HomeMy WebLinkAboutSPECIAL INSPECTION PLANSpecial Inspection Plan
SDB� ED
for St Cu
Cie C011rty
Balcony Repairs — Atrium I Condominiums
at
2900 North AIA, Unit 2A
Fort Pierce, FL 34949
THM PLANS AND ALL PROP085D VW
ARE SUBJECT TO ANY CORRSCT:ONS
REQUIRED BY FIELD INSPECT(YRS T14AT
MAY BE NECESSA%Y III 0AWR TO
CGI'APLY WITH AL APPLICABLE COOES.
Prepared By:
MM
MGM BV
ENGINEERING, INC.
MOEN BOWLES V1 LLAMIZAit &ASSOCIATES
CML m S1RUCIURAL S SURVEYING a E"ARONMENTAL
1835 20th Street eVero Beach, FL 32960
772.569.0035 w Fax: 772.778.3617
www.mbveng.com
DATE
GA #3i28
Engineers Project Number: 14-486
_% HI S4P
* ; No. 61000
PRO R10D 0 }t11 `zar, P
/oNA �
ORGY/
ST. LUCIE COUNTY
BUILDING DIVISION
REVIEWED
FOR COMPLIAN
.D BY
MUST BE KEPT O)(JOB OR
NO INSPECTION WILL BE MADE
FL PE# 61000
to
SPECIAL INSPECTION PLAN
SCOPE OF WORK
The Special Inspector shall observe that the work is executed in substantial accordance
with the permitted Official Contract Documents. The Office Contract Documents are
defined as the permitted plans, recorded addenda, and the Specifications with all
amendments thereto, including the special Inspector Plan.
I. DUTIES
The Special Inspector shall maintain a record of the progress, working
conditions, observations given to the Contractor and suspected deviations from the
Office Contract. Documents. The reports shall be in writing and shall be made out
promptly at the end of the period covered. The Special Inspector shall furnish these
reports directly to the building official, engineer of record, and others as required.
The reports may consist of any or all of the following:
a. Describe inspections and tests made with applicable locations
b. Indicate how non -conforming items were resolved
C. List unresolved items, parties notified, and method of notification
d. Itemize changed authorized by design professional in charge, if not included
in non -conforming items.
II. REPORTING INFORMATION & OBSERVATIONS
It is the duty of the Special Inspector to notify the Contractor, Building
Official, Architect/Engineer of Record and the owner, if the following events occur:
a. The use of materials, equipment, or workmanship which do not conform to
the Official Contract Documents or which may cause improper construction
which is not acceptable.
b. Work which is not being done in accordance with the approved Official
Contract Documents.
C. Faulty construction or construction performed without inspection and not
capable of being inspected or tested in place.
d. The request for interpretation from the Engineer of Record as required to
clarify the Construction Documents.
e. Observe that shoring and reshoring has been installed in accordance with
the Shoring/Reshoring Plans as submitted to the Building Department by
the Contractor. Such concrete or structural element which is dependent on
the shoring installed.
f. The Special inspector will verify proper placement of all concrete and
reinforcement installation.
III. REQUIREMENTS OF THE OWNER
a. The owner shall arrange for necessary construction documents to be
furnished to the Special inspector during the progress of the work in a timely
manner. Such records shall consist of, but may not be limited to: concrete
cylinder test reports, soil density test records, mill records, shop drawings,
pile driving logs, etc.
b. The owner shall insure that the Contractor provide a shoring and reshoring
plan to the Building Department which is signed and sealed by an Engineer
registered in the State of Florida. Such registered engineer may represent
the form supplier.
IV. RESPONSIBILITY
The Special Inspector does not surrogate the Building Official's or the
Engineer of Record's responsibilities. Further, it is not intended that the
contractor's contractual of statutory obligations are any way relieved or
foregone by the presence of the Special Inspector. The Contractor has the sole
responsibility for any deviations from the official Contract Documents. The Special
Inspector will not replace the quality control personnel of the Contractor. All
inspections will be in accordance with the provisions of the Special Inspector Law.
V. LIMITATIONS
Unless otherwise provided in written requests, this Contact limits the Special
Inspector to provide services only with regard to the structural frame of the building
including foundation, primary and secondary framing systems, and all other items
included in the Inspection Plan. This Contract does not include inspection of any
safety provisions as required by OSHA or other safety standards which apply
during the construction period. Nor does it apply to elements such as metal or
wooden balcony railings, fire protections, curtain walls, mechanical/electrical
systems. Architectural components, site work or other elements not contributing to
the capacity of the structural building frame.
THRESHOLD INSPECTION PLAN
A. The following is a description of the structural system employed for this
project:
Structure: reinforced concrete flat slabs.
B. Construction shall conform to the Permitted Documents as submitted to the
Building Department.
C. Approved Permit Drawings, the applicable Specifications and approved
Drawings submitted by MBV Engineering Inc. shall govern the requirements of
this work.
D. Reinforced Concrete:
Concrete Quality
Verify that individual batch tickets indicate delivery of the approved mix as
specified. Verify time limits of mixing, total water added, and property
consistency and workability for placement. Determine the required type,
quantity and frequency of tests to be performed on fresh and hardened
concrete. Observe sampling of concrete, field testing of fresh concrete and
making of test specimens. Provide or arrange for proper specimen
identification, site storage and protection, and transportation to the testing
laboratory. Provide or arrange for communication of field testing results to
the registered design professional in responsible charge and to the building
official.
2. Reinforcement
Verify that reinforcing steels are of the type, grade and size specified and
are in conformance with acceptable quality standards. Ensure that
reinforcing steel is free of oil, dirt and rust and that steel is properly coated
and/or sheathed as specified. Verify that reinforcing steels are located
within acceptable tolerances and are adequately supported and secured to
prevent displacement during concrete placement. Verify that minimum
concrete cover is provided. Verify that placement of reinforcing steel (or
ducts) complies with required spacing, profile and quantity requirements,
as indicated by both the approved plans and installation drawings. Verify
that hooks, bends, ties, stirrups and supplemental reinforcement are
fabricated and placed as specified. Verify that required lap lengths, stagger
and offsets are provided. Verify proper installation of approved mechanical
connections per the manufacturer's instructions and/or evaluation reports.
3. Concrete Placement, Protection and Curing
Verify acceptable condition of the place of deposit before the concrete is
placed. Verify the methods of conveying and depositing concrete avoid
contamination and segregation of the mix. Verify that concrete is being
properly consolidated during placement. Verify that concrete is protected
from temperature extremes, and determine that proper curing is initiated.
E. Other Miscellaneous Inspections
1. Inspect for any holes drilled in slabs, walls, columns, or any other structural
component without prior approval.
2. Check for any exposed reinforcing steel bars at face of reinforced concrete
member.
3. Maintain a correction list indicating the areas where discrepancies were
noted and status of repair.
4. Send a copy of the daily inspection report to Building Department, Owner,
General Contractor, and others, as requested by the owner.
5. Visually inspect all concrete surfaces for any cracks. Notify the Engineer of
Record immediately if any cracks are found.
F. Submission:
1. General: Various submissions to the Threshold Inspector will be required.
All submissions shall be reviewed by the Contractor and the Engineer of
Record prior to transmittals to the Threshold Inspector. Submit one copy for
this record and review. Review of submissions by the Threshold Inspector.
Submit one copy for his records and review. Review of submissions by the
Threshold Inspector does not relieve the Contractor of the Subcontractors
of their obligations for performance. The intent of the review of these
submissions is to confirm that off -site fabricated components comply with
the Approved Permit Documents.
2. Items required for the Threshold Inspector: The Threshold Inspector shall
be provided with copies of all correspondence related to the construction of
the project, all shop drawings, all deviations from the contract documents,
all test reports, a full set of the Contract Documents, and any other items he
may deem necessary to perform his duties.
STRUCTURAL -GENERAL NOTES
DESIGN CRITERIA AND LOADS:
1. MND DESIGN.
WIND SPEED (MPH)
RISKCATEGORY
EXPOSURE CATEGORY
ENCLOSURE CLASSIFICATION
INTERNAL PRESSURE COEFFICIENT
TOPOGRAPHIC FACTOR
V(ADJ)=124 V(ULT)=160
ENCLOSED
CPI =y- 0.18
KZT=1.0
Z LOADS ON THE STRUCTURE DURING CONSTRUCTION SHALL NOT EXCEED THE DESIGN LOADS AS
NOTED IN DESIGN CRITERIA 8 LOADS BELOW OR THE CAPACITY OF PARTIALLY COMPLETED
CONSTRUCTION AS DETERMINED BY THE CONTRACTOR'S SSE FOR BRACINGISHORING.
GENERAL REQUIREMENTS
1. THE DESIGN AND CONSTRUCTION OF THIS PROJECT IS GOVERNED BY THE*FLORIDA BUILDING
CODE (FBC)-,, 5th EDITION, HEREAFTER REFERRED TO AS THE FBC, AS ADOPTED AND MODIFIED BY
THE AUTHORITY HAVING JURISDICTION (AHJ).
Z THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND ACCURACY OF THE WORK
WITH ENGINEER AND OTHER TRADES, FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND
DIMENSIONS, FOR SELECTING FABRICATION PROCESSES, FOR TECHNIQUES OF ASSEMBLY,AND
FOR PERFORMING WORK IN SAFE AND SECURE MANNER
3. THE STRUCTURAL DRAWINGS ARE INTENDED TO SHOW THE GENERAL CHARACTER AND EXTENT OF
THE PROJECT AND ARE NOT INTENDED TO SHOWALL DETAILS OF THE WORK.
