Project No. 16-175 Report No. 1
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A DATE: October 3, 2016
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Luc
WEATHER:
Overcast slight rain
WORK INSPECTED:
Building A — North Building
Balcony repairs — Unit 508
Demolition of the concrete was observed at several locations which included the following:
1. Surface repair along the exterior at the south sliding glass door. This appeared to be
loose decorative topping on a previously repaired area and no structural damage to the
slab.
2. Slab edge of the south facing balcony. There was some corrosion of the reinforcing and
no post tension cables are affected, repair as per the documents
3. Full depth repair in the middle of the slab on the south side. This was caused by a
corroded post tension splice coupler that was not encapsulated or taped. The coupler
should be mechanically cleaned, coated with a corrosion inhibitor and wrapped with a
PVC tape. Do not excavate any further behind the bearing end of the anchor.
4. Column repair at the north end. There is corrosion of the reinforcing at the bottom of the
column which extends down into the columns. Further excavation into the slab is
required to repair the column as per the documents.
Re-inspedt prior to concrete placement.
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mlengineeringinc.com
Project No. 16-175 Report No. 1
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
2
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041 C
mlengineeringinc.com JVHIV _ NED
Project No. 16-175 Report No. 2
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTWCOl"' S CONCRETE REPAIRS
4250 NORTH HIGHWAY AlA, T. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Building A — North Building Balcony repairs
DATE: October 14, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Overcast slight rain
Unit 208
1. There are 3 post tension cables that Be completely corroded and broken in the upper
surface of the balcony slab. The pt anchors at the balcony edge are set back in about 12
inches from the slab edge with no pockets. The cables appear to have been tensioned
from the other end of the building on the west side.
2. The anchors on the west elevation are to be located and the cables replaced. The slab
should be shored when excavating the balcony slab to place the new section of cable.
Unit 508
1. The reinforcing and post tension splice coupler have been coated and taped and are
approved for concrete placement at the repair areas.
2. Anchors for the shutter track and guard rail clip should be 1 maximum in length to avoid
the possibility of damaging pt cables or touching the column reinforcing.
Unit 808
1. There is a large ceiling spall at the underside of the 908 slab above that requires repair
that was not on our original list. The two 2 sq ft surface spalls on the list do not require
repairs. The edge crack on the southern edge needs as well as the column at the north side
needs excavation and repair.
Unit 1001
1. The spall at the door threshold has been excavated and found to be loose topping. The
concrete needs to be chipped down further to allow a minimum repair mortar thickness of
about 3/8" for adequate bonding.
2. Concrete has been chipped out at the edge spalls on the north and east balcony edges.
There are 2 pt anchors on the east and 1 pt anchor on the north balcony edge. There is
some corrosion of the pt anchors and bursting bars. The existing reinforcing bars
perpendicular to the slab edges were too long and are corroded.
3. Continue cleaning the concrete from the top of the bursting bars just enough to verify if
the extent of corrosion and without affecting the live anchors.
M L Engineering, Inc. Project No. 16-175 Report No. 2
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 37ih Avenue Bob Stark Structure -Con.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 File
Fax (772)569-4041
mlengineeringinc.com
4. If there is less than 20% loss of section, the bars and anchors can remain and repaired,
if not, the cables are to be locked off, de -stressed and replaced per the specs.
Pic 2
Unit 208
Anchors of the three cables at the
balcony edge
Note how that these anchors are set
back in from the slab edge, and
cables may have been pulled from
the other end.
2
ti
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569AO41
mlengineeringino.com
Project No. 16-175 Report No. 2
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 3
Unit 508
Bars coated and ready for concrete
repair mortar
Pic 5
Unit 1001
East balcony edge
Two corroded pt anchors and
bursting bars.
Note the ends of the cables are too
long and not encapsulated back.
r 1 ,
M L Engineering, Inc.
