Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
STRUCTURAL INSPECTION REPORT
Bag =M V ENGINEERING, INC. MOIA aOWLES VILLAMIZAR & ASSOQHTES SCANNEL, STRUCTURAL INSPECTION REPORT BY.Project Number: 14-486 St. Lucie c�ounth CIVIL• STRUCTURAL• SURVEYING. ENVIRONMENTAL 1835 20th Street. Vero Beach, FL 32960 772.569.0035 . Fax: 772.778.3617 www.mbveng.com �Oyr Owner: Atrium I Condo Association Project Name: Atrium 1 Balconies Inspection Date: 2/19/2016 Weather: Sunny Permit#: 1608-0417 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 2A Large Balconies at North Discipline: _4pe"a4___ Threshold Type of Inspection: initial Partial Final Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit -Fill -Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wa11 Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping )OSITION OF INSPECTION (all pending inspections require a as Noted ADDITIONAL IN Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection StructuraIS teel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Below) Pending U Rejected INSPECTED (From inspection items All areas were inspected to ensure plans and specifications were followed. 2rd floor had 2 LF of edge repair. VERBAL INSTRUCTIONS: Approved to pour concrete O V1, NOTES: All steel and repaired concrete was coated with "Sika FerroGard 903" at time of inspection. _ uluuo Contractor had repair mortar on site "Sikacrete 211". �70 F � 'T Mll I IINSPECTOR: R0d01f0Villamizor, P.E. 61000, S17021620 1 ICERTIFIED BY: Rodolfo Villamizar, P.E.161090, S19d21620 I �.MBV ENGINEERING, INC. MOiA HOWLES VILLAMIZAR & ASSOCIATES CIVIL ® STRUCTURAL. SURVEYING . ENVIRONMENTAL 1835 20th Street. Vero Beach, FIL 32960 772.569.003S. Fax-772.778.3617 www.mbveng.conn Owner: Atrium I Condo Association STRUCTURAL INSPECTION REPORT Project Number: 14-486 Project Name: Atrium I Balconies Inspection Date: 2/19/2016 Weather: Permit#: 1608-0417 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 2A Large Balconies at North Discipline: —Speda — Threshold Type of Inspection: i'l Partial Final Re:a� Foundation Reinforcement _ Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking _ Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final !r (Use Additional member/Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) lApproved Approved as Noted ❑ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. 2rd floor had 2 LF of edge repair. VERBAL INSTRUCTIONS: to pour concrete NOTES: "• T- All steel and repaired concrete was coated with "Sika FerroGard 903" at time of inspection. = * ; No. 61000 -_ Contractor had repair -mortar on site "Sikacrete 211". IINSPECfOR: Rodolfo Villornizor, P.E. 61000, S17021620 1 �i S cC OR OP.,. ) CERTIFIED BY: Rodolfo Villamizar,PJE.,qUddltf YIJ121d2o STRUCTURAL INSPECTION REPORT r(,�A/,N1�� Project Number: 14-486 MOIA 60wLE5V1LLAMIZAR&ASSOCIATES SV/'IItlNEUp CIVIL• STRUCTURAL •SURVEYING • ENYIRONhfE( .tut @ CoUaVoject Name: Atrium I Balconies 1835 20th Street. Vero Beach, FL 32960 L 772.569.003E . Fax:772.778.3617 Inspection Date: 2/19/2016 www.mbveng.com Weather: Sunny Owner: Atrium I Condo Association Permit #: 1608-0417 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony #: 3A Large Balcony at North Discipline:—Speetal— Threshold Type of Inspection:" ' PaFtmal Final Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints,_ etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping )I Floor Decking 31 Roof Decking Aural Steel Column(s) Erection Aural Steel Horizontal Framing Aural Steel Connections Lath / Hock Lath )rywall, Type, Fastening, Rating, etc. tucco Application In -Progress tucco Application Final _ .xterior Veneers, Size, Type, Attachments :urtain Wall Framing & Glazing _ dorefront Framing & Glazing Vindow & Door Bucks Vindow & Doors structural Final )ther (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all penoing inspections require a re -inspection) X❑Approved Approved as Noted El Pending ® Rejected ADDITIONAL INFORMATION ON INSPECTED All areas were inspected to ensure plans and specifications were followed. 