4. DISCREPANCIES,OMISSIONS, OR INCONSISTENCIES WITH APPLICABLE CODE REQUIREMENTS SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING BEFORE SUBMITTING A BID OR
PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE CONFLICTS
BETWEEN THE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION
OF THE ENGINEER IN WRITING BEFORE PROCEEDING WITH THE WORK
6. THE CONTRACTOR IS RESPONSIBLE FOR THE STRENGTH AND STABILITY OF THE STRUCTURE
DURING CONSTRUCTION AND SHALL PROVIDE TEMPORARY SHORING, BRACING AND OTHER
ELEMENTS REQUIRED TO MAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. DO NOT LOAD
STRUCTURES, NEW OR EXISTING, WITH WEIGHT THAT WILL ENDANGER STRUCTURE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE WORK REQUIRED IN THE
CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS FOR EXECUTING IT PROPERLY
STRUCTURAL CERTIFICATION
1. 1 CERTIFY THAT THE PLANS AND SPECIFICATIONS COMPLY WITH THE STRUCTURAL PORTION OF THE
FLORIDA BUILDING CODE FIFTH EDITION.
Z 1 ALSO CERTIFY THAT STRUCTURAL ELEMENTS DEPICTED ON THESE PLANS PROVIDE ADEQUATE
RESISTANCE TO THE WIND LOADS SPECIFIED IN SECTION 1609 IN THE FBC.
ATRIUM I 1836-20TH STREET JOB NO. 14-486
BALCONY VEROEEAEM.FL 32960 DESIGNED R.V.
CONCRETE REPAIR INSPECTION MIMBV FX.(772) 56>}0035 DRAW AE.ft.
E INEERING INC P .aT2)TT636„
2900 N A1A CHECKED R.V.
FORT PIERCE. FL REPAIRS NON 13 1 v¢IAVIw A A55OCIRTE6 N6EWNNE R- Px (J21) 2]]-1510 I>ATE 7/5/2016
CONSUM0 ENONMIING G 13728 R. PERM R. - . (772) �_9055 PAGE 1 OF 9
G�
SGD
FLOOR: 2
UNIT NUMBER: 2A
2/19/2016
INSPECTED ON:
0
BALCONY FINISH: X COATING
BARE
TILE
CARPET
LEGEND
®
A. SLAB SPALL ON SURFACE
S.F.
®
B. SLAB SPALL FULL DEPTH REPAIR
S.F.
®
C. SLAB SPALL EDGE REPAIR
2
L.F.
®
D. SLAB SPALL UNDERNEATH
S.F.
w
E. CRACKS ON SLAB -GRAVITY FEED
L.F.
F. COLUMN REPAIR
L.F.
O
G. WALL REPAIR
S.F.
H. FLOOR PREPARATION
S.F.
I. WATERPROOFING
S.F.
®
J. RUST SPOTS
11111111I2.
E.A.
o
J
\��IVILL
�c .p
O0�. v
i
* *
Z
SGD
% OF
�'��•, QIr�O,
IAI R
9-.
ei?D00
IN
10
AT
BALCONY
s
1635 - 20TH STREET
SOB NO 16-486
OESIGNE°Ry
CONCRETE REPAIR
INSPECTION
'� B
VERO BEACH, FL 32980
Fz. mzi 5i3E¢-3617
°PAN?
AER.
CHEC�D
Ry
2900 N A1A
REPAIRS
ENGINEERING, INC
NON 60W NOAMRAR k ASSOCIATIS
M9JMR C R - PH (321) 253-1510
/5/201E
FORT PIERCE, FL
CONSULTING ENGNE O CA }3)28
R, PUDC R - pry (772) { -W!15
PAGE
2 OF 9
POST -TENSION
EDGE REPAIR
EXISTING CONDITIONS
SEVERE SPALL OUTSIDE
CABLE ANCHORING SYSTEM
STEP 1
SAWCUT AROUND
PERIMETER OF
SPALL IF POSSIBLE
CONCRETE OUT TO
VD CONCRETE AND
IN STEEL
EP 2
COAT EXPOSED SURFACES
WITH APPROVED BONDING
AND ANTI —CORROSION
AGENT.
STEP 4
PROTECT SURFACE WITH
APPROPRIATE COATING.
STEP 3
FILL PREPARED AREA WITH
REPAIR MORTAR.
REPAIR PROCEDURE
1. REMOVE ALL DAMAGED OR UNSOUND CONCRETE
FOLLOWING THE CONDIRONING OF CONCRETE
GUIDELINES.
2. CHIP OUT BY HAND THE DAMAGED CONCRETE.
REMOVAL SHALL CON71NUE ALONG THE LENGTH OF
THE REINFORCING STEEL UN71L AT LEAST 6" OF
THE UNCORRODED REBAR IS OBSERVED. DO NOT
DISTURB THE CABLE ANCHORS.
3. THE VERTICAL SURFACES SHALL BE ROUGHENED.
4. SANDBLAST OR HYDROBLAST THE EXPOSED
CONCRETE AND REBAR. AVOID DAMAGING OR
CUT7ING EXIS7NG REINFORCEMENT OR CABLES.
5. REPLACE EDGE BAR MIH A FIBERGLASS BAR OF
SAME DIAMETER IF EXIS7NG BAR IS HEAVILY
DETERIORATED.
6. COAT ALL NEW AND EXISTING REBAR WITH EPDXY,
POLYMER CEMENT SLURRY OR A ZINC —RICH
COA7ING FOR CORROSION PROTECTION.
INSTALLATION SHALL BE DONE FOLLOWING THE
MANUFACTURER .SPECIFICATIONS.
7 THE BONDING AGENT SHALL BE INSTALLED AS
DESCRIBED IN THE MANUFACTURER SPECIFICATIONS.
8. REPAIR REPAIR MORTAR OR READY MIX CONCRETE
SHALL BE PLACED AS DESCRIBED IN THE
MANUFACTURER SPECIFICATIONS.
9. REPAIR MIX SHALL HAVE A COMPRESSIVE
RESISTANCE OF 5,000 PSI AT 28 DAYS AND A
WATER CEMENT RATIO OF 0.45 OR LESS.
10. FINISH SURFACE TO TEXTURE AND SMOOTHNESS
REQUIRED FOR THE SPECIFIC APPLICA77ON.
11. UPON COMPLE71ON OF FINISHING OPERATIONS,
ALLOW MATERIAL TO CURE IN ACCORDANCE WITH
MANUFACTURERS'S RECOMMENDATIONS.
12. PRONDE THE ARCH17ECTURAL FINISH AS REQUIRED
BY THE OWNER. \�\\111 I IIII//AA
ILL A/
rl
C
0
P{�OFLFO I R
00
ATRIUM I
BALCONY
MVERO
1835-z0+al�paEt+11'
BEACH,
FL 32960
. " 14-46°
DESIGNED R.y
CONCRETE REPAIR
2900 NAIA
FORT PIERCE, FL
INSPECTION
DETAILS
�.MBV
ENGINEERING, INC
.0.I n 06B+cw�Im & G�]2B
0
FX.(772)77636I�
M6&N R -M (321) 4U 1510
".. PIMM R- M (772) 1 -%M
°� AE.R.
oa.E ° R°
/5/20t6
PAGE 3 OF 9
Q*H_:A.40ILLI EN=1aril1NP-1
EDGE REPAIRS LEGEND
® EXISTING #5 STEEL REBAR
® NEW #{5 STEEL DOWEL BARS
REMOVED CONCRETE
TYP. 12"
EXISTING STEEL #5 BAR 7 MAX' 18"
10"
CONCRETE EDGE REPAIRS
2"x2" ALUMINUM RAIL POST
BASE EMBEDDED IN DECK EDGE.
FOR POST BASE REPAIRS THAT DO
NOT COINCIDE WITH EDGE REPAIR,
CUT OUT 6"x6"x5" SECTION
AROUND SUBJECT POST.
CAREFULLY WORK AROUND EDGE
REBAR. CLEAN & COAT EDGE
REBAR. ADD 5/8" THREADED ROD
6" LONG THROUGH POST TO
STRENGTHEN CONNECTION OF POST
BASE. POUR NEW EDGE CONCRETE
6"x6"x5".
CLEAN & COAT EXPOSED REBAR.
NO VISIBLE CORROSION SHOULD
EXIST ON REBAR AT CONCRETE
CUTOFF POINT.
REMOVE CONCRETE. IF MORE
THAN 157 REBAR DIA. LOSS
HAS OCCURRED, THEN ADD
STEEL DOWEL BAR AS SHOWN
IN SECTION BELOW.
MECHANICALLY SCARIFY &
ROUGHEN SLAB EDGE.
IF BONDING AGENT IS NOT
PREMIXED W/ THE CONCRETE,
APPLY A BONDING AGENT TO THIS
SURFACE PRIOR TO CONCRETE
POURING.
POUR NEW EDGE W/ SIKACRETE
211 OR 5,000 PSI STRENGTH
CONCRETE.
IF EXISTING TEMP./SHRINK. BARS
HAVE OVER 157 DIA. LOSS, THEN
PROVIDE SHORING REMOVE AND PROVIDE (2) 95
FOR FORMWORK STEEL BARS LONGITUDINALLY.