Consulting Engineers
203037' Avenue SCANNED
Vero Beach, Florida 32960 Phone (772) 569-1257 BY
Fax (772) 41 St. Lucie County
mlengineeringinc.cginc.com
Project No. 16-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Cart Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH IHG14WAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Building A — North Building Balcony repairs
DATE: October 26, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Overcast slight rain
Unit 1001
1. The spall at the door threshold has been repaired.
2. Concrete has been chipped out at the edge spalls on the north and east balcony edges.
The reinforcing and pt anchors have been cut back, cleaned and coated with corrosion
inhibitor on the east edge. Remove the excess paint from the anchor insert to allow the
greased end caps to be placed.
3. The anchor and reinforcing is slightly high in the slab but they cannot be moved deeper in
to the slab unless other unaffected bars are removed. Clean the reinforcing bars and
anchors and repair the cable end and concrete.
4. There is an area of approximately 9 sq feet of ceiling and edge spall at the northeast
corner. This may require locking off at least one cable at the north edge. Contractor to
verify if there are other cables along the adjacent east prior to chipping out the concrete.
Unit 1006
5. Check for additional surface spall at balcony edge.
l
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.com
Project No. 16-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic I Unit 1001
East edge repair
Pic 2
Unit 1001
North edge repair
Anchor and bursting bar is close
to surface
2
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc. com
Project No. 16-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Cart Peterson SLC Bldg Dept
File
a
M L Engineering, Inc.
Consulting Engineers
2030 371° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringino.com
SCANNED
BY
St Lucie County
Project No. 16-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bab Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Building A —North Building Balcony repairs
DATE: November 11, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Sunny
Unit 808
1. The ceiling spalls have been excavated and all corroded reinforcing bars exposed. The
corrosion has been chased and all bars have been cleaned, primed and ready for pour. The
total area of ceiling repair is 19 square feet.
2. The edge crack at the southern edge needs excavation and repair.
Unit 1001
1. The northern slab edge has been excavated and one pt cable has been locked off. The
existing reinforcing bars have been cleaned, primed and ready for pour. The total area is
5 linear feet.
2. The northeast slab edge comer is in progress. One pt cable was discovered and will
require locking off prior to further excavating.
Unit 1101
1. The northeast corner has been excavated and one pt cable locked off. The existing
reinforcing bars have been cleaned and primed. The end of one bar running in the north
to south direction will require cutting to provide an edge clearance of 1 '/2". The total area
of repair is 4 linear feet of edge and 2 square feet of full depth.
All splice couplers shall be encapsulated in PVC or taped to prevent corrosion.
1
1
M L Engineering, Inc.
Consulting Engineers
203037' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringine.com
Project No.16-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
`A
1.
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone(772) 569-1257
Fax (772) 5694041
mlengineeringine.com
Project No. 16-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
M L Engineering, Inc.
Consulting Engineers
2030 371h Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
CM
Fax (772)569-4041
I ED
mlengineeringinc.com
B
St Curio n__
Project No. 16-175 Report No. 5
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMYV@ft CONCRETE REPAIRS
4250 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Building A — North Building Balcony repairs
DATE: November 22, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Sunny
Unit 208
1. The 3 post tension cables have been spliced and replaced from inside the unit east to the
balcony edge. The new anchors were placed all the way out to the edge so they can be
stressed. Provide 2 #4 bursting bars behind the anchors at the slab edge. Bars need to be
epoxy anchored in the middle of the slab. Since the slab is only about 4 to 5 inches thick
the bars should be offset and should not be aligned vertically.
2. There were existing splices in the same 3 cables which had to be excavated to so that the
new cables can be tensioned.
3. Tape all exposed post tension cables and connections.
Unit 1001
1. Concrete repair needed at NE corner of balcony. There is one pt cable that had to be
locked off and will require to be spliced and re -tensioned.
2. The repair to the cable at the north edge has been completed. Cable spliced, re -tensioned
and encapsulated, ready for concrete repair mortar.