3rd floor had 1 LF of edge repair. VERBAL INSTRUCTIONS: Approved to pour concrete NOTES: All steel and repaired concrete was coated with "Sika FerroGard 903" at time of inspectigll, )R,-E Fri'-- Contractor had repair mortar on site "Sikacrete 211". ,�� s L64 OF -rki�� �(D INSPECTOR: Rodolfo Villamizar, P.E. 10 0, SI 021620 CERTIFIED BY: Rodol o illy r 1O 51 , /77 //IIIIAI STRUCTURAL INSPECTION REPORT MMBV ENGINEERING, INC. Project Number:14-486 MOiA BOWLES VILLAMIZAR & ASSOCIATES CIVIL- STRUCTURAL• SURVEYING - ENVIRONMENTAL Project Name: Atrium I Balconies 1835 20th Street. Vero Beach, FL 32960 Inspection Date: 2/19/2016 772.569.0035. Fax:772.778.3617 Weather: Sunny www.mbveng.com GAl?v9 Owner: Atrium I Condo Association Permit #: 1608-0417 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N AIA Qualified By: Rodolfo Villamizar, P.E. Balcony #: 3A Large Balcony at North Discipline: -4 ee:ai— Threshold Type of Inspection: IRWRI--PaFtia! Final P_'mWee`!cc Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, -Embeds- - - --- ------------- Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Ins- -ulation ---- -- - --- -- - Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door. Bucks Window & Doors Structural Final Other (Use Additional member/Area Below) X DISPOSITION X❑Approved OF INSPECTION (all pending inspections require a re -inspection) Approved as Noted ❑ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. 3rd floor had 1 LF of edge repair. VERBAL INSTRUCTIONS: Approved to pour concrete :1�'0la 0 :] I11 OGANNED Ml BY STRUCTURAL INSPECTION REPORT 3t Lucie County ENGINEERING, INC. Project Number: 14-486 MOIA ROWLES VILLAMIZARCe ASSOCIATES CIVIL- STRUCTURAL. SURVEYING - ENVIRONMENTAL Project Name: Atrium I Balconies 1835 20th Street. Vero Beach, FL 32960 772-S69.0035 . Fax:772.778.3617 Inspection Date: 2/19/2016 ` www.mbveng.com Weather: Sunny rsu,. Owner: Atrium I Condo Association Permit #: Bi66— Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 2900 N A1A Qualified By: Rodolfo Villamizar, P.E. Balcony M 2A & 3A Large Balconies at North Discipline: — Threshold Type of Inspection: Initial Y�f Final-Reinspedien Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement -Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor._Ste_el Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) - Cmu wall Erection/Placement, Fill Cell Rebar, Horiz_ J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc 'Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter!.Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and FlrestoDDIng Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final _ Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing — Storefront Framing & Glazing Window _& Door Bucks Window & Doors - -- ---------- Structural Final Other (Use Additional member /Area Below) uibrubmtulu ur nvbrtLiiunl Lau penamg inspections require a re -inspection) lApproved Approved as Noted ❑ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): All areas were inspected to ensure plans and specifications were followed. 3rd floor had 1 LF of edge repair. 2rd floor had 2 LF of edge repair. VERBAL INSTRUCTIONS: Approved to pour concrete NOTES: All steel and repaired concrete was coated with "Sika FerroGard ! Contractor had repair mortar on site "Sikacrete 211". IINSPECTOR: Rodolfo tllamizar, P.E. 61000, 517021620 1' ction. i 3O 3i —�mayy •oN IEB` . Roz *nizor4.E 61000,51 SN3-O�^N , QERI ENGINEERING, INC. MOIA BOWLM VIIIAMIZAR & ASSOCIATES SCANNtL, STRUCTURAL INSPECTION REPORT BY St. LUCIe ftf6t Number: 14-486 CIVIL• STRUCTURAL. SURVEYING . ENVIRONMENTAL 1835 20th Street. Vero Beach, FL 32960 772.569.0035. Fax:772.778.3617 www.mbveng.com Owner: Atrium I Condo Association Project Name: Atrium I Balconies Inspection Date: 2/19/2016 Weather: Sunny Permit#: 1601-0168 Contractor: Daniello and Associates Inspector: Terence Schlitt, P.E. Project Address: 2900 N AIA Qualified By: Rodolfo Villamizar, P.E. Balcony #: 3A Large Balcony at North Discipline:—epe^�— Threshold Type of Inspection: initial — Paftia4 Final Foundation Reinforcement Foundation Concrete Placement Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping ADDITIONAL IT, as Noted a Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Below) Pending I I Rejected All areas were inspected to ensure plans and specifications were followed. 3rd floor had 1 LF of edee repair. VERBAL INSTRUCTIONS: Approved to pour concrete items NOTES: ��\111I I I11/r/,r2 All steel and repaired concrete was coated with "Sika FerroGard 903"'S'Ni p®oyWaiii * Contractor had repair mortar on site "Sikacrete 211". ' 1,qTATE INSPECTOR: Terence Schlitt, P.E. 81238 CERyI , `BY; (flPyil i�slr, .E. 1000, 517021620 ///;/7/ONIA `I�\����