DRILL 7/8" DIA. HOLE 2" AWAY FROM EXIS710 `RF�BA`Bllldw.
W/ MORE THAN 15% LOSS & EMBED #5
10" DEEP INTO EDGE OF CUT-OFF SLAB
W/ SIKADUR ANCHORFIX-1 EPDXY.
NOTES:
1. FINAL FINISH OF SLABS SHALL BE SMOOTH SPONGED SANDY FINISH OR AS SPECIFIED
ON -SITE PER OWNER'S REQUIREMENTS.
2. FOR ANY TENSION BAR, MAXIMUM CONCRETE COVER SHALL BE 2" & MINIMUM COVER 1.5:
TEMPERATURE/SHRINKAGE STEEL TO BE PLACED DIRECTLY UNDER TENSION STEEL.
3. ALL PRODUCT SUBSTITUTIONS MUST FIRST BE APPROVED BY THE ENGINEER.
4. ENGINEER SHALL BE IMMEDIATELY NOTIFIES CONCERNING ANY ENCOUNTERED DISCREPANCIES
BETWEEN ACTUAL CONDITIONS & THIS DESIGN.
FL. P.E.#61000'
'%-ZS-►4
ATRIUM I
BALCONY
®
� IMBVVERO(772)5
836-2pTH5TREET
FL32960
4-48
OESIGNEO Ry
CONCRETE REPAIR
INSPECTION
��
PH. (]]2) 589-0035
FX.
pRgy.M q,EF.
ENGINEERING,INC
(]]2)]76-361]
cNEcxEp R.v.
2900 AA1A
DETAILS
NOw BOWIES N.1DR k /SSOfAg16
NpB M R- W (321) 29-I510
OgIE ]/5/2016
FORT PIERCE. FL
CONSULLNO MOINEERINO G (6]28
R MM R. - M M2) K -9055
pppc d nc o
EXPOSING AND UNDERCUTTING
OF REINFORCING STEEL
THESE DETAILS ARE APPLICABLE TO HORIZONTAL, VERTICAL AND
OVERHEAD LOCATIONS. THEY ARE ALSO APPLICABLE TO REMOVAL BY
HYDRO -DEMOLITION, HYDRO-MILLLING, AND ELECTRIC, PNEUMATIC OR
HYDRAULIC IMPACT BREAKERS.
1. REMOVE LOOSE OR DELAMINATED CONCRETE ABOVE CORRODED
REINFORCING STEEL.
2. ONCE INITIAL REMOVALS ARE MADE, PROCEED WITH THE
UNDERCUTTING OF ALL EXPOSED CORRODED BARS. UNDERCUTTING
WILL PROVIDE CLEARANCE FOR UNDER BAR CLEANING AND FULL BAR
CIRCUMFERENCE BONDING TO SURROUNDING CONCRETE, AND WILL
SECURE THE REPAIR STRUCTURALLY, PROVIDE MINIMUM 414 INCH
(19 MM) CLEARANCE BETWEEN EXPOSED REBARS AND SURROUNDING
CONCRETE OR (4 INCH (6MM) LARGER THAN LARGEST AGGREGATE IN
REPAIR MATERIAL, WHICHEVER IS GREATER.
J. CONCRETE REMOVALS SHALL EXTEND ALONG THE BARS TO
LOCATIONS WITH MINIMUM SIX INCHES FREE OF BOND INHIBITING
CORROSION, AND WHERE THE BAR IS WELL BONDED TO
SURROUNDING CONCRETE.
4. IF NON -CORRODED REINFORCING STEEL IS EXPOSED DURING THE
UNDERCUTTING PROCESS, CARE SHALL BE TAKEN NOT TO DAMAGE
THE BAR'S BOND TO SURROUNDING CONCRETE. IF BOND BETWEEN
BAR AND CONCRETE IS BROKEN, UNDERCUTTING OF THE BAR SHALL
BE REQUIRED,
5. ANY REINFORCEMENT WHICH IS LOOSE SHALL BE SECURED IN PLACE
BY TYING TO OTHER SECURED BARS OR BY OTHER APPROVED
METHODS.
o`vi�L,44f,
\O�vy;OgNSF
•p�0 S T OF k�
LO
ATRIUM I
BALCONY
®
`J
1835 - 20TH STREET
VEROBEACH,FL3296D
JOB NO y_a86
DESIGNED Rp,
CONCRETE REPAIR
2900 N A1A
FORT PIERCE, FL
INSPECTION
DETAILS
1��� Y
ENGINEERING, INC
MDW 6DWIE5 w1 lw k A550GI.1E5
CONSULVND ENGWEERWC G 13725
PH. 560-DO35
FX. (772) 77e-3617
NELLtlMR 11- RR (321) 253-1510
B .EPEE, - pry (A2) Kg-g055
DRAM AE.R.
CXECKED R.V,
DATE v5izD16
pgcE 5 OF 9
CLEANING AND REPAIR
OF REINFORCING STEEL
CLEANING OF REINFORCING STEEL
ALL HEAVY CORROSION AND SCALE SHOULD BE REMOVER FROM THE BAR AS NECESSARY TO PROMOTE MAXIMUM BOND OF
REPLACEMENT MATERIAL. OIL FREE ABRASIVE BLAST IS THE PREFERRED METHOD. A TIGHTLY BONDED LIGHT RUST
BUILD—UP ON THE SURFACE IS USUALLY NOT DETRIMENTAL TO BOND, UNLESS A PROTECTIVE COATING IS BEING APPLIED
TO THE BAR SURFACE IN WHICH CASE THE COATING MANUFACTURER'S RECOMMENDATIONS FOR SURFACE PREPARATION
SHOULD BE FOLLOWED.
REINFORCIMG STEEL
wwivi
CLEANING BACKSIDE OF _
CORRODED BARS
REPAIR OF REINFORCING STEEL DUE TO LOSS OF SECTION
IF REINFORCING STEEL HAS LOST SIGNIFICANT CROSS
SECTION, A STRUCTURAL ENGINEER SHOULD BE
CONSULTED. IF REPAIRS, ARE REQUIRED TO THE
REINFORCING STEEL, ONE OF THE FOLLOWING REPAIR
METHODS SHOULD BE USED:
* COMPLETE BAR REPLACEMENT, OR
x ADDITION OF SUPPLEMENTAL BAR OVER
AFFECTED SECTION.
REQUIRED LAP
NEW BARS MAY BE MECHANICALLY SPLICED TO OLD
BARS OR PLACED PARALLEL TO AND APPROXIMATELY
Y4 IN. (19 MM) FROM EXISTING BARS. LAP LENGTHS
SHALL BE DETERMINED IN ACCORDANCE WITH ACI 318;
ALSO REFER TO CRSI AND AASHTO MANUAL.
AFFECTED LENGTH
LOSS OF SECTION
SUPPLEMENTAL BAR
REQUIRED LAP
AFFECTED LENGTH
rl s
0
=C N # R
O
11 & _
'4
ATRIUM I
CONCRETE REPAIR
zsoa N C
FORT PIERCEE C , FL
BALCONY
INSPECTION
DETAILS
;="///I �'r��'?Go
ENGINEERING,INC
Mow eGxtFs VM1gMIwt n a MIA1 MfIBJeMNE IT - PN (l]n W-1510
CONAILTNG ENCINEWNG G 13728 IT, pl M R - q1 (M) -gM5
N.
oRq�°"E° pE.R.
GNEOKE° R.
G E i6izG,5
pgGE 6 OF 9
SLAB WATER PROOFING
ADDITIONAL TOP COATS
TOP COAT WITH AGGREGATE TO REFUSAL
BACKROLLED INTO WET TOP COAT
BASE COAT
SUBSTRATE: CONCRETE OR LEVELING OVERLAY
.,SONG GUARD RAILS, SET BOTTOM RAIL 1 - MIN.
OFF DECK TO ALLOW WATER FLOW OFF DECK.
REPAIR PROCEDURE.
ALLOW CONCRETE DECKS TO DRY FOR 48 HOURS MINIMUM WITHOUT RAINFALL.
CONCRETE MUST BE VISIBLY DRY WITH MAXIMUM 49 MOISTURE CONTENT. IF REQUIRED
BY THE ENGINEER, A MAT TEST SHALL BE PERFORMED ON ONE OR MORE DECKS
PRIOR TO BASE COAT APPLICATION. TEST SHALL COVER AN AREA OF FOUR SQUARE
FEET, MAT SHALL BE A 6 MIL CLEAR POLYURETHANE SHEET, SEALED ALL AROUND WITH
ADHESIVE TAPE AND IT SHALL REMAIN IN PLACE FOR A MINIMUM OF 16 HOURS.
CONCRETE DECKS SHALL BE DRY, CLEAN, SOUND AND FREE OF ALL CONTAMINANTS
WHICH MAY INTERFERE WITH ADHESION OR PROPER CURING.
2. APPLY BASE COAT TO TOP OF SLAB AND VERTICAL EDGES PER MANUFACTURER'S
SPECIFICATIONS AND ALLOW IT TO CURE BEFORE TOP COAT APPLICATION. EXTEND
APPLICATION TO VERTICAL EDGE OF SLAB.