Unit 1101/1001
1. The 2 cables at NE corner of the 1101 floor slab (1001 ceiling) have been repaired, re -
tensioned and first concrete pour completed. The second pour is now ready.
All splice couplers shall be encapsulated in PVC or taped to prevent corrosion.
_
1
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569AO41
mlengineeringinc.com
Project No. 16-175 Report No. 5
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Cart Peterson SLC Bldg Dept
File
2
M L Engineering, Inc. SCProject No. 16-175 Report No. 6
Consulting Engineers cc: Gene Ross Elliott Merrill
2030 3r Avenue BY Bob Stark Structure -Con.
Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 St. Lucie Count, File
Fax (772) 569AO41
ralengineeringinc.com
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY ALA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A DATE: December 5, 2016
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Building A — North Building Balcony repairs
Unit 208
1. The 3 post tension cables have been spliced and replaced from inside the unit east to the
balcony edge. The new anchors were placed all the way out to the edge so they can be
stressed. Concrete around the anchors have been poured and cables stressed.
2. The three splice couplers have been taped.
The cable ends need to be cut shorter with a torch so that the greased end caps can be placed and
properly grouted.
The concrete can be poured around the splice couplers at the door sill. All anchors for the re-
installation of the door track shall be stainless steel anchors in holes sealed with a polyurethane
sealant with a maximum embedment of 1" so as to avoid damaging pt cables
Unit 1001
1. The one pt cable has been locked off and spliced.
2. Provide a 90 degree corner lap bar with 12 inch legs each way to tie the edge bars.
Raise the bursting bars and corner bar for proper concrete coverage.
Pour concrete and re -tension once the concrete has achieved a minimum of 3500 psi
r
M ,~44
M L Engineering, Inc.
Consulting Engineers
2030 371 Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 16-175 Report No. 6
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 3
Unit 1001
Pt cable splice and ready for
concrete pour before re -stressing
cable
Note the bottom bars at the corner
and under the anchor needs to be
raised up to provide the proper
concrete coverage
Provide a 90 degree #4 corner lap
bar.
2
M L Engineering, Inc.
Consulting Engineers
2030 3r Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringine.mm
SLAMMED
BY
St. Lurie Cnnr
Project No. 16-175 Report No. 7
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1608-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Luc
WORK INSPECTED:
Building A — North Building Balcony repairs
DATE: December 23, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Sunny
Unit 1001
1. The one pt cable at the north east corner has been tensioned and the pocket where the
lock off was placed can be poured.
2. Two additional pt cables along the north slab edge required repair due continued
corrosion of the reinforcing bars behind the cables along the slab.
3. The reinforcing bars have been cleaned and coated with rust inhibitive primer. The cables
have been locked off and spliced.
The first pour at these to cables is approved in order to re -tension the two cables and will
allow the lock to be removed and then the final pour once the concrete has achieved a
minimum of 3500 psi
4. Once this pour is completed, the concrete water proofing and the final coating and stucco
can be finished. This will complete the repairs to this balcony.
1
M L Engineering, Inc. Project No. 16-175 Repor ; ajG
Consulting Engineers cc: Gene Ross Elliott Alt
203037' Avenue SCANNED Bob Stark Structure -Con.
Vero Beach, Florida 32960 pv Carl Peterson SLC Bldg Dept
Phone (772) 569-1257 v T File
Fax (772) 569-4041 St. Lucie County
mlengineeringinc.com ,
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 16 8-0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
WORK INSPECTED:
Building A —North Building Balcony repairs
Unit-208
DATE: December 5, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Sunny
1: The 3 post tension cables have been spliced and replaced from inside the unit east to the
balcoriy edge. The new anchors were placed all the way out to the edge so they can be
stressed. *Concrete around the anchors have been poured and cables stressed.
2. The'three splice couplers have been taped.
The cable ends need to be cut shorter with a torch so that the greased end caps can be placed and
properly grouted.
