Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATE- Total: 3 hr 10 min Yield: 4 spfts Active: 5 min . Let: Easy Planning & Development Services :,...,Building &Code Regulation:--Division- Fort Pierce, FL 34982 - 6F-+d 772-462-2172 Fax 772-462-6443 St. Lucie County CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: SLC 160e-0211 JOB ADDRESS: 14191 RangeLine Rd. BUILDER/CONTRACTOR: Cwdck contracting Corporation _ PEST CONTROL CONTRACTOR: Service Tech u.SA. PEST CONTROL LICENSE #:JB1742 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 350 Percentage of solution: 1.250% Date of Treatment: 3 Footing x 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: Termodorsc Total gallons used: 140 Time of Treatment: Moming !—Slab x 1st Treatment Re -Treat Pools 1s' Treatment Re -Treat Perimeter for Final Inspection II Signatur Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be plcked up by the Inspector at Ame of each Inspection or the scheduled Inspection will fall and a re -Inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date -of -the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised r• FILE COPY