J. AFTER SUFFICIENT CURE TIME, SURFACE DEFECTS SHALL BE REMEDIED, CONTRACTOR
SHALL BE RESPONSIBLE FOR CORRECTING PONDING AREAS WITH COATINGS 3/16" OR
LESS. ALLOW IT TO CURE FOR 72 HOURS MINIMUM BEFORE OPENING THE BALCONY TO
TRAFFIC. TOP COAT APPLIED PER MANUFACTURER'S SPECIFICATIONS. BROADCAST SILICA
SAND IMMEDIATELY INTO THE WET TOPCOAT AND BACK ROLL TO EVENLY DISTRIBUTE
THE AGGREGATE. TOP COAT TO BE COMPATIBLE WITH BASE COAT.
4. APPLY FINAL TOP COATS PER MANUFACTURER'S
TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S
KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH
THE APPLICABLE MINIMUM BUILDING CODES AND THE
APPLICABLE FIRE SAFETY STANDARDS AS DETERMINED BY THE
LOCAL AUTHORITY IN ACCORDANCE WITH FS553 AND FS633.
INSTRUCTIONS 0\11 I I111////
V ILLAo
/y/
�vk•.`c gNSF
� " 0
C % No 81
�'o SIT OF�D,0 �bl LAMI AZ
ATRIUM
BALCONY
-'M v
FmlMB
1835-2DTHSTREE7F
VERO BEACH, FL 32960
,n-anti
oESicNeD qy
CONCRETE REPAIR
29PI N PIERCE,
FORT PIERCE, FL
INSPECTION
DETAILS
E
ENGINEERING, INC
mm BDHlES elm & ASSDCNTE9
CONSU MNO ENCMEDiNO G #3728
('H.(772)569D035
FX.(772) 569-0035
NRBUM R - PR (321) 253-,6,D
iT PIMM R - M (772) �-gp3y
AE.R.
DRAM
CHFC R.M.
DATE 7i5i2016
PADS 7 OF 9
BLAB FULL DEPTH REPAIR
REPAIR PROCEDURE:
1.
REMOVE ALL DAMAGED OR UNSOUND CONCRETE
FOLLOWING THE CONDITIONING OF CONCRETE
GUIDELINES.
2.
SAWCUT THE PERIMETER OF THE REPAIR AREA
FORMING A SHOULDER PERPENDICULAR TO THE
SUBSTRATE.
EXISTING CONDITIONS
3.
CHIP OUT THE FULL DEPTH. REMOVAL SHALL
SEVERE SPAL
CONTINUE ALONG THE LENGTH OF THE
REINFORCING STEEL UNTIL AT LEAST 6" OF THE
UNCORRODED REBAR IS OBSERVED.
•
STEP 1
4.
THE VERTICAL AND HORIZONTAL SURFACES SHALL
•
BE ROUGHENED WITH }" AMPLITUDE.
SAWCUT AROUND
PERIMETER OF SPALL
5.
SANDBLAST OR HYDROBLAST THE EXPOSED
CONCRETE AND REBAR TO REMOVE DUST,
LAITANCE AND OTHER BOND INHIBITING MATERIALS.
CHIP CONCRETE OUT TO
AVOID DAMAGING OR CUTTING EXISTING
SOUND CONCRETE AND
REINFORCEMENT.
•
CLEAN STEEL TO PRODUCE
6.
INSERT NEW BARS OF EQUAL DIAMETER NEXT TO
A WHITE METAL FINISH.
THOSE THAT HAVE DETERIORATED BY MORE THAN
159 ALL NEW STEEL SHALL BE ASTM A-615
GRADE 60. LAP SPLICES SHALL BE IN
ACCORDANCE WITH ACI 318.
STEP 2
7
COAT ALL NEW AND EXISTING REBAR WITH TWO 10
MILS OF EPDXY, POLYMER CEMENT SLURRY OR A
COAT EXPOSED SURFACES
ZINC -RICH COATING FOR CORROSION PROTECTION.
WITH APPROVED BONDING
INSTALLATION SHALL BE DONE FOLLOWING THE
AND ANTI -CORROSION
MANUFACTURER SPECIFICATIONS.
AGENT.
B.
THE BONDING AGENT, IF REQUIRED, SHALL BE
..
INSTALLED AS DESCRIBED IN THE MANUFACTURER
SPECIFICATIONS.
STEP 3
9.
REPAIR REPAIR MORTAR OR READY MIX CONCRETE
FILL PREPARED AREA WITH
SHALL BE PLACED AS DESCRIBED IN THE
REPAIR MORTAR.
MANUFACTURER SPECIFICATIONS.
10.
REPAIR MIX SHALL HAVE A COMPRESSIVE
STEP 4
RESISTANCE OF 5,000 PSI AT 28 DAYS AND A
%%f%5
WATER CEMENT RATIO OF 0.45 OR LESS.
PROTECT SURFACE WITH
APPROPRIATE COATING.
11.
FINISH SURFACE TO TEXTURE AND SMOOTHNESS
REQUIRED FOR THE SPECIFIC
12
COMPLETION iJAPPLICATION.
NG OPERATIONS,
U
.
ALLOWUPON
MATS . gid• E' 4N14WORDANCE WITH
13. PROVIDE
;;v FIN�3k RS t
3�* jHE OWNE�E _
CRODOL I LAMIZ
i �O', giPS FFLk- 1010_0
i� FLO \
��,nA.._ '_.
ATRIUM I
CONCRETE REPAIR
Al
2900 NCE,
FORT PIERCE, FL
BALCONY
INSPECTION
DETAILS
F,�oTR
MM Z sg kgi 960
111MBV EX.(]]2)S6PD035
E®INEERING,ING FX,(]]2)]]836R
MOIA oow NWJ4 & ,ES ND&I , R- FR (MI) 255-15tO
CONSUEKNO ENcwEDUNG CA IN26 FL KISS R - R1 M2) 169_9055
DESIGNED R,y
qE.R:
CHECK
CHECKR.V.
DATE 7i5i2016
PAGE 8 OF 9
EDGE AND SURFACE CONDITIONING
OF CONCRETE
BOUNDARY OF LOOSE AND RECOMMENDED
DELAMINATED CONCRETE LAYOUT
a<
o,
d
EDGE AND SURFACE CONDITIONING OF CONCRETE
1. THESE DETAILS ARE APPLICABLE TO HORIZONTAL,
VERTICAL, AND OVERHEAD LOCATIONS. THEY ARE ALSO
APPLICABLE TO REMOVAL BYHYDRO—DEMOLITION,
HYDROMILLING, AND ELECTRIC, PNEUMATIC OR
HYDRAULIC IMPACT BREAKERS.
2. REMOVE DELAMINATED CONCRETE, UNDERCUT
REINFORCING. STEEL, REMOVE ADDITIONAL CONCRETE AS
REQUIRED TO PROVIDE MINIMUM REQUIRED THICKNESS
OF REPAIR MATERIAL.
3. CHIP OUT THE CONCRETE TO EXPOSE THE ENTIRE
CIRCUMFERENCE OF THE REBAR. REMOVAL SHALL
CONTINUE ALONG THE LENGTH OF THE REINFORCING
STEEL UNTIL AT LEAST 6" OF UNCORRODED STEEL
IS OBSERVED.
4. AT EDGE LOCATIONS, PROVIDE RIGHT ANGLE CUTS TO
THE CONCRETE SURFACE WITH EITHER OF THE
FOLLOWING METHODS.
4.1. SAWCUT 112 " (13 MM) OR LESS AS REQUIRED
TO AVOID CUTTING REINFORCING STEEL.
4.2. USE POWER EQUIPMENT SUCH AS
HYDRODEMOLITION OR IMPACT BREAKERS. AVOID
FEATHER EDGES.
4.3. REPAIR CONFIGURATIONS SHOULD BE KEPT AS
SIMPLE AS POSSIBLE, PREFERABLY WITH
SQUARED CORNERS.
5. AFTER REMOVALS AND EDGE CONDITIONING ARE
COMPLETE, REMOVE BOND INHIBITING MATERIALS (DIRT,
CONCRETE SLURRY, LOOSELY BONDED AGGREGATES) BY
ABRASIVE BLASTING OR HIGH PRESSURE WATERBLASTING
WITH OR WITHOUT ABRASIVE.
6. CHECK THE CONCRETE SURFACES AFTER CLEANING TO
INSURE THAT SURFACE IS FREE FROM ADDITIONAL
LOOSE AGGREGATE, OR THAT ADDITIONAL DELAMINATIONS
ARE NOT PRESENyyT��. O\N� 1' I 1111
Z IF HYDRODEMO xw 037J S, 1
CEMENT AND R,A i
SLURRY MUSS RCOVED
FROM PREP 0M 9URFA EgiOo
BEFORE SLGRRZ IARAS. —
�4 giPj 0 Q f#6100FLO
ATRIUM
CONCRETE REPAIR
2900 N A1A
FORT PIERCE, FL
BALCONY
INSPECTION
DETAILS
;�,M�" 1a t1D ����
Y VEROB'�nbi1,FL3zeao
_ FX. Q]2)J]8361]
ENGINEERING, INC
u0w e0,1E5 W5glw h wSE ATES NuffiNRNE R-N(321)1 1510
CONSNL➢NO "61NOMMO U. d3728 {L RDIM R - RI(A2) 89-9055
3DRNQ "•66
OESIGNEDR,y,
OR— AE.R.
CHECKED R.V.