The concrete can be poured around the splice couplers at the door sill. All anchors for the re-
installation of the door track shall be stainless steel anchors in holes sealed with a polyurethane
sealant with a maximum embedment of 1" so as to avoid damaging pt cables
Unit 1001
1. The one pt cable has been locked off and spliced.
2. Provide a 90 degree comer lap bar with 12 inch legs each way to tie the edge bars.
Raise the bursting bars and corner bar for proper concrete coverage.
Pour concrete and re -tension once the concrete has achieved a minimum of 3500 psi
91018 0 J30 03AGJ3a
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 16-175 Report No. 6
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 3
Unit 1001
Pt cable splice and ready for
concrete pour before re -stressing
cable
Note the bottom bars at the corner
and under the anchor needs to be
raised up to provide the proper
concrete coverage
Provide a 90 degree #4 corner lap
bar.
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960 SCANNED
Phone (772)569-1257
Fax (772) 5694041 p"
mlengineeringinc.com O I
St. LUCID (,our
Project No. 16-175 Repo No. S
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBE i 60$ 0114
PROJECT NAME: Ocean Harbor South Bldg A
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
DATE: November 22, 2016
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WEATHER: Sunny
WORK INSPECTED: ILE
Building A —North Building Balcony repairsFCOPY
Unit 208 ;
E The 3 post tension cables have been spliced and replaced from inside the unit east to the
balcony edge. The new anchors were placed all the way out to the edge so they can be
stressed. Provide 2.44 bursting bars behind the anchors at the slab edge. Bars need to be
epoxy anchored in the middle of the slab. Since the slab is only about 4 to 5 inches thick
the bars should be offset and should not be aligned vertically.
2. There were existing splices in the same 3 cables which had to be excavated to so that the
new cables can be tensioned.
3. Tape all exposed post tension cables and connections.
Unit 1001
1. Concrete repair needed at NE corner of balcony. There is one pt cable that had to be
locked off and will require to be spliced and re -tensioned.
2. The repair to the cable at the north edge has been completed. Cable spliced, re -tensioned
and encapsulated, ready for concrete repair mortar.
Unit 1101/1001
1. The 2 cables at NE corner of the 1101 floor slab (1001ceiling) have been repaired, re -
tensioned and first concrete pour completed. The second pour is now ready.
All splice couplers shall be encapsulated in PVC or taped to prevent corrosion.
RECEIVED NOT 2 8 1016
M L Engineering, Inc.
Consulting Engineers
2030 376 Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlenginceringinc.com
Project No. 16-175 Report No. 5
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
PA
dJ(
.N �\
M L Engineering, Inc:
Consulting Engineers
2030 371° Avenue s`
Vero Beach, Florida 32960 \\
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
SCANNED
BY
St. Lucie County
Project No. 16-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBE . I6 8- 714
PROJECT NAME: Ocean Harbor
1
CLIENT: Elliott Merrill
CONTRACTOR: Structure -Cori
INSPECTED BY: Mike Lue
South Bldg A DATE: November 11, 2016
Community Mgt. LOCATION: Ft. Pierce, Florida
PROJECT MGR: Khris McConnell
WORK INSPECTED:
Building A — North Building Balcony repairs
Unit 808
WEATHER: 'Sunny
1. The ceiling spallslbave been excavated and all corroded reinforcing bars exposed. The
corrosion has.beemi hased and all bars have been cleaned, primed and ready for pour. The
total area of ceiling repair is 19 square feet.
2. The edge crack'at the southern edge needs excavation and repair.
Unit 1001
1. The northern slab edge has been excavated and one pt cable has been locked off. The
existing reinforcing bars have been cleaned, primed and ready for pour. The total area is
5 linear feet.
2. The northeast slab edge comer is in progress. One pt cable was discovered and will
require locking off prior to further excavating.
Unit 11�
1. The northeast corner has been excavated and one pt cable locked off. The existing
reinforcing bars have been cleaned and primed. The end of one bar running in the north
to south direction will require cutting to provide an edge clearance of 1 r/2". The total area
of repair is 4 linear feet of edge and 2 square feet of full depth.
