Loading...
HomeMy WebLinkAboutPROPOSAL-CONTRACTDate: AM 06,2016 kPf No: 060116 Daniello & Associates, Inc. And Daniello, Salazar and Sons Inc. SCANNED BY St. Lucie Countv Concrete Restoration Specialists) 2708 N. Australian Ave. Ste 9, West Palm Beach, A 33407 Office:, $61-835-4788 Toll Free: 1-888-370.4333 Fax: 561-833-3573 Email:.info@concreterepairing.aet State Certified General Contractor Lies: CGCO20617W 510734 & 1518181 PROPOSAL/CONTRACT VU]WTO BE PSFORNEDAT N3mt3: Same Stre t .aty. SPM Data ETrew CSMErtcjmeTM . Panne: 772-349-7261 772 = 4601 We are pleased to submit our proposal for the following: Concrete restoration repairs in accordance with ENGINEER'S and/or INTERNATIONAL CONCRETE REPAIRINSTITUTE specifications and procedures. - This proposal provides an estimate based on visual inspections. Actual quantities may increase or decrease and are based on .the following flied unit Prices and estimated quantities as follows: See Engineer's bid form Painting Of 'repaired areas if required is not included in the estimated cost unless itemized by a unit price which will be quoted if requested. WHENEVER POSSIBLE WORK W11 L BE ACCOMPLISHED FROM OUTSIDE VIA SCAFFOLDING AND/OR LADDERS. WHEN ACCESS MUSTBE THROUGH THE APARTMENT, A CLEAN RUNNER WILL BE PLACED FROM THE FRONT ENTRANCE TO THE WORK AREA. All material is guaranteed to be as specified. Work will be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike, manner. Owner to provide electric and water at no cost to contractor. Contractor will remove debris and leave premises broom clean. However, dust is an airborne nuisance and the contractor -can not be held liable for dust entry into units due to open windows by residence, broken or damaged windows, doors and other:areas due to wind forces and elements beyond the contractor's control. A 5 YEAR WARRANTY IS PROVIDED FOR CONCRETE REPAIRS COMPLETED UNDER THIS CONTRACT. Page 1 of3 Pages PROPOSAL/CONTRACT Continued Billing of actual repairs will be at the unit prices specified herein or, if not specified, equipment rental and material at cost plus 20%, labor at $56.90 per man per hour, which includes: small compressors, electric hammers, grinders, drills, vacuums, and other small tools as needed. However, despite all of our efforts in recent months to control costs, we are continuing to see rising prices in raw material, freight, insurance, utilities and environmental expenditures With that said unit prices might increase due to increase in material cost. Permit fees (if permit is required), Mobilization, Debris removal and General Conditions to be pay with first draw. Permit not usually required for maintenance type work Payments to be made as follows: Invoices will be submitted.twiee monthly based on work completed and approved by the Engineer. Payment to be made within 7 days of engineer approval. The pay request is subject to 10 percent retention (except on mobilization, permit fees and general conditions) on each request. The engineer shall review the application and approve it within 7 days. If the engineer finds an objection he shall notify the contractor within 5 days. If no objections by the engineer the approved request is sent to the owner for payment The owner shall pay the amount approved by the engineer within 7 days. The Engineer or Management shall prepare upon completion of a "stack" or specific area a punch list of any deficiencies in that stack or area. The contractor shall complete the punch list items before the swing stage and or scaffolding, is moved The Engineer or Management personnel shall make a final inspection of the area and approve as completed. The pro rata retention attributed to that completed area will be paid to the contractor. Upon substantial completion (all major work completed and approved) all amounts invoiced under this contract including retention, shall be paid to the contractor less an amount for "punch list" items to be done. The amount shall be determined by the engineer and/or by agreement of the contractor and owner. Appropriate release of liens will be issued with each invoice. Payment not made to the contract will bear I % % interest per month. Prior to final payment the contractor shall deliver final release of