DATE 7/5/2016
PAGE 9 OF 9
L
d LE C
` SCANNED
BY
Special Inspection Plan St. Luce County
for
Balcony Repairs — Atrium I Condominiums
at
2900 North AIA, Unit 3A
Fort Pierce, FL 34949
Prepared By:
M By
ENGINEERING, INC.
M91:1 eQN�LES V 3LLAMILAIi S A}SDCiryY L5
THESS PLAW AND ALL PROPOSGD WON(
ARE SUBJECT TO ANY COFZI:IECTIONS
REQUIRED BY FIELD INSPECTORS THAT
14AY BE NECESISAI'tY IN ORDO TO
CGP4PLY WM ALL APPLICAME CODES.
CNIL a S IRUCIU VAL s SURVEYING a ENVIRONMENTAL
1835 20th Street aVero Beach, FL 32960
772.569.0035 0 Fax: 772.778.3617
www.mbveng.com
CA 10728
Engineers Project Number: 14-486
ST. LUCIE COUNTY
BUILDING DIVISIO
REVIEWED
FOR COMPLI
DATE
MUST BE KEPT ON JOB OR
NO INSPECTION WILL BE MADE
\�\�\� \Vj o �V I<<q/��i%
No. 61000 , y�
STATE OF k/
61IFbA�Yiy'x r, P.
�//llllll\\
AUG 3 0 AECD
PE# 61
Z
SPECIAL INSPECTION PLAN
SCOPE OF WORK
The Special Inspector shall observe that the work is executed in substantial accordance
with the permitted Official Contract Documents. The Office Contract Documents are
defined as the permitted plans, recorded addenda, and the Specifications with all
amendments thereto, including the special Inspector Plan.
I. DUTIES
The Special Inspector shall maintain a record of the progress, working
conditions, observations given to the Contractor and suspected deviations from the
Office Contract Documents. The reports shall be in writing and shall be made out
promptly at the end of the period covered. The Special Inspector shall furnish these
reports directly to the building official, engineer of record, and others as required.
The reports may consist of any or all of the following:
a. Describe inspections and tests made with applicable locations
b. Indicate how non -conforming items were resolved
C. List unresolved items, parties notified, and method of notification
d. Itemize changed authorized by design professional in charge, if not included
in non -conforming items.
II. REPORTING INFORMATION & OBSERVATIONS
It is the duty of the Special Inspector to notify the Contractor, Building
Official, Architect/Engineer of Record and the owner, if the following events occur:
a. The use of materials, equipment, or workmanship which do not conform to
the Official Contract Documents or which may cause improper construction
which is not acceptable.
b. Work which is not being done in accordance with the approved Official
Contract Documents.
C. Faulty construction or construction performed without inspection and not
capable of being inspected or tested in place.
d. The request for interpretation from the Engineer of Record as required to
clarify the Construction Documents.
e. Observe that shoring and reshoring has been installed in accordance with
the Shoring/Reshoring Plans as submitted to the Building Department by
the Contractor. Such concrete or structural element which is dependent on
the shoring installed.
f. The Special inspector will verify proper placement of all concrete and
reinforcement installation.
III. REQUIREMENTS OF THE OWNER
a. The owner shall arrange for necessary construction documents to be
furnished to the Special inspector during the progress of the work in a timely
manner. Such records shall consist of, but may not be limited to: concrete
cylinder test reports, soil density test records, mill records, shop drawings,
pile driving logs, etc.
b. The owner shall insure that the Contractor provide a shoring and reshoring
plan to the Building Department which is signed and sealed by an Engineer
registered in the State of Florida. Such registered engineer may represent
the form supplier.
IV. RESPONSIBILITY
The Special Inspector does not surrogate the Building Official's or the
Engineer of Record's responsibilities. Further, it is not intended that the
contractor's contractual of statutory obligations are any way relieved or
foregone by the presence of the Special Inspector. The Contractor has the sole
responsibility for any deviations from the official Contract Documents. The Special
Inspector will not replace the quality control personnel of the Contractor. All
inspections will be in accordance with the provisions of the Special Inspector Law.
V. LIMITATIONS
Unless otherwise provided in written requests, this Contact limits the Special
Inspector to provide services only with regard to the structural frame of the building
including foundation, primary and secondary framing systems, and all other items
included in the Inspection Plan. This Contract does not include inspection of any
safety provisions as required by OSHA or other safety standards which apply
during the construction period. Nor does it apply to elements such as metal or
wooden -balcony railings, fire protections, curtain walls, mechanical/electrical
systems. Architectural components, site work or other elements not contributing to
the capacity of the structural building frame.
THRESHOLD INSPECTION PLAN
A. The following is a description of the structural system employed for this
project:
1. Structure: reinforced concrete flat slabs.
B. Construction shall conform to the Permitted Documents as submitted to the
Building Department,
C. Approved Permit Drawings, the applicable Specifications and approved
Drawings submitted by MBV Engineering Inc. shall govern the requirements of
this work.
D. Reinforced Concrete:
Concrete Quality
Verify that individual batch tickets indicate delivery of the approved mix as
specified. Verify time limits of mixing, total water added, and property
consistency and workability for placement. Determine the required type,
quantity and frequency of tests to be performed on fresh and hardened
concrete. Observe sampling of concrete, field testing of fresh concrete and
making of test specimens. Provide or arrange for proper specimen
identification, site storage and protection, and transportation to the testing
laboratory. Provide or arrange for communication of field testing results to
the registered design professional in responsible charge and to the building
official.
2. Reinforcement
Verify that reinforcing steels are of the type, grade and size specified and
are in conformance with acceptable quality standards. Ensure that
reinforcing steel is free of oil, dirt and rust and that steel is properly coated
and/or sheathed as specified. Verify that reinforcing steels are located
within acceptable tolerances and are adequately supported and secured to
prevent displacement during concrete placement. Verify that minimum
concrete cover is provided. Verify that placement of reinforcing steel (or
ducts) complies with required spacing, profile and quantity requirements,
as indicated by both the approved plans and installation drawings. Verify
that hooks, bends, ties, stirrups and supplemental reinforcement are
fabricated and placed as specified. Verify that required lap lengths, stagger
and offsets are provided. Verify proper installation of approved mechanical
connections per the manufacturer's instructions and/or evaluation reports.
3. Concrete Placement, Protection and Curing
Verify acceptable condition of the place of deposit before the concrete is
placed. Verify the methods of conveying and depositing concrete avoid
contamination and segregation of the mix. Verify that concrete is being
properly consolidated during placement. Verify that concrete is protected
from temperature extremes, and determine that proper curing is initiated.
E. Other Miscellaneous Inspections
1. Inspect for any holes drilled in slabs, walls, columns, or any other structural
component without prior approval.
2. Check for any exposed reinforcing steel bars at face of reinforced concrete
member.
3. Maintain a correction list indicating the areas where discrepancies were
noted and status of repair.
4. Send a copy of the daily inspection report to Building Department, Owner,
General Contractor, and others, as requested by the owner.
Visually inspect all concrete surfaces for any cracks. Notify the Engineer of
Record immediately if any cracks are found.
F. Submission:
1. General: Various submissions to the Threshold Inspector will be required.
All submissions shall be reviewed by the Contractor and the Engineer of
Record prior to transmittals to the Threshold Inspector. Submit one copy for
this record and review. Review of submissions by the Threshold Inspector.
Submit one copy for his records and review. Review of submissions by the
Threshold Inspector does not relieve the Contractor of the Subcontractors
of their obligations for performance. The intent of the review of these
submissions is to confirm that off -site fabricated components comply with
the Approved Permit Documents.
2. Items required for the Threshold Inspector: The Threshold Inspector shall
be provided with copies of all correspondence related to the construction of
the project, all shop drawings, all deviations from the contract documents,
all test reports, a full set of the Contract Documents, and any other items he
may deem necessary to perform his duties.
6-
STRUCTURAL -GENERAL NOTES
DESIGN CRITERIA AND LOADS:
1. WIND DESIGN.,.
WIND SPEED (MPH) V(ADJ)=124 V(ULT)=160
RISK CATEGORY 11
EXPOSURE CATEGORY D
ENCLOSURE CLASSIFICATION ENCLOSED
INTERNAL PRESSURE COEFFICIENT CPI =+/- OA6
TOPOGRAPHIC FACTOR KZT =1.0
2. LOADS ON THE STRUCTURE DURING CONSTRUCTION SHALL NOTEXCEED THE DESIGN LOADS AS
NOTED IN DESIGN CRITERIA & LOADS BELOW OR THE CAPACITY OF PARTIALLY COMPLETED
CONSTRUCTION AS DETERMINED BY THE CONTRACTOR'S SSE FOR BRACING/SHORING.
GENERAL REQUIREMENTS
1. THE DESIGN AND CONSTRUCTION OF THIS PROJECTIS GOVERNED BY THE"FLORIDA BUILDING
CODE (FBC), 5th EDITION, HEREAFTER REFERRED TO AS THE FBC, AS ADOPTED AND MODIFIED BY
THE A UTHORITY HA VING JURISDICTION (AHJ).
2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND ACCURACY OF THE WORK
WITH ENGINEER AND OTHER TRADES, FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND
DIMENSIONS, FOR SELECTING FABRICATION PROCESSES, FOR TECHNIQUES OF ASSEMBLY, AND
FOR PERFORMING WORK IN A SAFE AND SECURE MANNER.
