Date Desc ' lion Person
07/27/16 Review su ey, I r of intent JDB
11/07/16 lstinspectiNn,stack
(2-13) progress
12/02/16 2nd inspe progress
12/15/16 3d ins ti405 progress
01/10/17 Sta 6, fincgigD
01/24/17 sc 6 /
progress
C
13errnit-#-!c SL9--1606-026 c-
Date escnp on - -
Person
06/02116 Review survey, letter of intent
JDB
07/29/16 1st inspection, NE stack
progress
08/09/16 2nd inspection, NE stack
progress
08/17/16 3d inspection, NE stack, pre -pour
asse
09/26/16 SE pile (80% NE pile (7T)
assed
11/10/16 Pipe post installation
progress
Permit #- SLC-1606-0259
06/02/16 June, July, letter of in en
08/09/16 1st inspection, SE stack, demo
progress
08/25/16 2nd inspection, SE 2nd floor, final
rpWssed
09/12/16 3d inspection, (310,410,510 pre -pour)
asse
09/22/16 4th inspection (Unit 110)
progress
09/27/16 5th inspection, SE comer pile, 35'
passed
10/02/16 Pile caps @ NE, levels 2 & 3
asse
10/20/16 SE stacks, 2-5
progress
10/22/16 (same), pre -pour
assed
10/28/16 NE stack, 2-4
ass
11/07/16 SE Stack, 2-4
progress
12/02/16 NE stack
progress
12/08/16 SE stack columns, partial passe
01/24/17 Units601, 510 V progress
Permit #- SLC46050445
16033-1-Island Crest Condos" Closed out
11/412016 Final letter and report submitted -A/ O -
end
Hours
----------------
1 I
? tea; )Q-pe-
'ga Ofs` is Q/ y�i a G 2-8-17 (Reports)
23 � V rRor►+id AVE
FT Pi ap-o--j F I- 9-}982
1.50I
1.751
1.751
1.001
SCANNED
BY
St. Lucie Countv
St Lucie Co
;, .
Concrete Restoration
5