Loading...
HomeMy WebLinkAboutPROJECT INFORMATION2-8-17 (Reports) From: Date: 2/8/2017 Breitenbach Engineering, Inc 4853 SE Pilot Way Stuart, FL 34997 For period ending- 2/8/17 .ft fwtAl Q� To: St Lucie Co Building Dept c1L►O D-41VC4R-Lo,4ov- �Y1 Charles Darden cdarden(cDCSM-e-net CSM Engineers Lncauor - 1 2081 SE Ocean Blvd,i-A Stuart, Florida 34996 Prclecr#- Permit #- LC1608-0499 — 1 vC �� Date Desc ' lion Person 07/27/16 Review su ey, I r of intent JDB 11/07/16 lstinspectiNn,stack (2-13) progress 12/02/16 2nd inspe progress 12/15/16 3d ins ti405 progress 01/10/17 Sta 6, fincgigD 01/24/17 sc 6 / progress C 13errnit-#-!c SL9--1606-026 c- Date escnp on - - Person 06/02116 Review survey, letter of intent JDB 07/29/16 1st inspection, NE stack progress 08/09/16 2nd inspection, NE stack progress 08/17/16 3d inspection, NE stack, pre -pour asse 09/26/16 SE pile (80% NE pile (7T) assed 11/10/16 Pipe post installation progress Permit #- SLC-1606-0259 06/02/16 June, July, letter of in en 08/09/16 1st inspection, SE stack, demo progress 08/25/16 2nd inspection, SE 2nd floor, final rpWssed 09/12/16 3d inspection, (310,410,510 pre -pour) asse 09/22/16 4th inspection (Unit 110) progress 09/27/16 5th inspection, SE comer pile, 35' passed 10/02/16 Pile caps @ NE, levels 2 & 3 asse 10/20/16 SE stacks, 2-5 progress 10/22/16 (same), pre -pour assed 10/28/16 NE stack, 2-4 ass 11/07/16 SE Stack, 2-4 progress 12/02/16 NE stack progress 12/08/16 SE stack columns, partial passe 01/24/17 Units601, 510 V progress Permit #- SLC46050445 16033-1-Island Crest Condos" Closed out 11/412016 Final letter and report submitted -A/ O - end Hours ---------------- 1 I ? tea; )Q-pe- 'ga Ofs` is Q/ y�i a G 2-8-17 (Reports) 23 � V rRor►+id AVE FT Pi ap-o--j F I- 9-}982 1.50I 1.751 1.751 1.001 SCANNED BY St. Lucie Countv St Lucie Co ;, . Concrete Restoration 5