3. THE STRUCTURAL DRAWINGS ARE INTENDED TO SHOW THE GENERAL CHARACTER AND EXTENT OF
THE PROJECT AND ARE NOT INTENDED TO SHOW ALL DETAILS OF THE WORK
4. DISCREPANCIES, OMISSIONS OR INCONSISTENCIES WITH APPLICABLE CODE REQUIREMENTS SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING BEFORE SUBMITTING A BID OR
PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE. CONFLICTS
BETWEEN THE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION
OF THE ENGINEER IN WRITING BEFORE PROCEEDING WITH THE WORK.
6, THE CONTRACTOR IS RESPONSIBLE FOR THE STRENGTH AND STABILITY OF THE STRUCTURE
DURING CONSTRUCTION AND SHALL PROVIDE TEMPORARY SHORING, BRACING AND OTHER
ELEMENTS REQUIRED TO MAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. DO NOT LOAD
STRUCTURES, NEW OR EXISTING, WITH WEIGHT THAT WILL ENDANGER STRUCTURE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE WORK REQUIRED IN THE
CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS FOR EXECUTING IT PROPERLY.
STRUCTURAL CERTIFICATION
..
1. I CERTIFY THAT THE PLANS AND SPECIFICATIONS COMPLY WITH THE STRUCTURAL PORTION OF THE
FLORIDA BUILDING CODE FIFTH EDITION
2. 1 ALSO CERTIFY THAT STRUCTURAL ELEMENTS DEPICTED ON THESE PLANS PROVIDE ADEQUATE
RESISTANCE TO THE WIND LOADS SPECIFIED IN SECTION 1609 IN THE FBC.
G�NSE
OI y #
61V3
f
i -0''. S�p`j� QRO
VIL MIZAR
,0
1 Z I10
ATRIUM I
BALCONY
-' - 20T STREET
DESIGNEDCONCRETE
REPAIR
INSPECTION
�" ROBEATH,FL329
Y VERO H, FL
,a PH.(]]2) 5690035
FX. 92)9J8361]
OR
=7/5/201
ENGINEERING INC
2900 NCE.
REPAIRS
a A
CO RMIRNG 28 uFIBDURRE 0. - PN
FORT PIERCE, FL
ElNUMEE� F3 M) &1-9510RPIERCER - iX (TI) 966-90.55
G�
5
SGD
FLOOR: 3
UNIT NUMBER: 3A
INSPECTED ON: 2/19/2016
0
U)
BALCONY FINISH: x COATING
BARE
TILE
CARPET
LEGEND
®
A. SLAB SPALL ON SURFACE
S.F.
®
B. SLAB SPALL FULL DEPTH REPAIR
S.F.
®
C. SLAB SPALL EDGE REPAIR
1
L.F.
®
D. SLAB SPALL UNDERNEATH
S.F.
��-
E. CRACKS ON SLAB —GRAVITY
FEED
L.F.
F. COLUMN REPAIR
L.F.
O
G. WALL REPAIR
S.F.
H. FLOOR PREPARATION
S.F.
I. WATERPROOFING
S.F.
®
J. RUST SPOTS
\IIIIIII!/)
E.A.
VILLA4f
O % 6 000
— C ; No
SGD
�'��•, ST q�0{)(oL44�
LAMIZAR
��ii�FSSI NAB- lQ
��iZ�l
ATRIUM I
BALCONY
'
%
EROBEATH,FL329
VERO BEAOH,FL035
DESIGN. 14-466
DRAM
CONCRETE REPAIR
INSPECTION
�`
1m Y
PH. (T 2) 6s9-0o05
Fx.(nz)naas
DRAWN
&ER,V.
AE.R.
CHECNEG
qy,
zsooNA1A
ENGINEER] NG, INC
n
DNIE
7/5/2016
FORT PIERCE. FL
REPAIRS
M
Yow 30NWVILR k gS5XAw
CONSDLTNC ENCJNEOiINC CA 13728
xEIH D R-PH (321) 2S 1510
R, plEfifF. R _ M (M) �-9055
PAGE
2 OF 9
POST -TENSION
EDGE REPAIR
EXISTING CONDITIONS
SEVERE SPALL OUTSIDE
CABLE ANCHORING SYSTEM
STEP i
SAWCUT AROUND
PERIMETER OF
SPALL IF POSSIBLE
CONCRETE OUT TO
VD CONCRETE AND
IN STEEL
EP 2
COAT EXPOSED SURFACES
WITH APPROVED BONDING
AND ANTI -CORROSION
AGENT.
STEP 4
PROTECT SURFACE WITH
APPROPRIATE COATING.
STEP 3
REPAIR PROCEDURE
1. REMOVE ALL DAMAGED OR UNSOUND CONCRETE
FOLLOWING THE CONDITIONING OF CONCRETE
GUIDELINES.
2. CHIP OUT BY HAND THE DAMAGED CONCRETE.
REMOVAL SHALL CONTINUE ALONG THE LENGTH OF
THE REINFORCING STEEL UNTIL AT LEAST 6" OF
THE UNCORRODED REBAR IS OBSERVED. DO NOT
DISTURB THE CABLE ANCHORS.
3. THE VERTICAL SURFACES SHALL BE ROUGHENED.
4. SANDBLAST OR HYDROBLAST THE EXPOSED
CONCRETE AND REBAR. AVOID DAMAGING OR
CUTTING EXISTING REINFORCEMENT OR CABLES.
5. REPLACE EDGE BAR NTH A FIBERGLASS BAR OF
SAME DIAMETER IF EXISTING BAR IS HEAVILY
DETERIORATED.
6. COAT ALL NEW AND EXISTING REBAR WITH EPDXY,
POLYMER CEMENT SLURRY OR A ZINC -RICH
COATING FOR CORROSION PROTECTION.
INSTALLATION SHALL BE DONE FOLLOWING THE
MANUFACTURER SPECIFICATIONS.
7. THE BONDING AGENT SHALL BE INSTALLED AS
DESCRIBED IN THE MANUFACTURER SPECIFICATIONS.
8. REPAIR REPAIR MORTAR OR READY MIX CONCRETE
SHALL BE PLACED AS DESCRIBED IN THE
MANUFACTURER SPECIFICATIONS.
9. REPAIR MIX SHALL HAVE A COMPRESSIVE
RESISTANCE OF 5,000 PSI AT 28 DAYS AND A
WATER CEMENT RATIO OF 0.45 OR LESS.
10. FINISH SURFACE TO TEXTURE AND SMOOTHNESS
REQUIRED FOR THE SPECIFIC APPLICATION.
FILL PREPARED AREA WITH 11. UPON COMPLETION OF FINISHING OPERATIONS,
REPAIR MORTAR. ALLOW MATERIAL TO CURE IN ACCORDANCE NTH
MANUFACTURERS'S RECOMMENDATIONS.
12. PROVIDE THE ARCHITECTURAL FINISH AS REQUIRED
BY 7HEOWNER,\\\\\II
VI III//////
-\r
6100
1 TA E gPDOLF LAM R
i
S FL.' 610
ATRIUM I
BALCONY
lesdi d o
VERO B
oEs EB Raw"
CONCRETE REPAIR
Z9PI NAEA
FORT PIERCE, FL
INSPECTION
DETAILS
'�MBV
ENGINEERING, INC
CCU fi0 G I N INEERN k CA 1372B
consucnxc EncinE[ninc cn /.nse
PH.(772)718- 11
FX(T2)99R 3en
ff. P RYE. M1 - pN 72) Y'J-,S,U
R. Flm¢. R. _ pn (m) Ise -sass
ORAYM AER.
CHECKED
DATE 7/5
3 OF 918
ppcE 3 OF 9
DECK EDGE REPAIRS
EDGE REPAIRS LEGEND
® EXISTING #5 STEEL REBAR
® NEW #5 STEEL DOWEL BARS
EXISTING STEEL 115 BAR
REMOVED CONCRETE
AT EDGE TYP. 12"
(MAX. 18) WIDE
TYP. 12"
MAX. 18"
..... moo " rii.:-:•.-
10" L PROVIDE SHORING
FOR FORMWORK
2"x2" ALUMINUM RAIL POST
BASE EMBEDDED IN DECK EDGE.
FOR POST BASE REPAIRS THAT DO
NOT COINCIDE WITH EDGE REPAIR,
CUT OUT 6"x6"x5" SECTION
AROUND SUBJECT POST.
CAREFULLY WORK AROUND EDGE
REBAR. CLEAN & COAT EDGE
REBAR. ADD 5/8" THREADED ROD
6" LONG THROUGH POST TO
STRENGTHEN CONNECTION OF POST
BASE. POUR NEW EDGE CONCRETE
6"x6"x5".
CLEAN & COAT EXPOSED REBAR.
NO VISIBLE CORROSION SHOULD
EXIST ON REBAR AT CONCRETE
CUTOFF POINT.
REMOVE CONCRETE. IF MORE
THAN 15% REBAR DIA. LOSS
HAS OCCURRED, THEN ADD
STEEL DOWEL BAR AS SHOWN
IN SECTION BELOW.
MECHANICALLY SCARIFY &
ROUGHEN SLAB EDGE.
IF BONDING AGENT IS NOT
PREMIXED W/ THE CONCRETE,
APPLY A BONDING AGENT TO THIS
SURFACE PRIOR TO CONCRETE
POURING.
POUR NEW EDGE W/ SIKACRETE
211 OR 5,000 PSI STRENGTH
CONCRETE.
