESAPPLICATION NO: 2 ContYacrofs signed Certlflratlon Is attached. APPLICATION DATE: 8/17/2016 Use Column Inv PERIOD TO: 8/17/2016 2 DESCRIPTION OFWORK 3 4 S 6 SCHEDULED VALUE 7 8. wank COMPLETED 9 30 Value Cam IS leted PROJECT 12 Total CoinPleted and Storage NO: 13 % Prineess Condominium 14 anuxcA TO FINISe IS ALTAIxAee (IFVAAUBLE PROM PAAVIOU. APPLICATION THIS PERIOD Total room Pam"ous WIS PERIOD APPLICATION PATB) QY Urd I Frk¢ 3.5 7,8 7.4 8•5 10s11 6.12 Mub(lizatlon Demobilization 1 L9 $300.00 $300.00 1.00 1.00 $300.00 $0.00 $300.00 100% $0,q0 $0.00 Permitting at Cost 1 Ts $390.00 $300.00 1,00 1.00 $300,00 $0.00 $300.00 100% $0.00 Concrete Beam Repair 1 OF $300.17 $300.17 1.00 1.00 $300.17 $0.00 $300.17 100% $0.00 $0.00 Concrete Column Repair m' $0.00 0.00 $9.00 $0.00 $0.00 $0,00 : a Cdncrete Deck Slab Repair (Full 0epth) SF $0.00 0.00 $0.00 $0.00 $0.00 $0,00 'I Concrem Deck Slab Repair (overhead) 21 SF $91.00 $0,00 $1,911.00 12,28 0.00 $0.00 $0.00 $0.00 $0.00 w.uo Concrete Deck Slab Repair (Up to 50%Depth) 12.28 $1,117.48 $0.00 $1,117.48 58% $793.52 $0.00 Concrete Wall Repair SF $0.00 0.00 $0.00 $0.00 $0,00 0.00 $0.00 Concrete Stair Repair CF $0.00 0.00 $0.00 $0.00 $0,00 $0.00 $0.00 Concrete Deck Slab Repair(4" Thick Parking Roof) CF SF $0.00 $0.00 0.00 $0,00 $0.00 $0,00 $0.00 $0.00 Epoxy Injection overhead (LF) LF 0.00 $0.00 $0.00 $0,00 $O,QO $0.00 Epoxy injection Vertical (LF) LF $0.00 0.00 $0,00 $0.00 $0,00 $0.00 $0.00 Hhilzontal cracks -gravity feed (LP) LF $0.00 0.00 $0,00 $0.00 $0.00 $0,00 $0.00 Gelvashield XP embedded anodes 12 EA $43.00 $0.00 $540.00 0.00 $0,00 $0.00 $0,00 30,90 $0.00 Migrating Corrosion Inhibitor (Sika Ferrogard 903) SF $0.00 0.00 $0,00 $0.00 $0.00 0.00% $540.00 $0.00 Waterproofing (BASF SONOSHIRLD SONOGUARD). SF $0.00 0.00 $0,00 $0.00 $0.00 $9.00 $0.00 Painting. 0.00 $0.00 $0.00 $0,00 $0.00 $0.00 Reslapo open balcony SF $0.00 0.00 $0,00 $6.60" _ $0.00 $0.00 $0.00 Stucco repairs SF $0.00 0.00 $0.00 $0.00 $0,00 $OQO , $0.00 Preparatlon &testing of concrete cylinders. cylinders SF AA $0.00 000 . $q00 $000 , $0.00 $0,00 $0.00 Weather Wall Installation & Removal 18 LF $52.00 $0.00 $936.00 18,00 0.00 18.00 $0,00 $936.00 $0.00 $0.00 $0.00 $936,00 - loll% '' $0,110 $0.00 Remove& dispose of Glass Doors LF $0.00 $O,qO $93.60 93.60 Remove& dispose of Glass Window Systems LF $0.00 0.00 $0,00 $0.00 $0.00 $0,00 Remove &dispose of Rail &Screen 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Remove& dispose of Accordion Hurricane Shutters LF $0.00 0.00 $0.00 $0.00 $0,00 X00 'I Remove& dispose of Electrfe RR11-.Up Hurrincane Shutters LF LF $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 =`I Remove&dispose of Manual Rpll=Up Hurrincane Shutters LF $0.00 0.00 $0,00 $0.00 $0.00 $0.00 $0.001 Remove; store, & reinstall Glass Doors 15 LF $80,00 $1,200.00 15,00 0.00 15.00 $0,00 $1120400 $0.00 $0.00 $0.00 $1,200,00 100% $0,00 $0,00 $0.00 $120.00 Remove, store, & reinstall Class WlpdoW Systems LF $0.00 0.00 $0100 $0.00 $0.00 Remove, store, &reinstall Rail &Screen LF $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Remove, store,& reinstall Accordion Hurrincane Shutters LF $0.00 0.00 $0,00 $0.00 $0.00 Remove, store, & reinstall Electric Roll -Up Hurrincane Shutters LF $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Remove, store, & reinstall Manual Roll -,Up Hurrincane Shutters LF $0.00 $0.00 $0.00 $0.00 $0.00 Tile Removal 0.00 $0.00 $0.00 $0,00 $0.00 $0.00 Install New Tile SF $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CHANGE ORDER No. 1-CNEDITS SF $0.00 0.00 $0.00 $0.00 $0.00 $O, pO $0.00 Concrete Deck Slab Repair (Overhead) g SF $91,00 ($793.52) 0.00 $0.00 $0.00 $0.00 $9.00 $0.00 Galvashleld XP embedded anodes 12 EA $45.00 ($540.00) 0.00% ($793.52) ($540.00) GRAND TOTAIS $4,153.65 $4,153.65 $0.00 $4,153.65 300% $p.00 $213.60