Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 ' liu NNED St. Lucie Y County CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT BUILDER/CONTRACTOR: —jA PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: J13175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated:) 70 S l>% Chemicals used: BABPLINE Percentage of solution: -06% Date of Treatment: / =I/ Footing 1't Treatment Re -Treat Driveway 1st Treatment R -Treat .her t�'t ww�brn C t�i1'1 I' Treatment/ Re -Treat Total gallons used: Time of Treatment: Zo Slab 1� Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter,r Final Inspection 3 /-17 Signature of Extermli4rator Date 'SLI Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled Inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment forprevention of termites A weatherresistantjobsite posing board shall be provided to receive duplicate Treatment Certficates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building perm/t files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a venflabie record of protective treatment. If the, soil chemical barrier method for termite prevention is used, final exterior treatment -shall be completed pdor to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 Yyys