IF EXIS71NG TEMP./SHRINK. BARS
HAVE OVER 159 DIA. LOSS, THEN
REMOVE AND PROVIDE (2) 95
STEEL BARS LONGITUDINALLY.
CONCRETE EDGE REPAIRS DRILL 7/8" DIA. HOLE 2" AWAY FROM EXISTING REBAR
W/ MORE THAN 15% LOSS & EMBED #5 STEEL DOWEL BAR
10" DEEP INTO EDGE OF CUT-OFF SLAB & ANCHOR
W/ SIKADUR ANCHORFIX-1 EPDXY.
NOTES. �0 VILL,q
1. FINAL FINISH OF SLABS SHALL BE SMOOTH SPONGED SANDY FINISH OR AS SP*O;-- /
ON -SITE PER OWNER'S REQUIREMENTS. G F '9�
2. FOR ANY TENSION BAR, MAXIMUM CONCRETE COVER SHALL BE 2" & MINIMUA C�Zk 1.5 D
TEMPERATURE/SHRINKAGE STEEL TO BE PLACED DIRECTLY UNDER TENSIONTE>�Li N°'6
3. ALL PRODUCT SUBSTITUTIONS MUST FIRST BE APPROVED BY THE ENGINEER.
4. ENGINEER SHALL BE IMMEDIATELY NOTIFIES CONCERNING ANY ENCOUNTERED �1SCRkPANCIES pp
BETWEEN ACTUAL CONDITIONS & THIS DESIGN. ice % ST EROe,04f � MI[
�i�O�C •, FL R� Lf 1000
I N P-,V. Z, (P
ATRIUM I
CONCRETE REPAIR
2900 N AlA
FORT PIERCE, FL
BALCONY
INSPECTION
DETAILS
1835-20TH 6TREET
_' VEROBEACH. FL32060
PH.(772)568-UD35
Is
ENGINEERING, INC Fx. (772)n6 3617
m+E R-Pxn2)29]_M
NDv,LTNG HMEERW nC5SCCIA�137M IT.
CON311LTNC ENGWEEAWC G /]JPB R. PFR[[ R. - PN (III) 166-90.55
J09 NO. µ_-486
DESIGNED qy
DRgWN qER.
CHECKED
DALE 7/5
4OF916
PAGE ¢ OF 9
EXPOSING AND UNDERCUTTING
OF REINFORCING STEEL
THESE DETAILS ARE APPLICABLE TO HORIZONTAL, VERTICAL AND
OVERHEAD LOCATIONS. THEY ARE ALSO APPLICABLE TO REMOVAL BY
HYDRO -DEMOLITION, HYDRO-MILLLING, AND ELECTRIC, PNEUMATIC OR
HYDRAULIC IMPACT BREAKERS.
1. REMOVE LOOSE OR DELAMINATED CONCRETE ABOVE CORRODED
REINFORCING STEEL.
2. ONCE INITIAL REMOVALS ARE MADE, PROCEED WITH THE
UNDERCUTTING OF ALL EXPOSED CORRODED BARS. UNDERCUTTING
WILL PROVIDE CLEARANCE FOR UNDER BAR CLEANING AND FULL BAR
CIRCUMFERENCE BONDING TO SURROUNDING CONCRETE AND WILL
SECURE THE REPAIR STRUCTURALLY. PROVIDE MINIMUM J/ INCH
(19 MM) CLEARANCE BETWEEN EXPOSED REBARS AND SURROUNDING
CONCRETE OR 1; INCH (6MM) LARGER THAN LARGEST AGGREGATE IN
REPAIR MATERIAL, WHICHEVER IS GREATER.
3. CONCRETE REMOVALS SHALL EXTEND ALONG THE BARS TO
LOCATIONS WITH MINIMUM SIX INCHES FREE OF BOND INHIBITING
CORROSION, AND WHERE THE BAR IS WELL BONDED TO
SURROUNDING CONCRETE.
4. IF NON -CORRODED REINFORCING STEEL IS EXPOSED DURING THE
UNDERCUTTING PROCESS, CARE SHALL BE TAKEN NOT TO DAMAGE
THE BAR'S BOND TO SURROUNDING CONCRETE. IF BOND BETWEEN
BAR AND CONCRETE IS BROKEN, UNDERCUTTING OF THE BAR SHALL
BE REQUIRED,
5. ANY REINFORCEMENT WHICH IS LOOSE SHALL BE SECURED IN PLACE
BY TYING TO OTHER SECURED BARS OR BY OTHER APPROVED
METHODS.
,111111
LLA {
p1SE 24//�i
�L RODIDEZVILLAMIZ
51 % SFLp
Ft.�:E�.#61000
P��
I�ill(Q
ATRIUM I
CONCRETE REPAIR
2900 NAlA
FORT PIERCE, FL
BALCONY
INSPECTION
DETAILS
�� �` J ///'(s giiv N��\
Y FX{(�$�3�?
ENGINEERING,INC
NOU eo V N ml UM A & SOCIA NEIBY Mfl R - Pi (321) 351-1510
OGNSM G 840G Q 03728 n. � R. - PH (M) 189-9055
1R
pE51GNEO R.
DRAM pE.R.
CHECKED R.V.
DATE 7/5/3018
PAGE 5 OF 9
i
CLEANING AND REPAIR
OF REINFORCING STEEL
CLEANING OF REINFORCING STEEL
ALL HEAVY CORROSION AND SCALE SHOULD BE REMOVER FROM THE BAR AS NECESSARY TO PROMOTE MAXIMUM BOND OF
REPLACEMENT MATERIAL. OIL FREE ABRASIVE BLAST IS THE PREFERRED METHOD. A TIGHTLY BONDED LIGHT RUST
BUILD-UP ON THE SURFACE IS USUALLY NOT DETRIMENTAL TO BOND, UNLESS A PROTECTIVE COATING IS BEING APPLIED
TO THE BAR SURFACE, IN WHICH CASE THE COATING MANUFACTURER'S RECOMMENDATIONS FOR SURFACE PREPARATION
SHOULD BE FOLLOWED.
0*4
REINFORCIAG STEEL
PATH
CLEANING BACKSIDE OF
CORRODED BARS
NOZZLE
REPAIR OF REINFORCING STEEL DUE TO LOSS OF SECTION
IF REINFORCING STEEL HAS LOST SIGNIFICANT CROSS
SECTION, A STRUCTURAL ENGINEER SHOULD BE
CONSULTED. IF REPAIRS ARE REQUIRED TO THE
REINFORCING STEEL, ONE OF THE FOLLOWING REPAIR
METHODS SHOULD BE USED:
* COMPLETE BAR REPLACEMENT, OR
* ADDITION OF SUPPLEMENTAL BAR OVER
AFFECTED SECTION.
NEW BARS MAY BE MECHANICALLY SPLICED TO OLD
BARS OR PLACED PARALLEL TO AND APPROXIMATELY
3/ IN. (19 MM) FROM EXISTING BARS. LAP LENGTHS
SHALL BE DETERMINED IN ACCORDANCE WITH ACI 318,
ALSO REFER TO CRSI AND AASHTO MANUAL.
AFFECTED LENGTH
LOSS OF SECTION
SUPPLEMENTAL BAR
REQUIRED LAP [�-- REQUIRED LAP
— AFFECTED LENGTH V1LAM
O: o.
=C• N
* • * ROD�I
i �0 `• S
ZEPON
ATRIUM I BALCONY vlZil )Q \ �}13b\
CONCRETE REPAIR INSPECTION IM PH.("]2) 69 Obgs
_ FX. Q]2) T 8-381]
2900 N AIA ENGINEERING, INC.
DETAILS Rou 00� NLLAYRLR k �16 L R.— Isle
FORT PIERCE, FL CORs11L1Wc QiwRSQtwCA ". c a 13728 rt. p� i< - pR (VA ng) �—S_gOW
r
Y
SLAB WATER PROOFING
ADDITIONAL TOP COATS
TOP COAT WITH AGGREGATE TO REFUSAL
BACKROLLED INTO WET TOP COAT
BASE COAT
SUBSTRATE: CONCRETE OR LEVELING OVERLAY
LONG GUARD RAILS, SET BOTTOM RAIL 1/4" MIN.
OFF DECK TO ALLOW WATER FLOW OFF DECK.
REPAIR PROCEDURE:
ALLOW CONCRETE DECKS TO DRY FOR 48 HOURS MINIMUM WITHOUT RAINFALL.
CONCRETE MUST BE VISIBLY DRY WITH MAXIMUM 49 MOISTURE CONTENT. IF REQUIRED
BY THE ENGINEER, A MAT TEST SHALL BE PERFORMED ON ONE OR MORE DECKS
PRIOR TO BASE COAT APPLICATION. TEST SHALL COVER AN AREA OF FOUR SQUARE
FEET, MAT SHALL BE A 6 MIL CLEAR POLYURETHANE SHEET, SEALED ALL AROUND WITH
ADHESIVE TAPE AND IT SHALL REMAIN IN PLACE FOR A MINIMUM OF 16 HOURS.
CONCRETE DECKS SHALL BE DRY, CLEAN, SOUND AND FREE OF ALL CONTAMINANTS
WHICH MAY INTERFERE WITH ADHESION OR PROPER CURING.