liens, contractors final affidavit, contractors warranty for the repairs will be issued upon completion of funds due to contractor. IT IS MANAGEMENT'S AND/OR OWNER'S RESPONSIBILITY TO MOVE FURNITURE AND VEHICLES AND OTHER PERSONAL PROPERTY OUT OF THE VICINITY OF THE WORK AREA. ALTHOUGH UTMOST CARE WELL BE TAKEN BY USING SMALL CHIPPING HAMMERS AS APPROVED BY ENGINEERS, WE CANNOT BE RESPONSIBLE FOR INTERIOR APARTMENT DAMAGE CAUSED BY VIBRATION SUCH AS CRACKSPICTURES FALLING OFF WALLS, ITEM FALLING FROM SHELVES, ETC. , THE STATE OF FLORIDA AS OF OCTOBER 1,1996 REQUIRES AN0210E OF COMMENCEMENT BE FILED AND RECORDED BY THE OWNER PRIOR TO ISSUING OF ANY PERMIT IN EXCESS OF $2,500.00. ALL UTILITY LINES & PIPES SHALL BE CLEARLY MARKED By THE OWNER OF ITS PRESENT. DANIELL_ O CONSTRUCTION CAN NOT BE RESPONSIBLE FOR CONDUITS/ OR PIPES BARED IN CONCRETE UNLESS SPECIFIC IDENTIFIED OR MARKED. THE CONTRACTOR CANNOT BE RESPONSIBLE FOR DAMAGE TO UNMARKED LINES &'PIPES. UNLESS OTHERWISE PROVIDED FOR, THE CONTRACTOR WELL NOT BE HELD RESPONSIBLE FOR UNAVOIDABLE DAMAGES, INCLUDING BUT NOT LIMITED TO EXTERIOR WALL AREAS, PAVEMENT OR LANDSCAPING. Any alteration or deviation from above specifications involving extra costs will he executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work. Hurricane preparation work will be done under time and material basis. Contractor to carry insurance as required by the State of Florida and the municipality having jurisdiction. Page 2 of 3 Pages PROPOSAL/CONTRACT Continued Any disputes resulting from this agreement will be settled by binding arbitration under the rules of the BETTER BUSINESS BUREAU or other arbitration remedies as the parties may decide. If legal action is required in connection with the agreement the prevailing party shall be entitled to recover its reasonable attorney fees. Respectfully submitted, Louis J. Da_niello President We may withdraw this proposal if not accepted within 3o days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. PaYu#nt will be made as outlined above. lWszroposal becomes a contract when fitly ezecuted by both parties. Date: IG' Signature: 'j''!�+-L— Us PrintName: f'llr/0/�p 6E—/9CjC Enclosed: copies of licenses, insurance, warranty form and references upon request. DA2016princess Page 3 of 3 Pages Princess C6ndo Unit 203 Bid Spreadsheet -21-April r2016 :M21 'MRIMLIM .1 Mobilization I.S..... $300.00i $aw 00 2 Dem'obilln' t' ion $31)0.00. . - I .. $300* 3 Permitting at Cost 4 Ccir" eam Repair CF So 5 CDncratp.Column. Repajr. CF $0 Concreta Deck Slab Repair (Full D'el?N . $0 ii Concrete Deck Slab ReRaIr (Overhead) 21; SF $91.00 $1,9il 7 .. Concrete eta Deck Slab (Up to 50%,Depth). - SF 8 Concrete Wall R Repair CF $0 il 6' ncreteiia hRepair. $0 10 - Concrete Deck Slab Repair (4" Thick Parkin Roof$F . . . . . . . . . . . ' So I Epoxy. inject 10 n o ved i ea d (LF) A; EPcxy.Lnje"l 9 Vertical (LF)I LF 1 $0, 13 Horizontal cracks - qmvIN feed (LIF), i4 . Galvashleld XPembeded12 . ­ . � X. d . . _. . anodes. .._.. ; EA $45.00 $S40 15 Migrating Corrosion inhibitor (S!ka Ferrogarcl 903 . . . SF $0 W aterp rqofl.ng (BASKSONOSHIELD SONOGUARD SF $o 1 Paintin g. . g. SF SO: .18. eAcRe open balcon SF $0 I S St� tucco repairs 'of S� $o' o k .. Pr' relaration&testin con'c'rete- . . .0 .. ..- Winders $0 21 Weather wall Installation & Removal LF .00, $ 936' i2 Remove 84�pose of Glass Doors LF $0. 23 iierp-qve!&.dispos_e of Glass Window Systems LF s6, 24 Remove & dispose of Rail & Screen I LF $0* 25!Remove I &dispose of Hurricane Shutters ­. * . . I ­'.. .. t . . . . LF $0, 26 Remoyp.&dIs dispose Electric Roll -Up Hurrincane Shutters P? 1 1! . ic: . I ­ ... . I LF $0 27 Remove &dispose of Manual Roll -Up Hurrincane Shutt ers - .1 . I LF $6. 28 Rem- ; m�estqT,& reinstall Glass Doors 151 LF $go .66; . - 1. . $1,20.0 29 Remove, store, & reinstall Glass Window vr�y4em.� . .. UP. $0. SO ­ I Remove,.. .... stqre, & reinstall Rail & Screen . LF $0 31 Remove, store, & reinstall Accordion Hurrincane Shutters LF - $_: 0 - RemoRemove, store,& reinstall Electric Roll -Up Huxrincane Shutters LF $o: . Fern. ..9va, 5tomg�relnslatl Manual Roll -Up Hurrincare Shutters LF $0 34 Tile Removal SF $0 35 InstaliNevtTile So- 36 TOTAL LUMP SUM CONTRACT PRICE