All splice couplers shall be encapsulated in PVC or taped to prevent corrosion.
RECEIVED NOV 18 7016
A
M L Engineering, Inc.
Consulting Engineers
203037' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 16-175 Report No. 4
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
M L Engineering, Inc.
Project No. 16-175 Report No. 4
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
M L Engineering, Inc.
Consulting Engineers ,VNIVItlC®
2030 37 ° Avenue SCANNED
Vero Beach, Florida 32960 BY
Phone (772) 569-1257 7t 1_IIt;IP r%oUOty Fax (772) 5694041 q
mlengineeringine. com
Project No. 16-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1 - 114
PROJECT NAME: Ocean Harbor South Bldg A DATE: October 26, 2016
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Lue
WEATHER:
Overcast slight rain
WORK INSPECTED:
Building A — North Building Balcony repairs
Unit 1001
1. The spall at the door threshold has been repaired.
2. Concrete has been chipped out at the edge spalls on the north and east balcony edges.
The reinforcing and pt anchors have been cut back, cleaned and coated with corrosion
inhibitor on the east edge. Remove the excess paint from the anchor insert to allow the
greased.end caps to be placed.
3. The anchor and reinforcing is slightly high in the slab but they cannot be moved deeper in
to the slab unless other unaffected bars are removed. Clean the reinforcing bars and
anchors and repair the cable end and concrete.
4. There is an area of approximately 9 sq feet of ceiling and edge spall at the northeast
corner. This may require locking off at least one cable at the north edge. Contractor to
verify if there are other cables along the adjacent east prior to chipping out the concrete.
Unit 1006
5. Check for additional surface spall at balcony edge.
[E0F.0 7
OCT 3 1 RM
t.
y
I
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.wm
Project No. 16-175 Report No. 3
cc: Gene Ross Elliott Merrill
Bob Stark structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic I Unit 1001
East edge repair
Pic 2
Unit 1001
North edge repair
Anchor and bursting bar is close
to surface
Pic 3
Unit 1001
Ceiling spall at north east corner
May have to lock off this cable
Check for cables along this edge
Prior to lock off and demolition
^ M L Engineering, Inc. -
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-I257
Fax (772)569-4041
mlengineeringinc.com
S AiVNED
St. LucBY
County
Pra No. 16-175 Report No. 1
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
OCEAN HARBOR SOUTH CONDOMINIUMS CONCRETE REPAIRS
4250 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: M0011147
PROJECT NAME: Ocean Harbor South Bldg A DATE: October 3, 2016
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Luc
WEATHER:
Overcast slight rain
WORK INSPECTED:
(l3uildin W — orth Building
Balcony repairs Unit
Demolition of the concrete was observed at several locations which included the following:
1. Surface repair along the exterior at the south sliding glass door. This appeared to be
loose decorative topping on a previously repaired area and no structural damage to the
slab.
2: Slab edge 6f the."outh facing balcony. There was some corrosion of the reinforcing and
no post tension ;cables are affected, repair as per the documents
3:' Full depth repair -in the middle of the slab on the south side. This was caused by a
corroded post tension splice coupler that was not encapsulated or taped. The coupler
should be mechanically cleaned, coated with a corrosion inhibitor and wrapped with a
PVC tape. Do not excavate any further behind the bearing end of the anchor.
4. Column repairat the north end. There is corrosion of the reinforcing at the bottom of the
column which extends down into the columns. Further excavation into the slab is
required to repair the column as per the documents.
Re -inspect prior to concrete placement.
OCT 1 3 REC'D
P +
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone(772) 569-1257
Fax (772)569-4041
mlengineeringine.com
Prtt• - t No. 16-175 Report No. 1
cc: Gene Ross Elliott Merrill
Bob Stark Structure -Con.
Carl Peterson SLC Bldg Dept
File
Pic 2
Loose decorative topping in front
of the exterior sliding glass door.
At previously repaired area
2