2. APPLY BASE COAT TO TOP OF SLAB AND VERTICAL EDGES PER MANUFACTURER'S
SPECIFICATIONS AND ALLOW IT TO CURE BEFORE TOP COAT APPLICATION. EXTEND
APPLICATION TO VERTICAL EDGE OF SLAB.
J. AFTER SUFFICIENT CURE TIME, SURFACE DEFECTS SHALL BE REMEDIED, CONTRACTOR
SHALL BE RESPONSIBLE FOR CORRECTING PONDING AREAS WITH COATINGS 3/16" OR
LESS. ALLOW IT TO CURE FOR 72 HOURS MINIMUM BEFORE OPENING THE BALCONY TO
TRAFFIC. TOP COAT APPLIED PER MANUFACTURER'S SPECIFICATIONS. BROADCAST SILICA
SAND IMMEDIATELY INTO THE WET TOPCOAT AND BACK ROLL TO EVENLY DISTRIBUTE
THE AGGREGATE. TOP COAT TO BE COMPATIBLE WITH BASE COAT.
4. APPLY FINAL TOP COATS PER MANUFACTURER'S INSTRUCTIONS.
TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S
KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH
THE APPLICABLE MINIMUM BUILDING CODES AND THE
APPLICABLE FIRE SAFETY STANDARDS AS DETERMINED BY THE
LOCAL AUTHORITY IN ACCORDANCE WITH FS553 AND FS633.
ATRIUM'
BALCONY
CONCRETE REPAIR INSPECTION
2900 NA1A DETAILS
FORT PIERCE, FL
ASmCI m uO&ui R - m (321)'!SJ-I5f0
G 1372. R. p� R - M W2) Nd-9p55
VILLAMI,
-E.#61000
SLAB FULL DEPTH REPAIR
REPAIR PROCEDURE:
1.
REMOVE ALL DAMAGED OR UNSOUND CONCRETE
FOLLOWING THE CONDITIONING OF CONCRETE
GUIDELINES.
2.
SAWCUT THE PERIMETER OF THE REPAIR AREA
FORMING A SHOULDER PERPENDICULAR TO THE
SUBSTRATE.
EXIS77NG CONDITIONS
3.
CHIP OUT THE FULL DEPTH. REMOVAL SHALL
SEVERE SPALL
CONTINUE ALONG THE LENGTH OF THE
REINFORCING STEEL UNTIL AT LEAST 6" OF THE
UNCORRODED REBAR IS OBSERVED.
STEP 1
4.
THE VERTICAL AND HORIZONTAL SURFACES SHALL
BE ROUGHENED WITH}" AMPLITUDE.
SAWCUT AROUND
PERIMETER OF SPALL
5.
SANDBLAST OR HYDROBLAST THE EXPOSED
CONCRETE AND REBAR TO REMOVE DUST,
LAITANCE AND OTHER BOND INHIBITING MATERIALS.
CHIP CONCRETE OUT TO
AVOID DAMAGING OR CUTTING EXISTING
SOUND CONCRETE AND
REINFORCEMENT.
CLEAN STEEL TO PRODUCE
6.
INSERT NEW BARS OF EQUAL DIAMETER NEXT TO
A WHITE METAL FINISH.
THOSE THAT HAVE DETERIORATED BY MORE THAN
15% ALL NEW STEEL SHALL BE ASTM A-615
GRADE 60. LAP SPLICES SHALL BE IN
ACCORDANCE WITH ACI 318.
STEP 2
7
COAT ALL NEW AND EXISTING REBAR WITH TWO 10
COAT EXPOSED SURFACES
MILS OF EPDXY, POLYMER CEMENT SLURRY OR A
WITH APPROVED BONDING
ZINC -RICH COA77NG FOR CORROSION PROTECTION.
AND ANTI -CORROSION
INSTALLATION SHALL BE DONE FOLLOWING THE
AGENT.
MANUFACTURER SPECIFICATIONS. -
8.
THE BONDING AGENT, IF REQUIRED, SHALL BE
.
INSTALLED AS DESCRIBED IN THE MANUFACTURER
SPECIFICATIONS.
STEP 3
9.
REPAIR REPAIR MORTAR OR READY MIX CONCRETE
FILL PREPARED AREA WITH
SHALL BE PLACED AS DESCRIBED IN THE
REPAIR MORTAR.
MANUFACTURER SPECIFICATIONS.
10.
REPAIR MIX SHALL HAVE A COMPRESSIVE
STEP 4
RESISTANCE OF 5,000 PSI AT 28 DAYS AND A
. WATER CEMENT RATIO OF 0.45 OR LESS.
PROTECT SURFACE WITH
APPROPRIATE COATING.
11.
FINISH SURFACE TO TEXTURE AND SMOOTHNESS
REQUIRED FOR THE SPECIFIC APPLICATION.
"
12.
UPON COMPLETION OF,,--11�711 �JlJHING OPERATIONS,
ALLOW MATERIAL,TQ\r'•LWN II`JOKORDANCE WITH
- MANUFACTURE u �- V%LL
RECOMMEND "C-..DNS
E,N-�a*
13. PROVIDE�ARCHITEC$(M�L;
FINI$y,T, MREQUIRED=0=7HE
ER*
S
.•.-
I
"/4"pl�J'
ATRIUM I
BALCONY
VERO B0
�2i 96%-d
IMIMBV P"
NO
DESIGNED RN.
R.V.
CONCRETE REPAIR
INSPECTION
1108
( D'S
FX. (IJ2)T]8-3817
CHECK RN.
CHECKED R.V.
2900 N A1A
FORT PIERCE, FL
DETAILS
ENGINEERING, INC
xON 6MI NWUIWi k p55 J37M NQBWxN[ R - PH (J11) 2V-151g
rgxsuLnxc ENOxEFRIxD a pTxa IT_ pIDi3, fl _pry (np) �sg-g0.55
DATE 7/5/2016
ppcE 8 OF 9
EDGE AND SURFACE CONDITIONING
OF CONCRETE
BOUNDARY OF LOOSE AND RECOMMENDED
DELAMINATED CONCRETE LAYOUT
4°
4 ,
4 °
U
Li
°
4
EDGE AND SURFACE CONDITIONING OF CONCRETE
1. THESE DETAILS ARE APPLICABLE TO HORIZONTAL,
VERTICAL, AND OVERHEAD LOCATIONS. THEY ARE ALSO
APPLICABLE TO REMOVAL BYHYDRO-DEMOLITION,
HYDROMILLING, AND ELECTRIC, PNEUMATIC OR
HYDRAULIC IMPACT BREAKERS.
2. REMOVE DELAMINATED CONCRETE, UNDERCUT
REINFORCING STEEL, REMOVE ADDITIONAL CONCRETE AS
REQUIRED TO PROVIDE MINIMUM REQUIRED THICKNESS
OF REPAIR MATERIAL.
3. CHIP OUT THE CONCRETE TO EXPOSE THE ENTIRE
CIRCUMFERENCE OF THE REBAR. REMOVAL SHALL
CONTINUE ALONG THE LENGTH OF THE REINFORCING
STEEL UNTIL AT LEAST 6" OF UNCORRODED STEEL
IS OBSERVED.
4. AT EDGE LOCATIONS, PROVIDE RIGHT ANGLE CUTS TO
THE CONCRETE SURFACE WITH EITHER OF THE
FOLLOWING METHODS.
4.1. SAWCUT 112 " (13 MM) OR LESS AS REQUIRED
TO AVOID CUTTING REINFORCING STEEL.
4.2. USE POWER EQUIPMENT SUCH AS
HYDRODEMOLITION OR IMPACT BREAKERS. AVOID
FEATHER EDGES.
4.3. REPAIR CONFIGURATIONS SHOULD BE KEPT AS
SIMPLE AS POSSIBLE, PREFERABLY WITH
SQUARED CORNERS.
5. AFTER REMOVALS AND EDGE CONDITIONING ARE
COMPLETE, REMOVE BOND INHIBITING MATERIALS (DIRT,
CONCRETE SLURRY, LOOSELY BONDED AGGREGATES) BY
ABRASIVE BLASTING OR HIGH PRESSURE WATERBLASTING
WITH OR WITHOUT ABRASIVE.
6. CHECK THE CONCRETE SURFACES AFTER CLEANING TO
INSURE THAT SURFACE IS FREE FROM ADDITIONAL
LOOSE AGGREGATE, OR THAT ADDITIONAL DELAMINATIONS
ARE NOT PRESENT.
�\\Illllll//�
7. IF HYDRODEMOLITION ((S\\ EN/ LLq
CEMENT AND PARTI LTI A 'ENS
SLURRY MUST BE. 'AA� EDI, •'P
FROM PREPARED Sl1RE3 1p p
BEFORE SLURRY�ENS.No. S
* *ROI[�FO \iwj I R
i A •• IplEFe, P.E 00
'PO \
ATRIUM I BALCONY I ��A��t 1 VERO B�EnFjOkLpp9 Sb�\ I°EscxEo R.�Rm
INSPECTION lrl Y P� =>564 hb95 I°xnw, AE.R.
CONCRETE REPAIR s Fx.o���nR-ae��
ENGINEERING, INC "E`"`° R.M.
2900 N Al DETAILS "Ow earns x .Iw a ASS0=u xc�muum+c n - Pn (320 zv-Isla °ATE T/s/zaie
FORT PIERCE, FL caxsuuwC FrvClrv[wwc cA /3T29 fL gspcE Fl. _ px cn2) a59-goss PAGE 9 OF 9